TAl.Lt II Ainionr. asJitSTOS f lj'r R r.tiisilNf. A'O sA'iiti r: r, pf mnrsTi R RQSIN-P-`Sill SV5TI''!S C<v;i',V;:ij!,r$ ASW.5T0S
Sarnie Desdonation
Ccwercial Application
1. THEK>?SrT JESJJIJ'.olvesterl
1929-S2-3
Fabrication of reinforced fiberglass pipe.
1929-82-4
1929-S2-5
1-13
*
1-6
1-26 G-6 1-39
1-15
H-12 1929-84-4 1929-84-5
N-20 H-25
Fabrication of FRP tanks and pipe.
11
"
ll
Production of artificial bricks.
Production of fiber glass boats.
it
Date
Ashes tes.___ Approx.
Wt.
2/27/73 II
8/13/74
RG-144 2-3
2-3
W 2-3
RG-244 1.4
1.4
8/13/74
H
RG-244
11
II
1.5 1.5 1.5
l> 3/8/73
"
No Asbestos
0
"0
RG-244 2.0
" 2.0
11/26/74
II
RG-244 0.5 " 0.5
Operation %
Sample Time
il'iJLi
Operator pulls pipe along line. Saws Off end with circular saw.
Same operation as 1929-82-3.
Operator removing end of pipe with scarfing machine.
Operator shaping end of pipe with bell & spigot machine.
Operator cutting off pipe end and light grinding on exterior surface.
Operator grinding inside of 13' 1.0. x 26' tank.
Continuation pf same opera tion as I-?6.
Operator grinding edges of miscellaneous small parts.
Ooeratcr sanding inside of 26" I.D. x 15 pipe.
Continuation of same opera tions as 1-15.
Operator cutting with sabre saw.
Operator trimming with sabre saw.
Operator grinding inside of boat hul1 -
Operator grinding.
19 49 45 16 17
16 5
25 4
4 44 39 11
4
Possible Airborne Aslv:,: Fiber Coiccntr.v __fS1 cjrs_/cc_ 'b.
0.1
0.1 C.04
0.3
0.2
0.4 0.3 0.3
4,3
2.6 0.1 0.2
0.0 0.0
UCC 000152
A25072