Document YjLvr2Gd28OLxvz8R3e7nMj20

CEA 1430 & 1800 Date: August 28, 1967 TABLE OF CONTENTS 1.1 Title 1.2 Summa ry 1.3 Process Technology 1.31 1.32 1.33 1.34 1.35 Process Description Raw Materials Products and By-Products Waste Streams Personnel, Propertyand Public Hazard 1.4 Manufacturing Facilities 1.41 1.42 1.43 1.44 1.45 1.46 Description Design Capacity Flexibility Requirements Future Expansion Physical Appearance Storage and Shipping Requirements 1.5 Utilities and Services 1.51 Utility and Service Requirements 1.52 Utility and Service Facilities Page Ho. 1 1 2 2 3 5 7 8 9 9 13 16 17 18 19 20 20 20 APPENDICES A. Equipment Flow Sheet B. Suggested Equipment Layout C. Equipment List D. Scope of Work, Anniston Storage Tank Farm E. Scope of Work, Anniston Drumming and Flaking F. Scope of Work, WGK, New 40M Pound Plant G. Scope of Work, WGK, Storage Tank Farm H. Preliminary Schedule I. Project Loss Prevention Report (9 pages) (2 pages) (13 pages) (9 pages) (6 pages) (11 pages) (7 pages) (2 pages) (5 pages) 0345999 TOWOLDMONOQ44311