EQUIPMENT COMPANY MATERIAL
, 3,258.86 675.02
INVESTMENT EXPENSE
%/>i./cCJt.~ & /SC~2 7 V
| /C
LABOR
7,522.44
HANDLING AND OTHER
TOTAL
DESCRIPTION OF PROPOSED WORK;
1,145.60
salvage value s
500.00
, 12,601.92 rl if)
ESTIMATED LIFE: (YRS) ^
SPONSOR:
Manufacturing
Scrap collection system to run from the present UNIBESTOS scrap crusher to a #22 Rarefied Dust Collector, then through a rotary gate, into a new
21 foot diameter x 16 feet high storage bin (located near material feeders)
where it is distributed by a power spreader. Exhaust air is then taken
from the system and filtered through a bag collector located outside at
the south end of Plant #8.
r
_J
<
PLAINTIFF'S
CD
Ui
EXHIBIT
1
JUSTIFICATION summary: (Including estimates oj annual savings and other benefits)
3 C>V4b4,0G
The concentration of asbestos dust in the plant atmosphere is, in some areas, beyond the threshold limit and continued exposure could result in contraction of asbestosis by the workers. Dr, Gaze of Cape Asbestos was very critical of this situation, and the Pennsylvania Board of Health has made it clear that they expect us to improve the situation as soon as possible.
A better scrap handling system should yield better reclaimed scrap - it will be more uniform. Our present system runs the scrap through a fan and cuts it up too fine.
In view of the seriousness of the problem, we urge immediate approval of this request.
This equipment will replace present scrap handling system (1550-28) transferred to property account Apr 1 1964 and amounting to $3,695-00.
(cttfceT/crt HCI of}
30// j'j
ROUTING
WORKS ENGINEER WORKS MANAGER
INITIALS 4 DATE --
ROUTING
CHIEF ENGINEER VICE PRES . ,MFG.
INITIALS a DATE
,/
O/h A
,
ROUTING
TREASURER PRE 5IDENT rrurcil ACCOUNTING
tNl/ACs a DATE 2-23~t
/n 2-Wr TLU 9 /| io-
**
FajMflJf'. I
/PITTSBURGH
CORNING
CORPORATION
INSTRUCTIONS U*i flfttrlik (*) to donoto tlmoUd cost*
February 171 1965.
DATE....................
( APPROPRIATION REQUEST DATA PRELIMINARY ESTIMATE AND BILL OF MATERIAL
SUPPLEMENTARY LISTS ATTACHED No.
Attached find signed Appropriation Request in the amount of $ 12.601.92 This figure is based tjpon the following information:
:fORM >212
PITTSBURGH CORNING ^COP^PO RATION
` DETAIL SUPPORT FOR BILL OF MATERIAL
INSTRUCTION:
* Ua1 otlarlalt If ceil la sflmaltd*
PILL OF MATERIAL SECTION
ITEM LISTING
PURCHASED MATERIALS Ineludlno FiIbM In. C22 Modified Morse Rarefied Dust Collector Electric Powered Grain Spreader Butler Storage Bin 15 Cu. Yards Concrete 600 Ft. Reinforcing Rod 600 Bd. Ft. Form Lumber
COST $ 725.00
135.00 1.248.00
330.00 78.00 93.00
20 Pcs. 4x8 Transite 1/4" Thick
164.00
Commercial Items - Pulleys, Winch, Rope, Eye Bolts etc. 100 Ft. 6" "H" Beam @ 25# per foot Approximately $196.48 for Damper Materials
39.38 250.00 196.48
0. REQUISITIONED MATERIALS - Curr.nt Coil.
50 Ft. 1" dia. H.R.Steel Rod 50 Ft. 5/8" dia. H.R. Steel Rod Nuts & Bolts 4 "V" Belts B-68 11/2 Std: Pipe 54 inches long Steel Plate, Angle & Channel Electrical Material Wire, Conduit etc.
TOTAL
$3,258.86
COST *
13.35 5.00
10.00 8.00 1.71
586.96 50.00
.< ft7S.02
*O<u:^-:0v
* , v. *, *
LfiTSiUuG COPi'll It 3 CORf OiAVIOIs
WORK ORDER
* OCATION Port Alleqanv. Pa.
m B. K. Stout*
Pittsburgh* Pa.
T. H. Oonaldson,
11
DATF Feb. 25. !So5 T. C. Burgason (5) S. J. Carlson, Jr.
L. 0. erlfflth, Jr. C. W. Do1away
N. C. Ackman (2)
File
(2)
THE FOLLOWING HAS BEEN AUTHORIZED UNDER APPROPRIATION NllMRFR 1157 Scrap collection system for Plant Ho. 8 - Untbestos
ESTIMATED COMPLETION DATE:___________________________________________________________ ALL CHARGES AGAINST THIS APPROPRIATION ARE TO DE ACCUMULATED IN ACCOUNT
NO______1521
WORK ORDER NUMBER
DISTRIBUTION
DETAILED AS FOLLOWS:
ACCOUNTING DESCRIPTION
All 57-1
os above
1550-27
WORK COMPLETED--DATE ISSUED BY_________________________________
DEPARTMENT MANAGER
BY UPON COMPLETION OF YOUR PART OF THE WORK. DATE. SIGN AND
RETURN THIS COPY TO THE PERSONNEL AND ACCOUNTING DE PARTMENT.