Document YG9bV12gOMz1GXKYbBEmoeKzD
RETURN TO: CENTRAL FILES CENTRAL ENGINEERING DEPT. "F" BUILDiNG
DO NOT REMOVE ANY MATERIAL FROM THIS FILS. CENTRAL ENGINEERING DEPARTMENT PROJECT SCOPE REPORT AROCLORS EXPANSION CEA 1430 Add Storage Tanks, Drumming Facilities, Flakers, Packaging Equipment and New Manufacturing Building Anniston, Alabama, plant
CEA 1800 New Continuous 40M lbs/year Plant with Additional Storage Tanks for Raw Materials and Finished Goods
W. G. Krummrich plant
By: R. S. Yates CENTRAL ENGINEERING DEPARTMENT August 29, 1967
072$811
TOWOLDMONOQ44897
DISTRIBUTION
ORGANIC DIVISION 1. H. C. Carder 2. J. Cresce 3. P. E. Heisler 4. H. F. Ray 5. H. L. Williams
CENTRAL ENGINEERING 6. J. M. Depp 7. F. J. Holzapfel 8. S. B. Johnson 9. F. P. LaBelle 10. R. L. Miller 11. R. E. Lenz 12. A. B. Terry 13. C. L. parish 14. F. W. Enoch 15. R - E. Howard 16. R. P. Stevens 17. H. D. Gabelman 18. R. S. Yates 19. Central File 20-30. Extra
0725812
TOWOLDMONOQ44898
CEA 1430 & 1800 Date: August 28, 1967
TABLE OF CONTENTS
1.1 Title
1.2 Summa ry
1.3 Process Technology
1.31 1.32 1.33
1.34 1.35
Process Description Raw Materials Products and By-Products
Waste Streams personnel. Propertyand Public Hazard
1.4 Manufacturing Facilities
1.41 1.42 1.43
1.44 1.45 1.46
Description
Design Capacity
.
Flexibility Requirements
Future Expansion
Physical Appearance
Storage and Shipping Requirements
1.5 Utilities and Services
1.51 Utility and ServiceRequirements 1.52 Utility and Service Facilities
Page No.
1
1
2
2 3 5 7 8
9
9 13 16 17 18 19
20
20 20
APPENDICES A. Equipment Flow Sheet B. Suggested Equipment Layout C. Equipment List D. Scope of Work, Anniston Storage Tank Farm E. Scope of Work, Anniston Drumming and Flaking F. Scope of Work, WGK, New 40M Pound Plant G. Scope of Work, WGK, Storage Tank Farm H. Preliminary Schedule I. Project Loss PreventionReport
(9 pages) (2 pages) (13 pages) (9 pages) (6 pages) (11 pages) (7 pages) (2 pages) (5 pages)
0725813
TOWOLDMONOQ44899
CEA 1430 & 1800 Date: August 28, By: R. S. Yates
Page 1
1967
1.1TITLE
Aroclors - Increase Aroclor Capacity - Organic Division
At Anniston Plant - CEA 1430
At WGK Plant
- CEA 1800
1,2SUMMARY
The objectives of this project are to,
a) Provide adequate finished goods storage facilities at Anniston and WGK to assure a minimum inventory of the various Aroclors and Aroclor blends so that bulk shipments can be made on demand.
b) Provide at Anniston for blending and drumming of the several Aroclors with other components without interferring with primary production facilities.
c) Minimize potential for cross contamination of products.
d) Provide loading facilities for tank trucks and tank cars and unloading facilities for raw mater ials in tank cars.
e) Provide additional raw material storage at WGK for biphenyl and at Anniston for TCB and TTCB.
f) Provide at Anniston new expanded facilities for flaking and bagging biphenyl and solid Aroclors.
g) Provide new facilities at WGK to increase plant capacity from 29.5M lbs./year to 69.5M lbs./year.
h) Provide an overall production capacity for liquid Aroclors of up to 30% more than indicated in the latest Sales forecasts.
i) Provide for an orderly expansion of the WGK and Anniston Aroclor facilities.
Addition of these facilities will result in capacity increases over the present standard'll capacity as
follows:
0725814
TOWOLDMON0044900
3 1.31
CEA 1430 & 1800 Date: August 28, 1967 Page 2
At WGK,
Liquid 40.0M lbs./year
At Anniston, Liquid 5.7M lbs./year
Solid 1.0M lbs./year
(1) Note - Standard capacities at present are:
At WGK,
Liquid 29.5M lbs./year
At Anniston, Liquid 48.OH lbs./year
Solid 10.02H lbs./year
The installation at Anniston will include finished storage and blending tanks, two flakers for solid Aroclors and biphenyl, a drumming station, tank car spur and loading facilities and bagging station for solid Aroclors and biphenyl.
The installation at WGK will include a new continuous chlorination line, blow tank, intermediate storage, distillation equipment, continuous clay treatment facilities, finished storage tanks, and a biphenyl storage tank with additional rail spur and unloading docks.
Desired completion dates:
Tank farm at WGK Tank farm at Anniston Flaking facilities at Anniston New production facilities at WGK
July 1, 1968 August 1, 1968 September 1, 1968 December 1, 1968
PROCESS TECHNOLOGY
Process Description
Aroclors are the reaction products formed by the chlorination of biphenyl and/or terphenyls using an iron catalyst. The by-product HC1 gas produced is absorbed in water to produce muriatic acid.
Crude Aroclors are produced in chlorinator reaction vessels, air blown and distilled. Liquid Aroclors are earth treated, filtered and loaded for shipment. Solid Aroclors are drummed, flaked or flaked and milled and packaged for shipment.
Distillation residues are discarded as waste or sold as Montars.
A numerical system of nomenclature is used for iden tifying the various Aroclors.
0725615
TOWOLDMONOQ44901
1.32
CEA 1430 & 1800 Date: August 28, 1967 Page 3
Product yields are calculated on both chlorine and biphenyl and are different for each plant and for each Aroclor produced. They are recorded in the respective plant cost standards.
Process documents:
"Standard Operating Instructions for Aroclors Anniston Plant" - April 1966 - M. J. Williams
"Standard Manufacturing Process for Aroclors Anniston Plant" - September 1966 - M. J. Williams
"Process Description for the Manufacture of Aroclors - Department 246 - WGK Plant" - October 1966 D. E. Harris
"Process Description for the Manufacture of Pyranols and Inerteens - Department A246 - WGK Plant" October 1966 - D. E. Harris
"Standard Manufacturing Process for Pydraul A-200 Department B-246 - WGK Plant" - October 1966 D. E. Harris
"Operating Instructions - Aroclor and Pyranols Departments 246 and A246 - WGK Plant" - August 1966 - V. Brawley
"Final Report on the Continuous Chlorination of Biphenyl" - June 4, 1957 - R. A. Simone
"Tentative Process for Continuous Chlorination of Biphenyl" - March 23, 1956 - R. A. Simone
"Final Report on the Continuous Chlorination of Aroclors - Plant Demonstration" - May 7, 1958 R. A. Simone
Raw Materials
1.321 Specifications
Reference is made to the respective standard process manuals for raw material specifications. Raw materials at Anniston, for this project, are the Aroclors and additives used in blends and mixes and at the flakers. Raw materials at WGK are the materials used for the manufac ture of Aroclors. A list of materials follows:
0725B16
TOWOLDMONOQ44902
CEA 1430 & 1800 Date: August 28, 1967 Page 4
Plant
Material Code
Date
Material
WGK (246)
82601 33500 38800 19409 43099 81059
12/8/64 1/7/66 7/21/66 1/21/66 2/18/65 6/29/66
Diphenyl Ferric Chloride, Anhydride Lime, Hydrated
Attapulgus Earth 200/UP Nitrogen Gas Chlorine, Liquid
Anniston (27)
82612 81102 82641 82613 82613 826X4 82614 82615 36100 60200 58500
613- 20
64010
6/17/66 1/10/64 7/5/64 6/28/64 7/15/64 2/7/62 7/15/64 3/2/66 5/26/66 6/3/65 8/29/63
12/2- 3/63
12/18/64
Aroclor 1242 Electrical Grade Aroclor 1248 Electrical Grade Aroclor 1248 Non-Electrical Grade Aroclor 1254 Electrical Grade Aroclor 1254 Non-Electrical Grade Aroclor 1260 Electrical Grade Aroclor 1260 Non-Electrical Grade Aroclor 1262 Glycidyl Phenyl Ether (1) Trichlorobenzene (1) Tetrachlorobenzene (1) Epoxide 201 Toluene Xylene
(1) WGK Specification
1.322 Sources
WGK
Biphenyl
Received from the Anniston Plant in 20,000 gallon unlined steel, steam heated tank cars. Transferred to an existing 25,000 gallon storage tank.
Chlorine
Received direct from WGK's Department 232 in a 4" transfer line. This line is being replaced by a 6" transfer line in the third quarter of 1967.
Ferric Chloride
Received from the warehouse in 2 lb. glass containers.
Lime, Hydrated
Received from the warehouse in 100 lb. bags.
0725817
TOWOLDMONOQ44903
1.33
CEA 1430 & 1800 Date: August 28, 1967 Page 5
Attapulgus Earth
Received from the warehouse in 50 lb. bags.
Nitrogen Gas
Supplied by a bulk station located in the tank farm area.
Anniston
Aroclors are transferred by pipeline direct from department to storage and from storage tanks to mix tanks, to drumming station and to flakers.
Glvcidyl Phenyl Ether
Received from the warehouse in 55 gallon drums.
Trichlorobenzene
Received from Hooker Chemical Company in 8,000 gallon steel tank cars.
Tetrachlorobenzene
Received from Hooker Chemical in 8,000 gallon tank cars.
Epoxide 221
Received from warehouse in 55 gallon drums.
Toluene
Received from warehouse in 55 gallon drums.
Xylene
Received from warehouse in 55 gallon drums.
Products and By-Products
1.331 Quality Considerations
Marketing stresses that quality protection is the most effective means of protecting our present sales position of electrical grade Aroclors. Plant studies have shown that the use of aluminum tanks and aluminum transfer piping systems coupled with inert blanking of in-process and finished goods storage tanks will give us maximum protection.
0725818
TOWOLDMONOQ44904
CEA 1430 & 1800 Date: August 28, 1967 Page 6
1.332 Specifications
Reference is made to the respective standard process manuals for finished goods specifi cations. Finished products at Anniston, for this project, are the completed blends from mix tanks and solids from the flakers. At WGK, finished products, are the liquid Aroclors and Montars. A list of products follows:
Product Code
Anniston
Date
Product Code WGK
Date
Product
82611 82612
82612
81102 82641
82613 82613 82614 82614
8.2.6.15 ...
82622 82621 82620 62619 82618 82616 82601 82649 82658 82681
82659 82661
82685 82664
10/28/63
6/17/66
7/15/64 1/10/64 7/15/64
6/28/65 7/15/64
5/25/66 6/15/64 3/2/66 7/15/64 7/15/64 3/11/66
3/15/66 3/11/66 3/11/66 3/11/66 3/11/66
7/8/65 4/18/66 4/18/66
5/3/67 3/11/66 3/15/66 3/9/66 4/17/58
8115 81101
81101 81102 81102 81103 81103 81105 81105 81107 82868 82868
4/7/64 6/17/66 7/15/64 1/10/64 7/15/64 6/28/65 7/15/64 5/25/66 6/15/64 3/2/66 7/15/64 7/15/64
Aroclor 1232
Aroclor 1242 Electrical Grade
Aroclor 1242 Non-Electrical Grade Aroclor 1248 Electrical Grade Aroclor 1248 Non-Electrical Grade Aroclor 1254 Electrical Grade Aroclor 1254 Non-Electrical Grade Aroclor 1260 Electrical Grade Aroclor 1260 Non-Electrical Grade Aroclor 1262 Non-Electrical Grade Montars 1, 2 Montars 314 Aroclor 5460 Aroclor 5442 Aroclor 5060 Aroclor 4465 Aroclor 2565 Aroclor 1268 Biphenyl Inerteen PPO
A13B3B Inerteen 54201 KA
Aroclor 1260 - 10% Toluene Aroclor 1262 - 10% Toluene
Therminol FRO Aroclor 1254 - 10% Toluene
1.333 Packaging and Shipping
Liquid Aroclors
At both Anniston and WGK, liquid Aroclors are shipped in the following manner:
Tank Trucks
Size - 4,000 gallon
Materials of Construction - All electrical grade Aroclors are loaded into SS trailers.
Non-electrical grade Aroclors may be shipped in steel trailer tanks.
0726819
TOWOLDMONOQ44905
CEA 1430 & 1800 Date: August 28, 1967 Page 7
Tank Cars Size - 4,000 or 8,000 gallon
Materials of Construction - All electrical grade Aroclors are loaded into solid aluminum cars or in tin, zinc or aluminum spray-lined cars. Non-electrical grade Aroclors may be shipped in steel cars.
Drums and Cars
Size - 5, 30 or 55 gallon
Materials of Construction - Lacquer-lined containers.
Solid Aroclors
At Anniston, solid Aroclors are packaged in 5 and 40 gallon galvanized steel drums as a solid and in 41 gallon fibre drums as flakes. Biphenyl and Aroclor 5460 are packaged in bags as follows (major part of the production):
Bags
Aroclor 5460
Net weight - 100 lbs., St. Regis No. PCBG-32A. Size - 18" X 6" X 34" with a 5" valve. Type - Sewn Valve (SV).
Biphenyl Net weight - 50 lbs., St. Regis No. PCBG-145A.
Size - 16-3/4" X 5" X 33" with 5-1/2" valve. Type - Sewn Valve (SV).
HB-40
At Anniston, HB-40 is packaged in 5 and 55 gallon steel drums.
1.34 Waste Streams WGK
'
1,250 lbs./day of HC1 gas absorbed in a 50 GPM water stream (0.21%) will be discharged from the continuous blow tank into the plant sewer. Other process losses are of a minor nature.
0?25B20
TOWOLDMONOQ44906
1.35
CEA 1430 & 1800 Date: August 28, 1967 Page 8
Anniston
No change is expected in waste discharges as a result of this project. A dust collector will be installed to control Aroclor dusts from the milling operation of Aroclor 1268.
Personnel, Property and Public Hazards
Chlorine Gas
Causes eye, skin and mucous membrane irritation. In strong concentrations canister gas masks, Scott Air Paks, or oxygen breathing apparatus are required.
Biphenyl
Solid at normal temperatures. Fumes are toxic over a prolonged period of exposure. The flash point is 235 F.
HCl Gas
Fumes are very toxic and hazardous to teeth, skin, eyes and mucous membranes. In strong concentrations, rubber protective equipment and approved pack or cannister gas masks are required.
Ferric Chloride
Solid at normal temperatures. Material is not toxic but presents an eye hazard.
Xylene
Fumes are very toxic. Limiting explosion concentra tion is 1.27 to 7.0% by volume in air. The flash point is 40F.
Trichlorobenzene
Solid at normal temperatures. Fumes are medium toxic. Fire point is above 210F.
Crude Aroclors
During processing,Aroclors are generally hot, 100C or above, and can cause serious thermal burns. Con tinuous or repeated skin contact must be avoided. Vapors at room temperatures should not be breathed in a confined space. At elevated temperatures, fumes are quite toxic. Continuous or repeated skin contact with Aroclor must be avoided by the use of gloves and protective garments.
0725821
TOWOLDMONOQ44907
CEA 1430 & 1800 Date: August 28, 1967 Page 9
1.4MANUFACTURING FACILITIES
1.41 Description
1.411 General
The following information is included in the Appendix of this report:
Equipment Flow Sheets Suggested Equipment Layout Equipment Lists Scopes of Work Preliminary Schedule Project Loss Prevention Report
1.412 For Anniston
New storage and blending tanks to be added:
AroIcI lor
1242 1248
1 1254
II 1260
II 1262
II 1221/1232
Inerteen PPO and
A13B
TCB
TTCB
54,000 gallon
18,000
"
54,000
"
18,000
"
18,000
"
18,000
"
30.000 12.000 12,000
" " "
(2 (2
(1 (1
27,000 gallon) 27,000 gallon)
12.000 gallon) 18.000 gallon)
An existing 2,000 gallon mixing tank will be relocated.
One covered loading dock for tank cars.
One covered loading dock for tank cars and trailers.
A new railroad spur.
Four existing 12,000 gallon storage tanks with submerged pumps will be dismantled and scrapped.
New drumming facilities to be added include a high speed drumming scale and a conveyor system to bring empty drums to the scale and take filled drums away from the scale.
New flaking and bagging facilities to be added:
Storage for Aroclor 5460, 1268 and biphenyl
Flaker for solid Aroclors
0725822
TOWOLDMONOQ44908
CEA 1430 & 1800 Date: August 28, 1967 Page 10
Flaker for biphenyl
Mill for Aroclor 1268
High speed bagging machines for Aroclor 5460 flakes and biphenyl flakes Conveyor system to take filled bags away from bagging machines Fume control system for Aroclor 1268
The existing Aroclor and biphenyl flakers will be dismantled together with the present Aroclor feed tank. A suitable building (120' X 601) to house the drumming and flaking operations. Pipelines from Department 27 to tank farm as follows:
One line for Aroclor 1242 from existing 12,000 gallon day tank
One line for Aroclor 1248 and 1221 One line for Aroclor 1254 from existing 12,000 gallon day tank One line for Aroclor 1260 One line for Aroclor 1262 Pipelines from tank farm to mix tanks:
One line for Aroclor 1242
One line for Aroclor 1254
One line for Aroclor 1260 One line for Aroclor 1248 and 1262 Pipelines from tank farm to loading spots and drum filling: One line for A13B One line for KA and PPO One line for Xylene and Toluene blends (drum filling only)
0725823
TOWOLDMONOQ44909
CEA 1430 & 1800 Date: August 28, 1967 Page 11
One line for HB-40 (drum filling only)
One line for Aroclor 1242
One line for Aroclor 1254
One line for Aroclor 1221, 1232, 1248, 1262
One line for Aroclor 1260
Pumps will be provided as follows:
One for Aroclor 1242 transfer at tank farm
One for Aroclor 1254 transfer at tank farm
One for Aroclor 1248/1221, 1232/1262 trans fer at tank farm
One for Aroclor 1260 transfer at tank farm
One for Mix tank and PPO tank transfer
One for Xylene Mix tank transfer
One for TCB, TTCB tank car unloading
One for TCB, TTCB transfer to Mix tank
Three to transfer Aroclors from Building 27 to storage
1.413 For W. G. Krummrich
New storage tanks to be added:
Aroclor 1242 Aroclor 1248 Aroclor 1254 Aroclor 1260 Biphenyl
44,000 gallon (2 - 22,000 gallon) 22,000 gallon 22,000 gallon 22,000 gallon 100,000 gallon
A new railroad spur
Two unloading docks for biphenyl cars
Three existing 15,000 gallon storage tanks with submerged pumps will be dismantled.
Pipelines from day tanks to tank farm as follows:
0725824
TOWOLDMONOQ44910
CEA 1430 & 1800 Date: August 28, 1967 Page 12
One line for Aroclor 1242
One line for Aroclor 1248
One line for Aroclor 1254
One line for Aroclor 1260
Pipelines from tank farm to loading spots and drum filling:
One line for Aroclor 1242
One line for Aroclor 1248
One line for Aroclor 1254
One line for Aroclor 1260
Pumps will be added as follows:
One for Aroclor 1248 transfer
One for Aroclor 1254 transfer
One for Aroclor 1260 transfer
One for Aroclor 1242 transfer
Facilities to produce 40M lbs./year of Aroclor 1242:
A continuous chlorinator chain consisting of biphenyl mix and continuous feed tank, four chlorination tanks, four mass circulating pumps and four external air coolers.
A continuous blow tank and intermediate storage tank.
Two semi-continuous distillation systems
consisting of still pot, external circulat
ing system with therminol heating, entrain
ment separator, vapor condenser, receiver
and vacuum steam ejector.
'
Two continuous porocel treatment systems consisting of feed tank, absorber, cleanup filter and product receivers. One train will have two absorbers to provide flexi
bility.
0725825
TOWOLDMONOQ44911
CEA 1430 & 1800 Date: August 28, 1967 Page 13
A complete therminol heating, storage and circulating system.
Additions to the existing control room to provide space for a foreman and motor con trol center.
1.42 Design Capacity
1.421 Anniston
Finished Product Storage
Recommended ^ Provided
Product
(gal.)
(gal.)
Future Need (gal.) (1970)
1221 1232 1242 1248 1254 1260 1262
TOTAL
13,0507 14,000J 97,500 20,800 51,500 20,900
5, 550
223,300
18,000
66,000(2) 18,000,,. 66,000 18,000 18,000
204,000
27,000 27,000
Increased flexibility in the stojrage area will allow a capacity increase of 5.7M lbs./year (from 48M to 53.7M).
Estimated tank car shipments for 1971: Estimated tank trailer shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971:
372 (3) 66 (3)
25,610 (3) 2,030 (3)
(1) Letter from HJD to RSY 5/18/67. (2) Includes 12,000 gallon of day storage. (3) Anniston Job No. 370-720 (1) by R. H. Taylor
Mixing and Drumming Area
A new 12,000 gallon mix tank, a relocated 2,000 gallon mix tank and an 18,000 gallon mix tank
to provide for:
Estimated tank car shipments for 1971: Estimated tank truck shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971:
55 (3) 1 (3)
5,764 (3) 1,312 (3)
A new drumming station with associated conveyors to handle 150 drums/day. (Basis: 8 hrs./day,
260 days/year, 75% OST)
0725826
TOWOLDMONOQ44912
CEA 1430 & 1800 Date: August 28, 1967 Page 14
Flaking and Bagging
Aroclor flaking capacity (Aroclor 5460) 41,500 lbs./day (Basis: 8 hrs./day, 365 days/year, 75% OST)
Aroclor bagging capacity
2 bags/min.
Biphenyl flaking capacity 18,300 lbs./day (Basis: 8 hrs./day, 365 days/year, 75% OST)
Biphenyl bagging capacity 2 bags/min.
Flaking and bagging design will allow these operations to be carried out on a one-shift basis, seven days a week. Exception is Aroclor 1268 which will be flaked and packaged on a three-shift basis, seven days a week (3% of production).
Raw Material Storage
Raw Material
Provided (gal.)
TTCB TCB
12,000 12,000
1.422 WGK
Finished Product Storage
Recommended (1) provided Future Need
Product
(gal.)
(gal.) (gal.) (1970)
1242 1248 1254 1260
TOTAL
132,000 25.200 34,400 20.200
211,800
84,000^}
42.000 42,00014' 22.000
190,000
66,000 66,000
Estimated tank car shipments for 1971: Estimated tank trailer shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971:
112 306 12, 200 765
(1) Letter from HJD to RSY 5/18/67. (2) Includes 40M gallons on hand storage (3) Includes 20M gallons on hand storage.
Extra storage required for operating
flexibility. (4) Include 20M gallons on hand storage.
0*2582?
TOWOLDMONOQ44913
CEA 1430 & 1800 Date: August 28, 1967 Page 15
Raw Material Storage
Raw Material Biphenyl
Provided (gal.) 125,000^
(5) Includes 25M gallons on hand storage.
Provides capacity for 4 - 20,000 gallon cars and six days' supply at increased rate.
New unloading track and docks provide four days turnaround time at increased rate.
New Manufacturing Facilities
Continuous chlorination:
Basis: OST: Rate:
Producing Aroclor 1142 7,950 hrs./year 43H lbs./year
Semicontinuous distillation and earth treatment:
Basis: OST: Rate:
Producing Aroclor 1242 7,950 hrs./year 40H lbs./year
For the overall product group, after these additions are completed, Anniston and WGK plant capacity will be as follows, H lbs./ year:
Present Capacity
New Capacity
Increase in Capacity
Anniston WGK
48.0 29.5
TOTAL CAPACITY 77.5
53.7 69.5
123.2
5.7 40.0
45.7
Based on 1971 requirements for both plants
(July 1967 Sales Forecast), excess capacity at that time will be:
New capacity Required in 1971 Excess Capacity
Excess Capacity
123.2M lbs./year 99.2M lbs./year 24.0M lbs./year
24.2%
0725828
TOWOLDMONOQ44914
CEA 1430 & 1800 Date: August 28, 1967 Page 16
1.43 Flexibility Requirements
1,431 Anniston
Increased storage capacity and blending facilities will allow for better utilization of present still capacity. This will be accomplished by longer runs on the same product and result in increased pro duction capacity.
1.432 WGK
Based on the sales forecast of July 1967 for the Aroclor product group, batch units will produce Aroclors 1248, 1254 and 1260. The maximum capacity of these units is as follows for each Aroclor:
Aroclor 1248
8,750 hrs. X 7,200 lb./ba. X 5 chlor X 92% OST = 34.4 M lbs. 8.5 hrs./ba.
Aroclor 1254
8,750 hrs. X 8,040 lb./ba. X 5 chlor X 92% OST 30.8 M lbs. 10.5 hrs./ba.
Aroclor 1260
8,750 hrs. X 9,100 lb./ba. X 5 chlor X 92% OST = 29.2 M lbs. 12.5 hrs./ba.
For the year 1971, the maximum batch capacity will be:
For Aroclor 1248: 34.4 M lbs. X 21%*^= 7.25 M lbs..
For Aroclor 1254: 30.8 M lbs. X 35%*^= 10.80 M lbs.
For Aroclor 1260: 29.2 M lbs. X 43%^= 12.60 M lbs.
Total Batch Capacity on this basis
= 30.65 M lbs.
(1) From the July 1967 Sales Forecast for 1971.
0725829
TOWOLDMONOQ44915
1.44
CEA 1430 & 1800 Date: August 28, 1967 Page 17
Requirements for 1971 are 20.3M lbs., leaving an excess capacity of 51% at WGK.
For 1971, the continuous system capacity utili zation will be 25.6M lbs., leaving an excess capacity of 56% at WGK.
Flexibility will be designed into the WGK dis tillation systems to allow for the following operations:
Still No. 1 (existing) Aroclor 1260, 1262
Still No. 2 (existing) Boil down still to separate Montars (residues) from all products, Aroclors 1242, 1248, 1254, 1260 and 1262.
Still No. 3 (New)
Aroclor 1242 or 1254
Still No. 4 (New)
Aroclor 1242 or 1254
Future Expansion
1.441 Anniston
At the completion of this expansion, space will be available to the north of Building 27 for the addition of a complete new solid Aroclor line. Space is avail able in the tank farm area for additional tankage.
Flaking and drumming capacity can be increased by adding additional personnel and operating on a 2 or 3 shift basis.
1.442 WGK
One of the objectives of this expansion is to provide 25-30% excess production capacity for Aroclors. As we use up the excess capacity provided in this project we must consider the next step in department expansion. If we assume the product split will increase propor tionally according to the latest sales forecasts, we can postulate an operation diagrammed as follows:
0725830
TOWOLDMONOQ44916
CEA 1430 & 1800 Date: August 28, 1967 Page 18
1.45
The layout of the new chlorination-distillation facili ties at HGK will allow space for the addition of another chlorination unit, intermediate storage tanks and two additional distillation chains. Aroclor 1248
and 1262, because of the smaller requirements, would continue to be made in the batch units.
On this basis, we can postulate productive capacity as follows for liquid Aroclors, M lbs./year:
Anniston
HGK batch units Cont. 1242 unit Cont. 1254 unit Cont. 1260 unit
53.7
29.5 40.0
15.0 15.0
TOTAL CAPACITY
153.2
Physical Appearance 1.451 Anniston
Tanks of different heights will be grouped together to provide standardization.
In the flaking and drumming area, provision will be made for moving finished products directly into a new warehouse facility (when built) .
0725831
TOWOLDMONOQ44917
1.46
CEA 1430 & 1800 Date: August 28, 1967 Page 19
1.452 WGK
Tanks will be grouped together as an exten sion of the present tank farm.
The new facilities will be a separate structure to the south of the existing unit.
Storage and Shipping Requirements
1.461 Anniston
Facilities provided are noted in greater detail in other parts of this report. Provision is being made for:
Raw material storage of TTCB and TCB.
Finished product storage for all liquid Aroclors.
Loading docks for tank car and tank trailer loading of products.
Moving filled bags of solid Aroclors and biphenyl to palette loading station, then to warehouse storage.
Moving drums and cans to palette loading station, then to warehouse storage.
Storage in the drumming area of the new manufacturing facility for empty drums and containers.
1.462 WGK
Provision is being made for:
Raw material storage of biphenyl.
Finished product storage for all liquid Aroclors.
Unloading docks for tank cars.
Making an existing unloading dock a loading dock for tank cars of Aroclors. No extensions or additions are being made to the present blending and drumming facilities. WGK technical service is modifying an existing storage tank to a blend tank and revamping piping in the drumming area.
0725832
TOWOLDMONOQ44918
1.51 1.52
CEA 1430 & 1800 Date: August 28, 1967 Page 20
UTILITIES AND SERVICES
Utility and Service Requirements
1.511 Anniston Additions
Steam - 100 psig-For Storage Tanks
2,000 lbs./hr
-For Process Purchased Water- For Process (Cleanup) Compressed Air - For Storage Tanks
500 lbs./hr 150 GPM
20 GPM
Plant Water
- For Process (Flakers) 300 GPM
Nitrogen
- For Storage Tanks
50 SCFM
Electric
- Connected - Operating
300 HP 200 HP
WGK Additions
Steam - 80 psig - For Storage Tanks
5,000 lbs./hr
- For Process
3,000 lbs./hr,
200 psig-For Process
Natural Gas
- For Process
600 lbs./hr, 1,800 SCFH
purchased Water- For Process
150 GPM
Compressed Air - For Process
100 SCFM
Electric
- For Instruments - Connected
75 SCFM 315 HP
- Operating
250 HP
Plant Water - None Required
Nitrogen
- None Required
Utility and Service Facilities
1.521 Anniston
A new spur track from main track at north of plant to 5th Street, 1700 ft. long.
0725833
TOWOLDMONOQ44919
CEA 1430 & 1800 Date: August 28, 1967 Page 21
A new 300 KVA pole line transformer to supply tank farm and warehouse requirements.
A new sewerage lift station to replace existing field which is in the proposed manufacturing area. The lift station will tie into an exist ing city sewerage line.
Relocating a 24" IPS VC acid sewer.
Installation of a steel frame prefab-type building, 120' long X 60' wide to house the flaking, drumming and bagging facilities.
This building will be designed so that it can be attached to a new warehouse building which will be 120' wide X 240' long.
A 15' wide X 80' long tank truck loading sta tion.
Relocation of existing plant parking facilities 70' wide X 120' long.
1.522 WGK
'
Extension of existing track 10A for 110 feet and installation of a turnover to tie existing track 10A into track 10.
Replace existing gas meter with a larger capa city meter.
Install new pump at department city water break tank with associated piping.
Install new 600 amp breaker in Sub #17. Install fans in Sub #17 transformer. Transfer feeder 8-1 from Sub #8 to Sub #17. Install an overhead feeder from Sub #17 to Building CF. Install feeder cables from breaker 8-1 to Department 246.
0725834
TOWOLDMONOQ44920
TOWOLDMONOQ44921
V | ^1 vgi v^l
* A K
---- >-
A-
*
0725836
TOWOLDMONOQ44922
*
0725837
TOWOLDMONOQ44923
TOWOLDMONOQ44924
0725839
TOWOLDMONOQ44925
iff?)} 0725840
TOWOLDMONOQ44926
AJ33 Ki,PPO
----------- ^
#
h-
\ o 'a_
K
tft'ZCMLk
n*/>6e -ft#
*'J3S) *
k
/&*' 64; \^rir.L
:73S-'j
6
J/SS 1 Sn I
0725841
TOWOLDMONOQ44927
jfx/VA/li of, <- Gh*s>e/> t' Sitrjj. >/l- : /)*>/* r "fj
fp) /Vo /- Wo 8 1mt _-J ~A y ir^sf .f6Wr*a/r/- A:'/*/.'.
AMtii*'* A
0725842
TOWOLDMONOQ44928
MONSANTO COMPANY
^HOWPWCnCVMMVPMMMMMMII
ENOINEERIN0 DEPARTMENT ST. LOUIS, MISSOURI
/fxs-'dfsv /!rou.ck Otf'/i- -:r
Z'A'Ofls-t/A/': ~______________
punt
-WA/.cr^y
|
LOCATION . /iti/vt&Tfj . Sli/t
/*,' ,y7` //- qu/V
0725843
TOWOLDMONOQ44929
/Ten 7/9 \ /Z4Z '
/ren/Zo "/IS* '
DC tl 6N MANY UCTION NO.
PREPARED ov
______
ikiit___/_of / ...
Jrj^67
'2 R*V. NO.
-- 59727 AWp ASA
n"t*r<
?vW ^vii rr SiU> , Owl t.rvr
OAT*
RCVItlON
OHM (T/Ml
APPROVED
________________ xsrr
V
ftSTf V
OAT*
0725844
TOWOLDMONOQ44930
07258*5
TOWOLDMONOQ44931
OEAION MtNVtl CCTI
TK NO SETIMATE . -
-
IT1M ) t.A. h
PMEPAMEO V SSStBS. OATK ^^7
EH IE T ._, . / ^OF_Z_________ _
'
...
fjC
Kr-mP*v> 3
/ f',^.71.. ChL
.a?'
.
#/>
- $77 . #t>TT
y c=L~L _ ^ ^ ^ ^
3>|
i~i
*. /&/g hlf,fj?./ft-rt> &37.&&'}Cmt> 6/b
7?37
iim '
/bese 4 /
r3mM
0725846
TOWOLDMONOQ44932
OONSAWTO COMPANY
IHOlNCKAINO DCFARTMCNT IT. LOW!*, MIMOURI
tattTiBM 5flvT'f
J5af>Hrtr /W cSway-
.........
4o`
i II I
072584 7
TOWOLDMONOQ44933
KfTIMATt NO.
I rntPARCo 1 ink t ____or J
\l7*-y?&T
76 /rt't /Ori(exit) 7c Cn*cf:/cAraM3-
V-tiA /rllf.rjU. ArL
JICBiiSBSfjUf
TT^fSHZ. WL -'Aflf ,
0725648
TOWOLDMONOQ44934
MONSANTO COMPANY
iHOmetnmo otPAfttuittT IT. LOUIS. MISSOURI
dXOCloK Gt/'/tctrx
MJi
CM
3 6LOCATION < rtt/ T / /JU.
0725849
TOWOLDMONOQ44935
A*A*OV*0
Y .
OAT
0725650
TOWOLDMONOQ44936
MONSANTO COMPANY
tNOiHceniHO ocpaptmint tt. LOUIS, MISSOURI
JTxpam dx&fioA. OtrAorr fcWlr/Mi rfl/ii'}crc * AXCQvcKJ _ lacATtftM JAttAfT, //-U */&/
fktPt faioc/v/ms Abs 6, 7,8, 9 '
,
0725851
TOWOLDMONOQ44937
vaer.
V7 jX,
/ P^77 Atvtt /rtn v Si
MV. NO. OATf '
RIVIIINf
6B-1M 17/Ml
1:
AOMOVtO V
TST V
OATg
0725852
TOWOLDMONOQ44938
MONSANTO COMPANY
ENOINCtAIMO OCPAMTMtNT IT. LOUII, MUOUMI
EXPAND AROCLriR C.APACltV mYW. 1 .ATlrtN .L.T W6 KRUMMRICW
EQUIPMENT FLOW SHEET
0725853
TOWOLDMONOQ44939
iee:t
01C*1TOIOMNMMANO.UAL _ .. .
timat no JJsQCi________
prspaiIcd *r
V4Tf.S
HUT -4- or *T
; N*-
nt/v. wo,
s-is-a Avktt // SO-1, gzs.i'Zf' .0^ tfvvD OAT* 'rin/.rzz,
OC-IM n/MI
dWc/nb/x /'i
>
aapmoV vko
Mt' Y OATt
0725654
TOWOLDMONOQ44940
IONSANTO COMPANY
iwaiNECAlMO OePAATMtNT IT. LOUIS, MISSOURI
/}koCoK Clr'rtCtrY Iaxth VA&trAj/TA/r
u.t
LOCATION SMAtrr //JJA/6/C
0725855
TOWOLDMONOQ44941
iTt NO /0>O '
....
*^*> &___~ zfi
~4~Jr
'IKj-; /fpfisyj 4 /for 9
0725856
TOWOLDMONOQ44942
0725857
TOWOLDMONOQ44943
LfgMO [Dfroposeo FACiitr<c$ [L [XltTlN( FACILITIES CW* ClTy WATER FWF F'RE WATER f# fiRE HYORANT
SCALE'
Appm/I' /' & Ams /
Ot* <
0725858
TOWOLDMONOQ44944
,Tcray^TS5>?
c
o
0725859
TOWOLDMONOQ44945
TOWOLDMONOQ44946
7-26-A/ fan
DESCRIPTION
REV. NO.
REMARKS
fhtortrcM 2to
Pi hrni Z>3. Zwft, A20 >
3* 2 - /3 ///
OPERATING TEMP. A pHeSI.
MATERIALS OP CONSTRUCTION
- _____
71 /rAi <?// /i /re>l i'/i', '//mitoASd, C.rjj, iV
--
/a*,///
W/r/' ^#70 Z'v/'uf /*} Hf/rk A/l
/8"x//r) ",/)rCA jy.*7*
7SiC*
5/wtr At. Sr ?o J
/aft i Safi -$ r
Axi/ft>An,M
SfMt /fc !r ~7oll
/Co`t 4 '~t
Samc Ar> h 7->H WtrH *} i 70 &'**** Jft' tM AM* &&F? *
Si*if /K h- ''07
*v*re. rest
*
.
/oo`C 4 PCI /oft 4 'Rr-' ^iLi. -'./
At-uclimwil /A/Mz/VCM AjXit rtJWlMtj
5a<- />: h '/>? $Me s*J- h 'So/ 4v'> At->'-/?
`
/(x>t 4 Pd !U'( 4 P'-! /OCX
Aii/oi/a/VM 3/iCC
Ac 430, S/? ixAA
7/rrc toft TfTc
3/(Si
/v6 ,430, 5rc< 3*-?-/3
/OO^l 7(f e
3/(&c ,
Av's Aid, Size 2*?- /3
/ooc ' TEFC
3/(SS 0725661
TOWOLDMONOQ44947
MONSANTO COMPANY CENTRAL engineering department St. LOUIS. MISSOURI
PROJECT. _
____
SUBJECTJ'fti itj.cfo.
PLANT__________ZlA/mx7.&S/. . ____________,,
LOCATION_ _ _ _ _ _ AAH'Znijv____ ///&______
PROJ. NIQO.. PREPAR . OATE^l!
, TEA NO. jsm:
equipment list and summary
APPROX. OIM.
NOMINAL PATINO
NEW OR ON HAND
ITEM NO.
NAME
-4^ wu-mm/mr Ars>jw &P /?/
//,5d>0 <5/1.: i J/i /5tJi/ /SO'rOM O/J
7oo I'A Y 7/ir-j/-'
70/ TpAtV $ ^fA1 Ajf*.i P
Oh 701-oci /'iif(. /A
3te** - ^7 farz/z/r fta* /?/
JhSoo AA/z OH 70 Z i>A/ 7/trv.K
/Softthl JZ'L '70A SAL .... 7o3 7ft/fa,C.2~
Oa 7'/:a:oi AIook
/$}>* x v:'' ' f V )$h.'A -C' * ' ^ '
77&`S /* : A/ *7?vo <?//:; 7/
7os/ Ftminto (*oct> (
205 /'//l '-At
:
/ssi
A?4z
/24Z /?S4
/Vb,A / Zf\V' '
/S'U4, W''"
i\ /s'Pm X 02 'r- "
n`t>M x au "
:;PV
X J J 'r? "
/ii't'A r 6 "
MirnAjcch r*<.
V\-
. . V//V //<yv .S?*/ .)
:|A' ' M/x Albv/ oWi
% /c*s' <?* -J *7t>o- `'/i-'. /3-yj-, o/t-t.1. /&;' /i/U C /ft'V.YI OAlZ /Soso os.: i
S'coiSM) Air, riifj
tftp /co'ft) A
>SHr- /6u
'>/ fo'7t>H
/SHA /AioA'Psl
/V /V
A?
At
A/
A7
// /V -V <v /K A
V//v/ $7* ii/li ii'bi.ft.t /on '7t> H /K /SA/r` /(tofi Kris/ //
70& C/ntAueO
70V /n.litfi-, Ocoi. .
/2 s-*;
72/3 Fif.lOHtt, Ca.VZ.
70?
'330*:
7/o f/K ' w A A ,* 'CcoZ> /-'i7,/i%k
lZ^ n^i
Ou : .
K&*
7/2 6co>$
7/3 !fx-Z^AA 'PC. r< /"tfPi; A>
f
7/'2'06) AioTu H
7/1
j/'*v Tu#)/'*
7/4'CO/ AifffaR
7/S /AAa srt: / < A',i --
7/S-M) AA/cTt,Li
7/& Caa c-A(-4770
7/7 7fiA}i,iA/CR 7ifn
7/7-00/ Ax/cTok
C' /$><,!. /
0725662
TOWOLDMON0044948
rev. NO.
DATS
/ 7-ze~a
DESCRIPTION A/ZS.-'S-s
REV. NO.
REMARKS
OPENATINO
TEMP. * PRESS.
AiU.r
- - c W*rn *
/Vtwr /*J /lA/: i-`A. i !' V
Set /r 'it /
/,- 77/
A>r.y, /v?c
./
/&>:. S j
/fo<r
A,
MATERIAL! OF CONSTRUCTION
:. >/. -5 ' .r1. ' <? ,,>
Ctr h '/rj
tw-f Sut`\:
3/6 00
W/rfl 4*70 5'.*<* T'ttl.r' /'*/. r/fr 1
/p"+ /t, r" -/),>?/! t>n *-
* /O0ll 'A P.7 Al-ihhfifjfW
i.&HTHlWl Mittfu MttH SFAi.
-A'.'w/ J>
UJPTH
------
1
!?
jc-
Wtr* ^ M 70 /*V W* /tec* Si fr * 4a. r //' 506 5f/z> Oia*.
,
; 5iT^ # /a* ^< *:/ Ai-OkaA/VA)
/flsV
.. C.C
S`/
4/5 4^0 - 6/2^ 3y / ^ - /"
7Vrc
3/(, S5
A5 470- Site $*l}z->3
S./L CO
'SfHHXitrir ft &3i-/2 - rji Ante,
fXfr^r Srtn\ SV3 - Sr** Kit / p /$ $ z& -
&7'*6 rr* ahsp
,
M'/iy. ? * 7o swvw 7 4/OS
Tet,,,,.. ~
/& 'y / 7'1 -
A <T6 r 7 '
/0 cex #
rfrc /ok fc/'-/
/ttfC Sor'c/ soc y> 1
304 SO 304 GG
CyAPofy StC?,
0725863
TOWOLDMONOQ44949
MONSANTO LOMf'ANV CENTRAL KN&lNEtMiNU [.EPAR1 MEM 6T. LOUIS, MISSOURI
PROJECT.
S/CAa U UU________
3ToA6
it.ANT_ ..Jw&n&ju__ _______ L-
LOCATION. /brw&iufi/ j A*#__________ _
DESIGN MANUAL SECTION NO _ . . _ PROJ. n6------------CEA nO. PREPARED B V f \ %- S'**
.
3GSC
::*rr.
Am
F N
oi
% APPROX, DIM. 't
EQUIPMENT LIST AND SUMMARY
NOMINAL RATING
NEW OR ON HAND ITEM NO.
776
NAME f/./t.r. c-
/i 7/'? Akcourr /~/i rcn
A/ 720 f'hobvtr A-ji rr*.
IS'to/
A/ 72 7 7'h.z:. j/t /"ure-M
7-?Z Chm cz-lb o
i& "D/A * ' i&h/> II 'l//A *./$'<> "
CW'r'
A' 7^> Si^o>yjfr /-/j./si
72-J O/Ar f / lc'c
A isc /I/* 7?/v<
-V 7/Coo/ Ibiyfr
h * Zi '<3' S*#i *<r >a
S8o XPr.i
/V
7iiri/` /Sexaa.i a'
/0<wo
. A/
Zl'X) OA:
6H
OS
OH
7?r-ooz A/tTmcH 7SCOo3 Sloro+l 72c: f'A/is/ies, S/cvb s'zAint/p 727 /*f/y <fov< 727^,' / 727-03 z Ac/tAm <
Ctf 7/7-cos Aloft,*
.V
/SoSr/,) /<r,'7Ztt A 723
* /T* p\* i/Mi^
' ftHr3 /4i
/I/ 74~ooi /% :;o /%'
/isdcm /io'rc>v A/
127 720
C/r/oe/ ii.tr. o 7A//vOAr.H Ai*-/>
WSfe'v 5vv `r V.., . .
Y7. //W , /a 'o *
V 733-0Cl) Aforo/i
. 30/ !*a7
/V#- 7.5/ Cur/rn' "$&? Citrr/i.
/iex-r ,*/. // " 733 TVS V>c,HA* 7*i, v
/ktSssaJL {%$..<
.
0725864
I TOWOLDMONOQ44950
NO. DAT*
/
DetCNIFTtON
8-23-67 ApMbtrliJ.im, Tf i
RKV.
NO.
RCMARKI
/3See Mr# .3
;
/f.?o , 5/z,f 5v/H-/3
ViVoA/w*w Jfefc .rorrit/<t Be>x
'
TKMORR.tRAATRlNROEM.
&>* X>AS/
Ter-t
A?
MCAOTNEtTRRIAULC*TIOONf
fifteen/ Srvtj
Due rue /Raj
T(Fc
Ca'-ut Jr&*j
Art 430.Sue 3ii-B^h. Jr6o?
2 Avi Aiff; Sue 3V?-/, Ac/* h <os -?
Z Art A3d. S/2e 3>2~ /3. 'Red Jr 1 2
/v
Tire JooX
7(7 c /ooX
TCrc
3A tS 3 A 2 3/4 2 2
072S865
TOWOLDMONOQ44951
MONSANTO COMPANY Cf.NtRAL ENGINEERING DEPARTMENT
SI. C$<JIS. MISSOURI
---
/Hjux'c - 6c&j-,Snfr\*c__
PLANT_
'lL$&... .-- . _______________
LOCAT.O_ _ _ _ _ _ _
DES'ON MANUAL SECTION NO.___
~H3S~ 3T
,, /V/?M Ol
...
r . '
N ' ' '
APfffOK. OIM.
y^. //'0 '%fi * !8'0"
W
EQUIPMENT LIST AND SUMMARY
NOMINAL AT*NO
/Zooo Sal.
NEW OR ON HAND'
//
ITEM NO.
73 4
NAME
77(8 SroSA'.f H>/vc
ISoOpm /oo'TPM _ /Y . 7Sjr ~/<Afji~nn /$,,& /o HP /QoaPP/1 H 7Sf-HJ Htono^
73 6 Cma/CG%wt>
/SOSPH /co'TV/-, H 737 ^A/te/Ab
/sHr
H 73/-0VI SitlToX
738 Cfa,i k l.: t
Mirh *kr# t /u /SoOPa) I/O 'TPM A'
737 Mu - /
Txjk HmF
JSMft /BcokP*i
739-eol
WrtH AhtV StAt /SotP*/ W7VM H
JSf/P /BtoP/l M
740 A/<j. i jl T/vk 74o-ix>l /rf&faA.
!////* Meat 2cax. /SotPM Ho 'TPM A/ ISHP /ScoP/M H
74/ A/o> 3 74/-M! /%Fi)rK
A
--__
1A ' . V Vl :
.
(
/QV".'T/V u/ c' &! <,* 3
07*5866
TOWOLDMONOQ44952
RNEOV.. OATI J
DESCRIPTION
i /fwa // Bo z
MONSANT CE^TRAt St. LOUi!
REV. NO.
REMARKS
OPERATING TEMP. * PRESS.
, Atic4 MATERIALS OP. , CONSTRUCTION
7&Ll)0 tiabec V/U-A 6k8 UjKr/'tr
At sfieet>
sc* is s?nj.e*___
/ft)0*:
Srea. ,
CtfO'V OPAAATeii
.
Joy tlobCi. fAva A'RFtw
eoac>i
WoOrthuftTo*! 9Xla/P* W/rH Ah 7f
67*61:
.
TQwtf?
H/)2
/utL. TAkK,
CvAlPt, A1/tA/ Hoi
6aovity r (P
7fAiT TFfc
Jtrc rrrc
c. S.
> '
.
Sob* e.c.
cr
'* ^.acrtor..-a.. 072586?
TOWOLDMONOQ44953
l.SAi-no company NTRAL ENGINEERING DEPARTMENT
COUiS. MISSOURI
rffocto* /FA/ittv
^JBSZSSZZZZZl.
PLANT__ .Jvv.i'fiM____ _ _______________
LOCATION
_____________
~7*3cTproPj.AnRoED___BYJR&jfalGjg------ - _
PREP A
T-~0"6/ AHAAt 7 DA P-------
TA O!
APPROX, DIM.
EQUIPMENT LIST AND SUMMARY
NOMINAL RATINO
NEW OR ON HANO
ITEM NO.
NAME
Boo tW^fru.eo
l Z4"*- 3e>Pi/>TfL<t>t /to 2 ^Cupvi u /ff'r/
$01 2) Amii A~ul cn
86 2 Cosot'iu.ev
`tS'fvitf 9o tevO
CloA'AA-C Pi -i ZO Atoijrrrt-n
\
A/
03 2)^0/*} {*KtV'6rii.
a! te-a>f Sfc/nA
SO /Or) P-CJ. o..
Af
8<y) Cw>)i>Ar. z, i.jAi
Z5/tP AAooPP At dcrt-06) '%'t*__ _
f*.
$62iSV~" AHiPK Al/ATC At
8os- iE't?a42
Asc/Ocar/Pl ..A5
A/
/vSTA1 /</ ? HA '/Cfi,
3cCPM
A 8o7 SciufAAOe tTy/fifro'i
t^HP
At eo>ioot
V'
/A HP
At eol-ooz
-- $6*U,tb V & lo*v&
A____ m
Coo\t/<'/'. Ft,A /nll-rifi
/^ . ;r _
^ ( ---^-----T"
fxdstZ. ".far.::.: ' .. .
. ` ' ".. T,p;i
* *_c;
0725868
TOWOLDMONOQ44954
RIV. NO.
!
OAT* .
DMCAlPTION
AtfbGb if 8% 61 A*V /r $f>
*iv.
HP. RCMARKS
W>rn H> 7e> S'Mfiif Ae PtStrcK/i-z
/ se,"xn*
7wzi*
OPtRATlNO T*MP. 4 PA.
9ooC 4t/y\
MATERIAL* OP CONSTRUCTION
.
GlASjon, SrtHT.
W/fN TA HOST
7oori*
Mm MSft * (4'4 x A>`)
Twi fytPC Ami CirfHov Sti/l
fer 3mY orp Ak/v 9e>4cc.
ite'e Met) Vto*) fit PLAtCb
Tare
3o4S5
.,
'
TSfc Tbt dr.t
364 S
Srfevi fc)cr fat*. WnH SCrr / & '/ti Sr* b n>u Mca 1CFt'- (1'S* ')
Tsso * /ooce Ama /ooeC />*)
3c4
6# Sort, SrtfL
2>^uat
Zt>( 4 Su
Tire.
Srfesn FoHttt f-ti-j %ekcH
Wt Mm
3o4`Zc : Sofss
^fiAotrY ffPF
T0LEP6,
foil
Retort. - <L +4ZM
K-C4ZAr HJt&a &&?,'i$Sf
Tffc
Terc 7FFC
CtA&f, Srcu .
' ,\ :,: ...
0725869
TOWOLDMONOQ44955
IS*NT0 COMPANY iNTpAL ENGINEERING DEPARTMENT
LOUIS. MISSOURI
PROJECT--.
________
UPJECT /jAKHVe.
____
rl ANT--------- /pALC'&V__ .-------------
VIAl. OCat(ON_______,
__________________________
PROJ. NO.-.
^ C g * N<
PREPARED BY A'Zy&rCf,
nATfgy/'g/tHffT O nr
.<Q_____
t># - Oh
EQUIPMENT LIST AND SUMMARY
.! APPROX. DIM.
/o'bft1 V fa* IGftf, (,'6 "DM v '/V "
NOMINAL PATINO
Sooo <si. Sooo Sal.
NIP OP ON HAND
/V
ITEM NO.
8/o
NAME
A/MUi,/; SJo/iASK /Avr
A/ 6/! S~$60-//d& &/**,/: 7/t)
$' &
S'W/CjIx A& `tint
900 */Ay /OHO
A/ Af
Af
$fy6'v 41 Mt d'yf'y'f ~ 'p/K y d" f ' &H//14 v ZtA/6
3'vd'x 'A**
Z/V6
% B/tt ~ //a t/y /(90<5 OAL. SOSO *//r
Stir
Af At A/ At A/ Af Af
d'*d'y9'//t<S// UttOL.. *) B/ti'. /non
3//P
A! A/ A/
Pi "uiDr x 3e `itn< /`fr* re'
At,* Zoo 48 MAy
Af A/ Af
4~try>i AoPs/s Af
V.
f.'V ' .
N
rtp /too ftPm Af 4ScrM PoPcMi A SffP PfooPPM Af
OH
G/z /IAmu-iA Av.rt.yrx;
Q/oool
8/f'Oaz.
B/Z-OC& A/ercy
6/3 Artis''/"*'*'f\' '
6/4 AAiAUh rt'i fyvir
6/S 6/6
^v/y/^/v W,
7%+a<
BlAMc*, YL A~vyyf/$
&i-06\
6/7 O/qk'a t/F ^Qr'fJjr/\
6/S K'D/zct^xv Baa P/u/ri
6/? Firtrrrrjen-
e/9-06i A'hraH
@20 @i)
6/tli PtM/VMYaK 6>tue AOi^KrtL/Dv.
6-43 Chfck SfAvtr
633 f/UtZ>f2pas'*
>'<d$'.y/x
m-ooi A-jo/nrtt &Z4 PfuiD/x-x/O //>A BvHntrfi.
639-06! A/oAoA.
--...............
1
BPs '
f/V** &CAJ. , /* J&* #
/tW/Lr/J V C ' f^'*
0725870
TOWOLDMONOQ44956
RCV. NO.
/
/
MV. NO.
OAT*
OCSCNlOTlON
/ e-su? 4*nr /r 027,03$, 03?
MONSANK C<MTRAc.
ST. LOU!
nkmaAks
j
OOCNATINO TOMA. 0 AMISS.
/)%* -
OPMAT INI AH
:
construction
f/t-t&n rtr'i
!/Jtm JiH) FP Ahv Cr. i v.
IfJirtt Jttb FP/>** srsc*
/.; .
.
One t)P (t,oLK< - Soft /oh*
/, kltru rm FP /M> itT Xo *
/ /
/'
e * it- ii '*
TCFC TfFC
3*4 1 -
. " . 'V
7*Ft 1WC TlFC Tere Tefc
304 S3 : 3*4 S3 ;
,'
S4 SS j'
Che&n) &TttL.
7TFC . . {..... ---------- ------------- i
0725871
TOWOLDMONOQ44957
C>NS*NTO COMPANY ENT UAL ENGINEERING department T. U)UI*, MISSOURI
PROJECT...
us->*tT_. /*/
HvS,
PLANT____ . .teffatni'm ____
LOCATION..-OVMi&*L. / 7%Sl__
PROJ. NO.
W3e>"
PREPARED B v.~-,
DATeg^^J^SHceT --^,. qpJtL
;y/ - Ol
APPROX. OIM.
-- C W'b y 6
/2 "y /o ` Suv'. 1?"X 2/tl '/ti/v'
i tut /%"*/ Vtvrt --
EQUIPMENT LIST AND SUMMARY
NOMINAL PATINO
NtW OR ON HAND
w
ITEM NO.
SZ6
NAME
73(8 siuvL
/SHF
N 821-00! . Cfeog____________________
8? 7 Obvfeu.c (
favCrA
a! 8 23 Sutr/tirj Cti
$Hf~
8&a A/o'0*`.
Si 7 6Ant Siu-t. 4>
a! 030
A&Htvrii. $ooi>
StePif o'rt>N a!
ez/ I2&8 TpAH'orcH HimA
3HF /e&j'V'fy N 83PM Aiiv/on.
Sof,Prt So' TbH /V 3. HP /HooRfri A!
032
81pH SkA-n, A'/nrofi,
Hm/i
Cf:/> ce/nA 3HP
A/ $33 5//V a! . 634 w 631-M AfescH
Yok
A/ &3S /7 (d (cwYcyw
3HF
4L- 83S-C0I AHfoii
A/ eao . P./PH /'it, vf Ymc
SHF
a!
Sos/h1 so 'n>H N
3//P ftooRM //
63/-Ml 837 Ts/frtjlfCH Hvmp 837-001 A/uro \
7So (Fh\ *Ahp
// dsg t/ucr /iiLCe'oit
N faS-coi
Afore*;
/coo CM
/)/ 83 7 SivCT/fto Bm>vCa!
&/l ----S---l.o--T-c-v--i---. ---*--a--- ?rcai*A>-
///?,r. V* &i* }'
0725872
TOWOLDMONOQ44958
OKtCRIPTiON
MONSANK CENTRAL
ST. LOUIS
RIV. RCMARKI . , iJt/l t y< > BathivZ* Vs" AferW i * V/i" h/lfc P'SO ft >fi"S'ifaP./,c
AvS Mo , Srze3vZ-/o, Ttn> EP
ORKRATINO TfMR. * RRtU. 0St An* es c
/ifilA t MATERIALS Or ' CONITRUCTtOM
Sl&tL
&t',r rta.
7trc
Sfclltr V/t * IV/M /!>0/T tkrAt'Xe' r'Sckto P.fxU/ 2tto*t
Zco'P 4r#i (Atii&H Srtti
esv Am
Swt.
CaA'^-n Cftfi.
Sfoi} t*-tyfo f W/tfi /oc I t */' tAuchbet. 4tH* Kctx,rt*<
Ten: esC Mm
(a A/3CH Sref L-
CWL
AyS ASO ,S/2S 3y /'4-to, Jtrz> EP
rerc &s*c
Qnr Stcil
If/lTH S S
K
Art A30, Sue
~/3
7PEC >So`C SPi> /Sot
(/fiPiUfy SpfL 7>vtrii /Row
2)/&.cie/'%j>5i. A 58 $ S< SfoivKi 7]'f/V
TEEC Crru. Tubes
Htfc Safe/
rrpc
iso'c sps/
Mljyy Av$ ,430, 5/aff 3*<!'/3
>5oC s PS/ &h^6am Srtt L
/Sit
Therite Mt*
rpre 7ftiteft, Svetme&co * C~3 P'A'/t^irr X. "txjnfr
Wme-
/4t*e*. nA/*r RA**** ^/rr/A*t
0725873
TOWOLDMONOQ44959
MONSANTO COMPANY CENTRAL ENGINEERING DEPARTMENT ST. LOUIS, MISSOURI
[PROJECT.. SUBJECT,,
fort d!S AeHnvr
/Art* '
.
JSr&uuii:^.. /foUmUA^.,
PROJ.'NO
CvE . NO /600
PREPARED B vAlU/yt^f;
-7~~DT i'fo/^'6^ i-E f T .----/ -- OP--
/!<*/ O!
PLANT.._____ LOCATION__.
EQUIPMENT LIST AND SUMMARY
>p NEW ON
>k
APPROX. OIM.
NOMINAL PATINO
ON HANO ITEM NO.
NAME
'fL
26 '2>//V * 519 '
/OO.OO 0 (ZsIL a! 4o> B>P*e*, r<. roHA6e
1. A^r// Ajrrh' r)j,, /oaZHrt 00 'rOH A/ rfoz /HArvi/Wi 7\iv/J
$1///* /tooi'fttt A/ Sol'toV Afm/k
HI /o'6%>a k4o '6 " Z&dOO
OH /oz S/ff/tr* Yi Sra^AriJ*
Ht
v '?' 2j?JX>. frtlL /V fo'i
e* ri Afi), 7Ayji
/2S A'fi'Al // 103-001
ve
.
Ji"""!//) A, *.' ,* r.
fiL /?r A Hoi fifi fol-OOZ Ao/TA?or<
// / A , /tiooKfi*! At foi-ocz /%'S*.
. . . <
ft-
/*/"*//* * '/V "
2 &>'> OAL
A/ 406 ft/Waj Yc ft/rtra ftiA/*.
/< `5 /\ Pa(
At fol-OO! // L>ve
'' //) T'u 'V t.'AvA
a. /?S~ RHpt A/ foi-oaz Ao/rArafi
AHA rtco A-rtri a! fon-m Afo/aH
A/r*/ /)}('+ v
760f-H to'TPH aJ for S/f>/4 fti P/j ft's 'j/rt f/%//*
AHA. /oo??M A/ for-oof /info*.
fL
*7>*1 v
'
/ZOO 6/1
A> i foo Ctftt tz A/o 6
OtV
Wpm filer* St'AL ZsfofoAi /co'/OH A/
4o7 <^3 CtfU/tZ A/JW/J
e\e'*i'
fCH/' /foeArh! aJ /j/00,06J ^U/*K *
foy-ou S'fcraH 4o& /to 6 'CrtloH fiooLOK
2 AH /?K>*AH a! 4oS-oot sft/orz
e-i N fo>7 A/q > Ctii-vA. f1/,jr /ffofi/K/Sy/i/l
Hi. 4'PiA f Zo '
noo tsAi
a! 4/0
A
Mr* filer* Se/,L 266 6m A TM a/
4// Afi 7 Chuh Toturt
/Slip /&oof$Prt N fot-oct AleraH. r OH /0! &"* Stok/ics 7rntvi/*r,< FOri
'3 .
3/1H fidooHm OH /Ol-Ool /Ion* ,
.
. .. ___ -
//OAn.L'V C /vttr
0725874
TOWOLDMONOQ44960
REV.
OATS
DESCRIPTION
m6nsanto central, t
ST. LOUIS. '
REV. NO.
REMARKS
We* #/-?,8 S3?.
BK'hkz, Type
OPERATINO TEMP, t PRESS.
MATERIALS PP CONSTRUCTION
/5o"f SoK/ /Ua/M &A/Z
Sere
/5bt 5Kt
Srm
khrn $ "Spa Ate* 4./S 4 So . $n 3,2- /3
0/Wr* * A 'i 3 S 3 2
.
)S(fl S/i.i
?C.t
/Sift
7>utnL //ten
rrn
/SoC
St>rV.i
Sro-u AlvM
TfFC
Tujsti A/* *
ffe/Hid 7\-,%r
ISlfC SPSI
Mint S.S. $/>Aficn 4/5 A3o, S,zt 3*2->3
V/ut.y n /-ZB 5 3;
/St/C. SPu
/So^C
Atrne /Sun
rsFC Taktz
ISft S&Pi/ /kufA AwPA/^i
7Va* t'W" \Nitf* 3
u t, ^r7 /rj
TfPC
/soc ski 0,/lb?N &ICL
/Sc/C. Amt 6)pdc*v S/t-ft
4/S 450.3/ic B/l%~ SO
Mt_____
Sfe/l + 4tn< tz X"
me
~~~ . //SOO* : 6SC
As 4 So, Sne 3y/>i-/o
/oo1^
//otrae /fav
CaA>Ahn St&-L
2>uenu /fou
me
KJf/My***# A- 401.4
*/4t &*/ *
TV .
>*T *
i/Attr )
/5qC 7sP:/ CliP&OtV
' _
0725675
TOWOLDMONOQ44961
>NSANTO COMPANY SNTRAl. ENGINEERING DEPARTMENT
LOUIS, MISSOURI
40M /B A/Arsr . _
P_ANT________ ............................................. ........... .1---------
LOCATION.
T.J--- ------------- ---------
DESIGN MANUAL SECTION mO -
________ _
paoi no'-------
f. e. &. wft
PREPAREO
.
i-iatb Wl?*47VurgT _fC* A>_
equipment list and summary
APPROX. OIM.
-- e'y8'x '
NOMINAL RATINO
! ,/oo.aoa 2MP Kto RP*>
Ntft OR ON HAND
ITEM MO.
NAME
A/ 4'Z 4^ ~7 Chco*-
N 4/2-6*t /ihnp
a 4/3 A^d.7
4 't'fi 2(i 1 torn /fern &-.U
e'*#'* ^'
/2aO lift //
2C66P# Jto'rPH A/ /?#!* S&Kit.'PM A/ f,jb0,tooitu//Hft Ar 2PP /?oo PP*I A/
A/& &
4//7 At/a 6 CfeoP Aoai/* 4/S>eoi //<?//
4/6 *0 8 C/fi-oA . CoolCf 4A6-co/ A/erop
A/ 4/7 A/oft CPt-ati /h 5/ A~J.,sh,A/Art>A.
''A* y ?2> ' Mr# Aft.:* Cc/l
6\8'y/, '
/ZOO fi/U A/
ZSoCpa) /ec'TW A/
/SHP /Bui Rpm A/
h/Oil,060
Aj
24P l?0O%Prtl A/
A/
4/S CpMA A/a f
4a9 A/o 9 Ch/ha Aim/-
4/9-cot /Iona 470 A^O
&<//.*_ '
426-0:,! A/oroP 47/ A/a 9 Cr/mn A/,sr ATj/u/neorpp
C *2>/# x/0 *
42/ $Uw 7/bvi
Mr* /ice#
2szr,n /o'rDA/ A/ 47 S 77i/h\/5*~*l /1AtoH/S
3//P /dooPPtf * 423-co, Afe/oP
H"tA y2H '
/i'OOD 6*1 A/ 424 //\aTF*, S>caM/>jr 7/TaaK
tor# fie/n l>e#e. /006P* 6o`7P// A/ 42S 7p/*MJ-/t/t /~u,\,p>
Sf/P /fro'KPM A/
ref
8 ''Sirft y 8 blSfP 2`t>p> * /z'ior/%
42.5/*-C)\ zP>UA*rr
.
a/
A/
Izf-oo) Afo/BP
426 SeAbBSerP 427 Off Oas CtH'vFfs-.e/i
1 "
/!/<?*>/* V" .*></ 8
0725676
TOWOLDMONOQ44962
Rev. NO.
OATI
DESCRIPTION
/ 9-23-6? &>t>eb fr 43 3 j 4Z4
RIV. NO. REMARKS
ORCRATINO TEMP. A PRESS.
A vs A 30 i
3>^- )Z
-VC
fS/rAttrintt --'AV/L**
k/i't Us a oF 2 "Sri tfo
tffc
* A, 1 SV00 * ' obC m
$k>Ki T'ffie
AvS A 60 , S/a Sv2-/o
4o*C 5PCI bt
Tfrc
MATIRIALS OR ` : CONSTRUCTION hut rue Aw
CMStu Cn.r.i. fa/tSen S/e/i. hufnuc /(!5(V
/ &-K St<S,Mc*t &4oH / M A30. S,ze ov 2-/3 /
Ttre. Tpfc
fcl " ni'inreti
it* Tuj /finv
Xt'g- M
0725877
TOWOLDMONOQ44963
MONSANTO COMPANY
_
CENTRAL ENGINEERING DEPARTMENT
ST. LOUH MISSOURI
PROJECT.
OBJECT,
PLANT-- _____ A/M __________ LOCATION.J. SauAZr'7jJdA:t!i.^
PREPARED 6 . . t-------OATg`m>`fl/<ngtT
l&tcL
EQUIPMENT LIST AND SUMMARY
APPROX. DIM.
NOMINAL. RATING
NEW OR ON HAND ITEM NO.
NAME
bj/r>, n>rr* Zc/n.
Y MS &&Cvc/irzaaS
/shf /gooKw A/ te,9~oal AfvTQA.
'\Jk- Yi"bm *8'7" 3 ooo 'S^L
A/
r.i fj
/. .
tSo6r*i 7o'TPH Aj
4*9 4't>
OrA (i/fi 57ne 7Aas A' Sfw sfi'Af/A/AtoA
7&//A' /Bcn'KA# A/ 43/-4r.i A4or6P>.
4 /oPt/ti A/ 433 /too*?* A/ 933-Oot A4ara*>*
rft M'kver //?''>/*(# etocrn
A/
Wirt* M?.** /`Aj Sot.vZM AV >&y 4
433 434
Sep,, diM Mft&p /i/rf/A^
/o//P ScoA^s.l Af
434-00! Afonin
__________
4{ ;
.. \
11 - > \
'
'1
feetj/jiM-.C' 7k*.__ i. 0725876
TOWOLDMONOQ44964
rev. HO.
DATS
DESCRIPTION
/ 6-7z-a S6& i St>R .S/S'
,
REV. NO.
REMARKS
fiiTtFi'F #6 CM $/- Airr ft,SI'S
Sium a a /r Sqo St*aei *& >'Sfb Thk
4/00 *
A/t AAo , Size 4yZ-/3
ORCRATINO TEMP. ft PRESS. &5C /5PSI
UPxJSfst. m"t /v
ZStft
MATERIAL! OP CONSTRUCTION OiHhi Snffi
(a&/* Sm-L
Sm&oxi Srcu 5iitm f /At*,
T/TFC T^5~F^^7P~y~7^(i^~TWnx/uo~/i7Sel ' fyM-f&n'tJuH r,rfir Zo,rT______________________ ZSfft SfK/ St/h iwjrt Z Street.
/ M "inter 2 /i " .urn T //ttzi-C
gz-lY.`'/bylL 6A * & 'em* fu/nFo. / AAeA -fooFrkintl r, F /rF Jo,t7
?ac 2Sc,Jc
rv rv
Srfet sFru. lit net crAl Fua.s.nti
'ZGTtieiriir^JYFfC / Hern 4oft or/li '/ft An* e.u
H.nCl Mr 4-100if /5o`C
rv
tftuei 6 A Al
WrArHiH/iTOH 2.'/%tkA 2 Xt *//TH
litl,CL tuCtZlX j-T. Btur
A/C A SO . Site i//'4t.~/o
.
/x>"t
3/icz
Se/Hcz, Srb vka
4/oo*
bhrHM'HjLIT & /&''ount.r iVtZZeE
9Zrl/.Ut>*./6 6A X S'enui ruOmz
M*A /OO rr*-
Him Fy F jfhr Zorn r
Tsre
SS/ft FV &/}&*, Crete
?(>C astfe
/V Ay
CiFit*, Sen SrxCi. t/Hf**.
At ,fit*/!. cA Mes HJ> w
sente i V /'/// K77TR
FMmil V/t
! io FT of /At' /Fi Pi/ZT c*,L
zzoon
AMW(trw t/x OFF S '1 Him
/Vo ~*e> SrAO/m
4/S ASP, Site 3* / % -/o
/OoC
tfc>Ui. tA Ait. 0),rl A/fiXie ct e.br
i/i ss
fytu/t ir>obti_ fA/H
7FFS Sk.j, rtt&F-s
/oe'e SoFU Ai r,e/S
T/CFC
its-*
CnndoR Sreee
0725879
TOWOLDMONOQ44965
NSANTO COMPANY
NTRAL. ENGINEERING DEPARTMENT
LPU'S. MISSONI
PROJECT farif*
__________
ujbct__
____________
-l.~,______ U6&.' _____
LOCATION
J aZ-4^4fjl/______
DESIGN MANUAL SECTION N0.____________________ ^
PROj, NO - ,, JfAHfl PREPARto Bv&3aU-----------
--------
n*Tpy-<* ft/iHfFT 7 or X.____
EQUIPMENT LIST AND SUMMARY
APPROX. OIM.
NOMINAL PATINO
NEW OR ON HANO
ITEM NO.
NAME
.
v /' /"
3 O&fa
a/ SOO CZepAvP Suir-i
8"b'A *1*7*
"Id fyPAi
a) Sol Cacaaa/P /7lJ/i
'r* *y9"
ZmSM*
At Soz Snj.L Por //- /
3mrn, /oc'Tbh A/
Soz Sr/tL # / C/Stc Sa)/3
le/t. /'s "b/A / /?'
70 HP /(tuoRW -V CSOOTA *UA(. A!
SIS-001 /%/0p soq Stui Syr ffcnr
3lC'2>m v/O'OAP 3So/, */* a/ .
/'4"J>>A v/2 '
Soafco ^/pa At
So s
Sy'ftQA//? 'SC/V)$/*("**; Srui tiystr^'^K
So 7 (/IA/eFLlP6
y ^' ? *
7000 &PL
A/ SoB / 'Y/V v/r >* * f
......-fi> fit >
A/ So? S/iLL a / Jjjron.-i
tooSpai &>'n>p At S/o TAaaaS nr*< tv*) r
S/tf- /foo %7-0u /</ S/O-OO/ A)ors
ftf'H/A* t "
Zoo O SAi Z
At S/I
Still Pot #
S's'ivA y /o'oAH BSfiO */fi* // a? Cy(Lotjt- SePAppro-L
flBil t'l'D/A * # '
400000 *
a/ S/S) Sr/LL tC*y O Ftv SF-i
SlA
Si> "b)A V i ' 9 *
/to'-) &At
aJ
AO `B/aa 7ir ~
So Art/A
At
S/S Spill . Profiven t -2 S/C SrtLL * < SjFcnOti
/OoSPa) . to `TOP At
S/7 7&Aas S,*/r*i. /{Jv*. j f9
SPA /&C.KPM
z*3'\ S'f TB&ooo ^//tn. t 1 1 4w
3'%A >,fS* . 306 Oai. ~
At At At At
077-00! S/ii ?#><! *9/4*ii-
.
Stf-oo/ /f'jTiH
S/9 /prp A! 'V3L SyjT)r,f 7/)yjy
0725380
TOWOLDMONOQ44966
NO. OATS
DESCRIPTION
.
k/nvd W 6St,*t/-&t,f39 , [
/ g-23~67 <$W Mte StS,
*
' AJ4r4-// sss, fz 6
Q-m-' i$fA4v'tf
/r Ss&sys
MONSAN1 centrai ST. LO'JI
REV. NO.
AVS
REMARKS
) 5,'2/r 3y/'/z-/(>
/
/
/ /
/ Avt> /Ho, S/c
3 -1&
?2* 9ZV
/
/-?o- *V+A9 x/i<fp ft '*ts mbry.
/ .font
A7l W/TPFt r OP JQHjr
OPERATINO TEMP. A PRESS.
/a?c
Tire
MATERIALS OP CONSTRUCTION
2>ucn/P 4vvv
;_
/
/ttft /V
(%#&>*/ rPcz .
/#' A/
Cn/i&ttj Succ.
. ' 2>ik7iu //sum
Tf/e
'
^s/ sypfi A/a?; g:speu
Wtrn SK>rr eg 2'/PS Pip*
6ml-3it*i/n 4 M-x,
/)/ Wr /POO#
fau< dfanti. HWd fetHAte*
/feAr 4m
/kl*/M/vv>W '
' 3usl espApr
Ac KPb^r
7rc
VuOurfif-KV'Zbd i2 "iiitri 1/iCft W/f* - WohPM
4k>t #&/*>!
7TFC
V//7/ /A">iP >/t>" Gtfiie Ato**tX - r
Z &PA>Ar f%Arft ~______________________ 6PC Ax/Pst
SfvtAKLt*' A /(9 /*
z
M,r/t 4Vr. x s'V>i bAdtui Si/** >*/** ^ u a ,,
wsr/t
* *" /**+ /*?/<? ?'*
z **' > * *mc
,
Ays ASCMe S/lK'/o
~~ 'kw*
tSC oFs,l
3/6 S 3 !.
3/6M -' ss 1
/UmaAut/t/iX
3/i" is
z \i//7tt Sc'rrvr x*//>sApjz /)/ p/t
dun.- StiP/ti > '
/,(,*
/vux /lust. tieiHd 'AScbutta
7l/C
47... tefc
ai
/JlisHt/KWAi 3/^.5 &+AAT A A Tvfi &, A,#
0725881
TOWOLDMONOQ44967
3NSA.NTO COMPANY CNVRAL ENGINEERING DEPART MEWT '. LOL/lS MISSOURI
PROJECT...d&eMH^A`>&b V.jge'._________
_____
7PI ANT_________ ________________
LOCATION-jSau&II-,________________
PREPARED 0 __ D AT ^-/Q'C 7
0./&QQ... 7*gLo7J2L:Z
EQUIPMENT LIST AND SUMMARY
APPROX. OIM.
NOMINAL RATING
NCR OR ON HAND ITEM NO.
NAME
Hut nuftA Sfttt. /oof>AA! (o'ri>,v A/
Sic ThSfiAU^itK Ct <t A)jA)^
J--
A///3
------ --------------------------------------
V/-W A/
fgO-ixjf Afore*. s*t Cr>teu.m
.. '
CAA,rsu.Ci.
3'/ rD'd xV 'c?//____
r
SAn. 4
3i"2>/* *'<? *
8a:'; i>i/.
AJ
5 SoaSH/n Aoo'riH Af
Slit S3 4 Sis
C^TtH tyrOtrCft S> SruL 01 C*c SjnP
tU. / <" 'i;/ v
'
XoNt-' ASooAPfll Af
-gnr,
6 6c? iV'C-
AA
H
4 & ''&//) y i '9 '' 36 "ititi rutin,s/r
SrtA/T
'Y-'OO rV/ti. /to /ao /?/"//)
A) HA /Boo iKYf
a! A/
aa
A/
SiC-aoi A}on*
S~-Z
97-
s*rr
Stall far $S>? Afor Uiea
S3o Sufi(>c Mk re* fUZ
S3c-ccJ it* n,ir
S3q-go% As/mrit*
SSn^xii A1or0tt
37gP/t) AooPi- / Af JoHP A&oXPAj /V
43/ fAAvzrtP ftKtP SS/'OOi
So 2>/A x /S/
fit*, -
Af
y>'A* C'r v
/Z*v- /StiA*)
Af
CS'2A x f'9 '
%'JOO 6/Jip '
Af
4'"bM > '/9 *
/S*z
7/
bf/n* Afee* -HA-. twifiw ~(u' 7b77 Af
SSI SS2. S3 9 S3S SZ&
ffStMAiA'< Aohi AS S
&i.hJ*tA/r0 filpfXf
SuAAtS /SapV Son S?4Z& .
Ouf?/f //istsAS /&.*<. /**
,
---- Sj, ''tA r `J `
SAP 70to gPTI Af
1 /Ai><y Hai. ,
a/
S36-MI
ssr
R*.'4iWK-V*V/iv4;
SAB'JLL.^ '<w
.. .. JL^ Sg7^o)
Aforvn. 'S'tAfKfZtr1 7ftAsf\
/foyVivi v ?" `
^S //
'
0725882
TOWOLDMONOQ44968
REV. NO.
OAT C
DESCRIPTION
'
Z 7#??{ <5t3*cr/ Yey>ttfg4
3 i-ZS-i7 4&->n- StMiro trSi'Jj-Hf, &(
MV. NO.
REMARKS
2
Z
z
X <^.06, '2,,v<r &2>/r&y WtrH -*-/?// Kj h>,er/oA, x AVW* 4*0
z
z Sec Hem S'iZ
z rc/&#) rt
z S/ymK/,eK * H,l>Z
See Hem S'iH
2 See He* SSt
'
a 4vS y $f2tf $y /^i '/o
z St /!r. 5
MW 4* /OftATZCvti / ftf *> /r S*Z * *r
. ' ssg " " " cse
'v /<v ASO.S/zf 3,Z->3
"x y/9 * JTf '
'
3 Ai% A30, S/ze^Z'/S
V' ' .V e*-iM <-(
OPSWATINO
MATERIALS OP
TEMP. A PRESS.
CONSTRUCTION
rfiVMtvu*\ /Vr?<3/Ar
i '6> -' v- /*A*+-
Tefc
/tt'r /oor~.i 3// S C
T/r^c SSt M?-! {> s V /(><> '
B/S Z*
Z/i ? S04CS
it />xi /h V Hi'M/rt/
Zac
. " 3/< s s
Trrc
iSV /:/. , 3/i Ss * .\
*st /V^j/
at !hp$< m Xt*r isr Hint ISY >f>5/
rflvMWVM flt+At/A/VM At\iMif,e,i) //XV/I i'Ar t/iM
to>"f &>*/ TfC /tot Sofa rt*e
3//^ 3//i
0725083
TOWOLDMONOQ44969
ONSANTO COMPANY ENTRAL ENGINEERING DEPART ME NT T. LOUIS, MISSOURI
reojtc-r Ajiott.
.u.ctL J&ffj,,*Ok.r.._______
PLANT..___ - V\i5^S----------------------- ----------------------
LOCAYtON_*gj4ir..
_______
OeSIGN MANUAL SECTION NO_________________________ PROJ: no. r e. a. no /VCK>. ... PREPAREO BY ABSAAtrert,
DTE<22l2.HHT_fe_Of.XlZ
EQUIPMENT LIST AND SUMMARY
APPROX. OIM. `a^t
b` Im S/tgir
NOMINAL RATINO
NEW OR ON HANO
ITEM NO.
NAME
__ /ooilt'A___ _// _ Sly-coi. 4-i,rf,Tok
AO/tP ASo'-pfH A
--
3ASfat /no ft: / At
3 J-acP, 36
/OffP /StO\!PA 1 At ' sag-act AluroP
3b*'%iA v ' Au,; -At) <-V/ /V S3?
S'>\ /%
3,i"h,f > AC ' f/t u. /a
// 540 *4^ -C-*ft C i'ty At/<i. //-c> o'
*Y'b>s x s '/'
/V Si/ /oLK,fht/'\ S/t.rgH
6<S`bM v f'?'
V.tr>fi --P
// Sis Svt/t\' Sx.' fj4
A/ SAB i\trts,Y- 7a*,a
/V-4 ^
r
1i V^
ji **
! vc
Mt/t Alt ft; Cl At 9'6'itA X AS '
tobifo! Atct TtH St* /A/A't/f
F* tM " /O <
A/ ,v A>
tZihZ/A t 24 *
U'6"l>A IZ'/'lvA *Zi'
/i'(* t/A * <i ' /JVV'/ *<?V '
ZZ boo Gtu
*? ? 6*5 0 i-'srooo 6Ak
Yioao tS/U 2*000 &At.
H At At At ' At
A'/tf/Aliff S(ak frsfnv /co'rtt/t
ASHP /SmK-P/I i
ty/rtt Alan. Ctai 2*0 ^t Aoo'AbH
ASMS /6t&XM
r;y
' ?*!/. '-.I
At
ft At At
Si 4
sa-oat Ait K
S4S /!&pti'?ri? /"i-A /v^O Tyc -
SSJ
see /ttttcriib C/sni'A AB4Z
SSI So
Srhka*, f AZ4Z F/rvtskSC> &o/tA4i' /2
s<u S/f/iif/rtt SrnKfoa >2/O
s&z S/A-tstfAo A A'c-Kf- ir /'24S
f 3 OtA-eiiLec,
S64 7/>aa/$/',*ft/*, t*
S/i-oot AitTeK.
s/s ThA*,z*1
Ait, nn
,'i *,I' "
'fe&f'iil... t ' fStZAi-
072S884
TOWOLDMONOQ44970
RNEOV.. DATE
DESCRIPTION
MONSANT1 CENTRAL ST LOUIS
REV. NO.
REMARKS
3 A SO 1 O?*- 2^- A3
3 Avc~ A30,
3y3-/3
OPERATINO TEMP. S PRESS. /A)tr Sifci
7Jm we Sofo
7ESC
MATERIALS OP CONSTRUCTION
3/6 so
3MSS
a/& /?S"6 4AZ.nr' F&k Fn.?:*i; ftfirb /// P4ALt - Mr/-' * /0 tfjfh'A
Sec Mem 67 ""
" " 6?
/Oft SoPO/ WC So?`it , We so > Wt Sof-i./
<S1
*>
S/i SO
3/iOS ii/ S O
JBkemd
Aft, /oZ /J&>z<
M/rtf 3t>fr c* 3 `//>r,
&tL
T/i&ttf fa#?
SIS'? 75fz i ?V /)'*>
&E </ Cf>ea$'r* Sreti Cast Crsu
TSfC
Bf>tn*:s.v#/T - ->W /Ti ft>zrr#< (,A/rIM/Tft # /* /rj-r/r*/T
/a/C /6Pc>
'
0725665
TOWOLDMONOQ44971
<SA|,T(J COMPANY <TRAL ENGINEERING DEPARTMENT LOUIS. MISSOURI
PROJECT... ..AfieUi
>'Mr_
*#48 nfir___
.L A/.T.__,, ___
LOCATIONS
fJlUMe.f.ii--,.
DESIGN MANUAL SECTION NO._
Ipnoj. no._ PREPARED BY...............
DATE&ed2.SHEET.
iJe.es...
EQUIPMENT LIST AND SUMMARY
APPROX. OlM.
NOMINAL RATINO
Zk/PM AJo'TM
NEW OR ON HANO
sV
ITEM NO.
S/%
NAME
/SpP /BcpRPaI V &f-06/ pidn/i
Ztoew /oe `n>H
Si7 ~7f<`/*A/esjrJ> y'itu
/SPP /SeoK'Px fi 527-cal
/e \ 5 '' y 6"/ A1 c.
/# 7 * -
sw &A f/Fs* fi o /!/ S<f? //0WT A/ / 4.; // S/O // S'// /'P.ie.^r; Surj;
//?" y r'/tv-:
fj
/ v ^ ' -W'S A<Kyj.bor
J
S'o ''hA x /e `up o !5v0 SAL //
SSOCPnl /iS'7t>H a!
Softp /tea*?**/ //
f
i /'S */ '3 * 4Soo 'st* cu
s/z. f\>CvO Fh-ifu S79 - A/ur Kvt
77tc^A>-Ait. /JlArr*.
S&4 *<1/A/ZL. ytsK-m 7s*A/.<
SS 7 AJi/^Mtm1 ft <?L: ' lpV/^ '
ser-tot msm
s/o Cnu*if,c Pf'-ir
op
t
l *
' ' .
r
i. i ,
fe V;
. ` -v'1 ' ' ., .
............... "- n-., .. ;1,1
; iJi
0725886
TOWOLDMONOQ44972
CEA 1430 Date: August 28, 1967 By: H. D. Gabelman
SCOPE OF WORK Aroclor Expansion at Anniston Storms Tank Farm and Mixing Station
Appendix "D"
072S887
TOWOLDMONOQ44973
Appendix D CEA 1430 Date: August 28, 1967 By: H. D. Gabelman Page 1
General:
The facilities included in this project are intended to:
1. Assure storage capacity for minimum inventories of the various Aroclors and blends so that bulk shipments can be made on demand.
.2 Provide for blending of several Aroclors with other components
without holding up primary production facilities.
3. Minimize the potential for cross contamination of products.
4. Provide loading facilities for tank cars, tank trucks and unload ing facilities for raw materials in tank cars.
Major Equipment Includes
2 - 27,000gallon Aluminum Storage Tanks for 1242.
2 - 27,000gallon Aluminum Storage Tanks for 1254.
1 - 18,000gallon Aluminum Storage Tank for 1248.
1 - 18,000 gallon Aluminum Storage Tank for 1221/1232.
1 - 18,000gallon Aluminum Storage Tank for 1260.
1 - 18,000gallon Aluminum Storage Tank for 1262.
1 - 12,000gallon Steel Storage Tank for TCB.
1 - 12,000gallon Steel Storage Tank for TTCB.
1 - 11,500gallon Aluminum Day Tank for 1242 (Existing),
1 - 11,500gallon Aluminum Day Tank for 1254 (Existing).
1 - 12,000gallon Aluminum Blend Tank for A13B.
1 - 18,000 gallon Aluminum Storage Tank for KA-PPO.
1 - Existing and relocated 2,000 gallon Aluminum Blend Tank for Toluene and Xylene Blends.
All storage tanks to have plate coil heaters and to be insulated on
lower half.
Existing
day tanks will be left "as is". The 2,000 gallon blend tank will be
left "as is" except it will be relocated. The 12,000 gallon Aluminum
Blend Tank for A13B will have plate coils, heaters, insulation and an
agitator. The 18,000 gallon Aluminum Blend Tank will have plate coil
heaters and insulation.
0725888
TOWOLDMONOQ44974
Appendix D CEA 1430 Page 2
Pumps All 316 SS except TCB and TTCB which are cast iron.
1242 - Common loading pump for 2 storage tanks to loading spots; existing transfer pump from day tank to storage. See Code 93 paragraph 5 concerning pumps.
1254 - Common loading pump for 2 storage tanks to loading spots; existing transfer pump from day tank to storage. See Code 93 paragraph 5 concerning pumps.
1248/1221 - Existing transfer pump from receiver to storage - common pump. See Code 93 paragraph 5 concerning pumps.
1262 - Existing transfer pump from receiver to storage. See Code 93 paragraph 5 concerning pumps.
1248/1221/1232/1262 - Common loading pump from storage to loading spot.
1260 - Existing transfer pump from receiver to storage - loading pump from storage to loading spot. See Code 93 paragraph 5 concern ing pumps.
TCB and TTCB have one common pump for unloading from tank cars and one common pump for transfer to blend tanks.
Blend tank for A13B and storage tank for KA-PPO will have common trans fer pump from tanks to loading spot or drumming.
Blend tank for Toluene and Xylene blends will have a transfer pump from tank to drumming.
Filters
.
All 316 SS or 304 SS.
Separate filters (Alsop) are provided for 1242, 1254, 1260 and 1248/ 1262/1221/1232.
A new filter (Sparkler) is provided for A13B/KA-PPO from mix and finished blend storage tanks. An existing Sparkler filter will be relocated for the Toluene and Xylene blends.
Piping Separate transfer lines are provided for: 1242 - From day tank to storage to loading docks 1254 - From day tank to storage to loading docks 1260 - From receiver to storage to loading docks
0725889
TOWOLDMONOQ44975
Appendix D CEA 1430 Page 3
1262 - From receiver to storage to loading docks. 1221/1248 - Common line from receiver to storage to loading docks. All above lines are 3" aluminum, traced and insulated. Piping is provided for circulating the contents of each finished goods tank. Piping from tank cars for TCB and TTCB to storage and from storage to mix tanks will be steel. Utilities 1. Spur track from main track to 5th Street with 2 covered loading
docks for tank cars. One of these will be used for unloading TCB and TTCB. 2. One covered loading dock on 5th Street for loading tank trucks. 3. 6" steam main from Building 27 to tank farm. 4. 2" N- transfer line from existing N_ storage tank to tank farm (all tanks except TCB and TTCB are Nj blanketed.) 5. Electrical: Existing HB40 transformer will be dismantled and scrapped; HB40 load will be picked up on Aroclor motor control center. New load in the tank farm-warehouse area will be supplied from pole line transformer supplied from the existing HB40 overhead feeder. Roads An approximate 80' X 15' wide loading area at side of 5th Street will be provided as a loading area for tank trucks. Structures and Foundations Two tank car spots and one tank truck loading spot are weather protected by roofing. All storage tanks will be on ring walls with compacted sand fill except the 2000 gallon blend tank which will be on a concrete pad. Area be tween tanks will be covered with chat.
0725890
TOWOLDMONOQ44976
Appendix D CEA 1430 Page 4
01 - Equipment
As per Equipment List and Summary.
02 - Instruments
As per Instrument List and Summary.
03 - Setting and Testing Equipment
Tank farm is immediately adjacent to 5th Street and east of Aroclor office. Truck deliveries can be made directly to site.
04 - Setting and Testing Instruments
Nothing unusual.
05 - Piling
None allowed for.
06 - Excavation
For railroad spur track Tank foundations - 12 9-1/4r yd3 each
Tank pad for 2000 gallon mix tank 3
Pump foundations - 8 1 yd each Filter foundations - 6 2/3 yd3 each 2 Tank car loading docks 2 yd3 each
1 Tank truck loading dock
Pipe support foundations
= 7,000 yd3 = 111 yd3 = 15 yd3 = 8 yd3 = 4 yd3 = 4 yd3 = 2 yd3 = 15 yd3
All excavated earth will be spoiled in immediate area.
07 - Foundations
Tanks
12 ring walls 3 yd3 each 2
Forms 155 ft each Crushed rock and sand fill Pad for mix tank Form
36 yd^ cone.
I860 ft2
95 yd3 3
15 yd cone. 80 ft2
Pipe Support Foundations
6 2-1/2 yd3 each 2
Forms @ 100 ft each
15 yd3 600 ft2
0725891
TOWOLDMONOQ44977
3 Loading Docks Forms
8 Pump Foundations @ 1 yd"* each Forms @ 60 ft2
6 Filter Foundations @ 2/3 yd2 each Forms @> 20 ft^ each
Appendix D CEA 1430 Page 5
= 6 yd3 cone = 120 ft2
8
.3 y<3
cone
= 480 ft2
= 4 yd3 cone = 120 ft2
Approximately 6 borings for soil bearing determination will be made.
08 - Supports, Platforms and Structures
1 Pipe bridge over 5th Street
=
Pole supports to loading dock structure
=
Miscellaneous steel at ground level pipe supports
2-20' high ladders with safety cages.
3-1/2 ton steel 3 ton steel 2 ton steel
Platforms over tanks in farm
Platform
Stair Treads
Grating
Double pipe hand rail
Toe plate
.
3 loading docks (with covers over)
Galbestos roofing
= 5 ton steel 50
= 1050 ft2 * 750 ft = 700 ft = 6 ton steel = 600 ft2
10 - Sprinklers and Fire Protection
None
0725892
TOWOLDMONOQ44978
Appendix D CEA 1430 Page 6
11 - Piping - Process and Service
750' - For 1242 - From Bldg. 27 to storage tanks to loading docks A-ll const. - 3" Sch. 40 - I.P.S. - Aluminum
750' - For 1254 - From Bldg. 27 to storage tanks to loading docks A-ll const. - 3" Sch. 40 - I.P.S. - Aluminum
750' - For 1260 - From Bldg. 27 to storage tanks to loading docks A-ll const. - 3" Sch. 40 - I.P.S. - Aluminum
600' - For 1262 - From Bldg. 27 to storage tanks to loading docks A-ll const. - 3" Sch. 40 - I.P.S. - Aluminum
700' - 1221/1248/1232 - From Bldg. 27 to storage tanks to loading docks
All above 3" aluminum pipe to be single traced with 1/2"
~^~.o]per tubing. Trap condensate each 200' of tracing. *S'oSo A uni w/si Pitt'OCtS
300' - 125# steam from Bldg. 27 - F-41 const. - 6" Sch. 40 steel pipe
300' 125# steam
F-41 const. - 2" Sch. 40 steel pipe
500'
N, Nitrogen unit east of Chlorine - 2" vinyl covered ^ Sch. 40 steel
For TCB and TTCB from loading dock to storage - F-ll const. 350' Sch. 40 3" steel pipe
For TCB and TTCB from storage to mix tanks
- F-ll const. - 100' Sch. 40 3" steel pipe
Toluene to mix tank - A-ll const. - 20' - 3" Sch. 40 I.P.S. Aluminum
Xylene to mix tank - A-ll const. - 20' - 3" Sch. 40 I.P.S. Aluminum
KA-PPO to loading dock A-ll const. - 320' - 3" Sch. 40 I.P.S. Aluminum
i--(
<1
A13B to loading dock
const. - 320' - 3" Sch. 40 I.P.S. Aluminum
12 - Ductwork
None
0725893
TOWOLDMONOQ44979
Appendix D CEA 1430 Page 7
13 - Electrical
Yard lighting for tank farm area - 13 tanks - approx. 60' X 100' area. Lighting for two tank car loading docks and one tank truck loading dock area.
6 - Street light type Mercury Arc fixtures for loading dock and tank farm perimeter plus 8 - 175 watt Mercury Arc lighting fixtures over tank farm area.
8 - 15 HP motors on pumps
2 - 7>s HP motors on agitators
Pushbuttons at each pump and at remote location.
Install 300 KVA pole type transformer for warehouse and tank farm load.
14 - Site Preparation
Grade area east of Aroclor office to an elevation of 746't. Area equals approx. 120' north from 5th Street X 60' east of Aroclor office.
Terrace down from 746' elevation to 742' immediately to east of leveled area.
3 Earth moved approximates 300 yd and will be spoiled in immediate area.
15 - Sewers and Drains
None required.
16 - Underground Mains
None required.
17 - Yards and Roads
1. Establish tank truck loading spot on 5th Street adjacent to tank farm. Area approx. 1200 ft (80' X 15'). 3 Grade off approx. 50 yd earth. Crushed rock ballast for loading spot (8" thick) = 35 yd^
1200 ft^ 2" thick asphalt paving.
2. Tank Farm Area (120' X 60') Crushed Rock = 70 ydJ
'
0725894
TOWOLDMONOQ44980
Appendix D CEA 1430 Page 8
3. Repair construction damage to,,5th Street. Assume resurfacing of 3000 ft^ (30' X 100')
2" asphalt paving.
18 - Railroads
Install approximately 1700' rail spur from main line at north side of plant. Spur to extend along west side of Parkwin to 7th Street. Then offset to west approximately 130' and extend to 5th Street. This includes switch, bumper, ties, track, ballast and 4 crossings. Excavation for this spur is included in Code 06.
19 - Insulation
Tank insulation to be 1-1/2" thick calcium silicate - Std Kll.2 Std 100 with weather barrier.
Tanks as follows:
4-13' 5-12' 2-11'
diameter @ 600 diameter @ 400i
diameter 300
ft2 ft2 ft2
each = each = each =
2400 2000
600
ft2 ft2 ft2
Pipe insulation to be the same spec Std as tanks
For 1242
1-1/2"
- 100 - 750' - 4" pipe
For 1254
1-1/2"
- 100 - 750' - 4" pipe
For 1260
1-1/2"
- 100 - 750' - 4" pipe
For 1262
1-1/2"
- 100 '- 600' - 4" pipe
For 1221/1248
1-1/2"
- 100 - 700' - 4" pipe
For Steam
1-1/2"
- 100 '- 300' - 6" pipe
For Steam
1-1/2"
- 100 - 300' - 2" pipe
Pump and filter insulation to be same Kll.2 Std 100 insulating system with weather barrier.
6 - Pumps to be traced and insulated. 5 - Filters to be traced and insulated @ 25 ft2 = 125 ft2
20 - Painting
All structural steel to be hot dipped galvanized. Touch-up damaged areas with inorganic zinc coatings in field. (Carbo zinc #11)
0725895
TOWOLDMONOQ44981
Appendix D CEA 1430 Page 9
90 - Dismantling
Remove and scrap 3 X 15,000 gallon and 1 X 11,000 gallon horizontal storage tanks and 1 X 10,000 gallon vertical mix tank:
Item No.
Eguipment No.
Description
201
22-0077
10' X 26' long horizontal tank
202
22-0089
8' X 30' long horizontal tank
203 22-0076-01 10' X 26' long horizontal tank
204 - 10' X 26' long horizontal tank
205
22-0108
14' X 10' high tank
208 - Taber vertical subm. pump 209 - Taber vertical subm. pump
214 - Taber vertical subm. pump 215 - Taber vertical subm. pump
Remove and scrap existing HB-40 transformer.
93 - Relocations and Modifications Expense
1. Existing feeder cable from existing HB-40 transformer to Aroclor motor control center.
2. 360' of 8' high cyclone fencing.
3. Existing Sparkler filter (18"), from building 27 to new tank farm.
4. Existing 2000 gallon jacketed SS mix tank with agitator, from building 27 to new tank farm.
5. Money for replacing three existing transfer pumps is to be included in this scope. The existing pumps referred to are those noted in the "General" section of this scope under "Pumps" for transferring 1248/1221,1262 and 1260 from exist ing day tanks and/or receivers to. new storage facilities.
0725896
TOWOLDMONOQ44982
CEA 1430 Date: August 28, 1967 By: H. D. Gabelraan
SCOPE OF WORK Aroclor Expansion at Anniston
Drumming and Flaking
Appendix "E'
0725897
TOWOLDMONOQ44983
Appendix E CEA 1430 Page 1
General
This scope covers the installation of drumming and flaking facilities in a new prefab structure north of 5th Street and at eastern boundary of block 4 (east of tank farm, see Appendix D). Space and detail de sign will allow for attaching a warehouse to the north of this struc ture. The warehouse is a separate project covered by CEA 1452.
These facilities are intended to
1. Provide for drumming and flaking in an area, removed, but adja cent to the manufacturing area, so as to allow for greater effi ciency in use of manpower, both in the manufacturing area and in packaging and warehousing.
2. Rail and truck loading and unloading facilities at point of packag ing to minimize handling will be provided (see Appendix D).
3. Provide storage space for bags and a limited number of drums both empty and full.
01 - Equipment
See Drumming and Flaking equipment lists.
02 - Instruments
See Instrument list.
03 - Set and Test Equipment
04 - Set and Test Instruments
05 - Piling
None
06 - Excavation
Buildina foundation
Intermediate buildinq foundations
Pipe Supports 15 @ 2-1/3 yd3 each
City Water - 50' @6 ft3/ft = 300 ft3
C.T.W.
- 30' @ 12 ft3/l = 360
Fire Water - 120' @ 6 ft3/l - 720 ft3
l-t.ft CO
80 yd = 40 yd:
= 35 yd' = 11 yd = 14 yd = 45 yd:
0725898
TOWOLDMONOQ44984
Appendix E CEA 1430 Page 2
Backfill (CW, CTW, FW)
- 70 yd3
Spoil in immediate area - 177 yd3 (use for building fill)
Building fill
- 1600 yd^ (needed fill available from )
(R.R. excavation for tank farm) Excatation and backfill for 500' of 4" pressure sewer - 225 yd3 each
3 Excavation for sewage ejector - 14' deep - 52 yd
Excavation and backfill for 4" connecting sewers - 93 yd3 each
07 - Foundations
Building Foundations and Floor Forms
_ 300 yd3 concrete - 5000 ft2
Pipe Supports Forms
-
-
35 750
^ft22
concrete
6 Borings for soil bearing analysis.
Drumming: Air Compressor Pad for sewage ejector Concrete fill around ejector
- 2 yd3 concrete - 1.5 yd3
- 2000 psi concrete 7 yd
Supports, Platforms and Structures
Flakinq: - Structural Steel
- Grating
- Stair Treads
- Double Pipe Handrail
- Toe Plate
.
- Miscellaneous Steel
Drumming Miscellaneous Steel
- 30 ton - 1800 ft2 - 80 - 150 ft. - 90 ft. - 2 ton - 2 ton
All structural steel to be hot dipped galvanized; building steel to be painted (see Code 20).
09 - Building
A 120' clear span structure 60' long with 23' eave height will be provided. A canopy will be extended over the railroad tracks. The side next to tracks will be open for loading and unloading rail cars. One half of south side will be open to serve as a truck loading and unloading dock. East, north and part of south side will be covered with corrugated transite and corrugated vinyl.
Walls
Corrugated transite ' Corrugated vinyl
- 5000 ft2 - 1200 ft2
0726899
TOWOLDMONOQ44985
Appendix E CEA 1430 Page 3
Roof and Roofing
Corrugated "Galbestos" and Vinyl panels with 8' overhang over rail road tracks and 6' canopy over truck loading area.
Corrugated Galbestos Corrugated Vinyl
= 7500 ft^ = 1000 ft^
Gutters and Downspouts
240' - 6" Aluminum guttering 120' - 6" Aluminum downspouts
10 - Sprinklers and Fire Protection
Structure - Provide an automatic dry pipe sprinkler fire protec tion system designed for extra hazard spacing and pipe sizing for approximately 7200 ft^ (1 head each 100 ft*) = 72 heads.
11 - Piping
Drumming
2" parallel traced and insulated aluminum for 1242, 1254, 1248/1221/1232/1262, 1260, blend A13B, blend KA-PPO all originating at battery limits (connected to lines running to loading docks) - 6 lines @ 120' each = 720'.
' 2" parallel traced and insulated aluminum for Xylene and Toluene blends - 1 line = 300'
3" steel insulated line for HB-40
= 600'
4" steel insulated line for steam
= 200'
2" steel miscellaneous piping (for Jet, air comp.etc.) = 200' assumed
Flaking -3" X 2" jacketed steel line for 1168 & 5460 2" steeltraced and insulated for Biji "3" steel insulated line for Therminol 4" steel for CTW, S&R - 2 lines @ 150' each 2" steel insulated steam for Bi^ surgetank
2" steel insulated steam for Miscellaneouspiping
= 450' = 500' = 900' = 300' = 200'
= 200'
12 - Ductwork
Flaking
100 ft.
0725900
TOWOLDMONOQ44986
Appendix E CEA 1430 Page 4
13 - Electrical
Power from pole line transformer into motor control center in building (approx. 50' distance).
Power from motor control center to following motors:
Drumming: 1 - 25 HP Air Compressor Motor
Flaking:
1 - 15 HP 1268 Mill 1 - 10 HP Aroclor Flaker Motor 1 - 5 HP Bi(j) Flaker Motor 1 - 3 HP Bag Flattener Motor 2 - 5 HP Fluidizing Air Blower Motors 2 - 5 HP Suction Blower Motors ' 2 - 3 HP Transfer Pump Motors 3 - 3 HP Conveyor Motors 1 - V4 HP Shaker Motor 2 - 1*5 HP Ejector Compressor Motors
2 Lighting for ground level - area 120' X 60' (7200 ft )
18 - 175 watt mercury arc lights Lighting for 14* level - area 30' X 60' (1800 ft^)
5 - 175 watt mercury arc lights
14 - Site Preparation
Grade truck loading and unloading area at southeast corner of drumming and flaking structure.
3 40' X 50' area - Move approx. 80 yd earth.
15 - Sewers and Drains
300' - 12" V.C. storm sewer (Along east side of structure to Snow creek)
200' - 8" V.C; storm sewer for gutters 3 - Floor Drains
200' - 4" V.C. connecting sewers to floor drains. Provide 30 GPM sewage ejector with tank, controls, etc. 500 lineal feet 4" Cl pressure sewage line from ejector to pipe
shop service line. 140 lineal feet of 4" Cl sewer to connect existing sewers to
ejector. 1 manhole at ejector, 10' deep with cover, 1 manhole at pipe
shop, 5' deep with cover.
0725901
TOWOLDMONOQ44987
Appendix ?. CEA 1430 Page 5
16 - Underground Mains
50' 2" C.I. City Water Main
60' 12'' C.I. Fire Main
60' 6" C.I. Fire Main
60' 4" Steel C.T.W. - Supply and Return
17 - Yards and Roads 2000 ft 2 X 8" thick concrete truck pad = 50 yd3 concrete. 2 700 ft asphalt - street repair at sewage ejector.
18 - Railroads
None
19 - Insulation
Pipe insulation to be 1*5" thick calcium silicate K11.2 Std 100 with weather barrier. Quantities as follows:
Drumming:
4" - 200' 3" - 1620' 2" - 200'
Flaking:
3" - 1400' 2" - 400'
20 - Painting
Building steel to have 3 coat vinyl system.
90 - Dismantling
Disconnect and remove 4 septic tanks.
Item No.
Eguipment No. ______________Description
631
22-0700
Flaker hold tank with agitator, drive and motor.
690
14-0031
Model VMG 5-56, Flaker, size 24" X 48" with 5HP motor.
- - Biphenyl Flaker
646
17-0027
2dh Micro Pulverizer with 1/3HP motor
0725902
TOWOLDMONOQ44988
Appendix E CEA 1430 Page 6 Relocation 1. Relocate 520' of existing 24" acid sewer. Excavate and in stall new V.C. sewer between two existing manholes. 2. Relocate parking lot, extend to north of existing parking lot, 70' X 120', 8400 ft.4 of asphalt paving with parking stalls.
072*903
TOWOLDMONOQ44989
CEA 1800 Date: August 28, 1967 By: R. S. Yates
SCOPE OF WORK Aroclor Expansion at W. G. Krummrich
New 40 M lbs./yr. Plant
Appendix "F
0725904
TOWOLDMONOQ44990
Appendix F CEft 1800 Page 1
General The facilities included in this project are
1. Installation of a new continuous chlorination system. 2. Installation of two distillation units with a capacity of
25 M lbs./yr. in each system. 3. Poroce1/bauxite treatment for four different Aroclors. 4. Replacement of present off-gas recovery system with a new
system. Major Equipment Includes
A biphenyl mix (2000 gallon) and feed tank (2000 gallon) to supply continuous chlorinator line. 4 - 1200 gallon (41 Dia. X 20') chlorinator units with attached coolers, pumps and entrainment system. 1 - 2500 gallon continuous blow tank. 1 - 15,000 gallon intermediate storage tank. 2 - Flash distillation systems consisting of still pot, entrainment separator, condenser, receiver, and external therminol heater. Off-gas system consisting of gas cooler-condenser, surge tank (3000 gallon). Therminol cooling system for still condensers. 4 - Fixed bed absorbers (31 Dia. X 15') with associated tankage, filters and pumps. External therminol heating system for supplying therminol to the still pot heaters.
0725905
TOWOLDMONOQ44991
Appendix F CEA 1800 Page 2
01 - Equipment
See Equipment List and Summary.
02 - Instrument Items
See Instrument List and Summary.
03 - Setting and Testing Equipment
Area is accessible for truck and train unloading. High lift can be used advantageously.
04 - Setting and Testing Instruments
A control room is available for the instruments and panel.
05 - Piling
For Structural Steel
14 Concrete piles X 3 cu.yds. Size 24" dia. X 25' long
42 cu.yds.
For Blow Tank, Item 422
4 Concrete piles X 3 cu.yds.
12 cu.yds.
For Inter Storage Tank, Item 424
7 Concrete piles X 3 cu.yds.
21 cu.yds.
For Aroclor Surge Tank, Item 586
4 Concrete piles X 3 cu.yds.
12 cu.yds.
06 - Excavation
For Floor of Operating Area 2300 ft2 X 1' deep
85 cu.yds.
For Motor Control Center and Foreman1 Office 5 cu.yds. 6' deep X 5' wide X 40'
07 - Foundations
For Structural Steel
4.2 cu.yds.
14- 20" square pads 3' deep
0725906
TOWOLDMONOQ44992
Appendix F CEA 1800 Page 3
For Blow Tank
1.75 cu.yds.
1 - 1' X 3' high X T long support 1 - 1*5' X 2' deep X 8' long support
For Inter Storage Tank, Item 424
6.4 cu.yds.
18" thick X 12' dia.
For Floors
85 cu.yds.
Miscellaneous Supports, etc.
5 cu.yds.
Pipe Supports 6 X 2 cu. yds.
12 cu.yds.
For Motor Control Center & Foreman's Office Support 5' X 1.5' X 80' = 600 ft2 Floor 800 ft2
6 cu.yds.
Supports
Structure Supports
65 tons
Grating
4500 sq.ft.
Handrail Toe Plate
500 ft. 500 ft.
Stairway (15 ft. elev.)
4
For Motor Control Center & Foreman's Office 5 tons
For Item 545
5 tons
09 - Building Items
5 unit heaters with associated piping for operating structure.
For Motor Control Center and Foreman's office
2 personnel doors (3' x 6'8") Windows for office, 3 units 4' X 10'
10 Sprinklers
None
072S907
TOWOLDMON0044993
Appendix F CEA 1800 Page 4
Piping
Note: * With 2 - 1/2" O.D. copper tracers and insulated - 1-1/2" thick insulation.
** With 1 - 1/2" O.D. copper tracer and insulated - 1-1/2" thick insulation.
Item 403 - Biphenyl Mix
* Charge - 50 ft. of 2" IPS C.S. pipe with 2 No. CD3 valves.
* Overflow - 50 ft. of 3" IPS C.S. pipe.
* Vent - 15 ft. of 3" IPS C.S. pipe with spark arrestor jacketed.
Steam - 30 ft. of 1" IPS C.S. pipe to coil with 2 valves. - 30 ft. of 1" IPS C.S. pipe from coil with 2 valves.
Item 404 - Biphenyl Feed
* Charge - 20 ft. of 2" IPS C.S. pipe with 1 No. CD3 valve.
* Overflow - 25 ft. of 2" IPS C.S. pipe.
* To Item 405 - 20 ft. of 3" IPS C.S. pipe with 2 No. CD3 valves.
Items 406, 410, 414 and 418 - Continuous Chlorinators
Chlorine Charge Line
200 ft. of 4" IPS C.S. pipe with 6 DE6 valves.
* Circ. lines
280 ft. of 3" IPS C.S. pipe with 28 CD3 valves.
* Transfer to Item 422
75 ft. of 3" IPS C.S. pipe with 4 CD3 valves.
Vent Lines
50 ft. of 3" IPS C.S. pipe with 2 CD3 valves.
Trace chlorinators to allow for winter operation - 400 ft. of 1/2' copper tracing per chlorinator.
Item 405 - Biphenyl Feed Pump
* Chlorinator Charge - 80 ft. of 2" IPS C.S. pipe with 4 No. CD3 valves.
* Chlorinator Return - 70 ft. of 2" IPS C.S. pipe with 1 NO. CD3 valve.
0725908
TOWOLDMONOQ44994
Appendix F CEA 1800 Page 5
Item 422 - Blow Tank
Charge
30 ft. of 4" IPS C.S. pipe with 1 No. CD3 valve.
Vent
35 ft. of 6" IPS Saran lined steel Pipe-
Blow Line
30 ft. of 2" IPS C.S. pipe with 4 valves.
To Item 423 10 ft. of 3" IPS C. S. pipe with 1 No. CD3 valve
Item 424 - Intermediate Storage
** From Item 423 75 ft. of 2" IPS C.S. pipe with 1 No
** Overflow
25 ft. of 3" IPS C.S. pipe.
Vent ** To Item 425
10 ft. of 3" IPS C.S. pipe. 10 ft. of 3" IPS C.S. pipe.
Item 425 - Transfer Pump
** To Item 502 & 511 - 50 ft. of 2" IPS C.S. pipe with 2 No. CD3 valves.
** To Existing Chlorinators - 75 ft. of 2" IPS C.S. pipe with 3 No. CD3 valves.
Off-Gas System
Present HC1 header at southwest section of 12 ft. level to be modified and new line run from this header to new off-gas con denser, Item 427.
** Piping Required
30 ft. of 6" IPS C.S. pipe.
** From Chlor. 6-9
100 ft. of 6" IPS C.S.. pipe with 2 CD3 valves
Circ. Water System
75 ft. of 3" IPS C.S.. pipe.
Drain From Item 427 15 ft. of 4" IPS C.S.. pipe.
To HC1 Recovery
40 ft. of 6" IPS C.S,. pipe.
HC1 Transfer
1300 ft., of 8" IPS C.S. pipe. from Dept. 246 to Dept.. 218.
Steam to Item 429 ** To Item 431 ** From Item 431
60 ft. Of 2" IPS C.S,. pipe. 20 ft., of 3" IPS C.S.. pipe. 90 ft., of 2" IPS C.S,. pipe.
0725909
TOWOLDMONOQ44995
Appendix F CEA 1800 Page 6
Aroclor Circulating System To Items 504 & 526
125 ft. of 4" IPS C.S. pipe.
From Items 504 & 526
125 ft. of 4" IPS C.S. pipe
With 4 valves.
Item 502 - Still Pot Item 511 - Still Pot
Montar Drawoff 2-15 ft. of 2" IPS C.S. pipe = 30 ft. With 4 valves
To Items 505 & 512 2-15 ft. of 14" IPS C.S. pipe = 30 ft.
From Items 505 & 512 2-25 ft. of 10" IPS C.S. pipe = 50 ft. Above lines insulated with 2" thick insulation.
Item 506 - Still Condenser Item 513 - Still Condenser
To Item 508 & 515 2-15 ft. of 3" IPS S.S. pipe = 30 ft.
Item 508 & 515 - Still Receivers
To Items 523 & 524 2-30 ft. of 4" IPS C.S. pipe = 60 ft. with 2 valves
** To Items 510 & 517 2 - 15 ft. of 3" IPS S.S. pipe = 30 ft. with 1 valve
Item 523 & 524 - Catch Tanks
Drain Lines
To Ejectors
)
Items 509 & 516 )
2-35 ft. of 2" IPS C.S. pipe = 70 ft. with 2 valves
2-15 ft. of 4" IPS C.S. pipe = 30 ft. with 2 valves.
Item 509 & 516 - Ejectors
Steam Lines 60 ft. of 1-1/2" IPS C.S. pipe
Drain Line 30 ft. of 3" IPS C.S. pipe
0725910
TOWOLDMONOQ44996
Appendix F CEA 1800 Page 7
Item 518. 519 & 520 - Aroclor Cooling System
From Item 519 to Item 520
30 ft. of 2" IPS C.S. pipe with 2 valves.
From Item 520 to Items 506 & 513 60 ft. of 2" IPS C.S. pipe with 2 valves.
From Items 506 & 513 to Item 518 30 ft. of 2" IPS C.S. pipe
From Item 518 to Item 519
30 ft. of 2" IPS C.S. pipe
Item 503 & 525 - Circulating Pumps
**2-15 ft. of 4" IPS C.S. pipe = 30 ft. with 4 valves **2-10 ft. of 4" IPS C.S. pipe = 20 ft. with 2 valves
* 1 - 150 ft. of 2" IPS C.S. pipe for transfer to Still No. 2.
Item 530 & 537 - Surge Tanks
** From Items 510 & 517 ** To Items 531 & 538
Water/Steam Overflow From #2 Still Receiver
2 - 25 ft. of 2'' IPS Al pipe with 2 valves 2 - 20 ft. of 2'1 IPS Al pipe with 2 valves
100 ft. of 2' 1 IPS C. S. pipe 2 - 15 ft. of 3' 1 IPS Al pipe
200 ft. of 2'' IPS Al pipe with 2 valves
Items 532* 539 & 540 - Absorbers
* To Absorbers 100 ft. of 2 " IPS A1 pipe with 5 valves ' * From Absorbers 100 ft. of 2 " IPS A1 pipe with 5 valves
Items 541 & 533 - Filters ** 75 ft. of 2" IPS A1 pipe with 4 valves
Items 534 & 535 - Surge Tanks
* Vent Lines * To Item 544 * To Item 536 * From Item 544 * From Item 536
Steam Lin?
2 - 25 ft. of 3" IPS Al pipe 20 ft. of 3" IPS A1 pipe 20 ft. of 3" IPS Al pipe
100 ft. of 3" IPS Al pipe 125 ft. of 3" IPS Al pipe 100 ft. of 1-1/2" IPS C.S, Pipe
Items 426 & 433 - Scrubbers
Water Inlet Drain Line
100 ft. of 2" C.S. pipe with 3 valves 30 ft. of 8" Saran lined steel pipe 30 ft. of 12 " Saran lined steel pipe
0725911
TOWOLDMONOQ44997
Appendix F CEA 1800 Page 8
Miscellaneous
Feed line from batch blow tank to Items 502 & 511 ** 125 ft. of 2" C.S. pipe with 4 valves
To Item 434 - 20 ft. of 3" C.S. pipe with 1 valve
12 - Ductwork
.
None required.
13 - Electrical
Motors to be installed and wired
5 - 2 HP 1 - 3 HP 7 - 5 HP 1 - 7*s HP 7 - 10 HP 6 - 15 HP 2 - 20 HP 1 - 50 HP
Allow for remote pushbuttons and alarms for 15 motors.
Lighting required:
Operating area:
16 - 20 ft. X 20 ft. bays
Foreman's office:
o 225 ft2
2 Motor Control Center: 225 ft
Install 600 ampere breaker in Sub. No. 17.
Install fans in Sub. No. 17 transformer.
Transfer feeder 8-1 from Sub. #8 to #17.
Install overhead feeder cable from Sub. #17 to Bldg. CF, capacity 600 amperes, length 400 ft.
Install 400 ft. of feeder cable from breaker 8-1 to Dept. 246, capacity 600 amperes.
14 - Site Preparation
None allowed for.
0725912
TOWOLDMONOQ44998
Appendix F CEA 1800 Page 9
15 - Sewers
Floor drains
- 6 surface drains.
Sewer pipe
130 ft. of 4" permanite sewer pipe with two tie-ins to existing 8" sewer which runs directly south of Dept. 246.
Excavation
2 ft. X 4 ft. X 130 ft. = 40 cu.yds.
Sewer tie-in
Two for scrubbers.
Drinking fountains - Two required.
16 - Underground Mains
None allowed for.
17 - Yards 2
Allow for gravel surfacing approximately 2000 ft of access areas.
18 - Railroads
None allowed for.
19 - Insulation
Piping Equipment
- Refer to Code 11. - As below - Material Std #100, Weather-proof Std #65.
Item
403 404 422 424 429 430 500 501 502 505 508 511 512 515 519
Area
235 ft2 235 ft2 540 ft2 855 ft2 428 ft2 100 ft2
20 ft2 20 ft2 330 ft2 130 ft2 205 ft2 330 ft2 130 ft2 205 ft2 100 ft2
Thickness
iy iy iy iy iy iy iy iy 2" 2" iy 2" 2" iy iy
0725913
TOWOLDMONOQ44999
Appendix P CEA 1800
Page 10
Item 537 539 540 541 542 543 530 532 533 534 535 585 586 409 413 417 421 504 526 545
) Pumps
Area 205 ft2 160 ft2 160 ft2
50 ft2 330 ft2 330 ft2 205 ft2 160 ft2
50 ft2 330 ft2 330 ft2 120 ft2 200 ft2
60 ft2 60 ft2 60 ft2 60 ft2 100 ft2 100 ft2 160 ft2
--
Thickness
1*5"
1*5"
IV IV IV
1*S"
IV IV IV IV
1*5" 3"
2V
iv
IV IV
iv
iv
iv
iv
IV
20 - Painting
Coating Std #502, Epoxy system
Supports for Items 408, 412, 416, 420, 426, 433, 427, 509, 516, 518, 523 and 524.
Items 406, 410, 414, and 418
Uninsulated piping - air, water, gas
'
21 - Walls, Masonry, Roofs
Concrete block structure attached to existing control room.
Allow for 4 walls 15' X 20' high, total area - 1200 ft . 2
Concrete roof deck with tar paper coating - area 250 ft .
0725914
TOWOLDMON0045QOO
Appendix F CEA 1800 Page 11
90 - Dismantling Item No. 172 173
Eauipment No. 21-5150
38-5588
Description IMist eliminator, 30" X 13' Brinks unit
1Heat exchanger, 16" o.D. X 8' long
Present 6" HC1 line to Dept 218 will be dismantled.
93 - Relocations and Modifications Expense
Move and relocate one power line pole and electric wires now in conflict with the new structure.
Move and relocate the following pipe lines which are south of
the existing plant and which will interfere with the new struc
ture.
'
Air line
- 40 ft. of 4" C.S. pipe
Chlorine line
- 40 ft. of 4" c.s. pipe
Instrument air line - 40 ft. of 1*5' ' c.s. Pipe
Water line
- 40 ft. of 3" city water line
0725915
TOWOLDMON0045001
CEA 1800 Date: August 28, 1967 By: R. S. Yates
SCOPE OF WORK Aroclor Expansion at W. G. Krumxnrich
Storage Tank Farm
Appendix "G"
0725916
TOWOLDMON0045002
Appendix G CEA 1800 Date: August 28, By: R. S. Yates Page 1
1967
General
The facilities included in this project are intended to:
1. Insure adequate supply of biphenyl.
2. Assure storage capacity for minimum inventories of various Aroclors so that bulk shipments can be made on demand.
3. Minimize the potential for cross contamination.
4. Provide additional unloading facilities for biphenyl.
5. Remove existing underground storage tanks.
Major Equipment Includes
1 - 100,000 gallon Steel Tank for Biphenyl.
2 - 22,000 gallon Aluminum Tanks for Aroclor 1242.
1 - 22,000 gallon Aluminum Tank for Aroclor 1254.
1 - 22,000 gallon Aluminum Tank fpr Aroclor 1260.
1 - 22,000 gallon Aluminum Tank for Aroclor 1248.
All storage tanks to have plate coil heaters and to be insulated over the lower half. Tank for 1260 to be completely insulated.
Pumps
All 316 SS.
1242 - Common pump for two storage tanks.
1254 - pump for two storage tanks.
1260 - Pump for one storage tank.
1248 - Pump for one storage tank.
Filters
All 316 SS.
Separate filters for 1242, 1254, 1260.
Piping
Separate transfer lines from existing transfer pump (Item 144) to each tank and to truck dock as follows:
0725917
TOWOLDMON0045003
Appendix G CEA 3 800 Page 2
1,42 - From day tank to storage - to manifold station
1254 - From day tank to storage - to manifold station 3260 - From day tank to storage - to manifold station 1248 - From day tank to storage - to manifold station Separate circulating lines on each tank.
Lines to be 2" & 3" IPS aluminum with single 1/2" copper tracer and insulated.
Railroad
1. Extend spur track #10A, 125 feet and tie into existing track 10.
01 Equipment
See Equipment List and Summary
02 Instrument Items
See Instrument List and Summary
03 Setting and Testing Equipment
Area is accessible for truck and train unloading. High lift can be used advantageously.
01 Setting and Testing Instruments
.
Normal conditions.
06 Excavations
For 100,000 gallon tank - 25' x 30' high
For good soil (3O'0 x 15 feet deep) Ring Wall (25'0) Sandfill
400 cu yds 10 cu yds 19 cu yds
Pump Foundations
3 x 2 cu yds
6 cu yds
Pipe Supports
9 3 cu yds
27 cu yds
0725916
TOWOLDMON0045004
Appendix G CEA 1800 Page 3
For 5 storage tanks
For good soil 35' x 35' x 15' 18,400 ft3 20' x 18' x 15' = 5,400 ft3 23,800
Total Excavation
Spoil Backfill
07 Foundations
Pumps 4 x 2' x 3' x 2'
Pipe Supports 9 x 2-1/2 cu yds
Loading Dock
Miscellaneous
Base for 5 tanks 5 x .78 x 142 x 10/12 - 635 ft2 5 x 3.14 x 14 x 4' x 10/12 = 735 ft,
1370 ft3
880 cu yds
1,369 cu yds 1,300 cu yds
2 cu yds 25 cu yds
5 cu yds 5 cu yds 55 cu yds
Soil tests will be required. 06 Supports, Platforms and Structures
Loading Dock - (2 required for biphenyl cars) Tank Platforms Ladder to top of biphenyl storage tank - 30 ft Grating Handrail Toe Plate 0_ Building Items None J.1 Sprinkler s and Fire Protection None required.
2 ton 4 ton 700 sq ft350 1in ft 350 lin ft
0725919
TOWOLDMQN0045005
A;4:*undix ? ^T.A
Page 4
I> i.oina
Item 401 - Mphenyl Storage Tank
3 5 ft of 4" IPS CS pipe for pump suction with re valve.
<0 ft of 2" IPS CS pipe for circ. line with :re valve.
LOO ft of 2' IPS CS pipe from unloading spot to tank with two
7 a*'*1 s
?C ' ft \.f 2" IPS CS pipe from pump discharge tc Item 1C2, ex. c:r -. tiphenyl storage tank, with two valves.
200 ft cf 1" IPS CS pipe from Building CP to storage tank wutn two valves for stesm supply.
200 ft cf 1" IPS CS pipe for miscellaneous steam services at storage tank.
Pr >c .*>s Piping -lx 1/2" OD copper tubing tracers with 2-1/2" insulation, 2" thick.
Stourr piping - 2" thick insulation.
Stc v q :: e ranks (Item 558-562) 5 C.rc, Lines - 2 50 ft of 2" IPS A12 pipe with 5 AL valves.
5 Vent Lures - 5j ft of-3" IPS Al2 pipe with 5 AL valves.
200 ft of 1-1/2" IPS CS pipe for steam to plate coils with .16 vulveb.
Piping - i. x 1/2" OD copper tubing tracer with 2~i/2" & ?-l/2" diameter insulation 2" thick. Steam piping - 2" insu lation.
Nitrogen Piping
250 ft of 1-1/2" IPS CS pipe with 10 valves from existing nitrogen station.
Instrument Air Piping 200 ft of 1-1/2" IPS galvanized pipe with 16 valves. Transfer Piping to Storage Tanks
Tie into existing lines at Tanks 9, 10, 11, (items 117, 118, 119).
Piping required:
200 ft of 2" IPS aluminum pipe with 8 valves. (Note for 1254, 1242, 1262)
0726920
'
TOWOLDMON0045006
Appendix G CEA 1800 Page 5 New 1248 line from existing transfer pump (Item 144) piping required: 150 ft of 2" IPS aluminum pipe with 2 valves. Piping: 1 x 1/2" OD copper tubing tracer with 2-1/2" diameter insulation 2" thick. Transfer Piping to Loading Station (Tank Car) For 1242s 225 ft of 3" IPS aluminum pipe with 3 valves and aluminum loading arm for tank cars. For 1254; 225 ft of 3" IPS aluminum pipe with 3 valves and aluminum loading arm for tank cars. For 1260: 250 ft of 3" IPS aluminum pipe with 3 valves. For 1248: 250 ft of 3" IPS aluminum pipe with 3 valves. Pipings 1 x 1/2" OD copper tubing tracer with 3-1/2" diameter insulation 2" thick. Transfer Piping to Loading Station (Truck Dock) For 1242s 100 ft of 3" IPS aluminum pipe with 1 valve. For 1254: 100 ft of 3" IPS aluminum pipe with 1 valve. For 1260: 100 ft of 3" IPS aluminum pipe with 1 valve. For 1248: 100 ft of 3" IPS aluminum pipe with 1 valve. Pipings 1 X 1/2" OD copper tubing tracer with 3-1/2" diameter insulation thick. Transfer Piping to Drumming Station Fop_ 1242: 100 ft of 2" IPS aluminum pipe with 2 valves. For_ 1254; 100 ft of 2" IPS aluminum pipe with 2 valves. For 1260: 100 ft of 2" IPS aluminum pipe with 2 valves. Fqr_.1248 i 100 ft of 2" IPS aluminum pipe with 2 valves Pipings 1 x 1/2" OD copper tubing tracer with 2-1/2" diameter insulation 2" thick. 12__ D'.ct Work None
0725921
TOWOLDMON0045007
Appendix G CEA 18CC Page 6
13 Electrical
Install 4 x 15 HP motors for pumps.
No interlocks or alarms required.
Install 8 street light type, 400 watt mercury arc fixtures for load ing dock, tank farm perimeter and area lighting.
install 8-175 watt mercury arc fixtures over tank farm area.
14 Site Preparation
None
15 Sewers and Drains
None
16 Underqround Mains
None
17 Yards, Roads, Fencinq
Chat will be placed around storage tank area, depth 12".
For Item 401
2,500 ft2
For 5 Storage Tanks
1,600 ft2
18 Railroads
Spur track #10A will be extended 125 ft and a switch installed at the end to bring the spur back into main track #10. Existing bumper will be removed.
19 Insulation Pipinq: insulation is covered in the category #11 - piping.
Tanks t
Item 401 - Thick, 1-1/2", Insul. Spec. No. 100 (Calc, Silicate with weather barrier.
Side Wall - 7TDH * 3.14 x 25' x 3300*' - 2,360 ft2
Top
= 3.14 x (25)2
= 490 ft2
44
2,850 ft2
Item 558 - Thick, 1-1/2", Insul. Spec. No. 100 (Calc. Silicate'/ with weather barrier.
Side Wall - TfDH = 3.14 x 131 x 12' - 490 ft2
Remaining area to be spray covered with cork filled asphalt mastic, Spec. No. 700
0723922
TOWOLDMON0045008
'
Side Wall
-
Top
77b .78 4
x
, (13)z
Appendix G CEA 1800 Page 7
490 ft? 132 ft*
2 622 ft
Item 559 - Same as Item 558
Item 560 - Same as Item 558
Item 562 - Same as Item 558
Item 561 - Thick, 1-1/2", Insul. Spec. No. 100 (Calcium Silicate) with weather barrier.
Side Wall - 77bH = 3.14 X 13 X 24 = 980 ft2
Top area to be spray covered with cork filled asphalt mastic. Spec, #700,
Top
132 ft2
20 Painting Spec 502 for all steel items.
90 Dismantling Remove pump 4247 and motor 9905 now on Tank #10,(Item 118).
Dismantle 3 X 14,000 gallon underground storage tanks and associated equipment:
Item No. Equipment No.
148 149
21-0768 19-0585, 66-0853
150 21-0769 151 19-0584, 66-1501
152 21-1310 153 19-0929, 66-0856
Description
10' Dia. X 26' long U.G. Hor. Tank Pump and Motor
10' Dia. X 26' long U.G. Hor. Tank Pump and Motor
10' Dia. X 26' long U.G. Hor. Tank Pump and Motor
Relocation
Replace two existing pipe supports going out to present tank car loading dock.
072*923
TOWOLDMON0045009
TOWOLDMONOQ45010
TOWOLDMONOQ45011
TOWOLDMONOQ45012
? 1 f-4
S"r
-A*ks
. mgetC^ ' i | '---t--t.......... j--J---I--A
^/^JivTr-^t'TP T7VT?^
, *r*fam *,+.
. : ! : . ~l, /*\m s\r-:\
SrUifr/,b> lA-i-tS
; ,' 5r*>*bi**//c<rrftapv/., **A \ I ^*Cr *t4J* S
II
JArPtT4 X*iA/#/j(6 rpms t4 S*SS.X-S\
-O
r*Acn)4 '>fsuCr <fc avoyc*:-*-
erts t rst/CAd. 2>*vcs \
wj <rc/^f/tr dyv&s
1&XC/rPJff/Cs*et tCteOVrTtAC raff ' ---------/--/vsrAtt ft C 1
1 1 1 .... i ---------r-- o
PRELIMINARY
Oti'OH DA'tlHC MO(UtE>ENl
LlCtNO ^....................... ........ .
CONDUCTION O1-"""'"O
MSMAINT flOAT -----------------------------
A7/#57^VP PPOJECr SC*Pl/_it
C. A NO. '*PO
..
TITLE.*?***! AeoCi cE_
BBT | ^li h |l!l.{ J
iPPA/2>.'f /V
072-592?
TOWOLDMONOQ45013
Monsanto
W. B. Howard - St. Louis
J Tt August 28, 1967
'
KtrenCNCl
PROJECT LOSS PREVENTION REPORT 67-65 CEA-1800
/TTO S. Yates (Project Manager)
R. E. Doerr R. E. Howard J. L. Mathews H. B. Patrick - WGK S&PP Project File S&PP Location File
COPIES TO THOSE PRESENT
J. R. Fullgraf
H. D. Gabelman
R. J. Green
W. B. Howard
J. MacPherson - Anniston
M. J. Pistek - WGK
H. F. Ray
- WGK
R. P. Stevens
R. S. Yates
DATE AND PLACE OF MEETING August 15, 1967, Creve Coeur, Missouri.
CEA-1800 Increase Liquid Aroclors' Capacity, WGK Plant, Sauget, Illinois.
This project is for installing a new aroclor manufacturing plant and a tank farm. The capacity will be 40M ppy. The capital is approximately $1.4M; completion target is approximately January, 1969.
The project includes installation of a 100M gallon biphenyl storage tank and extension of trackage for access to this tank. Two biphenyl unloading docks will be provided. The drainage from the 100M gallon biphenyl tank will be away from the process.
PROCESS1
1. Biphenyl Storage Tank This storage tank will be air blan keted; it was stated that contact of the biphenyl with air will not result in deleterious effects on the biphenyl. The flash point of biphenyl is 235F. It was therefore , agreed that low pressure steam (5 psig max.) would be used for heating the large storage tank, the 25,000 gallon tank, and tank cars, in order to avoid heating above the flash point.
AA
,
J- CO
0725928
IN IO CV. 1165
TOWOLDMONOQ45014
2
2. Addition of Ferric Chloride to Biphenyl Mix Tanks
The
ferric chloride is added batchwise to the mix tanks by
opening the tanks and dropping in the solid. It was agreed
that, in order to prevent formation of any flammable mix
tures above the biphenyl in these tanks (Nos. 403 and 404),
the temperature of material in the mix tanks will be held
below the flash point.
3. Chlorination System
The chlorination proceeds at a tempera
ture of about 150C; approximately 550 BTU's are evolved per
pound of chlorine added. Heat removal is accomplished by
circulating batch material through an external air cooler
and back into the chlorinator. Safety provisions include
the following:
(a) A high temperature sensing element in the chlorinator mass detects high temperature, shuts off chlorine, and alarms.
(b) Circulating pump shutdown (motor circuit detection) shuts off chlorine feed.
(c) A temperature detector in the circulating line is used for temperature control in the system. When this ele ment detects low temperature it alarms and also shuts off the air cooler fan.
(d) A temperature detector in the chlorinator mass (separate from No. a_;_ above) alarms at a high temperature which is lower than the temperature at which the element in a alarms and shuts off chlorine.
FIRE PROTECTION
A new open type structure will be erected
adjacent to Building CR.
No automatic sprinkler protection is required for this structure. It should be noted, however, that a spill of biphenyl at a tem perature above its flash point (235F) has resulted in fires.
The existing hydrant protection is considered adequate to extin guish such a fire.
LOSS EXPOSURE
The therrainol furnace consists primarily of a
cylindrical combustion chamber containing finned tubes. Although
an explosion in the combustion chamber is possible, the combustion
chamber could in all probability contain the explosion pressure.
There appears to be no major hazard from this source. The stack
might of course be blown off.
ft (-Z)
'
0725929
TOWOLDMONOQ45015
3
A more likely source of loss exposure would appear to be the burning of a tube in the therminol furnace. A tube could be replaced within about two days if one is in stock. On a soldout basis the business interruption loss would be approximately $20M. The repair cost was approximated at $3M.
LOSS PREVENTION GUIDE
Attached to R. S. Yates' copy of this
report is a copy of Form G-1425, Loss Prevention Review Guide,
which can be used as a safety checklist for this project.
LOSS PREVENTION REVIEW BY PLANT
The S&PP Branch of CED does
not plan a complete review of design prints for safety provisions.
S&PP requests plant personnel, including plant safety personnel,
to follow the development of design prints and to check the pro
gress of construction with particular emphasis on personnel safety
and loss prevention.
SAFETY MANAGER
R. J. Green will be Safety Manager for this
project. Please contact him for reviews during the design phase
of this project.
bO-h. H W. B. Howard
js
0725930
TOWOLDMONOQ45016
Monsanto
W. B. Howard - General offices
August 29, 1967
c
PROJECT LOSS PREVENTION REPORT 67-64
CEA-1430
TO : Mr. R. S. Yates (Project Manager)
yf
R. E. Doerr R. E. Howard J. L. Mathews P. K. Ward - Anniston S&PP Project File S&PP Location File
COPIES TO THOSE PRESENT
J. R. Fullgraf H. D. Gabelraan R. J. Green W. B. Howard J. MacPherson - Anniston M. J. Pistek - WGK H. F. Ray - WGK R. P. Stevens R. S. Yates
DATE AND PLACE OF MEETING Missouri.
August 15, 1967, Creve Coeur,
CEA-1430
Increase Liquid Aroclors Capacity, Anniston
Plant, Anniston, Alabama.
This project is for a new tank farm, mixing area, flaking areax and drumming area. Capital will be approximately $1.6M; completion target is January, 1969. Although no additional capacity is claimed under this project, the operation will be changed from three shift, seven day, to one shift, seven day.
A flaker will be added for solid aroclors and another flaker for biphenyl. Exhaust systems will be provided to remove fumes from the flakers.
PROCESS
1. Mix Tank
Solutions of aroclors are prepared in toluene
and xylene in a mix tank. The toluene and xylene used
for this purpose are pumped from drums directly into the
2,000 gallon mix tank. This tank is jacketed for steam
and for water. The tank will be nitrogen padded.
2. Biphenyl Surge Tank
The flash point of biphenyl is
235F. The biphenyl surge tank in the flaking area will
be heated, but only to approximately 80C. The biphenyl
will thus be below the flash point.
r (vj
0725931
TOWOLDMONOQ45017
Mr. R'. S. Yates
-2-
August 29, 1967
3. Scale-up of Flaker Size
The new flakers will be of
significantly larger size than the present flakers. The
aroclors are expected to perform on the new flakers as
well as, or better than, they do on the present flakers.
The biphenyl gives some problems in flaking with the
present flakers, and some of these problems may continue
with the new flakers. Although there is a scale-up factor
with the new flakers, no significant scale-up problems
are anticipated.
FIRE PROTECTION
A 120' x 60' x 1 story metal siding on
steel frame prefabricated type building will be erected north
of Bldg. 27 for flaking and drumming of aroclors.
It is recommended that this building be provided with an ordinary hazard wet pipe system of automatic sprinklers. The system should be supplied from a feed connected to the fire main in Fifth Street with a post indicator type shut-off valve located at least 25 ft. from the proposed building.
LOSS EXPOSURE
The maximum probable loss is anticipated
to occur from the scarring of an aroclor flaker roll. Re
surfacing of the roll would require about one month. On
this basis the BI loss would be approximately $100M. Equip
ment repair costs for the resurfacing would be approximately
$4,000.
LOSS PREVENTION GUIDE
Attached to R. S. Yates' copy of
this report is a copy of Form G-1425, Loss prevention Review
Guide, which can be used as a safety check list for this
project.
LOSS PREVENTION REVIEW BY PLANT
The S&PP Branch of CED
does not plan a complete review of design prints for safety
provisions. S&PP requests plant personnel, including plant
safety personnel, to follow the development of design prints
and to check the progress of construction with particular
emphasis on personnel safety and loss prevention.
SAFETY MANAGER
R. J. Green will be Safety Manager for
this project. Please contact him for reviews during the
design phase of this project.
R. J. Green
W. B. Howard ps
0725932
TOWOLDMONOQ45018