Document YjV2w2wqbmx9ozbGBo54VY6ny
PLAINTIFF'S EXHIBIT
^SAiMSTEARNIDCAARND G-2 GAS
MANUAL
SUPPLEMENT FOR STEAM BOILERS FLUSH OR DELUXE JACKETS
CERTIFIED BY AMERICAN GAS ASSOCIATION
NOTICE TO INSTALLER AND OPERATOR THIS BOOKLET MUST BE AFFIXED ON OR ADJACENT TO THE HEATING EQUIPMENT
BP-8048-G2-Sup. Rev. 6/69 04987
G-2 GAS BOILER 2 FLOW.
1
or A B C 0boiler
Na OF
Na
number SECTIONS BURNERS
G-23D 3
2 13 '* 6*. 4 "4ft
G-24D 4 - 5 ,6S A >5 "'9'*
G-250 5
4 19 H
3 I9lft
G-26D 6
5 22% nth 6 19
G-27D G-280
7
e
6 26 It I3fc 6 19 7 295| '* 7 194ft
G-290 9
B 32 3ft '6 9fe 7 I9\
G-2IOD 10
9 35^ 17^ 6 I9lft
G-2IID 1 1
10 39 '9 * 8 191ft
NOTE-:EXTERNAL DRAFTHOOD IS ONLY PROVIDED FOR G-23-D BOILER
SIDE VIEW
FRONT VIEW BOILER WITH DELUXE
2' FLOW-
IP1* T
f,
I^B1
"t1
16
BOILER
N OF
Na OF
NUMBER SECTIONS BURNERS
A
BC
0E
G-23F 3
2 11 31ft 4 II 3
G-24F 4
3 i4 ia 7W 3 14 7
G-23F 5
4 17 t* H 3 14 7
G-26F 6
3 204* ioH 6 161ft 9
G-27F 7
6 24 12 6 161ft 9
G-2BF B
7 27lft uH 7 201* 12
G-29F 9
B 301ft ISlft T 20'a 12
G-2I0F 10
9 ssV 164ft 8 25H 16
G-2IIF 1 1
10 37 IBlft 8 2SV4 16
SIDE VIEW
FRONT VIEW
FIG. 2 - STEAM BOILER WITH FLUSH JACKET
04988
G-2 GAS BOILER
2
CONTROL APPLICATION
LOCATION SIZC OF ON BOILER TAPRIMO
CONTROL*
A 5' BLOW-OFF
K8 PRESSURE GAGE VC SAFETY VALVE
SECTION ASSEMBLY SHOWING TAPPINGS FOR STEAM BOILER
FIG. 3 - LOCATIONS OF TAPPINGS FOR BOILER CONTROLS
21
FIG. 4
BOILER WITH WATER COLUMN TRIM AND CONTROLS
1. JUNCTION BOX 2. SAFETY VALVE 3. STEAM LIMIT CONTROL
4. SYPHON FITTING 5. LOW WATER CUTOFF 6. WATER GAUGE
04989
G-2 GAS EOILER
2A
REDUCING TEE WITH PLUG""\
EQUALIZER
r
CONNECTION FOR HARTFORD RETURN
RISER - MIN. HEIGHT 18'
BOILER NUMBER
G-23 G-24 G-25 G-26 G-27 0-28 G-29 G-210 0-211
RISER UN.)
3 3 3 3 3 3 3 3 3
RETURN (IN.)
2 2 2 2 2 2 2 2 2
EQUALIZER (IN.)
1-1/2 1-1/2 1-1/2 1-1/2 1-1/2 2 2 2 2
FIG. 5 STEAM NEAR BOILER PIPING
04990
G-2 WS BOILER
P iH
il
px
>a
P
0
01 J3
nP
P
PhV
TJ
P
23 H
<D fl
2*3 gp
pm
bfi p
a
p
u
hP
P
*
CO
sc
04991
G-2 GAS BOILER
4
REFER TO WATER BOILER INSTALLATION MANUAL PACKED IN PLATEWORK AND CONTROL BOX FOR DETAILS NOT INCLUDED IN THIS SUPPLEMENT.
INSTALLATION OF JACKET - Proceed as directed in the Installation Manual for water boilers, with the following exceptions:
FLUSH TYPE JACKET - Select L.H. Side Panel (has 7-5/8" diameter knockout) and remove this knockout for all steam boiletrs also two knockouts for water gauge connections.
DELUXE TYPE JACKET -.Select L.H..Side.Panel (has 4".diameter knockout within a 7-5/8" diameter knockout) and remove the 4" knockout for all steam boilers. Remove two knockouts for water gauge connections. Assemble steam gauge to right end section with pipe nipple and coupling provided before assembling the jacket.
INSTALLATION OF WATER COLUMN TRIM AND CONTROLS: - (REFER TO FIGURE 4) -
1. After assembly of the jacket install a 1/2" x 4-1/2" brass pipe nipple in the lower 1/2" water gauge tapping.
2. Install the low water cutoff on this nipple before connecting any piping to the return tapping.
3. Install a 1/2" x 4-1/2" brass nipple together with the tee connecting fitting from the low water cutoff in the upper 1/2" water gauge tapping.
4. Install the brass tube and connectors as illustrated in the instruction sheet provided with the low water cutoff.
5. Install the water gauge fittings and gauge glass.
6. Install the syphon fitting in* the 1/4'.' pipe tapping on top of the low water cutoff and assemble the steam limit control to the syphon.
7. Install the safety valve in the 3/4" tapping on top of the boiler using the nipple and coupling provided also install the drain cock in the 3/4" tapping at the left side of the boiler.
8. Mount the junction box on the jacket side panel with the sheet metal screws provided. Connect wiring to accord with applicable installation shown on the wiring diagram for steam boilers.
Figure 5 shows a typical method of connecting the supply and return piping to the steam boiler. Return connections should be made through a Hartford loop. ALL SUPPLY AND RETURN PIPING SHOWN IS NOT SUPPLIED BY A.R. and S.S. CORP.
FILLING SYSTEM
CAUTION: - Never start boiler unless it is properly filled with approximately 4-3/4" of water visible in the gauge glass. After boiler is in operation, make-up water should be added slowly.
04992
0-2 GAS BOILER
5
CHECK-UP OF LOW WATER CUTOFF
1. Light pilot in accordance with applicable instructions shown in the installation manual for water boilers. Turn thermostat to highest temperature. Automatic gas valve should open
2. Open blow-off valve on bottom of cutoff and drain water until the water level in the boiler drops to approximately 1/4" visible in the gauge glass. Automatic gas valve should close.
3. Refill until water level is approximately 4-3/4't: visible in gauge glass. Automatic gas valve should open.
MAINTENANCE OF BOILER WHILE IN OPERATION 1. Check level regularly and add water slowly when needed.
2. This boiler is fired automatically.
3. Test safety valve at beginning of season and once a month, thereafter:a. Fasten cord or wire to valve lever. b. When pressure is up, stand safe distance away and pull cord.
CLEANING BOILERS - The grease used to lubricate the cutting tools during erection of new piping systems serves as a carrier for dirt, with the result that a scum of fine particles and grease accumulates on the surface of the water in all new boilers, while heavier particles may settle to the bottom of the boiler and form sludge. These impurities tend to cause foaming, preventing the generation of steam and causing an unsteady water line.
This unavoidable accumulation of oil and grease should be removed by
blowing-off the boiler as follows: If net already provided, install a surface
,blow connection of at least 1-1/4" nominal
pipe size with outlet extended to within
18 inches of the floor or to sewer,
, inserting a valve in line close to boiler.
Bring the water line to center of outlet,
raise steam pressure, and while burners
are operating, open valve in blow-off
line. When pressure recedes, close valve
and repeat process adding water at inter
vals to maintain proper level, As a final
operation bring the pressure in the boiler
to r.'oout 10 lbs. close blow-off and manual
shutoff valves, then open drain valve.
Af-.;er boiler has cooled, partly fill and
flush out several times before filling it
to proper water level for normal service.
The use of soda or any alkali, vinegar or
any acid is not recommended for cleaning
heating boilers because of the difficulty
`~
of complete removal and the possibility of
subsequent injury after the cleaning process has been completed. Illus
tration shows piping arrangement for blowing-off steam boilers.
CAUTION - After blow-off operation, a checkup should be made of the low water cutoff as directed above.
04993
:' '
DEALER'S NAME]_______ ADDRESS._____________ TELEPHONE NO.._____ DATE OF RETALIATION.
AMERICAN STANDARD
PLUMBING & HEATING DIVISION
40 WEST 40TH STREET NEW YORK. N Y I00W
04994