Document YnaVM9GMg9rzX7oVxwba2BMO

c. t; / 'w Fr*3\o\ rev.6/1/62 PITTSBURGH CORNING CORPORATION _ ____________________ APPROPRIATION REQUEST ' k.'Of -1 \ ON ** Port Allegany, Pa. - Plant #8 f//{ * ESTIMATED COST +*+ *-N ^ ^ APPROPRIATION NO * / / S7 rt '/</< Ho4 ' February 17, 1965 If. TRIBUTION OF EXPENDITURE EQUIPMENT COMPANY MATERIAL , 3,258.86 675.02 INVESTMENT EXPENSE %/>i./cCJt.~ & /SC~2 7 V | /C LABOR 7,522.44 HANDLING AND OTHER TOTAL DESCRIPTION OF PROPOSED WORK; 1,145.60 salvage value s 500.00 , 12,601.92 rl if) ESTIMATED LIFE: (YRS) ^ SPONSOR: Manufacturing Scrap collection system to run from the present UNIBESTOS scrap crusher to a #22 Rarefied Dust Collector, then through a rotary gate, into a new 21 foot diameter x 16 feet high storage bin (located near material feeders) where it is distributed by a power spreader. Exhaust air is then taken from the system and filtered through a bag collector located outside at the south end of Plant #8. r _J < PLAINTIFF'S CD Ui EXHIBIT 1 JUSTIFICATION summary: (Including estimates oj annual savings and other benefits) 3 C>V4b4,0G The concentration of asbestos dust in the plant atmosphere is, in some areas, beyond the threshold limit and continued exposure could result in contraction of asbestosis by the workers. Dr, Gaze of Cape Asbestos was very critical of this situation, and the Pennsylvania Board of Health has made it clear that they expect us to improve the situation as soon as possible. A better scrap handling system should yield better reclaimed scrap - it will be more uniform. Our present system runs the scrap through a fan and cuts it up too fine. In view of the seriousness of the problem, we urge immediate approval of this request. This equipment will replace present scrap handling system (1550-28) transferred to property account Apr 1 1964 and amounting to $3,695-00. (cttfceT/crt HCI of} 30// j'j ROUTING WORKS ENGINEER WORKS MANAGER INITIALS 4 DATE -- ROUTING CHIEF ENGINEER VICE PRES . ,MFG. INITIALS a DATE ,/ O/h A , ROUTING TREASURER PRE 5IDENT rrurcil ACCOUNTING tNl/ACs a DATE 2-23~t /n 2-Wr TLU 9 /| io- ** FajMflJf'. I /PITTSBURGH CORNING CORPORATION INSTRUCTIONS U*i flfttrlik (*) to donoto tlmoUd cost* February 171 1965. DATE.................... ( APPROPRIATION REQUEST DATA PRELIMINARY ESTIMATE AND BILL OF MATERIAL SUPPLEMENTARY LISTS ATTACHED No. Attached find signed Appropriation Request in the amount of $ 12.601.92 This figure is based tjpon the following information: :fORM >212 PITTSBURGH CORNING ^COP^PO RATION ` DETAIL SUPPORT FOR BILL OF MATERIAL INSTRUCTION: * Ua1 otlarlalt If ceil la sflmaltd* PILL OF MATERIAL SECTION ITEM LISTING PURCHASED MATERIALS Ineludlno FiIbM In. C22 Modified Morse Rarefied Dust Collector Electric Powered Grain Spreader Butler Storage Bin 15 Cu. Yards Concrete 600 Ft. Reinforcing Rod 600 Bd. Ft. Form Lumber COST $ 725.00 135.00 1.248.00 330.00 78.00 93.00 20 Pcs. 4x8 Transite 1/4" Thick 164.00 Commercial Items - Pulleys, Winch, Rope, Eye Bolts etc. 100 Ft. 6" "H" Beam @ 25# per foot Approximately $196.48 for Damper Materials 39.38 250.00 196.48 0. REQUISITIONED MATERIALS - Curr.nt Coil. 50 Ft. 1" dia. H.R.Steel Rod 50 Ft. 5/8" dia. H.R. Steel Rod Nuts & Bolts 4 "V" Belts B-68 11/2 Std: Pipe 54 inches long Steel Plate, Angle & Channel Electrical Material Wire, Conduit etc. TOTAL $3,258.86 COST * 13.35 5.00 10.00 8.00 1.71 586.96 50.00 .< ft7S.02 *O<u:^-:0v * , v. *, * LfiTSiUuG COPi'll It 3 CORf OiAVIOIs WORK ORDER * OCATION Port Alleqanv. Pa. m B. K. Stout* Pittsburgh* Pa. T. H. Oonaldson, 11 DATF Feb. 25. !So5 T. C. Burgason (5) S. J. Carlson, Jr. L. 0. erlfflth, Jr. C. W. Do1away N. C. Ackman (2) File (2) THE FOLLOWING HAS BEEN AUTHORIZED UNDER APPROPRIATION NllMRFR 1157 Scrap collection system for Plant Ho. 8 - Untbestos ESTIMATED COMPLETION DATE:___________________________________________________________ ALL CHARGES AGAINST THIS APPROPRIATION ARE TO DE ACCUMULATED IN ACCOUNT NO______1521 WORK ORDER NUMBER DISTRIBUTION DETAILED AS FOLLOWS: ACCOUNTING DESCRIPTION All 57-1 os above 1550-27 WORK COMPLETED--DATE ISSUED BY_________________________________ DEPARTMENT MANAGER BY UPON COMPLETION OF YOUR PART OF THE WORK. DATE. SIGN AND RETURN THIS COPY TO THE PERSONNEL AND ACCOUNTING DE PARTMENT.