Document Yj6kDYBD18XeyJMRx8yQREjVy
March 6, 1981
Mr. Paul LeCour. Product Eng. Rayloc P. 0. Box 431.4)6 Atlanta, GA '30,3$S' >i-.::
Dear Paul:
This is to confirm our phone conversation of 3/5/81 concerning lining thicknesses of our "new dimension" program, specifically in the'.area of foreign car applications, which generai 1 ly-are equipped with non servo brakes.
We have all experienced in the recent past, through feed-back from our Jobbers, that some of the shoe sets are oversized to the point that it is virtually Impossible to get them in the drums. We agreed that we are not really interested in the decisions that brought about this condition, nor who made them, but that it is a "now" problem and should be dealt with ASAP. With this thought in mind, we will submit the following recommendations to our respective Companies.
1. All shoe sets in the above category should be considered instead of waiting for complaints on a number by number basis. At present, this involves 1.17 sets.
2. The Rebuilders will run a test to determine how cam be. removed from a shoe 2-1/4"
widej;^ji|"sone pass". This is the widest set in the i7vfsets, with the exception of two numbers ,'Vwhich are 2-1/2" wide. The vast majority are two inches and under In width. 3. When the results of the above tests are known, (hopefully removal of .030" will not present a problem), American jlfakeblok should furnish the Rebuilders wi tjh;,aW pnf i n 1 shed lining .030" thicker than standard f.M.S.I. thickness for a given part. This should enable the Rebuilders to grind to standard thickness with "one pass" and also retain their flexibility of producing an over-size set.
IV
t.
Continued . . .
Napa 009
NOVO10739 SCF-NAPA-1638