-2-.
.2 DRAWINGS AND DOCUMENTS
2.1 ASARCO Drawing E-23685 shows the conduit routing and is hereby made part hereof.
2.2 Manufacturer's drawings of equipment, where applicable, will be mad available to the Contractor as an aid to construction.
3. APPLICABLE PUBLICATIONS AND CODES
The publications and codes listed or referred to herein or indicated on drawings are by such listing, reference or indication made a part hereof. The latest edition of the publication or code to the date of this specifics tion shall apply.
AMERICAN NATIONAL STAN :\D3 INSTTTU
( A-'.131)
NATIONAL ELECTS! CAL iH'-A/iCt T. t o
cciaticn (k:-:ma)
INSTITUTE OP ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)
INSULATED POWER CABLE ENGINEERS ASSOCIATION (IPCEA)
UNDERWRITERS LABORATORIED, INC. (Uh)
NATIONAL ELECTRICAL COTE (NEC - NITA NO. 70)
NATION'A-L ELECTRICAL GAIETY COLE (N'ESC)
NATIONAL ELECTRIC COLL (NEC)
U STAN DA ED SPEC! ?T CATION'S
Tne standard spccificaticns listed below and referred to herein are by such reference mace o part hereof as far as the provisions thereof are applicable to the work covered by this specification. Where any conflict occurs betwe the standard spccificaticns and this specification, this specification, si.all govern.
Specification CE-1-C0N'D, 2/23/72, Electrical Conduit, Steel, Rigid, Sine-Coated
Specification CE-l-EWI ,2/16/72, Electrical V.'ork - Industrial
Specification CE-l-UDC, 2/18/72, Concrete Encasement of Under ground Duct or Conduit
5. CONTRACTOR-FURN IS:: ED 'I'-'mi't-'i
MATERIALS
Tne contractor shall furnish all materials and equipment, except the equip ment and materiel furnished by the Owner, required for complete and operatin electrical systems as indicated on the drawings and specified herein. All contractor-furnished material cnc equipment shall be new, shall be of high quality, arid shall be Relive: ed to the jobsite in the manufacturer's ori ginal container. Substitution of equipment and materials that are indicated on the urawings shall be permitted only where the words "or equal"
ASARCO ELP 0007520
MATT-RIAL REQUIREMENTS
All material and equipment specified for installation under this specific shall be suitable for use in the most severe ambient conditions that will exist at the particular location. In wet areas1, NEMA 4 enclosures or herly sealed devices shall be used. These requirements apply unless modify herein or are indicated othorw:se on the drawings.
6.1 COMDUTT - All conduit shall be UL approved for the use intended. Al. conduit shall be rigid galvanized steel unless otherwise specified o; the drawings. Minimum conduit size shall be 3/4-inch above ground rr, 1" below ground.
6.1.1
Metallic conduit shall be rigid galvanized steel. Electrical metallic ti'uing will not be used.
6.1.2
Kon-motallic conduit shall be used only where indicated on the drawings and shall be Johns-Manville transite Korduct, or caua All end bells, couplings, spacers and other fittings shall be by the same manufacturer as the conduit itself.
6.1.3 Flexible conduit shall be American Brass "Sealtite", or equal.
6.2.1
Cast iron alloy conduit fittincs with threaded conduit shall be used unless, otherwise indicated on the drawings. Fittings shall be Crouse-Hinds "Condulets", Appleton "Unilcts", or approved equal. All fittings for flexible conduit shall be Appleton . Type "ST" to insure continuity of conduit system ground. All fittings installed in damp locations shall be of an approved type.
6.2.2
Device Bone*-- - All flush mounted device boxes shall be code gage pressed steel, galvanized. All surface mounted device boxes shall be cast iron alloy "ES" type with threaded hubs and gasketed cover All device boxes shall be surface mounted unless otherwise noted on the drawings.
6.2.3.
Pull Boxes ar.d Junction Boxer. - All pull boxes or junction boxes shall be made from sheet steel and shall have gasketed covers. Conduits shall be attached to the boxes with removable threaded conduit hubs, Appleton I'nit-Seal "Hl'3" series, or equal, when boxes are installed outdoors or in wet areas.
6.3 WIRE Aim CARLE
6.3.1 Cenernl
a. All lighting, power, control and signal conductors shall be stranded copper unless otherwise indicated.
ASARCO
-4-
b. No conductor smaller than No, 12 AWG shall be used lighting and power and none smaller than Ko. 14 fo; trol, cy.ccpt communication cable and instrumentatic when drawings specifically show an exception.
6.3.2 5 KV CABLES
a. Coble for installation in conduit shall be single c< shielded, ungrounded neutral, General Electric Cotnpr SI-58064, or equal.
6.3.3 600 VOLT CABLE a. Single conductor cable for installation in conduit si General Electric Company No. SI-58053, or equal. Cal bear the XHUV label.
6.3.4 Ground Uire - all ground wire shall be bare stranded, hard drawn medium hard drawn copper. Size as shown on drawings.
6.3.5 WIRE MARKINGS a. All wire shall be marked with wire numbers at termir.nt by the use of adhesive markers.
b. All power feeders shall be marked at termination point' with the folio-wing colors by means of precolored cloth hesivc tape:
Phase A - black Phase B - red Phase C - blue
Neutral D. C. Positive D. C. Negative
white red black
6.4 Ground Connectors - All underground connections to the ground grid system shall be made using exothermic-welded joints. All exposed connections shall be made as follows:
6.4.1
Connections to Ground Rods - All connections to ground rods shall be node with Burndy Type GAR, GD or CK connectors as re quirc-d, or equal. All connections to building columns shall 1 made with Burndy Type QQA connectors, or equal.
6.4.2
Connections to Motors - All connections to motors shall be nac with Burndy Type KC. connectors, or equal, except when motors a grounded through the conduit system.
6.4.3 Connections to Control Panels - All connections to control pan: caoinots and similar equipment shall be trade with Burndy CIKLUC or equal. All connections to conduit stub-ups shall be r.-.ndu wi grounding bushings. Bushings shall be connected together by means of bonding jumpers.
7 INSTALLATION rlomtr;::;;.::rs
7.1 GENERAL The. contractor shall install all work as shown on the drawings
0007522 ASAR ELP
-J-
and specified herein or in other parts of this spccificat: All work shall be performed by craftsmen experienced or ti in the installation of the materials and equipment specifi herein. The installation of all equipment and material sh meet or exceed the requirements of the National Electrical National Safety Code, and any enforcing authority at the 1. of the installation.
7.2.1
Conduit Expansion Fittings - Conduit expansion fittings sha be installed in each conduit supported by a building or olh structure where the conduit run crosses a building or struc foundation expansion section. *'This fitting may be omitted : 3/4-inch and 1-inc'n conduit if the conduit makes a 90 degree bend at the expansion joint and the point of attachment of t conduit to the structure on either side of the bend is 3-fee or more from the bend.
7.2.2
Conduit Sleeves - Conduit sleeves or blockout shall be provic for all penetrations. All penetrations through the walls ahe ceilings of electrical control rooms and equipment rooms shal be sealed dust tight. All penetrations in exterior or under ground walls and hanholes shall be watertight.
7.2.3
Underground ducts - Underground ducts shall he installed accordance with American Smelting and Refining Company Specification CE-l-UDC unless otherwise indicated on the drawings.
in
7.2.4
Instrumentation, in ter corn-uni cat ionr and other low level si<-ral circuits shall not be installed in the same conduit or duct, ou let box, junction box or pull box with power or lighting circuit
7.2.5
Conduit shall bo attached to control panels having NEMA 12 enclosures and to boxes in outdoor or wet locations with re movable threaded conduit, hubs, Appleton "tlUB" series, or equal.
7.2.6 Conduit stuh-Uns not attached to the equipment shall be grounded.
7.3 UTUTNC SYSTCM
7.3.1 7.3.2
Stress Relief Cones - Shall be provided on all 5 KV cables.
Splices or Tans - No splices or taps shall be permitted in either feeders or branch circuits except at outlets or accessible junction boxes.
7.4 GROUNDING SYSTEM
7.4.1
All exposed non-current carrying metal parts of electrical equipment, raceways, building structural steel and neutral con ductor of the wiring system shall be grounded. The grounding, of all equipment requiring, a ground connection by the National Electrical Code, hut not specifically shown on the drawings, shall be included ns part of the work and shall be installed by the contractor.
0007523
/vSABc0 elp
FIELD VERIFICATION' OF WORK
The drawings which constitute a part of this specification indicate general arrangement of circuits, location of control boards and panels, equipment, conduit, cable and other work. Data presented on these drawings are as accurate as surveys and planning can determine, but accuracy is not guaranteed and field verification of all dimensions is hereby directed. Where dimensions are not given, they shall be developed by the contractor and coordinated with :he equipment and other trades. Specifications and drawings are for assistance
nd guidance, but exact locations, distances and levels shall be governed y actual field conditions. The contractor shall also review architecturtil, Lvil, structural, piping, ventilating plans and shall adjust his work to
nform to all conditions shown thereon. Discrepancies shown on different ans, or between plans and specifications and any installation that alates the requirements of any codes, shall be promptly brought to the
ention of the Engineer for a decision.
'TIN'G
switchboards, panel boards and similar equipment furnished with enameled acquired by the manufacturer which arc scratched cr defaced by the Con
or during construction shall be refinishc-d and restored to the original h by the contractor at his cost.
'G
10.1 ,
The Engineer will conduct free iito tire such tests as nay be required to any part of the syste*. cr equipment to determine if it is installed in accordance vitr t:,e specifications. The contractor shall furnish all labor, materials, instruments, tools and make all necessary connections fc-r testing. All tests shall be witnessed by the Cvr.cr or his be r ignated representative and three copies of the verified test results shall be given to the Owner promptly upon completion of a test,
2 The contractor shall provide assistance to the various electrical manufacturers' field engineers as required in the testing and adjusting of the electrical power ar.d control equipment. Co operation of the contractor must be such that a minimum of time is required for testing.
Final inspection and test shall be rade in the presence of the Ownc- or his representatives. The tc-t shall be made with full operating voltage under conditions simulating as nearly as practicable those which will he obtain''.! in subsequent op eration and shall exhibit that the requirements of the specifi cations and the drawings have been fulfilled.
'w York Office
.nelting and Refining Department
December 8, 1975
Mr. W. R. Kelly El Paso Plant
Job 1^4-
Re your letter of December 5th to me, permission is granted to charge an estimated $6000 to operating expenses which covers the moving of the conduit above ground to a tunnel that runs under the railroad tracks.
cc: RRichter LCTravis
0007525
ASARc ELP
as Arranged Quotations, Specificationst Drawing, contract And Insurance Forms Attached
This requisition le To record Agreement Entered into aith Callaghan risetrie Co*, Inc. For Installation of Pasp liouee Feeders
>
December 3, 19?5
Electric' Power
Job 15A - Pump house feeders IJ4
EUP 0007526