Document YYxm4Vr8aDMBYGVb1gwpOLe0
ijSsSssfags
wSssfB^s . hv*C."m3`s^xsc y- :#?$* -'.-.s v--'-s,y' ;5 '-- ' iSSh'PART.^^.^WaSAIi'-COSDCTroMShi." ".y'
asreapfsfiffsiis-js i. v; : . .-
. Vjp;^^-gf fsjfis|&
,01 - Thb;pe^^oil^fJ herein ccaaUlpleledd the owner, conntteemmppXlaattesA"ttnhe
-Jr - yy
eo&stractlon"of an offshore oil-loading wharf witk'tapproacWe&igeway-, -
and" appurtenant works, for the transporting 'and handling of`petroleum' .
products, as part of its^PSgeS^^Sfid^SSk^'"'"'pg.'^t^biCkjrpsratixwssteri
-^c^^ntfl.-re-.^ferred-^D~asj>Qontr$GtBm. These specifications set forth
the terms, conditions, standards, methods, and detail requirements by
which this wharf and appurtenant facilities will be constructed.under
-a^ubcontract-agreement. '
,_ ,
<
1,02
The word="bidder", as used herein, shall designate the party or parties
who, at the request of contractor, may submit a proposal for the work
herein specified.'
. '' 'y ,i;
1.03
The word'subcontractor, as used herein, shall designate the party-or
-parties whose proposal has been accepted, and who have executed the.
subcontract agreement described in Section 8*0 hereof.
2.0 GENERAL DESCRIPTION AND SCOPE 03? WORK
2.01 The wharf is located approximately 5,600 feet offshore In Fidalgo Bay,
about l-l/2 miles southeast of the town of Anacortes, Washington.
-
2.02 out
A
The proposed installation consists essentially of berthing facilities.'
for -two tankers, together with barge'loading' facilities, mooring L'v.
platforms, breasting dolphins, .and' interconnecting catwalks and road?"'
way,-served by-a timber approach causeway, approximately--5,600 feet .. -long. -The-^causeway consists of a pipeway, adjacent roadway, and. appppat {1,
and other appurtenant works as .more specifically described" in these ' '
specifications and as shown in the drawings. Also--included In seope'.of
work, are approximately, 2500. feet-,,of..pipe. support trestle.
`
2.03
The work to be performed includes furnisMng of materials, labor, plant
equipment and all other incidentals required to complete-the construc
tion, as set forth in Parts XI and III of this specification.
. '.
-.*#?
3.0 REPRESENTATIVE OF THE CONTRACTOR
3.01 .
The 'contractor*-s representative on the job will be the general superintendent. He will have engineers and-inspectors who will follow the work closely, and who will report to him regarding the quality and acceptability of the work and materials of the subcontractor;
el
SECHTEI. CORPORATION
JfiVlEl
General .Revision Reissued for Approval and Quotation
Issued for . Approval and Quotations
- THE TEXAS COMPANY
' - ' . PUGET SOUND WORKS
'
OIL LOADING WHARF AND APPROACH CAUSEWAY'
JOB. MO. 2525 SPECIFICATION
22M-2
REV. M
SHEEt-
6f _2L:.
WA-TEX 000265
"V ... \
r im
. .' *
'
t - - -. v -- -.t-'
- WAi:h',T;V*" * 't&nJilii
' '/ r.-. " ' -
3yjp%-. i IfiS 'igeabrat feuperlnteh^'&t' `Bbalrde'id& SipOTi ther ii^aiiing?and', inter3
becessatfy t& their Igtfoper fulfillment. it shall he the ^.contraet82!2s responsibility to thoroughly familiarize, all of his supervisory personnel with the contents of these specifications.
h.O QUALITY OF WORK
h,01
The general superintendent shall he the final Judge of the quality of
the work,.and whether or not it meets the standards set forth in the
specifications and fulfills the contract requirements.
'.
4.02
The contractor reserves the right to prohibit the use of any men* tools, supplies, materials or pieces of equipment which in his opinion will not produce work-meeting these specifications; and the 'subcontractor shall be entitled to no extra compensation because of any such Prohibitions or changes resulting therefrom.
5.0 SHELTER AMD SANITARY FACILITIES. TRANSPORTATION
5.01 The contractor will not provide shelter, food, medical attention, or transportation for the employees of the subcontractor. Contractor will supply sanitary facilities and potable water at existing locations
' Pipeline extensions from existing outlets shall be provided by the subcontractor, if required, at his own expense. The contractor will designate storage and dump areas for the subcontractor's use.
5.02
The subcontractor shall provide shelter for all permanent materials
which, in the opinion of the general superintendent, require protection
from the weather.
'
6.0 SITE INVESTIGATION AMD REPRESENTATIONS
-
,
6.01 The bidder acknowledges that he has satisfied himself as to the nature
and location of work, the general and local conditions, particularly,
those bearing upon transportation, disposal, handling and storage' of
- materials, availability of labor, water, power, and uncertainties of
. weather, physical conditions of the site, the conformation and cbndi-
tions of the ground, the character of equipment and facilities needed
preliminary to and during the prosecution of the woak, the subcontract
agreement, and all other matters which can in any way affect the work
or the cost thereof under this contract.
7* FOUNDATION CONDITIONS
A
7-01 The logs of borings made at the wharf site, and the Dames and Moore
soil reports are on file at the contractor's field office where they
.
may be examined by any prospective bidders. Bottom contours shown on Drawing 22 AM-56 anc- 57 are in accordance with a hydrographic survey
. made by the Coast and Geodetic Survey in 195*!-. Contractor furnishes
. the above data for information only, and for what it may he worth.
se* niMbr
1% >- awMPtaaTiiwi wa. y--5g5-g2M^g
mat.
tJAfJVUtJLT.q'-1'
rJL
WA-TEX 000266
<
i^
7.02 Bidders shall draw their'own conclusions from these'data as"to-driving '
f
and other foundation conditionsj' atia. 'the subcontractor shall essume"
'
| full responsibility for his interpretation'thereof and the completion of the work, as specified herein, without' compensation other than" "
stated in the accepted proposal, regardless of subaqueous.'.conditions
or difficulties actually encountered- in the work.
'
8.0 CONTRACT DOCUMENTS
8.01 The contract documents consist ofs
(a) These specifications and subsequent addenda thereto, and- the.
drawings describing the work, and which are hereby made',, a"-part
of these specifications.
* . . `
(b) Those accepted portions of the proposal of the firm or corpora tion to whom the subcontract is awarded.
(c) The Bechtel Corporation subcontract agreement, copy of which' is
furnished with the invitation to bidders.
. *\
l
9.0 DRAWINGS
A
9.01
The drawings appended to -these specifications define the'nature and
:
scope of the work to a subcontractor experienced in wharf construction, i
to the extent that a firm bid price for the complete construction may
be submitted.
'
9.02 More detailed construction drawings, if required, shall be prepared by
l subcontractor and submitted for contractor's approval prior to the
start of construction.
..
9o03 It shall be understood that proposals submitted by bidders shall be `
based on a complete, finished job as hereinafter described in the " I detailed scope of workj andthe subcontractor shall be entitled to no
extra compensation because of his failure to include in his proposal the price of any items not specifically or fully detailed on the ' drawings.
9.04 . Drawings forming a part of these specifications and defining the nature and scope of the work are as follows s
4
WHIM t
SPCMFIOATiOH NO, 2525-22M-2
.REM____21
mm' w
WA-TEX 000267
\
22-AM-l 2
3 4
5 6
7
8
9 10 11 12
13 lit
15 16
17
18
* 19
20 21 22 24** 25 26
**27 **28
29 30
31 32
33 34
35 36
37 38 **39 ..48
' 53 ' 54
55 56
57
2 2
3 2 2 4
3
2
2 2 a 2 2 2
2 2 2 3
2 2 2 2 0 2 0 0 2 2 2 1
1 1
2 0
0 0 0 2
0 0
0 0
0
Pipe Trestle Han.
Pipe Trestle = Sections
Pipe Trestle ~ Piling Plan
Pipe Trestle ** Bent Betails
Pipe Trestle - Miscellaneous Details
Wharf and Causeway =* Plan and List of Drawings
Causeway Piling Plan
Wharf Piling Plan
.
Causeway, Typical Sections
Plan, End Dock
Causeway, Turnout
.
Causeway, Pipe Loop
Causeway, Small. Boat Passage
--
Wharf and Causeway Junction, Sheet 1
Wharf and Causeway. Junction, Sheet 2
Causeway Bents, Sheet 1
'
Causeway Bents, Sheet 2
Causeway Bents, Sheet 3
Small Boat landing
Typical Wharf Roadway and Details
Slips Stores Platform Plan of Berth i. Sheet 1
Plan of Berth 2, Sheet 1
Plan of Berth 2, Sheet 2 .
Plan of Berth 3, Sheet 1 Plan of Berth 3, Sheet 2
Miscellaneous Concrete Details, Berth 2
Catwalk Details, Sheet 1
Catwalk Details, Sheet 2
Wharf Bents, Sheet 1
Wharf Bents, Sheet 2
Wharf Bents, Sheet 3
Wharf Bents, Sheet 4
Mooring Platforms, Sheet 1
Ifooring Platforms, Sheet 2
Electric Substation
Miscellaneous Electrical Supports
Valve Platforms, Sheet 1
Typical Wharf Roadway
Plan, TestBorings, Sheet 1
Plan, TestBorings, Sheet 2
Plan, TestBorings, Sheet 3
Contour Map, Sheet 1
Contour Map, Sheet 2
* Wot issued with Revision 2 of this specification. Hot a part of wharf subcontract. Issued for information only.
i__________________________________________________________________________________________________________
SPECIFICATION HO. 2525~22M-2
REV- 2 ...
SHEET 4 , OF 2%
WA-TEX 000268
'
10.0 SURVEYS-;
T
imsteimmSi ;;^?33JSSi -, --'S'
' : ' 10.01' (The fifcbcohtractor shall furnistuall necessaiy survey crews, lines-'
.
arid." grades for the proper execution of the work, except that-
. necessary, base lines. Points, and bench marks on.shore or existing'
' facilities will he furnished and maintained by the.-contractor.
10.02
' .. - "
The -subcontractor shall be responsible for final completion, of the work to the lines and slopes called for on the drawings. Owner's and contractor's representatives shall at all times have access to the work. Subcontractor shall provide proper facilities for access and-for inspection.
U.O v COMPLIANCE WITH LAWS AMD REGULATIONS
11.01
During the performance of this work, the subcontractor shall fully
comply with all applicable federal and state laws and with.any and all applicable by-laws, rules, regulation, and orders, especially
those pertaining to navigable waterways in the area, made or
.
promulgated by any government, government agency or department, municipality, board, commission or other regulatory body, and shall `
give all stipulations and certificates of compliance therewith as may he required of such applicable laws, by-laws, rules, regulations
or orders. Special attention shall be paid to compliance with rules and regulations covering warning lights, obstructions to navigation,
floating debris, contamination of bay waters, etc.
`
11.02 .
The subcontractor assumes full responsibility for the payment of all contributions and payroll taxes, whether federal, state, municipal
or otherwise as to its employees, servants or agents, engaged in the performance of the work specified in this contract.
11.03
The subcontractor agrees to save ana hold the contractor and/or the. .
owner harmless from any and all penalties, actions, causes of action,
damages, claims ana demands whatsoever arising out of or occasioned-
by his failure to make full and proper compliance with said by-laws,
rules, regulations, laws and orders as herein"set forth; or arising
'
out of contamination to surrounding hay waters, damage to persons^' -
or property," and encroachment on lands outside the'limits of " prescribed working areas, where such contamination, damage, or
'
encroachment occurs as a result of-subcontractor's methods and
;;
procedures.
.^
SS MUM
SMStrtCATtON ml. 2525-22M-2
RH_____S
..
Of 21 "
"
WA-TEX 000269
!
&OL ^heT^ooixtractdr stalT fw^shTall plant, labor-,; materials;^_
' .
power'and inciaeatals tbcbnstruct thewharf,
`^ii^e-iiaiEuy*:e6^e%&*w4iai*?S;pew^'^>mooring plahfoxEii' and breasting
dolphlhs tlffefiasr~^rfits^T The work to be performed specifically
includes!
.
(a) Furnishing, driving, framing and connecting as^required, all
.timber piles.
'
* (b) .DriYing^-.-framing-;and protecting as required, all steel piles.
A
(c) Furnishing, fabricating..as'required,'and installing all hard ware including rubber bumpers,'bitts, cleats;' structural connections, bolts, spikes; dowels, wire rope, :chain, and other hardware shown on drawings, and as otherwise may be required to complete the work.
(d) Furnishing and'installing all timber girts, struts;--bracing, - caps,.^stringers, guards, blocking, chocks, handrail, decking
and other timber items.
(e) Furnishing and installing necessary special framing and/or
anchorages, as shown on drawings, for items listed in
Paragraph 1.02.
'
-
(f) Furnishing and installing all concrete; reinforcement, rubber
bumpers,' hardware, and related work for all- mooring platforms
and breasting^' dolphins.
"
'
(g) Furnishing and installing life preserver gear cabinets.
V ' '
(h) ...Furnishing-and installing all- steel floor-plate .
(i) Furnishing and installing all items for deck fire openings.
A
(j) Furnishing and driving piles, and performing load tests thereon
as covered in Part III of this specification.
1.02 Work specificaUy" excluded from the contract covered by this specifica
tion is as follows!
`
(a) All piping and electrical work except that required, furnished
and installed temporarily by the subcontractor as an incidental
to construction.
.
(b)-- All concrete work,-except-as-noted in Paragraph 1.01 (f) above.
AA
(c) Hose, hose derricks, and hose handling equipment.
-(d) - Uplift connections for'those timber pilesi-supporting Anchor- A-.-/* .-only, as shown on- Prawing-22=AM"4.
FOWH 29S
< SPEHFICATtOH Hoi -2525-22M-2 JS
' V. _
REV.
SHEET .-_g
or. 21
WA-TEX 000270
A' A
Fixorfi'^tlng facilities, Except forcleck openings5, monitor :p3AtfGnaS .atLd !as dtberwisecalled for oa the drawings.
(f> Earthwork and paving.
`
>
'
\
(g) Electrical shelters above deck. ` (fa) ' Wharf office and hose cart shelters above deck.
(i) Any mechanical equipment, e.gi powered winches, pumps,
compressors, etc.
'`
(3) Valve access platforms
2.0 .MATERIALS, GEHERAL
;
2.01
All materials'used in the construction shall be new and unused and
shall meet fully the requirements of the applicable specifications
hereinafter referred to.
2.02
The contractor reserves the right to reject any materials which in his opinion do not meet specified requirements, and the subcontractor shall remove such defective material and replace it with acceptable material at his own expense.
3-0. TIMBER PILES, GENERAL
'
3.01
All timber piles shall be Douglas Fir, and shall, except for tip and butt dimensions hereinafter specified, conform to the requirements for Class A round timber piles, ASTM Designation D25-55T.
3-02 All piles shall be treated as specified in Paragraph 4.0.
.
3.03 .
Pile lengths furnished shall he sufficient to obtain the penetrations into the soils, hereinafter specified, with ample length remaining to ensure cutoff atsound section below the butt.
3o4
The subcontractor shall furnish at his own expense such additional piles over and above the actual number entering into the finished work as will be required to cover breakage, rejection, or other contingeneie
3.05
Lagging may be required on some piles, and where deemed n&r.essary by the contractor, it shall he furnished and installed by the subcontracto ' and paid for as an extra.
\ Bidders shall include with their proposal a firm price per pile for lagging as detailed on the drawings.'
A
Lagging shall be untreated Douglas Fir meeting at least the requirement; of No. 1 posts and timbers. Paragraph 125-C of W.C.L.A. Standard Grading and Dressing Rules, March* 1956.
FORM 2 9 3
SPECIFICATION NO. z525~22M-2.
REV.
SHEET___ 1
21 OF
WA-TEX 000271
clurifig~t'fie'courBe'of" the'work/vhicfiinay require"spiKcingJ splice
aet'ail'B"eEaH; be" as shown'on Drawing
Bidders shall include
with their proposal a firm price per splice as detailed.
3.07
Pile dimensions shall meet the requirements set forth in the following
tables
Min. Tip
Butt Diameter
Pile Lengths
Diameter
Inches
Feet
Inches
Min,;
Max.
UP to 70' 70' to 90' 90* to 100"
100' and Over
8 8 8 8
14 18
16 20 17 22 18 24
4.0 PILE PRESERVATIVE TREATMENT
4.01
Preservative pile treatment shall be by the full-cell (Bethell and
Burnett) method. Plant, equipment and general process requirements shall conform to Specifications Cl-56 and C3-5^ of the American Wood Preservers Association.
A
4.02 The retention of treating solution for all treated piles shall not be less than 14 pounds per cubic foot.
4.03
The treating solution shall be Grade B or coal tar creosote solution conforming to Specification Pl=54 and P2-54 respectively of the American Wood Preservers Association.
4.04
All treated piles shall be branded to identify the treating company
and year of treatment. Piles shall he branded approximately 10 feet
from the butt.
,
5.0 DELIVERY-.AMD HANDLING OF TIMBER PILES
501
Means of transporting piles to the jobsite is optional with subcontract or; except that under any and all conditions, special precautions shall be taken in lashing and stapling to prevent injury to the treated surface^. Any such damage shall he repaired as specified, in Paragraph 5=03*
5.02
Piles shall be handled at all times in a manner to prevent damage. The use of hooks, cants, pesvies and other equipment that will damage creosoted material' shall he avoided.
5.03
Where any surface of a treated, pile is damaged, the dajra^gd area shall be mopped with a liberal quantity of hot creosote* followed by a 1/4" coat of coal tar plastic cement. All such repairs shall be made at . no additional cost to the contractor.
5-04
Treated piles which, in the opinion of the contractor's inspector, are
damaged to an extent as to permit the ready entry of marine borers
shall be rejected and replaced with acceptable piles at no additional
cost to the contractor.
.
62 NUOJ
2525-.22M-2 SPECIFICATION Ntfc.
NEW____ --
SHEET __8_.______ OP gL
WA-TEX 000272
;/ '6,0 . BRimg OF PlESSa GENERAL
f` - \ 6.01 "Driving' leads of sufficient length to hoUthe longest Piles firmlyt^f lf.
` position'and alignment with the hammer shall be used. 'Suitable
'
driving caps shall be used to prevent damage to pile butts during
i '
driving.
'
i. 6.02 Suitable bridles or slings for handling piles up to their position'in the leads, that will prevent excessive bending or unacceptable damage
to the piles shall be used.
'
6.03
Every effort shall be made to drive continuously without interrruption. Should driving of a pile be interrupted, the pile on resuming .driving shall-he "unfrozen" and driven to its specified penetration.
6.04 Piles shall be cut off true and level at the required elevations, or
as otherwise shown on the drawings.
'
6.05
The piles shall be spaced accurately as shewn on the plans, and shall " be driven vertically or on the batter shown with reasonable accuracy . iu the positions indicated, so that they need not be unduly pulled into line, A deviation of not more than ^ inches off center line of the bent, and not more than 6 inches out of position along the length of the bent will be permitted.
6.06 Any pile which, in the opinion of the general superintendent, or his
authorized inspectors, does not meet the requirements of this speeifi-
A
cation shall, at the <8ont-r,stor"s request be pulled and redriven, or
*
replaced as required, at the subcontractorss expense.
'"
6.07
The subcontractor shall prepare a driving record for each pile driven, except timber-fender, comer cluster, and hanging piles. Records shall includes
(a) Pile designation by bent number and row, e.g. 586 E.
(b) A driving log showing run under weight'of hammer, and blows Per foot of penetration through the firmer upper soils overlying the softer clays, which are shown in all borings from No. 100 to and*including No. 117. This log shall be continued until pile
I has penetrated at least 5 feet into the softer clays as indicate<: by decreased driving resistance.
Where the soft clays are not encountered and piles are driven to practical refusal, as hereinafter specified, the driving log need cover only the last 5 feet of penetration, in which case, the number of blows per final inch of penetration shall also " be recorded.
Jji (c) Pinal tip elevation, all piles.
i
t
\
(d) Any additional information required to explain unusual driving
A
conditions which deviate from fe03'^Rtieips.t@d]i and remedial
measures taken, if any.
""
ff>BN 298
2525-22M-2
SPECIFICATION HO..
REVL
SHEET ?
: OF___ ?!
WA-TEX 000273
l
l1 "
.The records .shall Ibe delivered to'the Cfflfc3asser within 24 houra
after'completion- of driving the recorded pile.
7.0
A
BRimG pg timber files
7.01
Piles shall be driven -with a hammer delivering not less than 15,000 nor more than 18,000 foot pounds of energy per blow.
A
7.02
Piles in bents shown below will derive their load carrying capacitythrough friction against the surrounding soils and shall, therefore, be driven to penetrations such that the elevation of the pile tip upon completion of driving does not fall above the elevations set fourth- in the following table, Elevations are based on MLLW datum equals 0.00*.
All Piles in Following locations
Final Tip Elevation
^Approximate - Minimum .Hie Length Before Cutoff
Bents 502 to 5^1 inel. Bents 542 to 605 incl. Bents 6q6 to 66l incl.
Bents 662 to 701 incl. Bents 702 to 716 ind. Bents 717 to 736 ind. Bents 737 to 752 ind. Bents 753 to 769 ind. Bents 770 to 793 incl. Bents 79b to 860 ind.
-23.0 -26.0 =35.0 =40.0 -45.0 =48.0 =52.0 =56.0
&
4l 44
53 s8
63 66
70 74 81
85
All remaining timber piles in causeway and complete pierhead
-73.0
* Tabulated lengths apply to vertical piles only.
94
7.03
The above specified final tip elevations shall apply to both hatter apd vertical piles, fetter piles shall be furnished in lengths sufficient to reach required tip elevations, up to maximum lengths of 110 feet after cutoff.
7.04
It is anticipated that in the locations set forth in Paragraph 702,
a layer of relatively firmer soils will be encountered at depths ..
generally a few feet below bay bottom to an extreme of some 30 feet
in the vicinity of "boring 105. Thickness of these firmer soils
appears to range from 12 to 25 feet, and they are underlain by a
softer blueish gray day. In all of the above locations, all piles
shall be driven through the firmer soils to the final tip elevations
specified. In case heavier driving than the contractor considers
prudent to achieve this result becomes necessary, contractor may order
either of the following options:
"
_a) b)
Stop driving at a higher elevation than above specified. The use of driving shoes.
"
A
In case contractor, orders option 2, subcontractor will be compensated
therefore under Extra "Work.
_
7.05 - -.For piles in the above locations, .jewoing will not be permitted.
SPECIFICATION NO. 2525-22M=2
*EV._
SHEET . IQ.
OF. 21
FORM 2 9 3
* WA--TEX 000274
.- . ,'
A A
7.66
'
7.O7
?
Should-ai^ uhuii&"or'unanticipated', driving ^oMi-fcions^i^^^i^ -with piles in* above1 locations,/giving shall be'stopped atid the !-f! ,,
condition reported to the conbractorfe general superintendent 'or his authorized representative immediately. Unusual conditions shall be
construed to'"siean failure to reach' specified tip elevations from any'
cause, {^failure to encounter the-firm soils in depth as described
in Paras
7-0h
Piles in Pipe Trestle and Roadway Approach
7.071
All Piles south of Bent 501 diall be driven thru the upper sandy loam soils, thru the blue clay, and into the sandy loam soils shown on the boring logs as "supporting soils". Penetration.into these supporting soils shall be not less than set forth in the following table,- except that driving will be considered complete when the driving resistance reaches 50 blows per foot of Penetration.
A
Boring Ho.
Required Penetration into "Supporting Soils" _______Feet
Required pile length in feet below Cutoff Elev.
46 2
47 1
48 6
49 '6
51 5-1/2 52 2
48=1/2 42-1/2 42
40 42=1/2 58
7.072
Required pile length for penetrations between borings shall be interpolated from the above table, and subcontractor shall furnish piles in sufficient lengths to meet these requirements
8. .
. steel piles8 general
,
i'
'
8.01 Steel piles will be furnished by the contractor in unfabricated mill
lengths from 55 to 70 feet. Subcontractor shall splice lengths as
necessary to meet required lengths of Piles for driving.
.
` 8.02
Steel Piles shall be spliced by butt welding, and as otherwise detalM on drawings. Splice welds shall be full penetration, and shall meet the requirements of the AWS Code for Welding in Building Construction.
8.03 All steel piles shall be protected as specified in Section l600
9.0 DRIVING OF STEEL PILES '
AAv9.01 All steel piles shall be driven with a steam hammer of sufficient
/A
` 902
rated energy to reach a final tip elevation of
feet. Required
' Pile lengths after cutoff will accordingly be IQS feet for vertical
Piles, and jjj.4 feet for batter Pilesi
Fia.-cform^'-sisere
= piles'wili be ppxb'ximar~>i! *yr r**at icmiser.
Jetting of piles during driving will not be permitted, and the same
requirements set forth iu Paragraph 706 for timber piles, aba'll also
apply to steel piles.
'"
'
IBM 293
SL
SPECIFICATION HO.
2525"22M-2......
HEW.
U.SHEET___
OF. 21
WA-TEX 000275
A A
>03 9-04
EU.es driveii on a' batter1' shall be pqsiH&oned for sufficient accuracy, and scheduled so as to elininafe danger of . encountering tinier plies already driven in the vicinity,' ;
Contingent upon results of load test No, 3 as specified in Bart III
hereof, contractor may order increased pile lengths. In such evefit,
subcontractor will be compensated therefore under Extra Work.
10.0 TIMBER, GEHERAL
10,01"
All framing timber furnished and used in the construction shall be
DsugJas^Rtr, -except as provided in Paragraph 10,02, confoiming^wittr the following applicable paragraphs from the West ' Coast 'Lumbermen8 s Standard Grading and Dressing-Buies as - effective-March 15,' 1956s..
A A n.o
(a) 3 Guard Posts and Handrails -
(b) Guard Rails at Deck Level
(a) .(c) Plank Decking at 45Laminated Decking
-;
(f)(e) . Deck Stringers
<- -
Caps Bearing on Riles
-
(s) Horizontal Struts, Girts and
Diagonal Bracing
(h) Misc Blocking, Chocks, Fillers, etc.
* TJ/'.lc
10,02 Deleted * PRESERVATIVE TREATMENT OF TIMBER
lar. 153-b (15O0F-) Par. 124=b (1500F)Par. 124b (1500F) Bar. 124=bb(l750F) Bar. 124=bb(l750F) Par. 124=bb(l750F) Par. 123"b
or 124-b (1500F) Par- 123-'h
or 124=b (1500F)
11.01
All. timber entering into the construction shall have a preservative
treatment. The treatment for timber, except as specified`in
Baragraph 11.02 shall meet fully the requirements of Paragraph 4.01 .
through 4.04, as hereinbefore spec??ied for timber piles, except that
minimum retention of treating solu ion shall be not less than 12 lbs
per cu ft for diagonal bracing in vertical and inclined plane, girts,
struts, and other main framing and blocking below pile cutoff elevation!
and treatment shall conform to Specification d~56 and 02=56 of the
AWPA.
'
11.02
Material in all bents north of and including Bent 666 comprising the
pile caps, deck stringers, decking guard posts, rails, struts, chocks, .
blocking, and other- framing at or above pile cutoff elevations, shall
be treated in a closed cylinder by the full=eell vacuum process with
one of the following preservatives, to the minimum net dry retentions !
shown:
,
-FORK 293
SPECIFICATION NO._...... 2525ggM2
REV.
2
SHEET_____ 12____ OF______ 21
! WA-TEX 000276
Preabfvatiye -"
;; ' Tanalith Salts . Claetoonite . -BoUden Salts Erdalith Salts
0.50
Preservative Materials and Practice shall be in accordance with " Standards P5r5^ and Cl-56 of the American Wood Preservers Association ;
/j\
11.03 Material comprising pile caps and deck stringers for all construction
a
/g\ `
south of Bent 666, shall be given preservative treatment in
`
accordance with requirements of Paragraph 11.01. Material above
'
stringers shall he treated in accordance with Paragraph 11.02.
12.0 PBEFABRICATION AND. DETAILING
.
12.01
It is intended that timber be Prefabricated wherever Possible,' especially that framing below Pile cutoffs which will be subject to immersion at high water.
12.02 All holes, daps, and finish cut lengths in Prefabricated timber shall be made Prior to treatment.
12.03 Surfacing and dressing of timber shall be as follows;
All diagonal bracing, struts, )
girts, blocks, chocks,'fillers,)
etc., fit or below pile cutoffs,)
unless otherwise noted
)
Rough
CaPs
Surface Top & Bottom
Stringers
Surface Top & Bottom
Blocking, chocks and fillers }
below deck, but above, pile cut-)
offs
)
optional
Decking at 45
S 2 s'
Laminated Decking
S4S
All -timber above Beck
s4 s
12.04
Detailing of timber by the subcontractor, for fabrication and
construction, shall conform to Section 2508' of the Uniform Building
Code, 1^55 edition, especially as regards "end margin" and "edge
margin." distances for bolted connections. .
...
AAl2.05 All washers used in the construction shall be malleable iron, ribbed type, unless otherwise called for on the drawings.
A
12.06' All drifts dowels and bolts shall be 1" nominal diameter unless otherwise called for on the drawings."
S62 NIKM
SPCStFlCATtOM up. 2525-22M-2
H
2.
ar ^ 7.-,. oy
WA-TEX 000277
-y
largerihaffthe bolt' diameter.,r'^ield-holes for drifts 'shall be " ; a^-llea one sixteenth under''drift diameter; and; for through bolts. ^''the same diameter as the bolt.
13.0 FtKT.T ibamotg add item ihjiective theatmeiep
damage' the treated material, will not be permitted. Any scaffolding that Inay be required shall be hung'by ropes or'supported."by'means other than temporary nailing or- bolting to treated material.
13.02 '
All timber and pile cuts shall be made accurately so a.s to secure the cleanest and closest Possible fit with full'contact over the bearing surfaces, and shall be given a protective treatment as ' specified in Paragraph 13.04 before bolting up. '
13.03 Holes drilled in the field through treated material shall be' thoroughly swabbed with HOT preservative of the same type used`in
the original treating. The bolt shank shall be fully coated'with coal tar plastic cement, and the end of the bolt dipped in plastic
' cement so that as much cement as possible wili be Pushed ahead of the holt when inserted in the hole. Unused holes shall he filled at eaeh'end with creosoted wooden Plugs coated with Plastic cement.
13.04
At all cuts in creosoted material, or where any surface thereof is
damaged, the subcontractor shall mop such surface with a liberal
quantity of hot preservative, followed by a l/4-inch coat of coal tar
Plastic cement before bolting up.
-
1-
1305 .The tops of all timber piles imme diately after cutoff, shall be ' mopped with a liberal quantity of hot preservative, followed by"a
_ " l/l6-inch coat ol coal tax plastic cement. This shall be followed with a 30-inch by 30-inch Piece of coal tar pitch saturated, heavy'
. ` cotton fabric (made Pliable in cold weather by 'warming) which shall
be pressed smooth to contact the pile, lapped oh the side of the Pile nailed with four l-l/2-inch galvanized roofing nails 4 inches from th - top, and trimmed 2 inches below the nails. Plastic cement, l/8-ineh thick, shall be applied to the top surface of the fabric. After the caps are ' set and secured by the drift .dowels, not less than 3/8-inch of Plastic cement shall be applied to the exPosed area of the fabric with a 5/8-ineh to 7/8-inch fillet along the face of the cap setback from the edge of the Pile. Uncapped Piles shall receive 3/8-inch to l/2-inch of Plastic cement over the entire area of the fabric.
13.06 Cut surfaces in salts treated timber shall be soaked with hot salts
solution before, framing up.
"
FORM M S
2525-22M-2
SPECIFICATION NO..
'S RE*.
WA-TEX 000278
v*4f
Inch. rin creosoted timbgr,' shall'be thoroughly cleaned of airt,
wit# hot Preservative and coated with plastic cement* JP -- *>' .
'
13.99 "`" in lading jlcrsrn the individual Pieces for laminated deck, special card . ffh^i be'"aken in selecfli^*'''orientation, an<| sequence of sPjking to stingers and adjacent pieces, such that each Piece .bears fully on '
all stringers and adjacent Pieces* .
*
/>4.0
J
inspection of piles amp timher
''
14.01'
The' subcontractor shall,' at his own expense, secure the services of
reputable'testing agency, and shall submit to the contractor in
duplicate, test report's certified'by such agency, that all Piling,
timber, and'the treatment thereof, meet the requirements of these
specifications.
'
15.0 HARDWARE
15.01 All structural steel shall conform to ASTM Specification A7-55 Steel for Bridges and Buildings.
15.02 AljL welding shall be'of first class workmanship conforming to the AWS Code for Arc Welding in Building Construction.
15.03 Bolts, nuts,' washer, drifts, spikes, etc., shall all be of top commercial quality.
A
A
15-04
All hardware and'miscellaneous metal, including drifts, spikes,
bolting-material, slide Plates for Piping, cable lashing, fender chalfi,
etc., but not including mooring cleats or bollards, shall be hot diP
galvanized after fabrication. Galvanizing shall conform to ASTM
Designation A123-53-
,; .
15-05
Mooring bitts shall be as shown on Drawing 22-AM-36, except that
contractor will entertain Proposal to accept cast steel bitts of
similiar tyPe Provided they are of suitable size for handling
tankers of 85,000 gross D.W. tons', and Provided it can be shown that
their cost is less than the bitt detailed on Drawing 22-AM-36.
Bidders'shall include fifm Prices in their proposals for type of bitt|
they propose to furnish.
.
15.06
Cleats shall be 36-inch minimum'overall length, capable of-safely
resisting a'15-ton mooring load, and shall be"'of cast steel. Bidders|
shall include in their Proposal Price a firm allowance for all
material e".g. anchor holts, and labor required for securing bitts and]
cleats to decks.
'
15.07
Welding of galvanized material shall be avoided. If' found necessary in the field, galvanizing shall he'removed down to bare steel in areas to be welded. . After welding, all unprotected areas shall be thoroughly cleaned and recoated with Sealube Company's ZRC to the satisfaction of the general superintendent.
SPECIFICATION m. 252?-22M~2
REV.
SHEET. 15
21 OP.
WA-TEX 000279
,,-. ;: 5
^-rw^Tr:m
#^v
*?*# *,s&mmm.s0R. w&b, Etas-* . * -. '<*' I , . -vW-SV. . '.........".' :- .. ,: -.
' .. -' \
.*
v. '''*%&$&
;'
fSrM'L `
w-.r'- -...........A-r:~-' . V* . l6iOi -Each -steel'pile.Mli -"be proteetta'-vith*a jcexicreie Jaa^-iBWmral
. - ,v elevation -4.5' and. a steel collar at the aru&line. '' .y-.; "
."
.y' -
. . .... " 1 >!
. .. 16.08 Jackets may be JPdimed rectangular in sections' detailed on the
drawings, or circular provided diameter is not less than 28 inches. "
. *i
'
...
16.03 Concrete for the pile jackets shall conform in all respects with the . '.
requirements for concrete as specified in Section 17-0 hereof, except:
that maximum aggregate size is limited to l-i/2 inches.
\&,
16.04 Steel collar to he located at the mud line shall be as detailed on_tfi&
2 '`
drawings, and may he bolted around the pile before
*'
' driving. Collars shall be located in their permanent position at the'
. mud line as soon, as practicable after completion of driving each pile.,
and shall he so positioned as to extend not less than one foot, nor
/ more than three feet into the bottom.
..
16.05 With the collar in its permanent position,, it is imperative that it have a snug fit In contact with the pile surfaces, hut not necessarily so tight a fit that it cannot be driven down to its final position.
17.0 REINFORCED CONCRETE 17-01 Materials
HP
i.
-
A
17.011 Cement shall conform to all requirements of standard specifies}* tions and tests for Portland Cement, ASTM Designation C-150-52 Cement shall be Type II unless otherwise approved by the ' ft' -.
- contractor.
'
17.012 Coarse and fine aggregate shall meet the minimum requirements
in every respect of ASTM Specification for Concrete Aggregates,
Designation C33-52T, except that grading shall he modified as
required to produce concrete of optimum density and workability,
Maximum, size of aggregate shall be three inches.
j'
17.013 Steel reinforcement shall conform to the requirements of jfche
''Standard Specification for Billet Steel Concrete Reinforcement
' Bars", ASTM- Designation A15-52T for intermediate grade feteel.
Bar deformations shall conform to "Standard Specifications for
Minimum Requirements for Deformations of Deformed .Bars for if'
Concrete Reinforcement", ASTM Designation A-305.
' , ,.
., 17.014 Reinforcement splices, unless otherwise shown, siiall be made by
lapping bars a minimum of 30-bar diameters.
*
I7.CS Proportioning and Placing
'
17.021 Concrete shall develop at 28 days, not less th$sf,'3,500 psi ultimate compressive strength. The minimum' eeinent content;''lVx'
. shall be 6 sacks P.er cubic'yards-. ' `
10 A
(VI
a
ptc
SPEG1FICATIOH MO. 2525- 22H~g
REV. 2
SHEET. 16
OF 21
WA-TEX 000280
17.022 KLxes shall he . so designed and proportioned as tp m______--t-i----,
concrete of optimum density- and durability.
*
.,
j''
.`
17.023 Concrete shall be deposited as nearly as practicable in iXS'^'3
final position to avoid segregation due to rehandling or
flowing. Ho concrete- that has partially hardened or has been `
contaminated by foreign material shall- be deposited in the
work, nor shall retempered concrete be used. Concrete shall
not be deposited during rain unless adequately protected from
rain until it has hardened sufficiently, so that it will not he
damaged.
-
17.024 All ends of chutes, hopper gates, and other points of concrete
discharge shall he so designed or fitted with suitable baffles
' that concrete passing from them will not fall separated into
whatever receptacle receives it. The free fall of concrete
into forms shall be limited to five feet.
-
17.025 Concrete shall be placed as dry as possible, and shall be workei, throughout with approved mechanical vibrators to ensure eompleti . embedment of reinforcement and other steel, and a resulting concrete of maximum density. Overvibration shall be avoided.
17.026 Concrete shall be limited to a maximum slun$> of 4 inches.
_
Wet batches shall be subject to rejection at no cost to the -
contractor. '
..
17.027 Mass concrete in mooring and breasting platforms may be placed in separate lifts not to exceed three in number for each plat form. Vertical joints are not permissible.
17.028 Horizontal joint surfaces shall be.keyed in both directionsi .
Key recesses shall be 12 inches wide by 3 inches deep at 2'-0"
centers.
-'
17.029 Subcontractor shall furnish the contractor with a sketch showing his proposal for depth of lifts, additional reinforcement re quired in top face of initial lift, and general keying pattern. Details shall be subject to contractor's approval.
17.0210 Joint surfaces shall he thoroughly dean and free of standing water before placing concrete for subsequent lifts thereon-..
17.03 Admixture
17.031 "ELastimant" as manufactured by Sika Chemical Corporation shall .
be added at the mixer for all concrete, in the amount of 0.5-lb .
of the nonhygroscopic powder or its equivalent in liquid form ' per sack of cement.. The use of ''Plastiment" does not abrogate .7
minimum cement requirements hereinbefore specified.
-
17.032 With use of "Plastiment", water content in mix shall he reduced below that used for plain concrete, to produce concrete of maximum permissible slump hereinbefore specified.
fie? fUKM
SPECIFICATION HO. 2525-22M-2
rev..
SHEET. IT
OF. 21
V/ >/
! WA-TEX 000281
17.04 Forms
17.041 Forms Bhall be of sufficient strength and rigidity to
their position and shape-under loads incidental to placing
concrete.
_'
17,.042. Fom ties or tying methods which cause spalling of concrete
' form stripping, or which leave any permanent, metal' exposed to
the air., ;shall not be used. ,,
.
"
A
Holes left after removal of form ties shall be plugged with a stiff mortar mix consisting off' parts sand to 1 part cement.
. 17.043 Forms shall not be removed until at least 72 hours after pouring of concrete, unless otherwise approved by the general superintendent.
17*05 Curing of Concrete
..
17.051 .Concrete shall be cured by maintaining it in a continuously damp condition for not less than 7 days after form removal.
' Curing may also be accomplished with 2 coats of an approved
white pigmented curing compound, e.g. A.C. Horne's "Rc'-ncure"
Ho. Uo W.
. '
17.06 Protection of Reinforcement
17.061-The minimum, clear distance from reinforr* .j.ent to face of finished concrete shall be 3 inches, -pecial care shall be taken to provide and maintain this eiearance.
` 18.0 SITS CLEANOP
18.01 !Xhe (^JJ&ontractor shall keep materials stored in an orderly manner, and' keep site and work clear of debris so as to eliminate as far as. possible hazards of fire and personal injury.
,
18.02 At the conclusion of the work, the^j^fcontractor shall clean the site
of all debris resulting from his operations, and remove it from the premises, all at his own expense, and to the satisfaction of the general superintendent. No debris shall at any time be disposed of in the bay or surrounding waters.
\
resti ts s
SPECIFICATION NO. 2525-22*1-2
rev.fL
cr. 18
sx OF.
WA-TEX 000282
l
1.01 '
immediately after award of contract, the -^ffeontraetor shall prepare
to perform without delay load tests on 3 piles. Tests shall consist
of and he designated as followss
Test No. 1 . Bearing test-on-u: timber'pile
Test No. 2 Pullout test on a timber pile '
Test Ifo.-,# ' Bearing test on a steel pile
1.02 Subcontractor shall furnish all material, equipment, and labor for performing the above tests as hereinafter specified, exoepb-that
' contractor will.-furnish steelv.piles.-.in-mill'-lengths.
2.0 TEST LOCATIONS
'
3.0
A
2.01 Test piles shall be located as shown on Drawings 22~AM"5^ and 55.
Each test pile shall be numbered 1, 2, or 3# depending on the test number as defined above. Additional reaction piles required for each
test shall be designated 1-A, 1-B, 1-C for Test No. 1, etc. . ,,
- `.'-'XL'yug.rW&s*'*HE ABRAEGEMESKTS
.
r.w
'.
t^^lv KYlCo" r '
. ^ ?r,
,.
3.01
Test Ho. 1 shall consist^df the test pile flanked by 2 or more tension
reaction piles as required. Reaction piles shall be driven on a slight batter (l=l/2rto l) away from the test pile, and shall be
sufficiently long to be driven through the firm soils described as
grayish brown silty clay in Boring 10k. Reaction piles shall be capabi
of resisting a maximum load on Hie test pile of hO tons, without
appreciable movement.
.
3.02
Test No. 2 shall have the same pile.arrangement as Test Ho. 1, "
except that reaction piles will be in compression under test loading,
and two jacks will be required.
3.03 3.04
Test No. 3 shall have the same pile arrangement as Test Ho. 1. Reaction piles Shall be steel, driven firmly into the sands below approximate`..elevation -115.0^ They shall be capable of resisting a
150-ton load on the test pile without appreciable movement.
; : :
;
;
l&nner of arrangement, details of reaction beams and other structural ]
members and connections are optional with the subcontractor. All
'
such details shall be capable of safely sustaining the maximum test -j
loads hereinafter specified.
1
FORM 2 9 8
doBtaetnamott
9S9<?_PP]W-
4 ' REM 2
SHEET,,____XSU- OF , 21.
I WA-TEX 000283
4
4.02
. 4.03
Steel test and reaction piles shall he l4w x 14-1/2" bearing piles
weighing 89 lbs per foot. They will be furnished by the contractor in
mill, lengths.
*
/
5.0 DRIVING OF PILES
'
5.01 Reaction piles shall be driven as set forth in Section 3.0 above
5.02 Load test 'piles shall be driven vertically to the following tip elevations.
.
Test No. 1
Elevation -45.0'
Test No. 2
Elevation -45.0'
Elevation ~95
5.03
Length of all piles shall be sufficient to allow for a minimum cutoff
elevation of +15.00 after driving to penetrations specified. All
elevations are based on MLLW=0.00 feet.
'
5.04
A complete driving log and record shall be prepared for each pile driven. This record shall show ground elevation, blows per foot for each foot of penetration, final tip elevation, type of hammer used, date and hour of driving, and weather conditions. Record for each pile shall be delivered to the contractor within 48 hours of completion of driving.
= 'I
6.0 TESTING OF PILES
6.01 Settlement or movement of tested pile under loading shall be measured
by devices which will give accurate readings to .01 inch.
'
6.02
Test loads shall be applied by hydraulic jack with calibrated load gauge reading in tons, in increments as hereinafter specified for each test.
6.03
Each load increment shall be maintained until rate of settlement or ' movement is less than 0.10 inches per hour> before loading to next ^
increment, or load shall be sustained for not less than 1/2 hour
..
between incremental loadings. Movement readings shall be taken at
'
regular intervals during the test period. Ultimate load, or failure \ '
shall he considered as that load beyond which an increase in load
\
produces a sudden disproportionate increase in movement. '
.
, SPECIFICATION NO.. 2525-22M-2
REV____2
' SHEET 20
OF... 21-
| WA-TEX 000284
V
FORM 2 9 3
ry^';
Try ^r7
SWgw
.!\}J! -6,04
/V Vr^<'-;*y.V 4'Sv$^ V.'.-'A?:^-'.-.'-^'.- .':-3j* Ceire `ilji^,-]^J.'t*a^.S!q,%J3^ly.*^;iiaci!eafe*feal. losldloga.-slowlir^Bp^
v,*' il
6.05
Loads for. Test Sunibers 1 add 2 shall be allied in 5-ton increments ^
up to failure* or-to 40 tons, whichever is reached first.
"'
'i.. .'
6.06 Loads for Test Humber 3' shall, be applied in- 10-ton increments up to
failure, or to 1$0 tons,..whichever is readied first.
6.67
Load movement curves shall he prepared by the subcontractor, for
each test'. These curves shall show movement for each incremental
loading, movement under sustained loading, and rebound upon unloading.
These data shall he delivered to the contractor within 48 hours after
completion of each test.
.
7.0 CLBAHPP
A -7.01
After completion of tests, all timber piles shall he removed so Ijhat they do not project above the bottofflo
.
7.02
Steel piles shall be either pulled complete, or cut off not more than I'-O" above the bottom, after which they shall he returned to contractor's stock as directed by the general superintendent.
0.7 >
*l -JK
SPECIFICATION NO.. 2525-22M-2.
REV.-
SHEET SL..
OF____ flL
; WA-TEX 000285
Job No. 2525-22
December 7, 1956
THE TEXAS COMPANY PUGET SOUND WORKS WHARF STUDYMAJN STRUCTURE ONLY
45.000 D.W.T.
65,000 D.W.T.
* 85,000 D.W.T.
1. Ship Data Length O.A. Beam Draft (Summer) Pump Capacity @ 125 lb/'sq in Hoses Capacity - 35 HPI
?36*-6" ios'-O"
37'*6" 18 M bbl/hr
4-10" 4
325. 000 bbl
790*-0" 108-0"
40*3" 22 M bbl/hr
4-12" 4
490. 000 bbl
845*-0" 125-3"
44'-3" 25 M bbl/hr
4-12" 4
585.000 bbl
2. Water depth at Wharf
45'-0"
47*-6"
50*-0"
3, Length of W harf 4, Length Causeway 5. Relative amt. Timber Piling 6. Relative amt. Struct, Timber 7. Relative amt. Gone. Piling 8. Relative amt. Reiiii. Cone.
1140*
5600*
1.0
1.0
..
1.0
1.0
1220* 5800* 1,06 1.04 1.07 1.14
1280* 6000* 1.11 1.08 1.18 1.25
9. Relative and Prestressed Beams and Deck
10, Relative amt. Pipe
l.o 1.0
1.10 1.05
1.17 1,10
*85.000 D.W.T. offshore and 65.000 D.W.T. shore side
Note
.
If design is to be for T-2 or 25.000 D.W.T. (max) tankers reduction from
45.000 D.W.T. would be approximately equal to increase shown for 65.000 D.W.T
over 45,000 D.W.T. tanker.
WA-TEX 000286