Document Yr3B7w4Vy9YqkgdLOv9qwJ9dN
INTERNAL. CORRESPONDENCE
UNION CARBIDE CORPORATION TECHNICAL CENTER
P.O. BOX B361, SOUTH CHARLESTON. WV 25303
TolNaTMH. E. Rucker 512/2009
LoCStJOn
Are
copvto g# Avashia, M.O. - 512/23 J. W. Barna - 2009/6 W. L. Browning - 2009
-- R. E. Coyner - 2009 J. E. Liana - 740/2322 C. P. Maxwell- 701/2 B. R. McMakin - 2009
Da" June 11, 1987
Onigin8t.no Dept. EM&TS _
A~a Sob,ect
Industrial Hygiene Asbestos Exposure Monitoring
,
Li' i
. Attached are the results of asbestos exposure monitoring for two days on insulators at the Institute Plant while removing asbestos on lines at the #2 dock area. One area sample result is included in the data. A 3-inch steam line and two 3-inch product lines were stripped on the risers and the overhead piperack across the roadway. Glovebags and enclosures were not used because it was not feasible according to the Construction Department insulation craft representative (Asbestos Competent Person) and the 512 Plant Industrial Hygiene Department. Employees used a powered man-basket to reach lines that were overhead. Area was barricaded until removal of asbestos was completed.
Employees wore two pair of coveralls, headcovers, boots, gloves and AO R57-A half-face HEPA cartridge respirators. No street clothes were worn. They showered before lunch and at the end of the workday before leaving plant.
UCC 024440
ASBESTOS EXPOSURE MONITORING
-2-
June 11, 1987
Please inform S. R. Erskine, P. K. Snodgrass and C. B. Clendenin of their exposure monitoring results as soon as possible. Have them sign and date this report and return to M. A. Patel at Building 701-330.
If you have any questions or if we can be of further assistance, please call us on extension 4779 or 3750.
WORK BY:
APPROVED BY:
Attachment
VES:HJK:MAP:rab 2384P
Manhar Aw Patel
UCC 024441