Document YGGGM2OvoOdeQb4DY98EOyy0K

TENNECOINTER-OFFICE MEMO CHEMICALS, INC. To J. T. Sweeney At Flemington From W. D. Bord At Flemington Subject VCM Control for the period July 29, 1978 to August 4, 1978 Date August 30, 1978 copy to C. N. Brown* W. R. Fogelsanger D. M. Hershkowitz F. W. Kanzler F. S. Klopp R. A. Lojewski S. P. Robbins* P. D. Ruane M. K. Rosen C. F. Rothenbeck G. I. Rozand M. E. Wagshul *Table III Only Area Reactor Building Recovery Comp. Room General Area Pilot Plant Parshall Flume VCM Average Level 1.2 8.0 0.3 0.1 0.7 % 1 ppm 8.7 29.3 1.6 2.0 49.8 Number P* 100 ppm 12 11 2 0 0 The high readings in the Reactor Building were because of monomer lines being flushed and disassembled in preparing for the Plant shutdown. Bendix TWA Analysis: All classifications were below 1.0 ppm except for the vessel cleaners, reactor operators and shift foremen. They were protected by the use of breathing air. WDB:ms W. D. Bord 008403