Document Yr7aY9ny3dpv6rowDJmODq1V0
PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING DECEMBER 1982
Present were:
G.A. Danner G.W, Daues D.E. Kaldenberg B.C. Lancaster D.D. Kos C.M. McCullough D.W. Metten
C.F. Navarrete S.G. Pappas G.T. Ryan A.H. Conrad for J.G. Trafton
G.L. Tromblee J.A. Glass R.M. Fritz
I. REVIEW OF STATISTICS--J.A. Glass A. Texas City Plant Safety Performance Summary - November
(A) WITHOUT LOST WORKDAYS (medical treatment only)
(B) LOST WORKDAYS **BX RESTRICTED ACTIVITY **B2 DAYS-AWAY-FROM-WORK (C) FATALITIES
TOTAL RECORDABLE CASES
1981
1982
1982
NOV YTD NOV YTD TARGETS
2 18 2 13 11
0 60 5 2
0 00 0
0 60 5
0 00 0
2 24 2 18 13
INJURY RATES PER 200,000 MANHOURS
1981
1982
1982
NOV YTD NOV YTD TARGETS
YTD 1982 MCIC TARGET YTD
TOTAL INJURY - TIR TOTAL RECORDABLE - TRR TOTAL LOST WORKDAY - TLWR DAYS-AWAY-FROM-WORK - DAWR
6.71 14.61 1.49 1.54 0.00 0.38 0.00 0.38
12.20 10.29 1.52 1.17 0.00 0.32 0.72 0.32
--
0.75 0.12
_
--
1.45 -----'
--
1.21 0.38 0.31
Comments on Statistics
The total injuries for the year are 30% under last ;year, the total Recordable cases are 25% under last year, and the total Days-AwayFrom-Work cases are 16% under last year.
Department 33 has completed a year without an injury of any kind. This is an outstanding accomplishment.
SC 003174
LAM004188
PMSB Meeting Minutes - December 15, 1982
Page 2
Groups having rising trend lines include: Analysts, Departments 51, 13/14/15/16, 44/45/46, Insulators, Pipefitters, and Pumper Gaugers.
The following units have shown an improvement by turning their trend line: Department 50, Carpenters, ami Boilermakers.
The following units are well helow their best previous year: Machinists, and Instruments.
The overall trend lines for the following units are equal to their best previous year: All Operators as a group, and Maintenance as a group.
C. Contractor Safety--C.M. McCullough
For total plant contractor safety results the Recordable Injury to Total Injury ratio is up with about a 25% higher Total Recordable Rate. However, the Total Days-Away Rate is lower than last year. In Capital Projects contractors show that the Recordable Rate is also up. However, the Total Days-Away Rate shows a long term reduction. Detailed statistics for these two groups will be attached to the minutes.
D. CEP Project Safety--B.C. Lancaster
This group suffered a Recordable Injury that was not a lost time injury. It was a laceration that required stitches. The statistics for this group are attached to the minutes.
II. REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC)--C. F. Navarrete
A. SHAC Recommendations, Incident Report 82-22
1. Bypass of safety shower audible alarms during testing. SAC supports recommendation as follows:
a. Practice of unrestricted bypass of audible safety shower alarms for testing should be stopped.
b. Exceptions to this rule will require explicit approval of the general superintendent. Procedures defined in P-0123 must be followed.
c. Policy statement should be communicated through the line and publicized by SHAC Alert on Bulletin Boards.
This recommendation was approved by PMSB.
B. Crowsfeet Connections
We propose to modify SHAC's recommendation as follows:
sc 003175
LAIW004189
PMSB Meeting Minutes - December 15, 1982
Page 3
1. Installation of permanent crowsfeet or THOR fittings on process equipment should be kept to a minimum. Consideration should be given to proper material of construction for the service. Each area will develop control procedures to Insure that those fittings not needed for routine, frequent operation are removed.
2. The above policy and the following reminder will be Included In a bulletin board announcement.
All utility stations should conform to the plant standard which includes provision for a bleeder valve. Prior to the use of utility hoses, the condition of the connections must be Inspected (connection corrosion or rubber grommet aging), and the utility station bleed valve must be checked to ensure operability. Bleed valves are not to be used as another hose connection (this may be prevented by removal of the threads on the outlet of the bleeder valve).
3. We believe that the subject of "Proper Dse of Boses" should be a required subject for one or more safety meetings, plantwide, in 1983. We also recommend that the Quarterly Safety & Housekeeping Inspections make crowsfeet, utility stations, and training received on these Items one of the points to be highlighted during inspections in 1983.
This procedure was approved by the PMSB.
C. Steam Lines Inspection
One of the recommendations from the investigation of the failure of the 75 psi Dip Leg on the SW corner of the Office Annex was to consider further inspection of piping by MMTS.
JAG will review subject with MMTS to evaluate current practices and develop appropriate action plan to be reviewed by SAC in January.
D. SAPP Recommendation 82-6, Tank Valve Blind Flanges
In November the SAC supported the recommendation for the installation of blind flanges on tank valves that apply to:
1. Tank bottom valves.
2. Where leak or valve failure could cause a hazardous condition or serious environmental exposure.
3. Large storage tanks where there is very little surveillance.
The Plant Manager's Safety Board members reviewed the status of surveys of their areas and reported the degree of compliance and/or exceptions.
SC 003176 LAM004190
PMSB Meeting Minutes - December 15, 1982
Page 4
The Plant Manager's Safety Board accepted the recommendation of SAC and stated that tank valve blind flanges should be made a part of the regular inspections within the operating unit and off-battery limit storage area. This change in policy will be added to the procedure bulletin on regular inspections. The modified procedure bulletin will be circulated to the PMSB for approval prior to issue.
III. REPORT OF THE PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)-- D. D. Kos
A. Hourly Safety Committee
1. Six of eight in attendance.
2. D. Kos discussed PMSB meeting highlights: statistics, fire, entry, special P-Bulletin, general permit, and STOP status.
3. Reviewed one newly issued procedure bulletin and the hose rupture Incidents.
4. Discussed status of physical fitness publicity planned for December.
5. Plant concerns:
a. Chief Operators are not hanging permits in all cases.
b. phenol hose draining at Dock 2.
B. Eyebath/Safety Shower Standards
The SHAC proposed standard was reviewed briefly by PMSB. In summary, this is the standard by which all new installations will conform. Comments should be returned to D. D. Kos before January PMSB meeting.
In the July/August PMSB meetings the retrofitting of double eyebath and freeze protection to all present installations was approved. This is to take place over a two to three year period.
C. Fourth Quarter Safety/Housekeeping Inspection
The fourth quarter Inspections will be held January 3 through 14. Team members will be contacted for scheduling inspection dates. Emphasis on a detailed, tough Inspection.
D. Eating in the Field
Leonard Schwab presented a revised policy which was approved by PMSB. SHAC will prepare and distribute the new policy statements, questions and answers, and the bulletin board notices.
SC 003177
LAM004191
PMSB Meeting Minutes - December 15, 1982
Page 5
E. 1983 Safety Calendar
SHAC baa considered the value and make-up of a Texas City, 1983, safety calendar. An example has been prepared by Elaine Salles of LP&S for the month of January.
Each month would have different safety joggers and important day and week captions highlighted.
This could be done by our printing department. With two colors (red and black) the cost would be low. Estimated time to prepare the total year is two weeks, with possibly some overtime.
The PMSB was requested to approve the following plan: Issue monthly safety calendars--one month in advance. SHAC to administer and prepare calendar content. The first calendar will be prepared by our printing department (trial basis).
The PMSB approved the calendar idea and instructed SHAC to proceed.
F. Items on Active Agenda
1. Sample bottle disposal policy
2. Competition publicity
3. General Permit
4. S&PP Inspection assignments
5. Hose incident assignments
IV. RENEWAL OF FAMILY SAFETY SUBSCRIPTION--J.A. Glass
The Plant Manager's Safety Board approved the renewal of the subscription to Family Safety Magazine to be sent to the homes of all employees.
V. REVIEW OF INCIDENTS
Monsanto Incidents
Date Incident No.
Description
10/26/82 82-32 (issued)
Slip/Fall--Dept. 51; hit head and shoulder. (Townsend)
11/02/82 82-33 11/04/82 (issued PMSB only)
Recordable Injuries--Operating
Engineers; crane parking area (Old Dept. 10); steam burns. (Jackson)
10/29/82 82-34 (not Issued)
Contractor Incidents
NONE
SC
Spill--Dept. 51; crude ACN; NO INJURIES. (Zabcik)
003178
MM004792
PMSB Meeting Minutes - December 15, 1982
Page 6
VI. STATUS OF S-T-O-P PROGRAM--G. W. Daues
The results of the comment sheets from the last STOP Program offered to supervisors have been compiled with a very positive result. A summary of the results from the comment sheets is attached to these minutes.
The new STOP Program for Chiefs/Leadmen is almost ready for printing. Ve expect to be able to start this program in January.
VII. FLARE LINE INCIDENT
As a result of the discussion of the recent incident in which there was a flare line flashback resulting from opening a flare line with the flare lit raised serious questions about our control procedures for working on active flare lines. The PMSB has Instructed that the Fire and Entry Permit state that a Special Permit will be required for working on or opening an active flare line while the flare is lit.
VIII. PLANT MANAGER'S COMMENTS
The Plant Manager reviewed all of the items that are planned to overcome the "January Syndrome" to Increase safety awareness plantwide during this critical period. We have a full agenda of items that are related to keeping the level of awareness up to increase our ability to Identify and 8top unsafe acts, to highlight the key elements to be remembered during the month of January, a new program for the chiefs and leadmen, and additional safety meetings for all supervisors. The review of the agenda Indicates that we have a "full plate" of safety items scheduled for the new year.
Attachments JAG/es
J. Arnold Glass
SC 003179
LAM004193
TOTAL PLANT CONTRACTOR SAFETY
TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES
19 82 YTD 53 13
3
TOTAL MANHOURS WORKED (MHW)
FREQUENCY RATES/200.000 MHW
TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE
487,518
21.7 5.3 1.2
Nov '82 5 0
1981 Totals 70 12
05 46 ,208.25 521,991
21.6. 0.0
0.0
26.8 4.5
1.9
sc 003180
LAM004194
Cummulative In ju rie s
Cummulative TIR
1982 SAFETY - TOTAL CONTRACTORS Total Injuries
---------------- Total Injury Rate
1981
Recordable Injuries ------------------- Recordable Injury Rate
Cummulative Recordable In ju rie s
Cummulative RIR
SC 003181
LAM004195
CAPITAL PROJECTS CONTRACTORS
TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES
1982 YTD 33 6
2
Nov *82 4 0
0
TOTAL MANHOURS WORKED (MHW) FREQUENCY RATES/200.000 MHW
204,020 .5
14,823.5
TOTAL INJURY RATE
32.3
TOTAL RECORDABLE INJURY RATE ________ 5.9________
TOTAL LOST WORKDAY RATE
o CM
TOTAL DAYS AWAY RATE
54.0 0.0
0.0
1981 Totals 22 4
2 161,709
27.2 4.9 2.4
003182
LAM004196
1982 Safety - Capital Projects Total Injuries
Cummulative In ju rie s
Cummulative TIR
Cummulative Recordable In ju rie s
Cummulative RIR
Recordable Injuries Recordable Injury Rate
1981
SC 003183 LAM004197
CED CONSTRUCTION TEXAS CITY PLANT ACCIDENT STATISTICS
NUMBER OF CASES
Lost Workdays (Days Away) Fatalities Total Injury Total Recordable
'
FREQUENCY RATES
Total Injury Total Recordable Total Lost Workdays
MANHOURS WORKED
11/82
0 0 4 1
31.1 7.7 0
25,721
YTD 11/31/82
7
0
58 12
29.5 6.1 3.5
391,931
00318*
LAM004198