Document Yn7rqVq5wz0J5wy3RngmyBEO

UNIVERSAL MANUFACTURING CORPORATION TOTOWA, NEW JERSEY I. Composite sample taken 12/2/74 & 12/3/74 (This sample obtained from below floor level tank trap in impregnation area. You considered this the main effluent stream from processing area. Corresponds to Nos. 9 & 10 on our numbered list of samples from both plants.) II. Grab samples taken 12/2/74 and 12/3/74 (Combined the two grab samples taken from the main plant effluent obtained in the office after process and sanitary effluent streams joined. Corresponds to Nos. 8 & 12 on our numbered list of samples from both plants.) III. Plant water taken 12/3/74 (Grab sample of city water taken from sink. Corresponds to No. 11 on the numbered list.) IV. Signac Brook 12/3/74 (Grab sample taken at bank of stream and in brook upstream from plant. Corresponds to No. 7 on numbered list.) V. Passaic River taken 12/3/74 (Grab sample taken along river bank opposite and slightly downstream from point when Signac discharges into Passaic River. Corresponds to No. 6 on the numbered list.) PCB's 24.8 ppb 130 ppb 1 ppb <0.25 ppb 0.25-0.5 ppb E. E. Stewart During plant sampling period, total plant waste flow averaged 7.1 GPM per Mike Mautic's meter readings. HONS 093591