Document Yjeqk16QVLngjYN3epBrRMpkV
' IDLE PIPELINES-'
I. PURPOSE '"
The purpose of this bulletin is to define responsibilities and procedures
for the controlmaintenance .^nd removal of idle pipelines
*.. ~
v .. . **
It." SCOPE
- ..................
,
This bulletin covers the; control, maintenance^and removal of all ex-battery idle pipelines, both underground and in-the main pipe racks.- ..
All idled pipelines in dx-battery .limits will be.removed from the pipe racks
unless they are to.be retained for. specific, future uses and procedures set
forth in thisrbulletir> are foil owed'.I
-
^
Hi. RESPONSIBILITIES
..* A-
"
A. The Owning Department (Production, Utilities, etc.) is responsible for:
1. .'Decontaminating, isolating and placing the Tine that is being taken out of service in a safe and iron-hazardous/condition. This applies whether the line is to be removed or retained for future service.
2v Notifyingv'alT other departments using the line and coordinating the
^ . -'.shutdown; Isolation,-decontamination with their departments, to dnsure
'
. that no hazardous'situations occur.
; -.
.; ^
3. Notifying the Engirieeririg Department (Engineering Aide, Ext." 2738) of
the idled line and assisting .in.locating7blinds, valves,.etc.
, - -r 'i-.-'.A.r. :v<
>
..*'/ . \* ,
4. If a line-that has been idled :and decontaminated ts taken-over by a new owner* the new owner shall assume the responsibility and cost for any additional cleaning needed. In addition, the new owner will
notify the Engineering Department of the new. operating conditions " required for the line.
'Vr-"
V
... '
.
. ?.[
.j
B. The Engineering Department is responsible for:
- r .
1. Maintaining an'up-to-date record of all idle lines, including`draw
ings as necessary to define the limits thereof and inspection reports
. ' on line conditions.
'
. ..-
2. Requesting nbn--routineMhspections and tests when neEe'ssary :to deter
mine the suitability of a line for future service.
V: ' '
-` ` ' `
.
3. Determining which tines' are to be retained and which are to be removed.
Submit request to remove-lines to the Work Preparation Supervisor,
responsible for same.
v. . 4. Assigning idle lines to new services for all projects.
SC 004523
^"" ORlGIN^^SOrt;; 4/13/7D
REVISED: '3/24/82'
PAGE-JL OF-i.
LAA/I005734
PROC E DU RE --&UkL-T IN --texas c ity a^t -p 0409
IDLE PIPELINES
-
C. The Materials arid Mechanical Technology Section is responsible for:
1. Making routine biennial inspections of idle lines above ground - and yearly, inspections for .underground lines with reports and ' recommendations tio Engineering-and the.owning rdepartment.,
tL c,'
S' j'" }? r~ 0
' *.* i ; *
*
' .. r
, Z. Making specia.1 ^inspections and tests as requested by Engineering.
D. The Maintenance Department is responsible for: , v
,,
1. Performing.the work necessaryrfor.isolation, decontamination,
cleaningf^rtesting, -.acquiring permits, femovai, dtc. ,1 ?s.requested
by Produption or MMTS. or? Engineering.
' '' , 1
. :r ,
- . fv ' v V T
2. Maintaining idle-lanes in.a-seryiceable,.condition, ipcluding pro-
.. teqtiqn frpm(external and internal corrosion^
'v
. T'
'
'* . * '
k
JiT
.t/-'
*.'* .
i' , c
IV. PROCEDURE
.'
'V
.. . V - * V' '
t:* '.O ^ ' * ..
A. Decision-to. Remove--or. Retain
. ' ;>
;
--When a line is to be taken out of service, the owning department super
visor will consult with the. Engineering zone design supervisor concerning
t the future status of the line. -.If the decision is made to retain a line,
-> t; an "Authority to Retain Pipeline" sheet (Appendix A) must.be filled out
. and returned tp the Engineering Superintendent who will decide whether the 1 ine.^lsr to'be removed;or retained. , His .recommendation.must be ap-
* . - proved, by'the owning'.General- Superintendent. '
, "1..,
Factors to consider before requesting,a line to be retained
' 1. As a. general rule, any line 4!' ,and underhand, less, than 1000 feet
; .`
In length wi]l not be retained unless there.:1s a^known specific
* need forjt-.., - ^
V - "N:
''
' '
2. Condition of the line. If the line is insulated, it must be stripped of insulation, cleaned and painted. ^
....
. -
-
*: ,
3. Potential use for plant or CED project's. .
4. Need to remove to make room, for a line tif larger diameter, higher pressure rating or different material. '
5. Pipe rack structural loading.
6. -Cost of maintaining idle lines.
"
SC 004524
LAM005735
ORIGINAL ISSUE 4/13/70
REVISED: 3/24/82
PageJlof-L
PROCEDURE BULLETIN
wsaaBaBesa--gqca u 11 ssaBaasafcaaBtf ......."sa
IDLE PIPELINES
*
TEXAS CITY PLANT
-s .*i.. ."srryu.. "
*.v;.-r
P--0409
*w
If a line is to be removed, this may be done:
*J - .* i ' :< . w - - '
j\. V
`V
...
4. Immediately, or ,
,
2. '.Oefeb!Kj...to`cq'$f<fi,de; W1th`'6th6'r`''Worlc''tipiniinlrolze the cost of removal. Hdviever, this deferral will never be grea^er thah~s'ix months unless
.... approval is obtained from proper authorities (Appendix B). When `' removal i^ defdri^ed, the linerwi 1T OtMT be decontaminated immediately. . ti :. mu-.-i.vJv- * 'V
B. Lines to be Removed'0 T
..When a line,is. to be,,removed"'theiVtirk Pre^ara'tibn Supervisor responsible ' 'foiLsame? wifi process1 an Authority for"Ji'etiremerit. VThfc cost of removal
of such line will be charged against the project, requitihg the removal.
: t r'
c
' Removal 'niay be handled; by Texas "City Engineering orby Central Engineering,
if the work can bedone more eddnomicSTly in connection with a CED project.
If the latter course is selected. Engineering will coordinate the job with
CED.
Immediately after the lines are removed.Jthe,:Ehgiheerihg.Department Aide
(Ext. 2738) is to be notified so that..the:.::liner IdeiiHivi.Oat-i.bn ..signs can
be revised.
. W.
', .0.
tines to`be'Retained. ;'
1 i.
4f a line fs to bei retained';' it wll'T be reihtsioeef^d Wlthiirt' one yeaur of
'the date:it is ta^en out-of serviced--Vtf this inspecticih-shows that the
line is ho longer serviceable^ the^HgihaT'oVming deparimlnt will be
responsible for its removal
TL '.(ML
Engineering will publish annually'a list of idle, retained lines including
underground lfnest, along with an identifying plot.plan reference. The list. ancj'plot plan.'reference'will be updated for.each change of status.Status will include'date of Tast:'inSpect5iohV: 'Copies:off'this will be sent to:
Plant Manager ' - ^v.
Plant Engineer
'.
Superintendent of Plant Engineering Services
Materials'and Mechanical Technology Sbctlon -
Superintepdents of Manufacturing
CED Engineering Director _
:H
Property Accounting
Central Files
The- procedure for pipe rack signs is covered in Procedure Bulletin P-0403.
SC 004525
ORIGINAL ISSUE; T/13770"
R EVl'S'ETD T` 3/24/82
LAM005736 s -- ' PAIGE J- OF-i.
PROCEDURE BULLETIN --TEXAS CITY PLANT p-49
IDLE PIPELINES
The cost of maintaining corrosion protection.of idle lines will be charged to the idle equipment department (896.49) as repairs.
Requests for assignment of idle lines to new service should be sent to the Engineering Superintendent.
REVIEWED BY: Plant Manager's Safety Board
UPDATED BY:
e. hill--------------o
. s-
SC 004526
ORIGINAL ISSUE: 4/13/70
REVISED: 3/24/82 ~
LAM005737 PAGE .I^OFJL
PROCEDURE BULLETIN --texas city plant' p-0409
mm=s3=sgsa=c=sr=: ....... .. - -- --
1
,aass"
"=sassaaaaaaBaag
idle pipelines
..-
_________________
AUTHORITY TO RETAIN PIPELINE
A. Description
1. Owning Department 2. Type of Service ..3. Size,, in. 'di.-a.-~ - 4. Length, ft. 5. Location, in Ptipe Rack
B. Condition of Pipeline
1. Pipeline inspected and acceptable for further use. 2. Consents:
` . i~. ,.r- - ;t ,, ."
Approved: Engineering Superintendent
C. Status of Pipeline
General Superintendent
1. Pipeline has been decontaminated._______________
2. Pipeline is open at both ends._______________________________________________
3. Pipeline is stripped of insulation and coated.____________________________
Manufacturing Supervisor
Maintenance Zone Supervisor
Return to Engineering Superintendent when completed. SC
LAM005738 004527
ORIGINAL ISSUE-* 3/24/82
REVISED:
PAGE JL. OF_L_
Bailey, E. P. Barbier, R. A. Barfoot, D. A. Barger, C. W. Barnhill, D. Bobo, W. R. Bostick, G. W. Bradley, R. B.
Bretz, K. E. Butler, J. Caban, M. T. Christopher, S. J. Clemens, P. M. Coleman, R. D. Converse, J. G. DeNicola, D. K. Devore, M. T. Flowers, B. A. Forsthoffer, R. A. Fransham, R. M. Gatewood, J. M. Gore, K. W. Grannon, J. R. Hammond, R. L. Hanson, D. H. Harstad, D. Hennington, J. M. Hernandez, R. A. Higgins, N. G. Horan, J. E. Howard, D. A. Howe, W. G. Inskeep, L. L. Istre, R. D. Jackson, R. S Kaldenberg, G. L. Kam, B. R. (Cos, D. D. Roster, A. F. Kukuk, M. L. Lassiter, V. L. Lee, M. R. Lobo, M. J. Macrini, J. E.
SS-19 51F 19D 33D AB-1 0-2 0-15 0-6 56D 5 ID 0-5 AB-3 AB-1 51D AB-1 5 ID 51D 0-5 0-10 SMD SS-19 50D SMD 0-4 56D 19D 44D 50D 0-3 2Z 16D 0-6 0-8 53D 0-11 AB-i 3 3D 0-10 ED 5ID (2) 5 ID SS-26 5 ID CL-l
Mapes, 0. L.
Mapes,
A.
Martin, W. D.
Mata, C. A.
Mathison, A. R.
McKee, A. D.
McPhail, J. D.
Mears, R. E.
Nielsen, K. J.
O'Donnell, W. V.
Olson, G. R.
Orum, G. A.
Paganucci, D.
Papillion, P. H.
Ramos, I.
Reagan, J. R.
Richards, J. D.
Richardson, D. R.
Robinson, H. W.
Salles, L. K.
Sanders, B. J.
Saunders, P. K.
Silvertooth, W.
Smart, B. R.
Stal, J. A.
Strickland, T. W.
Sweeney, M. J.
Trafton, J. G.
Tromblee, G. L.
Walzel, P.
Whelton, R. C.
Wilhelm, S. W.
Willis, R. C.
Witt, M. D.
Wogoman, K. S.
Yieh, D. T.
o-;
0-3 2R-8 SS-19 ED 0-7 0-10 ED 53D (2) ED SMD 0-5 AB-1 2PD ED ED PER 2PD 0-0 0-15 0-2 0-4 2Z 0-1 0-6 4Z 5 ID 56D 0-4 2PD AB-1 0-19 SMD
AB-1 R2 3 3D
HCN Control Room LA Control Room SM Control Room Syn Gas Control Room HOAc Control Room Night Supt/Guards
19D 3 3D SMD (2) 44D 50D MG (2)
Houston Office
Mary Rimroth J. R. Messinger
If there is an addition or change in the above distribution please call Maxie Dillon at ext. 3502.
9/24/87 P BULLETIN DISTRIBUTION
SC 004528
lam006''39
LAM005733
o
c
004521
Monsanto
lamo5732
fr~'
'-v-* fc
to o X M
I I *1 o t-1 D W
LAM005731