Document YjgRmR1qvNvxMDYBgm4Zax1On
iNlJl - i
To: T. H. Huffman
Interoffice Communication
From:
Date:
Subject:
D. C. Skokna September 25, 1991
ABERDEEN MONTHLY PROGRESS REPORT AUGUST, 1991
There were four first aid injuries reported during August. A new housekeeping program, Operation Cleansweep, began this month. Everyone was trained in housekeeping standards, and then cleanup of areas designated by natural teams was started. As of August 31, the plant's employees completed 4440 days (5,943,784 manhours) since the last lost time injury.
FY1991 Kev Statistical Information
Y.T.D.
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
38.3 91.0 95.4 1.0412
5.7 98.3
1.4 84.9
< 19.5>
< 87.5>
15.6
420.3 86.2 97.9
1 .0242 53.6 97.1 16.8 84.2
< 11.6> < 271.4> < 200.8>
Operations
The resin unit ran well. Some problems related to the new DCS in the New Module were encountered and corrected. Conversion of the Old Module is scheduled to begin in early October.
The flexible compound schedule remains tight. Rates in the rigid unit were reduced to closely monitor quality and to produce the new Dayton product (RP152) which runs slower due to cooling limitations.
Costs
Variable efficiency variances were essentially at budget.
Fixed costs were unfavorable due to MM&C charges related to the July turnaround and plant painting.
-'"t- 4 i !" : =i
VAB.0001189566
-F
T. H. Huffman 9/25/91 Aberdeen Monthly Progress Report - August, 1991 Page 2
QMP
The Compound "B" Shift presented their stabilizer spill reduction project to management, This project reduces the amount of this hazardous waste by 42% and reduces costs by $11,000 per year.
Southwire's CEO visited the plant to present Vista Southwire's Excellent Supplier Award. Vista is the first and only Southwire supplier to receive this highest rating.
I Nibco, a resin customer, performed an audit of the plant on August 6. Our quality system received a 98% rating, and we are now considered a "certified" supplier by Nibco.
On August 27, a group of Nibco employees met with us to formalize communication channels, determine action on items of common interest, discuss D.O.E. for Nibco's priority quality concerns, and discuss pellet quality.
Environmental
Two VCM leaks occurred on August 16 and they were reported to the National Response Center, as a pre caution. The first incident, an approximate threepound leak, occurred when a drain plug in a recovery compressor vibrated out. The second, a leak of approximately forty-six pounds, involved a line rupturing at a weld spilling unstripped slurry.
Results from DuPont Environmental Remediation Services (DERS) confirmed previously detected methylene chloride, acetone, etc. in groundwater samples were lab relics. VCM was again found in shallow groundwater south of the New Module. Additional sampling to determine the extent of VCM contamination south of the New Module is planned to begin in September.
t-
VAB.0001189567
ir
T. H. Huffman 9/25/91 Aberdeen Monthly Progress Report - August, 1991 Page 3 Environmental - Continued
m We provided Conoco an estimate of $1.8MM to reclaim the resin in old pond #2.
m A contractor was selected to*' remove buried drums near the wastewater treatment plant. A plan for drum removal and site cleanup was submitted to MDEQ for approval. Work is scheduled to begin in October or November.
D. C. Skokna Plant Superintendent rah
VAB.0001189568
DISTRIBUTION
COVER LETTER
ENTIRE REPORT
Hous ton
J. D. Burns
X
R. T. Ferrell
X
T. H. Huffman
X
C. J. Matson
X
D. F. Harman
X
H. R. FI aminer
X
R. R. Smith
X
B. J. Bean
X
R. H. Gerlach
X
R. D. Gamblin
X
C. R. Miller
X
Aus tin
R. L. Poe
X
H. J. Hall
X
Oklahoma Citv
H. D. Garrison
X
LCVCM Plant
P. D. Carrico
X
LCCP Plant
J. Friend
X
LCLAB Plant
J. W. Ware
X
Baltimore
L. R. Bauer
X
Hammond
J Pavao
X
Premiere
P. L. Foote
X
Aberdeen RWS/DCS (File Copy), TJA, JBA, JEB, JME, SCH, DAB, DAM , JEN, JDO, BLT
VAB.0001189569
SAFETY - B. L. Trego
First Aid OSHA Recordable
Total Injuries
Number of Restricted Workday Cases Number of Lost Workday Cases
Injuries bv Department
Aug.
4 0 4
0 0
Fiscal
Y.T.D. 1991
Fiscal
Y.T.D. 1990
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
Injuries bv Type
1
2
1 0 0 0 4
Cuts and Abrasions Eye Injuries Burns
S trains/Sprains Stings Other
Totals
Non-Occunational Injuries
3 0 1 0 0 0 0 4
Lost Workday Cases Days Lost
Contractor Injuries
First Aid Cases Medical Treatment Cases Lost Workday Cases
Safety Record
b
0 0
0 0 0
Last lost time injury - 7/5/79
Days since -
4,440
Employee hours since - 5,943,784
On August 30, 1991, the employees of the Aberdeen plant completed 4,440 days with no lost time injury.
VAB.0001189570
r_J L .
HM- |
SAFETY - Continued
Topics for plant safety meetings during the month included: Operation Clean Sweep.
CPR and
A new housekeeping program called Operation Clean Sweep began this month. All employees were trained in housekeeping skills for their August safety training. They then cleaned up their designated plant areas.
An emergency drill involving a maintenance worker with a simulated heart attack went well.
f
Supervisors' brown bag safety lunches are going well. held.
One per month is
Routine dosimetry results for the month were:
Chemical
VCM Lead Total Particulates
Monthly Injury Summary
< PEL Number Percent
81 98.8 9 100.0
4 100.0
> PEL________
Number
Percent
0 0 0
Iniurv Class FA
FA
FA FA
Department Compound
Maintenance
Vinyl Compound
Description
First degree burn, upper right arm.
Cut, left "ring" finger.
Scratch, left elbow.
Cut, left "middle" finger.
VAB.0001189571
OTTAT.TTV MANAGEMENT PROCESS - T. J. Arbeiter
All of the plant's natural teams met during August. teams' highlights for the month were:
Some of the
m Compound "B" Shift Natural Team made a presentation to management on August 28. The team presented results of their project to reduce the amount of stabilizer hazardous waste generation. The team described the action steps completed and procedures implemented that resulted in- a 42% reduction in stabilizer hazardous waste from the baseline period (second quarter 1988 to third quarter 1990) to the present period (fourth quarter 1990 to third quarter 1991).
This 42% reduction positively impacts the environ ment , safety and productivity - as well as saving nearly $11,000 per year on stabilizer and disposal costs.
Most of our teams were busy this month completing assignments for Operation Clean Sweep. Clean Sweep is a plant-wide housekeeping project with areas of the plant assigned to each natural team.
i Southwire's management visited the Aberdeen Plant on August 1 to present our employees with the Southwire Excellent Supplier Award. In attendance from Southwire were: Roy Richards, President and CEO; Wayne McAmis, Senior Vice President and General Manager Wire and Cable Division; Melinda Jones, Supplier Excellence Manager; Jack McLendon, Purchasing Agent; Tom Robertson, Compound Develop ment Manager; and Wayne Posey, Plastics Blending Manager.
In addition to approximately seventy-five plant personnel, Vista was represented by Jim Ball, Senior Vice President - Commercial; Wayne Hilgers, Manager - Quality Development; and Charles Matson, Manager of Marketing - Polymers Resins.
Vista is the first and only Southwire Supplier to receive this highest rating in the Southwire program.
On August 6, Lou Macakanja, Purchasing Quality Engineer for Nibco, Inc., conducted a Quality Systems audit of the Aberdeen Plant. Our Quality Systems received a rating in excess of 98% and are now considered "certified" by Nibco.
TT
VAB.0001189572
I
QUALITY MANAGEMENT PROCESS - Continued
On August 16, Southwire employees, Darrell Smith, Manufacturing Engineering Manager, and Steve Bohannon, Engineering Manager visited the Aberdeen Plant. The opuropose of their visit was to gam familiarity with our plant and processes and discuss areas of mutual interest with Aberdeen operations and engineering personnel.
Nibco, Inc. visited the plant on August 27. Nibco
attendees included John Rouch, Plastic Division
Project Engineer;
Richard Kauffman, Plant
Services-Greensboro; Todd Nowicki, Director of
Manufacturing; and Wil Pinto, Corporate Chemical
Engineer.
The purpose of the meeting was to formalize commun ication channels, determine action on items of mutual interest, discuss DOE application to priority quality concerns and discuss pellet quality.
K
COST VARIANCES - D. C. Skokna
Variable Costs
Product
Efficiency
PVC Flexible Compound Rigid Compound Plasticizer
Total
<$52.4> 12.2 10.3 45.5
$15.6
Resin
Price
$537.9 < 317.1> < 72.2> < 90.7>
$ 57.9
Total
$485.5 < 304.9> < 61.9> < 45.2>
$ 73.5
Utility usage was above budget.
Flexible and Rigid Compounds
Efficiencies were essentially at budget. Plasticizer
Raw material consumption was favorable.
Major Price Variances:
Variance - $M
VCM Natural Gas Phthalic Anhydride Resin to Rigid Compound Resin to Flexible Compound Alcohols Plasticizers Other Price Variances
Total
$486.7 43.7 27.2
< 76.7> < 81.0> <130.6> <175.4> < 8.8> $ 57.9
Fixed Cost Variances
m Payroll and Benefits MM&C Miscellaneous TI&D m Clearances
Variance - $M
Total
$13.6 < 94.3>
3.8
< 7.8>
< 2.8> <$ 87.5>
Payrolland Benefits - A favorable payroll variance of $29.2M was partially offset by an unfavorable benefits variance of $15.6M.
MM&C - Turnaround costs and contract painting caused the unfavorable variance. Year-to-date this category is $285.7M favorable.
VAB.0001189574
11 .............................- 111! 11 |q 11 - ll l 1-LI I H'l'li I
.iIMi <: :jr t! | |
11. ,
ii ->41 ! .
ii i'-t*1 H I *
I :-
f
I|-.i|prni- :r -|!| iMUr- .4i-fjNl"-|:C|!ci1f2r!x! |!.'I'S- ilrtriHl MI i*s 1II
f-i n ! .........;t| -!|i 11 iti 1111 ..!i-| .viMi* 11|.iiir
N mjj^pmi h''lLrl!I'|14:-l
+Jil ||ll|:|,iMMi>i . I:I: |li-rj =!-i il^lr!ji-jtf-lEj jj^1 j::e! Ii!"L 11 *
iv|:n/'M i *
VINYL - J. D. Olson, D. E. Knittig
The Vinyl Department had no first aid case or OSHA recordable injuries during Augus t.
The monthly safety meetings were concentrated on "Operation Cleansweep". Each shift was assigned specific plant areas for cleanup.
General
1. VCSM project prepared for a late August conversion. The date was moved to October 4th due to inventory. The team focused on optimization and documentation.
2. The slurry dump line developed a leak while splitting a batch due to incorrect charge amounts. The line was repaired and procedures changed to eliminate this problem.
3. Preliminary testing of a closed dump system was completed. A full test is planned for mid-September.
Aust.
YTD
Production, MM Lbs. Daily Rate, M Lbs./C.D. Capacity Utilization Factor, % Total Reactor Charges Charges/C.D. Reactor Stream Factor, % Rotary Dryer Stream Factor (#4-#8), Fluid Bed Dryer Stream Factor, % Resin Quality, % Prime
%
38.3 1235.5
96.7 907.0
29.3 91.0 94.6 95.6 95.4
420.3 1254.6
98.4 9858.0
29.4 86.2 90.7 90.2 97.9
Reactor
Hours
Operational downtime (recovery scheduling conflicts, charge/rinse water conflicts, Q.C. data delays, and dump conflicts).
471.0
Maintenance downtime (hydroblast D-700 condenser, New Module slurry dump line repairs, hydroblast D-742 condenser, low of steam due to boilerhouse trouble, D-300 rupture disc, polyvic valve on D-745, D-700 seal change, PM D-743 gearbox, change D-743 drive shaft, PM D-500 gearbox, change D-745 rinse nozzle, PM D-600 gearbox, and D-700 evacuation valve transition piece.
196.0
.I
i---------M
i | .L.K .H
VAB.0001189575
VINYL - Continued
Dryer Time
m Operational downtime (centrifuge plugs, dryer cleaning, flameouts).
- Maintenance downtime (dryer PM).
Reactor limited production.
% of Total Downtime
35.4
12.2
52.3
Key Maintenance Items - J. B. Autrey, S. A. Truitt
1. The reactor seal on D-700 was changed. Failure was due to the flush line plugging with resin.
2. Condensers on reactors D-700, D-742 and D-744 were drilled to control contamination.
3. The drive shaft on D-743 was replaced due to wear.
4. Annual rupture disc changeout on D-300 was completed.
5. The wet end boot of the #7 Bird centrifuge was badly worn and was replaced.
6. Trunions on dryers #4 and #6 were changed out.
7. The faulty low flow shutdown switch on the east incinerator was changed.
8. One maj or valve was changed in the vinyl unit.
*
. -4 ' :
I".- !. I
h. . |,M.
r; -M##-;i :*j..:I
~r'L!~ l i V-K"
VAB.0001189576
COMPOUND - S. C. Hillman, M. R. Kane
Safety
The Compound Department had no OSHA recordable injuries in August.
General
Orders remain tight on all production lines although there are some signs of lower orders on Line I. Close monitoring of dry blend product quality has caused hieher than normal downtime and slower than normal rates.
Compound Production
Operating Days
Line I
31
Line III
31
Line V
10.5
Total
% Prime
Capacity Utilization Factor
Month
1878 3267
513 5658 98.3 72.3
61 105
49 183
Fiscal Y.T.D.
18269 31541
3795 53602
97.1 62.5
Downtime
Line I
- Product Changes - One Dicer Offline - Miscellaneous Maintenance
Line III
- Product Changes - Miscellaneous Maintenance - Quality
Line V
- Product Changes - Miscellaneous Maintenance
Hours
107 56 28
108 23 7
23 16
VAB.0001189577
COMPOUND - Continued
Operating
Days
H
Rigid Compound
30.5
% Prime
Capacity Utilization Factor
Month
3339 96.8 46.2
Avg./Day
109
Fiscal Y.T.D.
48895 99.0 72.1
Downtime
- Quality Problems & Control - Running One Blender - Miscellaneous Maintenance - Product Changes
Operating Days
Plasticizer
31
% Prime
Capacity Utilization Factor
Hours
94 85 57 41
Production (M Lbs.
Month
Fiscal Y.T.D.
1406 84.9 63.4
16813 84.2 76.6
Key Maintenance Work - J. B. Autrey, S. A. Truitt
1. The bearings and shaft on the #1 boiler feedwater pump were replaced due to wear.
2. The #1 boiler feedwater pump was rebuilt and mechanical seals were installed to reduce leakage.
i I-
I*"?'1 P!
I1
I
(i*.
-- - H |-
I.
VAB.0001189578
I I I > .
ENGINEERING - J. E. Nickerson, M. L. Carter
PROJECTS IN DEVELOPMENT - GENERAL VCSM
Converting the Old Module equipment from the old control room to the DCS system is scheduled to start October 5. Initial loop checks for the Old Module are 85% complete.
VCM monitors and other common equipment alarms have been switched over to the new system during the month.
Dry Blend Oversize Problems
A DOE was performed on the dry blend line to determine the effect of
processing variables on
ized particles. The response chosen
was significant. Results from the DOE were used to plan another
test run to determine the effect of transfer temperature on over
sized particle formation. Low transfer temperature is responsible
for impaired product rates.
Vinyl Cooling Tower Performance Evaluation
Performance testing of the vinyl cooling towers concluded in early August and the data is being evaluated. The results will be used to determine necessary changes to meet current and future cooling limitations.
i
-I - i-.ii 'll ' n %:li':. 'V.i!',tillJ 111|>-.: I :i 1 :'H:!-:jiL- : -7nv;;iii:i|ir.'*h i: |+ll|--i-li-_ J|
KJ- frini JM'H-
"li .ii
:i
VAB.0001189579
* i* -. f
\d4i
ift
ifiljAIDMy?"
*4 ft 4 fth'J T 44 X-
f**DT Vilft 4
If
* ft
* * a* 4
ftk 4 i.L t * 4 - L
1 *
* I *
a v : y- t* w *4 * ft ^ J *
*I 1 UU *
V *W *4 fca
^ 4 L.
1 1 J! ;.j1
1 * -v^
,j
j
i f4
* : .1 VV 4
*4
v s* .P r-
H- , V i
d ' *V
.TtS* 11 j p
* 4^V -`)QQ - v Jw
WV 4 "*ra 4 fi J W W^*
-* A rt A 4 %d
j k; Ij UH K * *J
* *4 V <4 /***!
1 ^J
-i^Vi 1 '4 A
V** * Pi /1
v s*^ . '+ A - W *d M
r P*. i j. t jr - - \m
* * * S\ _- '.] -l -v * H rf J
*..' **%* ^ I
_t - * 4 *W
** *. * ' ^ V *T
r ' - 4 *
' h<, '
1 4
41" 'T- I * V -* h
-*4 i - J i; ^
.* r v V *4 1
'''AT? * 4tWld ftd U * W 44 W
T
^\* vJ
RiCii v^isEAi/S:f urtmi" ** f
<f
r^iji
- :I Jki
"*vvt /'nrrnjAT rvpT"W ^riS^KiT''*"7*'*' ^ - *1 * id 4 V vl 4 Ilw^ li i U ibli ftft J Vy 4**1 4 4* Jft ft* l v i ^
'SCUT? :*VA1TiT VAnTST^iTT^ A
*3Y3! 7V-I **V ji ftj biddfcly
rfup? JlUJjT 4iJ4
'*v^
~v ? Ai?'I in yp"s-^a-PTnv-pk"f vw^ hdVuJ^3i4
hdw +y i i a vu 4 t Sj3^
;iTTii ir',T?c? "T> Ua 4 0 iX^ft A W V *i>Uw ; ki/d I 4 w **44 y **44 */ v\ woTli?r" OJATM???y Ayr^Tki ir.-T-r
:TrAy7cy
':5?cut?
^ ^4 * V4 .
4* b
~rAS?TCT?E1l f.r4ST*5 t :vTAnTS('W*#*^ 4 4 l * U it *a J **V 4 4* a JI ^ *'nJ W * 4^ Si f + + -+r w t
'iAD si*!)l IST sr\ ?y:rA''T7 sapfr? *s
utJUV
J L U*44 ^VViiy
v ^4 4 vO
JIAUT'.^*f|Tjp' *ri*T ^
t lftT-r Ti|r * ** ^ * * *i
p Itija v y
W * tT Id V ^ulii 4 Wl^y.i Myaii1 ,
k y# at
aSKB tile BHIDGE S1UIJ3
RAILCAE CaIK SACi
L*it<
A T
ui/<
l/4*^4*4f 4
305K
vv
SKI DUAL
VCH
SKUCTIO!
:ixc;niD hath
J8T283 S0.4 i 5 COJTMISATICS 3!
i kf
^,- n r r
wi i
'-'OuMiuAtSTlilllT
WSTKATSE INFLUENT EQUALIZATION
*V
^wa- tASCp pjQJJJJ U i/k4^ 4i
4ih4 V V *
V **V fc ta ^ < 4
tTrrjTi,^ 4^4>>*4**4(* A
^7 W 4 ^ * It *
y i* 1 ^ *
SSJi 15'iS 3AGH0U3E3
"ivm vr3 sv^r?
#. dft
4 ''u*
ity v i udid
'T
f '. ,4 4 aATS2 STITSU
^X'TJT.Tt*
* *
^W(*
- ! 1 y T
* ^ n.c ^ <
a J4
ii?-? ;jaT4r7M?rw^d 4 4 *i U j i' At AmI * v1 * a^yi yU v w**y J *
* ;u
=0T'W
4dw iftdftildt 4
Ti Wpilf'MFST
`ila Wa< 4 *4*` U *i^ 4 4*ili v> U*t
4
?VC IIA3BGXIEPLAC2SSST
`,.7if
* * *U
:v
iha
) :ey' i ve
shaft
h!?l
1" i !* J - ^ rf )t * 444* U-
rr
a * 4 fl
444* *%. ^ 4i
"" tY } J 1
I *ftr^T|
.`.A Aijita*wT.
'" *y * * w
''JtAWiTAA.Tjipi: t:TJ--TJSA7 4*41 * J y lyli 4 | ^ * it ftu ^ w
t -1T * 4 V * 41 aa t *41 * ar
* * 4d -4
V*44M>* 4
^ t ^p
w A 41 t \l
* ^ . H , # * v V u v ft
~K ililfeT
P1?7)j
rfWr7T7^ u;" '/via* ytriftttw idllir
-
4
i^*i
*1**' ' ,T 4 iL^vfear
* _,. T4 *w
tfetv V at** *4 ^ V V 1
1" CONVERSION WAS HAS! IN JULY T'A -
?AWn'A1f i a i* ' yi4>ta 4 V fc*
C-'pj?,'jTi s f I** 4 ^ rfW#
PAD { vu
fifT y^vl I
:* it'?'} ? AP?3i9T?H R-^i !t,iPf!?vP r?r?v r''"r?" r'7 -i*
: . ; ]|v i ct' r ^ * N*
^ ^ !.^
"PMfp-p ?r;? o_ai
'*ss::mn ."AMDr.:?:-*:
4 * *d W
*, l*ai iftftd 4 i 4/ * **
t/*N
'7C7-78 sjrfiM T? 'K spngwc? viTia^T: -47; aypr
*9 i+ ft ad*1 WtV JViiU ftd * ft ft ** V UlitU V *> 4 MU ft *dft*ft id
iiU I y
L
.:
ft* ^ ft * m ft v t*
'.5^11
- ** k BA
ILACiO IN OPERATION
5-91.
lAHGETD fll"
; V - ft- f ^itivvf ft4 ^
:*7?i5 umt !S auAf-ijffc?
: *r\ 7A"
wtv
':`r>!
-'i***M!,
'TMa'?l- ?*tfTtl MntAlJS
rw 'QWrijft ;7iifii^f twiVU?i t* .*|.1
.
^:. *w4 r
**3f w k4i
a;
* M4
4 .V
* ftpyBiftri
* *" Wldy ft* V A W i**J * # ft *'
.-30CSSS :n ji
t
-ft i* w
"-C1 '*' 4-' ft *
!rl''7'77* * a >> ^ la 4 i#y
::I *h
7' *:*?? V',;; c*
VV
|1 ^ I V*
*r ft *d
wrnT^1*ty^rsT M u 4 * f aA * i W al 4 h 4 4 .* 4 #
wt
vrnrjTrjyrns?
^Vkrftft 4 V aa 4 4 J J %
Kjwf
Uli * M
ay?f
y ftdftdlf
w*f
MUft 4d *
'*?? rns at?
U 4 4i ft 4 ant** > kftAv
a;?**
W it 1
d vny 4 i w a# ar
^o.T!fT 3m htp4 J 1/ 4i U i *UiJ 41 yi' ^ iJ w" ftJ ft
ip d . - \. ^ ^ W! t r ? ^ . ^ 1 w ; t w A ^1 * r ! r
*
d i iu*t dy y
V 4 44
4 P 44 *
'LICK IS OPIBATIOS 8-31. TARGETED :^ * PrTI ]i yyv
'"' ncnTT WuUwVMy
w-j i* d 1
v 4.
J WIak smss SCHEDULES TO BE IN PLANT S-PI ilCH. m iliCT DISI3S COUPLETS
PROJECT IS TARGETED TO 3E PLACED IN OPERATION IS OCT 91
m
FILTERS
OS
ORDER
TARGETED
COLLET IT!
FOR
4TH
ft mi^^
<4*4*1
-^* 1
4m
PROJECT HAS BEEN CLOSED TO FIELD CHARGES 5-31 FINAL REPORT.
PROJECT
HAS
BEES
CCHPLOD
AS1
^
+*
X4fcrfM*y-*!^ fH r* r' -.
n ;*
i V*V
i^fti 4^ft
J w >d D VAdw
^ ^ ' ft V
^X
rr\
ju
-TAM ii>i>
tC ftyf
^!T
A 4>
. ! f` I . - K - * y id iib a* k> ft 4
'lar.T"?": * ift*1* i*4d 4 ftdlr
'Pt-iT'rt*' Vi diy4 1 <Uv
-<'t*d * y
w W fift ^ 4
PROJECT HAS BEES C03PLETED AND TARGETED
r K *'Cl UAC
n T'?rY ^'i
iil# V^4J4 4 d* AJ r>^ v ftJ 4 *. ^1*
rv
FOR
Ifl* 4T *
J -r . " yyjy'
ft* ft.*'"taT?fTMl 7 \r>yJidF vv w *4fti
t * +* m vf
t*<
yI 4i|4
4 4-4d n* J k# ^
! : ^^,01 4 1/ iv v ft
FT 91
EDIFICATION OF HSSHASI BACKING IS SCHEDULE FOR OCT OUTAGE.
f!l(lV
I \ ) ' * * -j ' I .4 Jriik*^;
ri
ft ^
* 7 7 r*vif
. Ct 1 di<u,, *;i TM'\ravi; CIVIL ASH SITE CONSTRUCTION IN PROGRESS
"o SUUT?TM*?^
Pk ' -- *
** * W
^ a * f M1 ft 4
^W
7ft 7-
^^
v J-
*V
t* - i* 4 rt "*Tfr
-' v
it
*
*V *
INCINERATOR INSTALLED.
PROJECT COMPLETION TAF.GE3D
PC ** fe1*
* 4 -^
* k -r V ft
NSW TANK HAS BEEN INSTALLED. MINOR CAPO AUDI "'"VT JJVjryTr.^
-
*i 4/4.iu*4 ^ il ft if U
THE m GEARBOX HAS ARRIVED IN THE PLANT.
"TR9MTLT VP w T ' i 7 T7K7 *BTiOC: *<`: a:--^'I a
^ ^ *ft* Id 4^ ft ft A
d ' S# * -A ft 4' d
I ^ a1 * t
^ hi a
44i* 4 # .J
* v^ft ft fl
ft**
. kX J^ II 1^
ki
'IH* uky*E 1 id 4
1 I ft *f * i 4 r ' ft <ft it tP> t ft ^
-. *.* 4J
\- * miA
* ^ . I* '
- Ji4ti4I U n i ft .- i a d ^ i4 v
* * i.*
------- tfi
*- * ft ** * V ^ *
:?^J7(7 >'i? srrcpnro '
1 '. 1
i**ai(/ d V4 mW lift * *yr Iftfft/ * a 1 d ^ ^ a * * ft
M-*Pr\rvTATr':
* H* 4 4I
X U J
.VE?TWftdftJ-* ^ ftLfttidftr' 4
fti-vyyid4
'3T w ^Aii. Mi *
* *b- hk*i*n
J iT1 d- *
*^ * ftft
*
'*
ft. # ' *W ft.
1- !:: :|l!-,i MJ-'rt'
k:jii:^M -| : ^ I . is--1:r :| iI-.i-li-i n -ns -i-i- 1 HHft 1 LpK-rfc.iaih|>^.i-i-| |c-.^|411 i-t^i^ thiit^^r|L|1< 1%||MJr |: - rnhr it::!-.rh ...............%!'- ?iJ ,,,J '
VAB.0001189580
ENVIRONMENTAL - K. G. Akins
Vater
All wastewater discharge parameters were met for the month of Augus t.
Work continues on gathering information necessary for submitting the storm water permit application due November 18, 1991. We have five unpermitted storm water outfalls that will be covered by these regulations.
A wastewater bypass occurred during testing of the Old Module deluge system on August 22, 1991. A process sewer west of V-10 overflowed to a storm sewer. The MDEQ was notified.
Sunerfund
Results from DuPont Environmental Remediation Services (DERS) resampling of the groundwater, soils, and sediments were received. The results confirmed that previous detections of methylene chloride, acetone, etc., were lab relics. VCM was still detected in the shallow groundwater south of the New Module. The concentration was 0.5 ppm versus 3.5 ppm during the first round of sampling. Phthalates were detected in every deep well during the last sampling. This contradicts the earlier sampling in which phthalates were present in only one deep well. DERS believes the water samples could have been contaminated by vinyl tubing that was mistakenly used during the second sampling.
These wells will be resampled (at DERS' expense) the week of September 16, 1991. At the same time, further investigation will be done to determine the extent, if any, to which the shallow groundwater is contaminated with VCM south of the New Module.
Aberdeen Process Engineering revised the estimate of the cost to Conoco for Vista drying resin excavated from Pond 2 using our existing resin reclaim system. The new estimate was $1.77MM with $107M required up front to prepare the system for operation as required for this project.
ENSR was selected as the vendor to remove the drums buried near the wastewater treatment system. A work plan for drum removal and site clean up will be submitted to MDEQ for approval with work scheduled to begin in October or November.
-y r
I T`
is
-- t;
t :(Jn-.-f
I' Liv
"I'
I >........... I p
VAB.0001189581
ENVIRONMENTAL - Continued
GeneraI
Two vinyl chloride leaks were reported to the National Response
Center on August 16, 1991.
Because these were leaks and not
releases and posed no threat to anyone outside plant boundaries, we
were not required to report. The reports were filed as a precau
tion. The first incident involved a plug in a recovery compressor
casing that vibrated out. Water saturated with approximately three
pounds of VCM leaked from the casing plug before being stopped. The
second incident involved a line rupturing along a weld spilling
unstripped slurry containing about 46 pounds of VCM.
During excavation for the new water plant, two drums were uncovered. The drums appeared to contain a heavy weight lube oil. The contents of the drums along with the contaminated soil were transferred to new drums. Conoco was notified that the drums would be held for disposal with other drums removed from the old drum burial site near the waste water treatment system.
Waste
There were no waste shipments during the month of August.
*
I- r' 1-
*|- 01
' L . . I `v *<
1
VAB.0001189582
ENERGY CONSERVATION - J. R. Ganc
Aug.. 1991
Fiscal Y.T.D.
I. Energy Conservation Data
A. Unadjusted EUI B. Adjusted EUI C. BTU/Lb. Product D. Total Energy Consumption MMM BTU
< 21.0%> < 19.5%>
3047.2 149.1
< 12.4%> < 11.6%>
2803.1 1505.0
II. Boiler Operation
Boiler
Combustion Efficiency % Aug.. 1991 Fiscal Y.T.D.
No. 1 No. 2 No. 3
83.2% 83.3% 82.6%
83.2% 83.4% 82.8%
j-
. . id-
vHT..-*-
VAB.0001189583
*
HPMMI RESOURCE REPORT AOGP8T- 1991
WMTWomml ~ J* E. Beall
William Berlin Genetti - New Hire - Engineering Co-op Student.
William Dwight McComb, Jr. - New Hire - Engineering Co-op Student.
Proiotiona/Tyanaferg
Amy E. Bagwell - Production Scheduler, transferred and promoted to Lab Supervisor replacing Billy Paul
RBTIRBMB1W
None.
TBRMIHATIOH8/RB8IGNATIOM8
Holli Harris - Engineering Co-op Student returned to school.
Michael Schneider - Engineering Co-op Student returned to school.
TO/TPOM TYRAVE QF ABSENCE
Allan Bodron - Engineering Co-op Student - Educational
!L-d-:!i) rl" - ,--
L
VAB.0001189584
MONTHLY
15 11 39 24 38 33
5 165
74
90 50 80 52 23 1 10 1 20 62 4 7 18
60% 45% 20.5% 20.8% 59% 30% 40% 37.6% 9.5%
0 0 0 8.3% 2.6% 3.0% 0 2.4% 24.3%
0 0 0 0 0 0 0
0 1 0 0 4 0 0
r
M r !PI'
'* i'."' Hi H'
t
VAB.0001189585
V a c a tio n
360 _
316
128 128
552 180
o x* CM
CO o 8
CM O'
CO -Q -
co
ml i 4-* O H
CM O e ro o
00 in
CO o
o
in
o
c* ft
ro
CM o
d
ft
ft
8 N*
ft
O' ft
tn CO
CM
e
rs na g to
O
i io
o
o oft
o oft
o oft
o oft
o Q
o o
ft
8
o o
ft
O
o o
O o
o o 8 o o o ^3
IM
KJ
n
S .
Av E <0 CD (Du.
o o
o oft
o oft
o oft
o oft
o o
o o
8 ft
8 ft
8 ft
88 ft ft
o o o o o 00 ** O o O O O
rg
O
3--
o o o oooo o o
oo
d- <0 T3
BCL
o
oft
oft
oft
o
o ft
o 4
o ft
ooo ft
l O (D
o o o CO
--3
OC M O
o o o o 00 >o o ** fO
CO CO
X >*
33 -a Q
8 8 8 8o o o o o o
ot
oft
oft
oft
oft
o
o
ft
o
o
ft ft
ft
oo
o. o o o o o o o o
4> g CO
s 8eg o
00i oft
f o o o in jo
ft
ft oft
o ft
ft
ft
ft
o oo O
8
ft ft o
K
"O
s s 1C s 8 8CL flT (A
o oft
ft
ft
oo8o
ft
o ft
o ft
in
o in >>
ft
s IAJ
o in o
CM to
OO
ae a:
*
8
* O' O'
co
fr
o
}.............................. ............
*- -:i-
A co
AII
II
ac>
1Uoi
CO U</I
Ui 3E
s sUI CO s2 oa
CO h
3C Ui
aU*i g SUi CO
o
IIIIII 4>
gc
rsi CO
u
CO
CL
<0
Oab>
+o
i:
il.-.-*
.I ' M .f . / " -
" ' t .........................................
VAB.0001189586
2
UaJ
uui
(A UI
UI
(A
UI --
uo
S
o
O
A i/%
A O) C
- '
i
VAB.0001189587
.b
ADMINISTRATIVE SERVICES - D. A. Barclay
There were no reportable safety Instances this month.
Quality
All natural teams met in August
OASIS Progress
We are still experiencing problems with monthly closing of the OASIS system.
Processed Invoices Working Fund Checks Written Cost Savings Through Bid Process Raw Material Purchase Orders Issued MRO/AFE Purchase Orders Issued Spare Parts Purchase Orders Issued
Packaged Finished Goods Ending Inventory
Month
1186 15
$5172 116 236 165
T.T.D.
10345 142
$28590 997
1986 1931
(Decrease)
%
July. 1991 Aug.. 1991 /Increase Change
Compound "A" Grade PLENEX Compound Off-Grade (BC) Compound Off-Grade (H) Millscrap Dry Blend "A" Grade Dry Blend Offgrade Resin Type I Resin Type "BC" Vacuum Dust
Total Packaged Warehouse
3,580,700 96,292
329,086 151,348
87,278 509,092 244,754 485,306
100 161.533 5,745,489
4,309,548 85,626
365,738 182,848 117,408 537,998 356,699 731,450
100 172.939 6,860,354
728,848 < 10,666>
36,652 31,500 < 69,870> 28,906 111,945 246,144
0 11.406 1,114,865
20 <11>
11 21 <37>
6 46 50 0
7 19
*
i
VAB.0001189588
ADMINISTRATIVE SERVICES - Continued
Bulk Finished Goods Ending Inventory July. 1991 Aug.. 1991
(Decrease)
%
/Increase Change
Compound "A" Grade Compound Offgrade Dry Blend "A" Grade Dry Blend Offgrade Resin "A" Grade Resin Offgrade
Total
1,119,270 177,500
2,850,600 1,112,560 10,450,500 1.385.100 17,095,530
643,615 177,500 2,984,939 1,112,560 11,179,589 1.775.473 17,873,676
<475,655>
0
134,339
0
729,089 390.373
778,146
0
5
0
7 28
4
i ... .i..
- I : ft- I L- Jf- .. !.; - : : ! ..fc
V|' ' ft ! * k - JW .j.!.
VAB.0001189589
4..
ABERDEEN CHEMICAL PLANT SHIPPING ANALYSIS AUGUST 1991
-SHIPMENTS BY PROOUCTS-
PUBLIC
RESIN-BULK RESIN-PACKAGED
19.007,510 578,837
FLEXIBLE COMPOUND-BULK FLEXIBLE COMPOUND-PACKAGED
232,010 3,254,581
NEU BUSINESS
8,016
RIGID COMPOUNO-BULK RIGID COMPOUND-PACKAGED RIGID COMPOUND-PELLETS
1,857,450 509,679 0
TOLLING - BULK TOLLING PACKAGED
0 0
PLASTICIZER
131,800
TOTAL
25,579,883
-SHIPMENTS BY MODEBULK :
................. AUGUST*
RESIN FLEXIBLE COMPOUND RIGID COMPOUNO PLASTICIZER
RAILCAR
148 11 7 5
TOTAL AUGUST
171
*YTD* RESIN FLEXIBLE COMPOUND RIGID COMPOUNO PLASTICIZER
1,706 114 217 28
TOTAL YTD
2,065
PACKAGED:
AUGUST* RESIN FLEXIBLE COMPOUND RIGID COMPOUNO PLASTICIZER
CUSTOMER PICKUP
3 24
1 0
TOTAL AUGUST
*YTD*
RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
28
35 270
10 0
TOTAL YTD
MONTH
IPT/ITC EXCH/TOLL
15,144,480 285,850
0 0
2,000,700 0
0 0
00
618,396 126,445
0
0 0 0
00 00
664,840
364,800
18,840,711
364,800
YTD
PUBLIC
IPT/ITC
212,334,182 139,105,110 3,260,833 2,341,950
6,660,895 15,117,540
33,567,247
832,470
135,575
0
33,742,280 4,303,941 38,022
6,893,996 906,801 0
00 00
951,390 2,609,610
294,994,365 167,807,477
CUSTOMER PICKUP
COMMON CARRIER
35 53 05 0 34 06
35 98
425 0
27 29
481
COMMON CARRIER
24 80 18
0
122
439 49
155 37
680
TOFC AIR/UPS
00 00 00 00
00
AIR/UPS
0 0 0 0
0
157 0 0 823 0 0 164 0 0
300
1,147
52 81
4 0
EXCH/TOLL 1,777,400
0 0 0 0 0 0 1,401,960 33,600 4,202,810 7,415,770
TOTAL
TOTAL 27
104 19 0
150
244 1,174
178 3
1,599
CC: DAB.TLC,AEV,JRF
VAB.OOOl189590
CL. cu
Ii
tn cn
LU CJ
j
cn
U H*
CO a: -
LU I-- cn cn cu cn
cu UJ CU L--
ccej cc*n:
LU LO lju
Iii
cn
a:
cu
cn
cn
cc cu
cn
<r
cn -- l-
co
cn cn
tn cn
&
n O' o~
CM
cm
'7_> O' 4*"S o
i
o 1
r1 1 -a CM CP'
--u m
U'j CO
O
O
O <o O o
O
ii I i
JO Ct
cn
40 tO hn rn
w
cn r* c-' L-..
)S3 ca ca <:*> Ci o CM M 04 o Oo
cnl M3 t*3 ca
*o CM
rn 40
CM <r>
CM <o
CM CM CM
CM
CD* i IM
CM CM
CM CM CM CM CM CM
CM
CM
40 40 40 CP'
1*3 to
1 CO 1 o m 1 w*l
i Oio tn i
CM 1 CM 1 t
ca i CD i
1O
r-*
CM
1 A1
CM
M.
--4
ii
II co ii f**** ii tn
ii - j*. II M II IMS
cn era tn
$sLU LU LU
tn
tn
tn
9 tn
LU
tn tn tn uu LU LU
=3 cn
cn LU
s cn
tn LU cn
CO CO CO
S sca CO cu
So
ca CD
o CO CD CO
CO
to O CO CO
tn cn
to
O'* M3
I-- t".
)I
un hO
CM
cm
r^
cn
CM
cm rn
cn
i
CM
<
CM
;r-
P'1
CM ci m Mi
I CP'
CM I
CM ro M c>
W~a Ml 41*1
in u*^
~U M CJ
cn
cn
c- C c
CM
-M
U*1 p'% P'-
150 CO co
CO PO
CO M
CO p*>
-.o CP' Ml
I TM
CO co
hn io
UTj
ca
ca
r^.
CjU Cu xz an
u *-*
s
tu UJ LU ac
h*1 cn to cn 3 o "D CO LO JD
ZO =r <r <C
to oc
CQ
LO ctz
ca JC <r
--J ,.J __i
Ii* 2s-
UJ
tn to cn *L *-
co -E r ;r
cn
--j _i LU LU UL
x CO
i.n cn cn
cn tn
cn ca
O cc JC
v_/
CO
t.1 CJl C.3
i..
CM CM CM
O -O
C ... p ..
i :
c
CM
`ii i
t*J U.J
LU l_*_ t_U
O' cr**
LU
gj
cn cn
Ct. CU
*"3
CU
cn
~n
VAB.0001189591
c
(Thousands of lbs.)
f
FLEXIBLE & RIGID OFF-GRADE
AUGUST '90 THRU AUGUST '91
1400
1200
1000
08/90 10/90 12/90 02/91 04/91 06/91 08/91 09/90 11/90 01/91 03/91 05/91 07/91
PKG'D PRODUCTS INVENTORY
VAB.0001189592
*
LABORATORY - J. M. Edwards m
A. Safety
There were no safety incidents in the Laboratory during Augus t.
B. Customer Contacts
Representatives from Southwire visited on 8/1 to present the Aberdeen Plant with the Excellent Supplier Award. Repre sentatives from Nibco visited the plant on 8/27 to discuss technical issues and partnership agreements.
C. Customer O.C. Problem Reports and CNR*s
8/01 Flexible Technologies. Abbevlle. SC
The customer complained of contami
nation in 58031 Wat Cl 328 compound
causing lumps and grainy appearance
on hoses.
The contamination re
sembles crystallized Soya Epoxy.
Samples are being analyzed in R&D
Analytical.
8/01 Dayton fatniHad Plastics. Mlamisburg. OH
The customer complained of poor com munication by Vista that a shipment of dry blend would not deliver on time.
1/06 Bee Wire & Cable. Whitten. CA
8/07
The customer complained that Visalia 2153 Natural compound had three UL failures. R&D Technical Service is investigating the problem.
Cerro Wire & Cable. Hartsville. AL
An Ergon truck driver mistakenly took
a load of dry blend to a 5415 resin
customer.
A process was started
which requires the driver to produce
a bill of lading before picking up a
shipment at the plant.
8/08 Thermal Industries. Pittsburgh. PA
Due to the lack of raw materials, a product shipment had to be delayed.
I :
VAB.0001189593
IABORATORY - Continued
C. Customer Q.C. Problem Reports and CNR*s - Continued
8/08 Davton BTtmrfftd Plastics.
hnrg. oh
The customer complained that the first truck of 489-116 WHT 140 (new product) produced pitting on window profile caused by oversized par ticles .
8/12 Uniroval Plastics. MlsImmItji. IN
The customer complained of out of spec I.V.on three orders of resin. A process was started for lab release of bagged resin before any shipment is made.
8/13 Formtech. Bozart. GA
8/14
The customer complained of "shooting stars" in RP-91 WHT 110 finish pro file. This material had been re jected at the Stowe plant and rescreened at Aberdeen.
Thermal Industries. Pittsburgh. PA
The customer complained that they were charged for the gross weight on the shipment instead of the net weight of 489-136A.
8/15 Horthwire. Osceola. WI
The customer complained of wood chips in the pellets of 38601 Black. Samples were received of the PVC and wood chips sandwiched together.
8/15 Thermal Industries. Pittsburgh. PA
Again, Vista delayed shipment of this material (see CNR above) and was forced to pay overtime for help at the unloading dock to receive the shipment Friday night.
I . |...
.
VAB.0001189594
LABORATORY - Continued C. Customer O.C. Problem Reports and CNR*a - Continued
8/16 Elecon. Venezuela
The customer complained of 35451
which failed I.R. testing.
This
material was made in September of
1990 following a compound which had
Soya Epoxy in it. Soya Epoxy is very
detrimental to I.R. Thfe plant has
started a flushout procedure
Soya Epoxy is used so that the cross
contamination in the plasticizer line
will not harm wire and cable com
pounds .
8/20 Flexible Technologies. Abbeville. SC
The customer complained that 46801 Black compound did not adhere. R&D Technical Service investigated the problem and it was discovered that the solvent used at Flex Tech caused the problem.
8/21 Thermal Industries. Pittsburgh. PA
The customer complained that a ship ment expected at 7:00 but delivered at 10:00 was not a problem this time, but could have been a big problem. Also, the next weights on the boxes of BGE product did not add up to the weight on the bill of lading.
8/21 Thermal Industries. Pittsburgh, pa
The customer complained that Vista shipped only 13,000 pounds of BGE 347 against an order for 20,000.
8/23 Northwire. Osceola. BT
8/23
The customer complained of metal 38601 Black compound. Analysis samples showed the metal to aluminum.
in of be
Northwire. Osceola. ITT
The customer complained of foreign material in 38601 Black compound. The sample looked like RTV (silicone sealant).
it
P
*
d
VAB.0001189595
Continued
Prswtasfc fftfrrftgg Customer
Product
Dayton
489-116 WHT 140
Dayton
489-116 WHT 140
Vycom
RP-461 WHT 140
IfMon
Color
Color & Torque Rheometry
40 Mesh
No.
3 H/T 2 H/T
2 H/T
njfCM
RVCM of
The following is a summary of residual VCM results on inprocess samples. None of the reactor daily averages ex ceeded 400 ppm RVCM during the month of August, 1991.
Number of Semples Average RVCM, ppm
Reactor Slurries
904 71
Drier 5265
27 0.078
81 0.195
RVCM of Shipment Samples
The following is a summary of the residual VCM analysis of shipment samples for the month of August, 1991.
Product
Number of Samples
Averaee RVCM. xyom
5225 5265 5305 5325 5385 5395 5415 5465 Debox Pond Dry Blend
2 49 161
0 42
9 59
2 14 12
5
0.009 0.013 0.048
r
0.094 0.016 0.016 0.008 0.126 0.057 0.030
VAB.0001189596
Conttnued
F. ReBln Process Capabilities (based on dryer "regulars")
5265
5305 5.311 mi 5415
Bulk Density Inherent Viscosity
(vs. 0.64 - 0.67) (vs. 0.715 - 0.744) "L" Color "a" Color "b" Color % on Pan (vs. 2% max.) % thru 140 Mets I.R. (vs. 95% of Control) Hard Particles, (% > 10) Average Particle Size, Microns
0.81 0.80 0.20
--
3.67 10.00
5.67 0.73
--
0.91
--
-------------
------------
141
0.83 0.64
--
0.44 2.67 3.11 6.00 0.93
--
1.06
----
--
--
1.28 0.41
--
--
2.67
--
2.00 1.22
--
1.69
-------------
----
6.9
1.17 2.00
--
--
3.78
--
2.17 1.81
--
1.57 3.08
--
0
1.36 0.37
--
--
4.22
--
3.00 2.83 0.33 3.72 4.95 2.38
2.9
144 166 152 174
6. Flexible Compound .flirt HIT
~
Hardness Color Hard Particles Heat Stability Contamination Dicing METS-IR
Totals
M Lbs.
26.0 51.7
<0.43> <0.85>
5.0
--
<0.08>
--
82.7 <1.36>
M Lbs, ill
---* 12.5 11.6
1.5 15.6 30.0 71.2
- - -> -
<0.21> <0.19>
--
<0.02> <0.26> <0.49> <1.17>
H. Rigid Compound Quality Summary
Re lections M Lbs. (%}
Torque Rheometry Torque Rheometry & Contamination Torque Rheometry, Contamination
and Color Color Contamination
Total
14.2 <0.45> 15.0 <0.47>
3.0 33.9 _JLJL 72.6
<0.09> <1.07> <0.20> <2.29>
wm mummmm
mmm
emieui1
VAB.0001189597
LABORATORY - Continued
I. Miscellaneous
1. All natural teams met once during the month.
2. The software to link lab data to the vinyl VAX was completed in the following area:
A. RVCM data entry B. Viscosity data entry and auto report C. Regular Q.C. data entry
Work is still needed for Regulars report and the RVCM report.
3. The Perkin-Elmer RVCM analysis instrument failed for two days and required an outside repairman.
Assisted Administrative cumulative IPA terminal for OASIS.
s to track down Also, helped set up a
VAB.0001189598
SAMPLE SHIPMENTS AUGUST 1991
RESIN Ship Date 8/01/91 8/07/91 8/13/91 8/19/91 8/21/91 8/22/91
8/22/91 8/28/91 8/30/91 8/30/91 COMPOUND Ship Date 8/08/91 8/15/91 8/19/91 8/21/91 8/22/91 8/22/91 8/30/91 8/30/91 DRTBLEND Ship Date 8/16/91
Product 5395 5325 5225 5225 5415 5225 5325 5385 5385 5385 Pond
*
Product 16851 CB 50 35852 NAT 58162 BLK 462-143 BLK 462-34-B BLK 57121 WAT CL 487-5A NAT 487-5A NAT
Product 378--143 Purge
Amount 50 lbs. 10 lbs 100 lbs. 50 lbs. 100 lbs. 2 lbs * 2 lbs. 500 lbs. 50 lbs. 10 lbs. 50 lbs.
Amount 100 lbs. 200 lbs. 100 lbs. 500 lbs. 500 lbs. 150 lbs. 5 lbs. 5 lbs
Amount 50 lbs.
Customer Baerlocher USA C. E. Shepherd Novatech Plasics Co. Congoleum American Thermo Hemisphere
Eri Extrusion INEX S.A. DE C.V. Akzo Chemical Hawk Plastics
Customer Vista - Austin Chicago Magnet Wire Corp. Vista - Austin Donnelly Corporation Donnelly Corporation Accurate Extrusions Essex Group Inc. Vista - Austin
Customer Nibco, Inc.
VAB.0001189599
* wrnmm
TI
ABERDEEN CHEMICAL PLANT INJURIES
(Twelve Month Running Totals)
NUMBER OF INJURIES
7 PMNiffWi
VAB.0001189600
tw
ABERDEEN ENERGY CONSUMPTION
T" mm
PMHIH
VAB.0001189601