JUNE SAFETY MEETING OUTLINE
SAFETY CONTROL PERMITS
1981 SAFETY PROGRAM - KEY ELEMENTS
^J
^
m
A. Job Planning - Permits are done to formalize the job planning step
The objective of permit writing is to minimize risk
to the indiduals performing the work through hazard
avoidance or personnel protective equipment.
*
Teamwork
Everyone involved in performing work must work together
to observe--for hazards--and unusual conditions which
can have a safety impact on the work and/or process. ~
^Personnel performing the work should challenge working
--cond.itions until they believe the risks associated with
the work are minimal.
~ ~ ~------- - -
Changing conditions may require a reevaluation.of the
work and possibly a new pe rmi t. Again a 11
involved with the work*
be-involved
accessment.
+
jJirt -- - *
Communication- Method is very important. Challanges to working _
conditions must be constructive. Communications
which put the other party on the defensive tend
to minimize 2-way communications. A brief dis-
*
'*
-1 " '
-E-
cussion of safety requirements specified on permits
will help to. define job restrictions and initiate
questions by personnel performing the work.
Positive safety reminders should always accompany job assignments and work authorization.
At best, permits are formalized communication, tools which state that the equipment has been properly pre pared, that any restrictions noted on the permit must be adhered to and that the work may begin. Make them work to our advantage.
D. Training -
For the greatest net effect, training must be done in the field as well as in the classroom. Deviations noted in the field are a supervisor's most important clue to training needs . Timeliness is critical. Train ing should be done when the deviation is noted. Positive methods should be used and can include Interaction Management methods.
'v
4
I
VAB.0001074722
June Safety Meeting Safety Control Permits Page 2
A
I. 1381 SAFETY PROGRAM - KEY ELEMENTS (continued)
j
E. Fell ew- U -
Our overall success can only be judged by the
actions of the personnel doing the work through observation. If our follow-up actions are in adequate, short-cuts which have increased risk can become common practice. Follow-up actions can also help to define inadequacies in our standard work methods. Your efforts can help to improve our work methods whenever inadequacies are noted.
I I. THE SAFETY CONTROL PERMIT SYSTEM
T
rf
[ A. Purpose -
To minimize risk to people and property through the
proper equipment preparation, specification of work
methods and protective equipment, and finally, the authorization for work to begin.
B. Who Must Get One
Contractors must always obtain permits while working in the plant operating areas and during off hours work only in the contractors fab area. Mechanics working in departments other than their own or on utilities equipment must have permits. All entries into equipment must be done under authority of a permit. Operating personnel do not need permits for the conduct of their normal job duties. They are however responsible to conduct their work with the same precautions which would typically be required if a permit were written.
C. Safe Work Permit
This permit is for work which does not require spark =fi#king tools or equipment entry.
D. Hot Work Permit
Required for all spark and heat producing equipment. Special precautions are indicated in the procedure, pages 5 through 7.
E. Entry Permit - Vessel entry checksheet and permit required on the jobsite (posted) prior to entry authorization.
1. Vessel to be entered must be monitored on a routine basis (15 to 30 minutes) to check for contamination.
2. j Personnel performing "manhole watch" duties must be given detailed instructions regarding their outside observer duties. These include:
a) Their duty station while personnel are in a vessel is at the manhole observing personnel inside.
b) A radio must be provided to the observer in order that he/she has the ability to immediately summon help if need be.
VAB.0001074723
June Safety Meeting Safety Control Permits Page 3
II. THE SAFETY CONTROL PERMIT SYSTEM (continued)
2. c) If the work area becomes contaminated with gases or other leak problems develop, the observer must make sure the personnel inside the vessel come out and go to a safe area.
. '* -
d) An extra set of entry equipment must be provided for the outside observer in case he/she must enter to render emergency assistance. (This could include an air mask, protective clothing, safety harness, and the like as specified on the permit or checksheet).
e) wnereever air movers-e-re used as exhausters on vessels
to keep contamination levels (VCM in reactors) low enough
to eliminate need for air masks, outside observers must
riot Ify personnel inside if contamination levels
safe levels and require the use of air masks or to come
out.
' ..... ' VI-1.
3- In the future, nitrogen for blanketing and emergency air sii will require respirators which are pressure
emergency egress bottles for escaped his equipment wi be required on all equ i pmen t for which n i t rogeri can eh ter through the plant air system.
k. Electrical equipment used inside a vessel must be of the low voltage type (36 volts or less) or protected by a ground fault circuit interupter.
5. Only cylinders which contain breathing quality air can be taken inside a confined space. Under no circumstances are oxygen,
actylene or other compressed gases to be taken into a confined space.
.6 Oxy-actylene hoses must be removed from the confined space during
breaks or other periods of non-work. Welding machines must also
be shutdown during these periods.
i
o
7. Arc welding leads which are to be taken into a vessel or confined space must be checked for damaged insulation prior to entry. If damage is found, the insulation must be repaired prior to use.
.8 Samples of contaminant (build-up) on vessel surfaces must be
sampled for contaminant level and the results entered on the permit or checksheet prior to entry authorization.