Document YG9bV12gOMz1GXKYbBEmoeKzD

RETURN TO: CENTRAL FILES CENTRAL ENGINEERING DEPT. "F" BUILDiNG DO NOT REMOVE ANY MATERIAL FROM THIS FILS. CENTRAL ENGINEERING DEPARTMENT PROJECT SCOPE REPORT AROCLORS EXPANSION CEA 1430 Add Storage Tanks, Drumming Facilities, Flakers, Packaging Equipment and New Manufacturing Building Anniston, Alabama, plant CEA 1800 New Continuous 40M lbs/year Plant with Additional Storage Tanks for Raw Materials and Finished Goods W. G. Krummrich plant By: R. S. Yates CENTRAL ENGINEERING DEPARTMENT August 29, 1967 072$811 TOWOLDMONOQ44897 DISTRIBUTION ORGANIC DIVISION 1. H. C. Carder 2. J. Cresce 3. P. E. Heisler 4. H. F. Ray 5. H. L. Williams CENTRAL ENGINEERING 6. J. M. Depp 7. F. J. Holzapfel 8. S. B. Johnson 9. F. P. LaBelle 10. R. L. Miller 11. R. E. Lenz 12. A. B. Terry 13. C. L. parish 14. F. W. Enoch 15. R - E. Howard 16. R. P. Stevens 17. H. D. Gabelman 18. R. S. Yates 19. Central File 20-30. Extra 0725812 TOWOLDMONOQ44898 CEA 1430 & 1800 Date: August 28, 1967 TABLE OF CONTENTS 1.1 Title 1.2 Summa ry 1.3 Process Technology 1.31 1.32 1.33 1.34 1.35 Process Description Raw Materials Products and By-Products Waste Streams personnel. Propertyand Public Hazard 1.4 Manufacturing Facilities 1.41 1.42 1.43 1.44 1.45 1.46 Description Design Capacity . Flexibility Requirements Future Expansion Physical Appearance Storage and Shipping Requirements 1.5 Utilities and Services 1.51 Utility and ServiceRequirements 1.52 Utility and Service Facilities Page No. 1 1 2 2 3 5 7 8 9 9 13 16 17 18 19 20 20 20 APPENDICES A. Equipment Flow Sheet B. Suggested Equipment Layout C. Equipment List D. Scope of Work, Anniston Storage Tank Farm E. Scope of Work, Anniston Drumming and Flaking F. Scope of Work, WGK, New 40M Pound Plant G. Scope of Work, WGK, Storage Tank Farm H. Preliminary Schedule I. Project Loss PreventionReport (9 pages) (2 pages) (13 pages) (9 pages) (6 pages) (11 pages) (7 pages) (2 pages) (5 pages) 0725813 TOWOLDMONOQ44899 CEA 1430 & 1800 Date: August 28, By: R. S. Yates Page 1 1967 1.1TITLE Aroclors - Increase Aroclor Capacity - Organic Division At Anniston Plant - CEA 1430 At WGK Plant - CEA 1800 1,2SUMMARY The objectives of this project are to, a) Provide adequate finished goods storage facilities at Anniston and WGK to assure a minimum inventory of the various Aroclors and Aroclor blends so that bulk shipments can be made on demand. b) Provide at Anniston for blending and drumming of the several Aroclors with other components without interferring with primary production facilities. c) Minimize potential for cross contamination of products. d) Provide loading facilities for tank trucks and tank cars and unloading facilities for raw mater ials in tank cars. e) Provide additional raw material storage at WGK for biphenyl and at Anniston for TCB and TTCB. f) Provide at Anniston new expanded facilities for flaking and bagging biphenyl and solid Aroclors. g) Provide new facilities at WGK to increase plant capacity from 29.5M lbs./year to 69.5M lbs./year. h) Provide an overall production capacity for liquid Aroclors of up to 30% more than indicated in the latest Sales forecasts. i) Provide for an orderly expansion of the WGK and Anniston Aroclor facilities. Addition of these facilities will result in capacity increases over the present standard'll capacity as follows: 0725814 TOWOLDMON0044900 3 1.31 CEA 1430 & 1800 Date: August 28, 1967 Page 2 At WGK, Liquid 40.0M lbs./year At Anniston, Liquid 5.7M lbs./year Solid 1.0M lbs./year (1) Note - Standard capacities at present are: At WGK, Liquid 29.5M lbs./year At Anniston, Liquid 48.OH lbs./year Solid 10.02H lbs./year The installation at Anniston will include finished storage and blending tanks, two flakers for solid Aroclors and biphenyl, a drumming station, tank car spur and loading facilities and bagging station for solid Aroclors and biphenyl. The installation at WGK will include a new continuous chlorination line, blow tank, intermediate storage, distillation equipment, continuous clay treatment facilities, finished storage tanks, and a biphenyl storage tank with additional rail spur and unloading docks. Desired completion dates: Tank farm at WGK Tank farm at Anniston Flaking facilities at Anniston New production facilities at WGK July 1, 1968 August 1, 1968 September 1, 1968 December 1, 1968 PROCESS TECHNOLOGY Process Description Aroclors are the reaction products formed by the chlorination of biphenyl and/or terphenyls using an iron catalyst. The by-product HC1 gas produced is absorbed in water to produce muriatic acid. Crude Aroclors are produced in chlorinator reaction vessels, air blown and distilled. Liquid Aroclors are earth treated, filtered and loaded for shipment. Solid Aroclors are drummed, flaked or flaked and milled and packaged for shipment. Distillation residues are discarded as waste or sold as Montars. A numerical system of nomenclature is used for iden tifying the various Aroclors. 0725615 TOWOLDMONOQ44901 1.32 CEA 1430 & 1800 Date: August 28, 1967 Page 3 Product yields are calculated on both chlorine and biphenyl and are different for each plant and for each Aroclor produced. They are recorded in the respective plant cost standards. Process documents: "Standard Operating Instructions for Aroclors Anniston Plant" - April 1966 - M. J. Williams "Standard Manufacturing Process for Aroclors Anniston Plant" - September 1966 - M. J. Williams "Process Description for the Manufacture of Aroclors - Department 246 - WGK Plant" - October 1966 D. E. Harris "Process Description for the Manufacture of Pyranols and Inerteens - Department A246 - WGK Plant" October 1966 - D. E. Harris "Standard Manufacturing Process for Pydraul A-200 Department B-246 - WGK Plant" - October 1966 D. E. Harris "Operating Instructions - Aroclor and Pyranols Departments 246 and A246 - WGK Plant" - August 1966 - V. Brawley "Final Report on the Continuous Chlorination of Biphenyl" - June 4, 1957 - R. A. Simone "Tentative Process for Continuous Chlorination of Biphenyl" - March 23, 1956 - R. A. Simone "Final Report on the Continuous Chlorination of Aroclors - Plant Demonstration" - May 7, 1958 R. A. Simone Raw Materials 1.321 Specifications Reference is made to the respective standard process manuals for raw material specifications. Raw materials at Anniston, for this project, are the Aroclors and additives used in blends and mixes and at the flakers. Raw materials at WGK are the materials used for the manufac ture of Aroclors. A list of materials follows: 0725B16 TOWOLDMONOQ44902 CEA 1430 & 1800 Date: August 28, 1967 Page 4 Plant Material Code Date Material WGK (246) 82601 33500 38800 19409 43099 81059 12/8/64 1/7/66 7/21/66 1/21/66 2/18/65 6/29/66 Diphenyl Ferric Chloride, Anhydride Lime, Hydrated Attapulgus Earth 200/UP Nitrogen Gas Chlorine, Liquid Anniston (27) 82612 81102 82641 82613 82613 826X4 82614 82615 36100 60200 58500 613- 20 64010 6/17/66 1/10/64 7/5/64 6/28/64 7/15/64 2/7/62 7/15/64 3/2/66 5/26/66 6/3/65 8/29/63 12/2- 3/63 12/18/64 Aroclor 1242 Electrical Grade Aroclor 1248 Electrical Grade Aroclor 1248 Non-Electrical Grade Aroclor 1254 Electrical Grade Aroclor 1254 Non-Electrical Grade Aroclor 1260 Electrical Grade Aroclor 1260 Non-Electrical Grade Aroclor 1262 Glycidyl Phenyl Ether (1) Trichlorobenzene (1) Tetrachlorobenzene (1) Epoxide 201 Toluene Xylene (1) WGK Specification 1.322 Sources WGK Biphenyl Received from the Anniston Plant in 20,000 gallon unlined steel, steam heated tank cars. Transferred to an existing 25,000 gallon storage tank. Chlorine Received direct from WGK's Department 232 in a 4" transfer line. This line is being replaced by a 6" transfer line in the third quarter of 1967. Ferric Chloride Received from the warehouse in 2 lb. glass containers. Lime, Hydrated Received from the warehouse in 100 lb. bags. 0725817 TOWOLDMONOQ44903 1.33 CEA 1430 & 1800 Date: August 28, 1967 Page 5 Attapulgus Earth Received from the warehouse in 50 lb. bags. Nitrogen Gas Supplied by a bulk station located in the tank farm area. Anniston Aroclors are transferred by pipeline direct from department to storage and from storage tanks to mix tanks, to drumming station and to flakers. Glvcidyl Phenyl Ether Received from the warehouse in 55 gallon drums. Trichlorobenzene Received from Hooker Chemical Company in 8,000 gallon steel tank cars. Tetrachlorobenzene Received from Hooker Chemical in 8,000 gallon tank cars. Epoxide 221 Received from warehouse in 55 gallon drums. Toluene Received from warehouse in 55 gallon drums. Xylene Received from warehouse in 55 gallon drums. Products and By-Products 1.331 Quality Considerations Marketing stresses that quality protection is the most effective means of protecting our present sales position of electrical grade Aroclors. Plant studies have shown that the use of aluminum tanks and aluminum transfer piping systems coupled with inert blanking of in-process and finished goods storage tanks will give us maximum protection. 0725818 TOWOLDMONOQ44904 CEA 1430 & 1800 Date: August 28, 1967 Page 6 1.332 Specifications Reference is made to the respective standard process manuals for finished goods specifi cations. Finished products at Anniston, for this project, are the completed blends from mix tanks and solids from the flakers. At WGK, finished products, are the liquid Aroclors and Montars. A list of products follows: Product Code Anniston Date Product Code WGK Date Product 82611 82612 82612 81102 82641 82613 82613 82614 82614 8.2.6.15 ... 82622 82621 82620 62619 82618 82616 82601 82649 82658 82681 82659 82661 82685 82664 10/28/63 6/17/66 7/15/64 1/10/64 7/15/64 6/28/65 7/15/64 5/25/66 6/15/64 3/2/66 7/15/64 7/15/64 3/11/66 3/15/66 3/11/66 3/11/66 3/11/66 3/11/66 7/8/65 4/18/66 4/18/66 5/3/67 3/11/66 3/15/66 3/9/66 4/17/58 8115 81101 81101 81102 81102 81103 81103 81105 81105 81107 82868 82868 4/7/64 6/17/66 7/15/64 1/10/64 7/15/64 6/28/65 7/15/64 5/25/66 6/15/64 3/2/66 7/15/64 7/15/64 Aroclor 1232 Aroclor 1242 Electrical Grade Aroclor 1242 Non-Electrical Grade Aroclor 1248 Electrical Grade Aroclor 1248 Non-Electrical Grade Aroclor 1254 Electrical Grade Aroclor 1254 Non-Electrical Grade Aroclor 1260 Electrical Grade Aroclor 1260 Non-Electrical Grade Aroclor 1262 Non-Electrical Grade Montars 1, 2 Montars 314 Aroclor 5460 Aroclor 5442 Aroclor 5060 Aroclor 4465 Aroclor 2565 Aroclor 1268 Biphenyl Inerteen PPO A13B3B Inerteen 54201 KA Aroclor 1260 - 10% Toluene Aroclor 1262 - 10% Toluene Therminol FRO Aroclor 1254 - 10% Toluene 1.333 Packaging and Shipping Liquid Aroclors At both Anniston and WGK, liquid Aroclors are shipped in the following manner: Tank Trucks Size - 4,000 gallon Materials of Construction - All electrical grade Aroclors are loaded into SS trailers. Non-electrical grade Aroclors may be shipped in steel trailer tanks. 0726819 TOWOLDMONOQ44905 CEA 1430 & 1800 Date: August 28, 1967 Page 7 Tank Cars Size - 4,000 or 8,000 gallon Materials of Construction - All electrical grade Aroclors are loaded into solid aluminum cars or in tin, zinc or aluminum spray-lined cars. Non-electrical grade Aroclors may be shipped in steel cars. Drums and Cars Size - 5, 30 or 55 gallon Materials of Construction - Lacquer-lined containers. Solid Aroclors At Anniston, solid Aroclors are packaged in 5 and 40 gallon galvanized steel drums as a solid and in 41 gallon fibre drums as flakes. Biphenyl and Aroclor 5460 are packaged in bags as follows (major part of the production): Bags Aroclor 5460 Net weight - 100 lbs., St. Regis No. PCBG-32A. Size - 18" X 6" X 34" with a 5" valve. Type - Sewn Valve (SV). Biphenyl Net weight - 50 lbs., St. Regis No. PCBG-145A. Size - 16-3/4" X 5" X 33" with 5-1/2" valve. Type - Sewn Valve (SV). HB-40 At Anniston, HB-40 is packaged in 5 and 55 gallon steel drums. 1.34 Waste Streams WGK ' 1,250 lbs./day of HC1 gas absorbed in a 50 GPM water stream (0.21%) will be discharged from the continuous blow tank into the plant sewer. Other process losses are of a minor nature. 0?25B20 TOWOLDMONOQ44906 1.35 CEA 1430 & 1800 Date: August 28, 1967 Page 8 Anniston No change is expected in waste discharges as a result of this project. A dust collector will be installed to control Aroclor dusts from the milling operation of Aroclor 1268. Personnel, Property and Public Hazards Chlorine Gas Causes eye, skin and mucous membrane irritation. In strong concentrations canister gas masks, Scott Air Paks, or oxygen breathing apparatus are required. Biphenyl Solid at normal temperatures. Fumes are toxic over a prolonged period of exposure. The flash point is 235 F. HCl Gas Fumes are very toxic and hazardous to teeth, skin, eyes and mucous membranes. In strong concentrations, rubber protective equipment and approved pack or cannister gas masks are required. Ferric Chloride Solid at normal temperatures. Material is not toxic but presents an eye hazard. Xylene Fumes are very toxic. Limiting explosion concentra tion is 1.27 to 7.0% by volume in air. The flash point is 40F. Trichlorobenzene Solid at normal temperatures. Fumes are medium toxic. Fire point is above 210F. Crude Aroclors During processing,Aroclors are generally hot, 100C or above, and can cause serious thermal burns. Con tinuous or repeated skin contact must be avoided. Vapors at room temperatures should not be breathed in a confined space. At elevated temperatures, fumes are quite toxic. Continuous or repeated skin contact with Aroclor must be avoided by the use of gloves and protective garments. 0725821 TOWOLDMONOQ44907 CEA 1430 & 1800 Date: August 28, 1967 Page 9 1.4MANUFACTURING FACILITIES 1.41 Description 1.411 General The following information is included in the Appendix of this report: Equipment Flow Sheets Suggested Equipment Layout Equipment Lists Scopes of Work Preliminary Schedule Project Loss Prevention Report 1.412 For Anniston New storage and blending tanks to be added: AroIcI lor 1242 1248 1 1254 II 1260 II 1262 II 1221/1232 Inerteen PPO and A13B TCB TTCB 54,000 gallon 18,000 " 54,000 " 18,000 " 18,000 " 18,000 " 30.000 12.000 12,000 " " " (2 (2 (1 (1 27,000 gallon) 27,000 gallon) 12.000 gallon) 18.000 gallon) An existing 2,000 gallon mixing tank will be relocated. One covered loading dock for tank cars. One covered loading dock for tank cars and trailers. A new railroad spur. Four existing 12,000 gallon storage tanks with submerged pumps will be dismantled and scrapped. New drumming facilities to be added include a high speed drumming scale and a conveyor system to bring empty drums to the scale and take filled drums away from the scale. New flaking and bagging facilities to be added: Storage for Aroclor 5460, 1268 and biphenyl Flaker for solid Aroclors 0725822 TOWOLDMONOQ44908 CEA 1430 & 1800 Date: August 28, 1967 Page 10 Flaker for biphenyl Mill for Aroclor 1268 High speed bagging machines for Aroclor 5460 flakes and biphenyl flakes Conveyor system to take filled bags away from bagging machines Fume control system for Aroclor 1268 The existing Aroclor and biphenyl flakers will be dismantled together with the present Aroclor feed tank. A suitable building (120' X 601) to house the drumming and flaking operations. Pipelines from Department 27 to tank farm as follows: One line for Aroclor 1242 from existing 12,000 gallon day tank One line for Aroclor 1248 and 1221 One line for Aroclor 1254 from existing 12,000 gallon day tank One line for Aroclor 1260 One line for Aroclor 1262 Pipelines from tank farm to mix tanks: One line for Aroclor 1242 One line for Aroclor 1254 One line for Aroclor 1260 One line for Aroclor 1248 and 1262 Pipelines from tank farm to loading spots and drum filling: One line for A13B One line for KA and PPO One line for Xylene and Toluene blends (drum filling only) 0725823 TOWOLDMONOQ44909 CEA 1430 & 1800 Date: August 28, 1967 Page 11 One line for HB-40 (drum filling only) One line for Aroclor 1242 One line for Aroclor 1254 One line for Aroclor 1221, 1232, 1248, 1262 One line for Aroclor 1260 Pumps will be provided as follows: One for Aroclor 1242 transfer at tank farm One for Aroclor 1254 transfer at tank farm One for Aroclor 1248/1221, 1232/1262 trans fer at tank farm One for Aroclor 1260 transfer at tank farm One for Mix tank and PPO tank transfer One for Xylene Mix tank transfer One for TCB, TTCB tank car unloading One for TCB, TTCB transfer to Mix tank Three to transfer Aroclors from Building 27 to storage 1.413 For W. G. Krummrich New storage tanks to be added: Aroclor 1242 Aroclor 1248 Aroclor 1254 Aroclor 1260 Biphenyl 44,000 gallon (2 - 22,000 gallon) 22,000 gallon 22,000 gallon 22,000 gallon 100,000 gallon A new railroad spur Two unloading docks for biphenyl cars Three existing 15,000 gallon storage tanks with submerged pumps will be dismantled. Pipelines from day tanks to tank farm as follows: 0725824 TOWOLDMONOQ44910 CEA 1430 & 1800 Date: August 28, 1967 Page 12 One line for Aroclor 1242 One line for Aroclor 1248 One line for Aroclor 1254 One line for Aroclor 1260 Pipelines from tank farm to loading spots and drum filling: One line for Aroclor 1242 One line for Aroclor 1248 One line for Aroclor 1254 One line for Aroclor 1260 Pumps will be added as follows: One for Aroclor 1248 transfer One for Aroclor 1254 transfer One for Aroclor 1260 transfer One for Aroclor 1242 transfer Facilities to produce 40M lbs./year of Aroclor 1242: A continuous chlorinator chain consisting of biphenyl mix and continuous feed tank, four chlorination tanks, four mass circulating pumps and four external air coolers. A continuous blow tank and intermediate storage tank. Two semi-continuous distillation systems consisting of still pot, external circulat ing system with therminol heating, entrain ment separator, vapor condenser, receiver and vacuum steam ejector. ' Two continuous porocel treatment systems consisting of feed tank, absorber, cleanup filter and product receivers. One train will have two absorbers to provide flexi bility. 0725825 TOWOLDMONOQ44911 CEA 1430 & 1800 Date: August 28, 1967 Page 13 A complete therminol heating, storage and circulating system. Additions to the existing control room to provide space for a foreman and motor con trol center. 1.42 Design Capacity 1.421 Anniston Finished Product Storage Recommended ^ Provided Product (gal.) (gal.) Future Need (gal.) (1970) 1221 1232 1242 1248 1254 1260 1262 TOTAL 13,0507 14,000J 97,500 20,800 51,500 20,900 5, 550 223,300 18,000 66,000(2) 18,000,,. 66,000 18,000 18,000 204,000 27,000 27,000 Increased flexibility in the stojrage area will allow a capacity increase of 5.7M lbs./year (from 48M to 53.7M). Estimated tank car shipments for 1971: Estimated tank trailer shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971: 372 (3) 66 (3) 25,610 (3) 2,030 (3) (1) Letter from HJD to RSY 5/18/67. (2) Includes 12,000 gallon of day storage. (3) Anniston Job No. 370-720 (1) by R. H. Taylor Mixing and Drumming Area A new 12,000 gallon mix tank, a relocated 2,000 gallon mix tank and an 18,000 gallon mix tank to provide for: Estimated tank car shipments for 1971: Estimated tank truck shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971: 55 (3) 1 (3) 5,764 (3) 1,312 (3) A new drumming station with associated conveyors to handle 150 drums/day. (Basis: 8 hrs./day, 260 days/year, 75% OST) 0725826 TOWOLDMONOQ44912 CEA 1430 & 1800 Date: August 28, 1967 Page 14 Flaking and Bagging Aroclor flaking capacity (Aroclor 5460) 41,500 lbs./day (Basis: 8 hrs./day, 365 days/year, 75% OST) Aroclor bagging capacity 2 bags/min. Biphenyl flaking capacity 18,300 lbs./day (Basis: 8 hrs./day, 365 days/year, 75% OST) Biphenyl bagging capacity 2 bags/min. Flaking and bagging design will allow these operations to be carried out on a one-shift basis, seven days a week. Exception is Aroclor 1268 which will be flaked and packaged on a three-shift basis, seven days a week (3% of production). Raw Material Storage Raw Material Provided (gal.) TTCB TCB 12,000 12,000 1.422 WGK Finished Product Storage Recommended (1) provided Future Need Product (gal.) (gal.) (gal.) (1970) 1242 1248 1254 1260 TOTAL 132,000 25.200 34,400 20.200 211,800 84,000^} 42.000 42,00014' 22.000 190,000 66,000 66,000 Estimated tank car shipments for 1971: Estimated tank trailer shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971: 112 306 12, 200 765 (1) Letter from HJD to RSY 5/18/67. (2) Includes 40M gallons on hand storage (3) Includes 20M gallons on hand storage. Extra storage required for operating flexibility. (4) Include 20M gallons on hand storage. 0*2582? TOWOLDMONOQ44913 CEA 1430 & 1800 Date: August 28, 1967 Page 15 Raw Material Storage Raw Material Biphenyl Provided (gal.) 125,000^ (5) Includes 25M gallons on hand storage. Provides capacity for 4 - 20,000 gallon cars and six days' supply at increased rate. New unloading track and docks provide four days turnaround time at increased rate. New Manufacturing Facilities Continuous chlorination: Basis: OST: Rate: Producing Aroclor 1142 7,950 hrs./year 43H lbs./year Semicontinuous distillation and earth treatment: Basis: OST: Rate: Producing Aroclor 1242 7,950 hrs./year 40H lbs./year For the overall product group, after these additions are completed, Anniston and WGK plant capacity will be as follows, H lbs./ year: Present Capacity New Capacity Increase in Capacity Anniston WGK 48.0 29.5 TOTAL CAPACITY 77.5 53.7 69.5 123.2 5.7 40.0 45.7 Based on 1971 requirements for both plants (July 1967 Sales Forecast), excess capacity at that time will be: New capacity Required in 1971 Excess Capacity Excess Capacity 123.2M lbs./year 99.2M lbs./year 24.0M lbs./year 24.2% 0725828 TOWOLDMONOQ44914 CEA 1430 & 1800 Date: August 28, 1967 Page 16 1.43 Flexibility Requirements 1,431 Anniston Increased storage capacity and blending facilities will allow for better utilization of present still capacity. This will be accomplished by longer runs on the same product and result in increased pro duction capacity. 1.432 WGK Based on the sales forecast of July 1967 for the Aroclor product group, batch units will produce Aroclors 1248, 1254 and 1260. The maximum capacity of these units is as follows for each Aroclor: Aroclor 1248 8,750 hrs. X 7,200 lb./ba. X 5 chlor X 92% OST = 34.4 M lbs. 8.5 hrs./ba. Aroclor 1254 8,750 hrs. X 8,040 lb./ba. X 5 chlor X 92% OST 30.8 M lbs. 10.5 hrs./ba. Aroclor 1260 8,750 hrs. X 9,100 lb./ba. X 5 chlor X 92% OST = 29.2 M lbs. 12.5 hrs./ba. For the year 1971, the maximum batch capacity will be: For Aroclor 1248: 34.4 M lbs. X 21%*^= 7.25 M lbs.. For Aroclor 1254: 30.8 M lbs. X 35%*^= 10.80 M lbs. For Aroclor 1260: 29.2 M lbs. X 43%^= 12.60 M lbs. Total Batch Capacity on this basis = 30.65 M lbs. (1) From the July 1967 Sales Forecast for 1971. 0725829 TOWOLDMONOQ44915 1.44 CEA 1430 & 1800 Date: August 28, 1967 Page 17 Requirements for 1971 are 20.3M lbs., leaving an excess capacity of 51% at WGK. For 1971, the continuous system capacity utili zation will be 25.6M lbs., leaving an excess capacity of 56% at WGK. Flexibility will be designed into the WGK dis tillation systems to allow for the following operations: Still No. 1 (existing) Aroclor 1260, 1262 Still No. 2 (existing) Boil down still to separate Montars (residues) from all products, Aroclors 1242, 1248, 1254, 1260 and 1262. Still No. 3 (New) Aroclor 1242 or 1254 Still No. 4 (New) Aroclor 1242 or 1254 Future Expansion 1.441 Anniston At the completion of this expansion, space will be available to the north of Building 27 for the addition of a complete new solid Aroclor line. Space is avail able in the tank farm area for additional tankage. Flaking and drumming capacity can be increased by adding additional personnel and operating on a 2 or 3 shift basis. 1.442 WGK One of the objectives of this expansion is to provide 25-30% excess production capacity for Aroclors. As we use up the excess capacity provided in this project we must consider the next step in department expansion. If we assume the product split will increase propor tionally according to the latest sales forecasts, we can postulate an operation diagrammed as follows: 0725830 TOWOLDMONOQ44916 CEA 1430 & 1800 Date: August 28, 1967 Page 18 1.45 The layout of the new chlorination-distillation facili ties at HGK will allow space for the addition of another chlorination unit, intermediate storage tanks and two additional distillation chains. Aroclor 1248 and 1262, because of the smaller requirements, would continue to be made in the batch units. On this basis, we can postulate productive capacity as follows for liquid Aroclors, M lbs./year: Anniston HGK batch units Cont. 1242 unit Cont. 1254 unit Cont. 1260 unit 53.7 29.5 40.0 15.0 15.0 TOTAL CAPACITY 153.2 Physical Appearance 1.451 Anniston Tanks of different heights will be grouped together to provide standardization. In the flaking and drumming area, provision will be made for moving finished products directly into a new warehouse facility (when built) . 0725831 TOWOLDMONOQ44917 1.46 CEA 1430 & 1800 Date: August 28, 1967 Page 19 1.452 WGK Tanks will be grouped together as an exten sion of the present tank farm. The new facilities will be a separate structure to the south of the existing unit. Storage and Shipping Requirements 1.461 Anniston Facilities provided are noted in greater detail in other parts of this report. Provision is being made for: Raw material storage of TTCB and TCB. Finished product storage for all liquid Aroclors. Loading docks for tank car and tank trailer loading of products. Moving filled bags of solid Aroclors and biphenyl to palette loading station, then to warehouse storage. Moving drums and cans to palette loading station, then to warehouse storage. Storage in the drumming area of the new manufacturing facility for empty drums and containers. 1.462 WGK Provision is being made for: Raw material storage of biphenyl. Finished product storage for all liquid Aroclors. Unloading docks for tank cars. Making an existing unloading dock a loading dock for tank cars of Aroclors. No extensions or additions are being made to the present blending and drumming facilities. WGK technical service is modifying an existing storage tank to a blend tank and revamping piping in the drumming area. 0725832 TOWOLDMONOQ44918 1.51 1.52 CEA 1430 & 1800 Date: August 28, 1967 Page 20 UTILITIES AND SERVICES Utility and Service Requirements 1.511 Anniston Additions Steam - 100 psig-For Storage Tanks 2,000 lbs./hr -For Process Purchased Water- For Process (Cleanup) Compressed Air - For Storage Tanks 500 lbs./hr 150 GPM 20 GPM Plant Water - For Process (Flakers) 300 GPM Nitrogen - For Storage Tanks 50 SCFM Electric - Connected - Operating 300 HP 200 HP WGK Additions Steam - 80 psig - For Storage Tanks 5,000 lbs./hr - For Process 3,000 lbs./hr, 200 psig-For Process Natural Gas - For Process 600 lbs./hr, 1,800 SCFH purchased Water- For Process 150 GPM Compressed Air - For Process 100 SCFM Electric - For Instruments - Connected 75 SCFM 315 HP - Operating 250 HP Plant Water - None Required Nitrogen - None Required Utility and Service Facilities 1.521 Anniston A new spur track from main track at north of plant to 5th Street, 1700 ft. long. 0725833 TOWOLDMONOQ44919 CEA 1430 & 1800 Date: August 28, 1967 Page 21 A new 300 KVA pole line transformer to supply tank farm and warehouse requirements. A new sewerage lift station to replace existing field which is in the proposed manufacturing area. The lift station will tie into an exist ing city sewerage line. Relocating a 24" IPS VC acid sewer. Installation of a steel frame prefab-type building, 120' long X 60' wide to house the flaking, drumming and bagging facilities. This building will be designed so that it can be attached to a new warehouse building which will be 120' wide X 240' long. A 15' wide X 80' long tank truck loading sta tion. Relocation of existing plant parking facilities 70' wide X 120' long. 1.522 WGK ' Extension of existing track 10A for 110 feet and installation of a turnover to tie existing track 10A into track 10. Replace existing gas meter with a larger capa city meter. Install new pump at department city water break tank with associated piping. Install new 600 amp breaker in Sub #17. Install fans in Sub #17 transformer. Transfer feeder 8-1 from Sub #8 to Sub #17. Install an overhead feeder from Sub #17 to Building CF. Install feeder cables from breaker 8-1 to Department 246. 0725834 TOWOLDMONOQ44920 TOWOLDMONOQ44921 V | ^1 vgi v^l * A K ---- >- A- * 0725836 TOWOLDMONOQ44922 * 0725837 TOWOLDMONOQ44923 TOWOLDMONOQ44924 0725839 TOWOLDMONOQ44925 iff?)} 0725840 TOWOLDMONOQ44926 AJ33 Ki,PPO ----------- ^ # h- \ o 'a_ K tft'ZCMLk n*/>6e -ft# *'J3S) * k /&*' 64; \^rir.L :73S-'j 6 J/SS 1 Sn I 0725841 TOWOLDMONOQ44927 jfx/VA/li of, <- Gh*s>e/> t' Sitrjj. >/l- : /)*>/* r "fj fp) /Vo /- Wo 8 1mt _-J ~A y ir^sf .f6Wr*a/r/- A:'/*/.'. AMtii*'* A 0725842 TOWOLDMONOQ44928 MONSANTO COMPANY ^HOWPWCnCVMMVPMMMMMMII ENOINEERIN0 DEPARTMENT ST. LOUIS, MISSOURI /fxs-'dfsv /!rou.ck Otf'/i- -:r Z'A'Ofls-t/A/': ~______________ punt -WA/.cr^y | LOCATION . /iti/vt&Tfj . Sli/t /*,' ,y7` //- qu/V 0725843 TOWOLDMONOQ44929 /Ten 7/9 \ /Z4Z ' /ren/Zo "/IS* ' DC tl 6N MANY UCTION NO. PREPARED ov ______ ikiit___/_of / ... Jrj^67 '2 R*V. NO. -- 59727 AWp ASA n"t*r< ?vW ^vii rr SiU> , Owl t.rvr OAT* RCVItlON OHM (T/Ml APPROVED ________________ xsrr V ftSTf V OAT* 0725844 TOWOLDMONOQ44930 07258*5 TOWOLDMONOQ44931 OEAION MtNVtl CCTI TK NO SETIMATE . - - IT1M ) t.A. h PMEPAMEO V SSStBS. OATK ^^7 EH IE T ._, . / ^OF_Z_________ _ ' ... fjC Kr-mP*v> 3 / f',^.71.. ChL .a?' . #/> - $77 . #t>TT y c=L~L _ ^ ^ ^ ^ 3>| i~i *. /&/g hlf,fj?./ft-rt> &37.&&'}Cmt> 6/b 7?37 iim ' /bese 4 / r3mM 0725846 TOWOLDMONOQ44932 OONSAWTO COMPANY IHOlNCKAINO DCFARTMCNT IT. LOW!*, MIMOURI tattTiBM 5flvT'f J5af>Hrtr /W cSway- ......... 4o` i II I 072584 7 TOWOLDMONOQ44933 KfTIMATt NO. I rntPARCo 1 ink t ____or J \l7*-y?&T 76 /rt't /Ori(exit) 7c Cn*cf:/cAraM3- V-tiA /rllf.rjU. ArL JICBiiSBSfjUf TT^fSHZ. WL -'Aflf , 0725648 TOWOLDMONOQ44934 MONSANTO COMPANY iHOmetnmo otPAfttuittT IT. LOUIS. MISSOURI dXOCloK Gt/'/tctrx MJi CM 3 6LOCATION < rtt/ T / /JU. 0725849 TOWOLDMONOQ44935 A*A*OV*0 Y . OAT 0725650 TOWOLDMONOQ44936 MONSANTO COMPANY tNOiHceniHO ocpaptmint tt. LOUIS, MISSOURI JTxpam dx&fioA. OtrAorr fcWlr/Mi rfl/ii'}crc * AXCQvcKJ _ lacATtftM JAttAfT, //-U */&/ fktPt faioc/v/ms Abs 6, 7,8, 9 ' , 0725851 TOWOLDMONOQ44937 vaer. V7 jX, / P^77 Atvtt /rtn v Si MV. NO. OATf ' RIVIIINf 6B-1M 17/Ml 1: AOMOVtO V TST V OATg 0725852 TOWOLDMONOQ44938 MONSANTO COMPANY ENOINCtAIMO OCPAMTMtNT IT. LOUII, MUOUMI EXPAND AROCLriR C.APACltV mYW. 1 .ATlrtN .L.T W6 KRUMMRICW EQUIPMENT FLOW SHEET 0725853 TOWOLDMONOQ44939 iee:t 01C*1TOIOMNMMANO.UAL _ .. . timat no JJsQCi________ prspaiIcd *r V4Tf.S HUT -4- or *T ; N*- nt/v. wo, s-is-a Avktt // SO-1, gzs.i'Zf' .0^ tfvvD OAT* 'rin/.rzz, OC-IM n/MI dWc/nb/x /'i > aapmoV vko Mt' Y OATt 0725654 TOWOLDMONOQ44940 IONSANTO COMPANY iwaiNECAlMO OePAATMtNT IT. LOUIS, MISSOURI /}koCoK Clr'rtCtrY Iaxth VA&trAj/TA/r u.t LOCATION SMAtrr //JJA/6/C 0725855 TOWOLDMONOQ44941 iTt NO /0>O ' .... *^*> &___~ zfi ~4~Jr 'IKj-; /fpfisyj 4 /for 9 0725856 TOWOLDMONOQ44942 0725857 TOWOLDMONOQ44943 LfgMO [Dfroposeo FACiitr<c$ [L [XltTlN( FACILITIES CW* ClTy WATER FWF F'RE WATER f# fiRE HYORANT SCALE' Appm/I' /' & Ams / Ot* < 0725858 TOWOLDMONOQ44944 ,Tcray^TS5>? c o 0725859 TOWOLDMONOQ44945 TOWOLDMONOQ44946 7-26-A/ fan DESCRIPTION REV. NO. REMARKS fhtortrcM 2to Pi hrni Z>3. Zwft, A20 > 3* 2 - /3 /// OPERATING TEMP. A pHeSI. MATERIALS OP CONSTRUCTION - _____ 71 /rAi <?// /i /re>l i'/i', '//mitoASd, C.rjj, iV -- /a*,/// W/r/' ^#70 Z'v/'uf /*} Hf/rk A/l /8"x//r) ",/)rCA jy.*7* 7SiC* 5/wtr At. Sr ?o J /aft i Safi -$ r Axi/ft>An,M SfMt /fc !r ~7oll /Co`t 4 '~t Samc Ar> h 7->H WtrH *} i 70 &'**** Jft' tM AM* &&F? * Si*if /K h- ''07 *v*re. rest * . /oo`C 4 PCI /oft 4 'Rr-' ^iLi. -'./ At-uclimwil /A/Mz/VCM AjXit rtJWlMtj 5a<- />: h '/>? $Me s*J- h 'So/ 4v'> At->'-/? ` /(x>t 4 Pd !U'( 4 P'-! /OCX Aii/oi/a/VM 3/iCC Ac 430, S/? ixAA 7/rrc toft TfTc 3/(Si /v6 ,430, 5rc< 3*-?-/3 /OO^l 7(f e 3/(&c , Av's Aid, Size 2*?- /3 /ooc ' TEFC 3/(SS 0725661 TOWOLDMONOQ44947 MONSANTO COMPANY CENTRAL engineering department St. LOUIS. MISSOURI PROJECT. _ ____ SUBJECTJ'fti itj.cfo. PLANT__________ZlA/mx7.&S/. . ____________,, LOCATION_ _ _ _ _ _ AAH'Znijv____ ///&______ PROJ. NIQO.. PREPAR . OATE^l! , TEA NO. jsm: equipment list and summary APPROX. OIM. NOMINAL PATINO NEW OR ON HAND ITEM NO. NAME -4^ wu-mm/mr Ars>jw &P /?/ //,5d>0 <5/1.: i J/i /5tJi/ /SO'rOM O/J 7oo I'A Y 7/ir-j/-' 70/ TpAtV $ ^fA1 Ajf*.i P Oh 701-oci /'iif(. /A 3te** - ^7 farz/z/r fta* /?/ JhSoo AA/z OH 70 Z i>A/ 7/trv.K /Softthl JZ'L '70A SAL .... 7o3 7ft/fa,C.2~ Oa 7'/:a:oi AIook /$}>* x v:'' ' f V )$h.'A -C' * ' ^ ' 77&`S /* : A/ *7?vo <?//:; 7/ 7os/ Ftminto (*oct> ( 205 /'//l '-At : /ssi A?4z /24Z /?S4 /Vb,A / Zf\V' ' /S'U4, W''" i\ /s'Pm X 02 'r- " n`t>M x au " :;PV X J J 'r? " /ii't'A r 6 " MirnAjcch r*<. V\- . . V//V //<yv .S?*/ .) :|A' ' M/x Albv/ oWi % /c*s' <?* -J *7t>o- `'/i-'. /3-yj-, o/t-t.1. /&;' /i/U C /ft'V.YI OAlZ /Soso os.: i S'coiSM) Air, riifj tftp /co'ft) A >SHr- /6u '>/ fo'7t>H /SHA /AioA'Psl /V /V A? At A/ A7 // /V -V <v /K A V//v/ $7* ii/li ii'bi.ft.t /on '7t> H /K /SA/r` /(tofi Kris/ // 70& C/ntAueO 70V /n.litfi-, Ocoi. . /2 s-*; 72/3 Fif.lOHtt, Ca.VZ. 70? '330*: 7/o f/K ' w A A ,* 'CcoZ> /-'i7,/i%k lZ^ n^i Ou : . K&* 7/2 6co>$ 7/3 !fx-Z^AA 'PC. r< /"tfPi; A> f 7/'2'06) AioTu H 7/1 j/'*v Tu#)/'* 7/4'CO/ AifffaR 7/S /AAa srt: / < A',i -- 7/S-M) AA/cTt,Li 7/& Caa c-A(-4770 7/7 7fiA}i,iA/CR 7ifn 7/7-00/ Ax/cTok C' /$><,!. / 0725662 TOWOLDMON0044948 rev. NO. DATS / 7-ze~a DESCRIPTION A/ZS.-'S-s REV. NO. REMARKS OPENATINO TEMP. * PRESS. AiU.r - - c W*rn * /Vtwr /*J /lA/: i-`A. i !' V Set /r 'it / /,- 77/ A>r.y, /v?c ./ /&>:. S j /fo<r A, MATERIAL! OF CONSTRUCTION :. >/. -5 ' .r1. ' <? ,,> Ctr h '/rj tw-f Sut`\: 3/6 00 W/rfl 4*70 5'.*<* T'ttl.r' /'*/. r/fr 1 /p"+ /t, r" -/),>?/! t>n *- * /O0ll 'A P.7 Al-ihhfifjfW i.&HTHlWl Mittfu MttH SFAi. -A'.'w/ J> UJPTH ------ 1 !? jc- Wtr* ^ M 70 /*V W* /tec* Si fr * 4a. r //' 506 5f/z> Oia*. , ; 5iT^ # /a* ^< *:/ Ai-OkaA/VA) /flsV .. C.C S`/ 4/5 4^0 - 6/2^ 3y / ^ - /" 7Vrc 3/(, S5 A5 470- Site $*l}z->3 S./L CO 'SfHHXitrir ft &3i-/2 - rji Ante, fXfr^r Srtn\ SV3 - Sr** Kit / p /$ $ z& - &7'*6 rr* ahsp , M'/iy. ? * 7o swvw 7 4/OS Tet,,,,.. ~ /& 'y / 7'1 - A <T6 r 7 ' /0 cex # rfrc /ok fc/'-/ /ttfC Sor'c/ soc y> 1 304 SO 304 GG CyAPofy StC?, 0725863 TOWOLDMONOQ44949 MONSANTO LOMf'ANV CENTRAL KN&lNEtMiNU [.EPAR1 MEM 6T. LOUIS, MISSOURI PROJECT. S/CAa U UU________ 3ToA6 it.ANT_ ..Jw&n&ju__ _______ L- LOCATION. /brw&iufi/ j A*#__________ _ DESIGN MANUAL SECTION NO _ . . _ PROJ. n6------------CEA nO. PREPARED B V f \ %- S'** . 3GSC ::*rr. Am F N oi % APPROX, DIM. 't EQUIPMENT LIST AND SUMMARY NOMINAL RATING NEW OR ON HAND ITEM NO. 776 NAME f/./t.r. c- /i 7/'? Akcourr /~/i rcn A/ 720 f'hobvtr A-ji rr*. IS'to/ A/ 72 7 7'h.z:. j/t /"ure-M 7-?Z Chm cz-lb o i& "D/A * ' i&h/> II 'l//A *./$'<> " CW'r' A' 7^> Si^o>yjfr /-/j./si 72-J O/Ar f / lc'c A isc /I/* 7?/v< -V 7/Coo/ Ibiyfr h * Zi '<3' S*#i *<r >a S8o XPr.i /V 7iiri/` /Sexaa.i a' /0<wo . A/ Zl'X) OA: 6H OS OH 7?r-ooz A/tTmcH 7SCOo3 Sloro+l 72c: f'A/is/ies, S/cvb s'zAint/p 727 /*f/y <fov< 727^,' / 727-03 z Ac/tAm < Ctf 7/7-cos Aloft,* .V /SoSr/,) /<r,'7Ztt A 723 * /T* p\* i/Mi^ ' ftHr3 /4i /I/ 74~ooi /% :;o /%' /isdcm /io'rc>v A/ 127 720 C/r/oe/ ii.tr. o 7A//vOAr.H Ai*-/> WSfe'v 5vv `r V.., . . Y7. //W , /a 'o * V 733-0Cl) Aforo/i . 30/ !*a7 /V#- 7.5/ Cur/rn' "$&? Citrr/i. /iex-r ,*/. // " 733 TVS V>c,HA* 7*i, v /ktSssaJL {%$..< . 0725864 I TOWOLDMONOQ44950 NO. DAT* / DetCNIFTtON 8-23-67 ApMbtrliJ.im, Tf i RKV. NO. RCMARKI /3See Mr# .3 ; /f.?o , 5/z,f 5v/H-/3 ViVoA/w*w Jfefc .rorrit/<t Be>x ' TKMORR.tRAATRlNROEM. &>* X>AS/ Ter-t A? MCAOTNEtTRRIAULC*TIOONf fifteen/ Srvtj Due rue /Raj T(Fc Ca'-ut Jr&*j Art 430.Sue 3ii-B^h. Jr6o? 2 Avi Aiff; Sue 3V?-/, Ac/* h <os -? Z Art A3d. S/2e 3>2~ /3. 'Red Jr 1 2 /v Tire JooX 7(7 c /ooX TCrc 3A tS 3 A 2 3/4 2 2 072S865 TOWOLDMONOQ44951 MONSANTO COMPANY Cf.NtRAL ENGINEERING DEPARTMENT SI. C$<JIS. MISSOURI --- /Hjux'c - 6c&j-,Snfr\*c__ PLANT_ 'lL$&... .-- . _______________ LOCAT.O_ _ _ _ _ _ _ DES'ON MANUAL SECTION NO.___ ~H3S~ 3T ,, /V/?M Ol ... r . ' N ' ' ' APfffOK. OIM. y^. //'0 '%fi * !8'0" W EQUIPMENT LIST AND SUMMARY NOMINAL AT*NO /Zooo Sal. NEW OR ON HAND' // ITEM NO. 73 4 NAME 77(8 SroSA'.f H>/vc ISoOpm /oo'TPM _ /Y . 7Sjr ~/<Afji~nn /$,,& /o HP /QoaPP/1 H 7Sf-HJ Htono^ 73 6 Cma/CG%wt> /SOSPH /co'TV/-, H 737 ^A/te/Ab /sHr H 73/-0VI SitlToX 738 Cfa,i k l.: t Mirh *kr# t /u /SoOPa) I/O 'TPM A' 737 Mu - / Txjk HmF JSMft /BcokP*i 739-eol WrtH AhtV StAt /SotP*/ W7VM H JSf/P /BtoP/l M 740 A/<j. i jl T/vk 74o-ix>l /rf&faA. !////* Meat 2cax. /SotPM Ho 'TPM A/ ISHP /ScoP/M H 74/ A/o> 3 74/-M! /%Fi)rK A --__ 1A ' . V Vl : . ( /QV".'T/V u/ c' &! <,* 3 07*5866 TOWOLDMONOQ44952 RNEOV.. OATI J DESCRIPTION i /fwa // Bo z MONSANT CE^TRAt St. LOUi! REV. NO. REMARKS OPERATING TEMP. * PRESS. , Atic4 MATERIALS OP. , CONSTRUCTION 7&Ll)0 tiabec V/U-A 6k8 UjKr/'tr At sfieet> sc* is s?nj.e*___ /ft)0*: Srea. , CtfO'V OPAAATeii . Joy tlobCi. fAva A'RFtw eoac>i WoOrthuftTo*! 9Xla/P* W/rH Ah 7f 67*61: . TQwtf? H/)2 /utL. TAkK, CvAlPt, A1/tA/ Hoi 6aovity r (P 7fAiT TFfc Jtrc rrrc c. S. > ' . Sob* e.c. cr '* ^.acrtor..-a.. 072586? TOWOLDMONOQ44953 l.SAi-no company NTRAL ENGINEERING DEPARTMENT COUiS. MISSOURI rffocto* /FA/ittv ^JBSZSSZZZZZl. PLANT__ .Jvv.i'fiM____ _ _______________ LOCATION _____________ ~7*3cTproPj.AnRoED___BYJR&jfalGjg------ - _ PREP A T-~0"6/ AHAAt 7 DA P------- TA O! APPROX, DIM. EQUIPMENT LIST AND SUMMARY NOMINAL RATINO NEW OR ON HANO ITEM NO. NAME Boo tW^fru.eo l Z4"*- 3e>Pi/>TfL<t>t /to 2 ^Cupvi u /ff'r/ $01 2) Amii A~ul cn 86 2 Cosot'iu.ev `tS'fvitf 9o tevO CloA'AA-C Pi -i ZO Atoijrrrt-n \ A/ 03 2)^0/*} {*KtV'6rii. a! te-a>f Sfc/nA SO /Or) P-CJ. o.. Af 8<y) Cw>)i>Ar. z, i.jAi Z5/tP AAooPP At dcrt-06) '%'t*__ _ f*. $62iSV~" AHiPK Al/ATC At 8os- iE't?a42 Asc/Ocar/Pl ..A5 A/ /vSTA1 /</ ? HA '/Cfi, 3cCPM A 8o7 SciufAAOe tTy/fifro'i t^HP At eo>ioot V' /A HP At eol-ooz -- $6*U,tb V & lo*v& A____ m Coo\t/<'/'. Ft,A /nll-rifi /^ . ;r _ ^ ( ---^-----T" fxdstZ. ".far.::.: ' .. . . ` ' ".. T,p;i * *_c; 0725868 TOWOLDMONOQ44954 RIV. NO. ! OAT* . DMCAlPTION AtfbGb if 8% 61 A*V /r $f> *iv. HP. RCMARKS W>rn H> 7e> S'Mfiif Ae PtStrcK/i-z / se,"xn* 7wzi* OPtRATlNO T*MP. 4 PA. 9ooC 4t/y\ MATERIAL* OP CONSTRUCTION . GlASjon, SrtHT. W/fN TA HOST 7oori* Mm MSft * (4'4 x A>`) Twi fytPC Ami CirfHov Sti/l fer 3mY orp Ak/v 9e>4cc. ite'e Met) Vto*) fit PLAtCb Tare 3o4S5 ., ' TSfc Tbt dr.t 364 S Srfevi fc)cr fat*. WnH SCrr / & '/ti Sr* b n>u Mca 1CFt'- (1'S* ') Tsso * /ooce Ama /ooeC />*) 3c4 6# Sort, SrtfL 2>^uat Zt>( 4 Su Tire. Srfesn FoHttt f-ti-j %ekcH Wt Mm 3o4`Zc : Sofss ^fiAotrY ffPF T0LEP6, foil Retort. - <L +4ZM K-C4ZAr HJt&a &&?,'i$Sf Tffc Terc 7FFC CtA&f, Srcu . ' ,\ :,: ... 0725869 TOWOLDMONOQ44955 IS*NT0 COMPANY iNTpAL ENGINEERING DEPARTMENT LOUIS. MISSOURI PROJECT--. ________ UPJECT /jAKHVe. ____ rl ANT--------- /pALC'&V__ .------------- VIAl. OCat(ON_______, __________________________ PROJ. NO.-. ^ C g * N< PREPARED BY A'Zy&rCf, nATfgy/'g/tHffT O nr .<Q_____ t># - Oh EQUIPMENT LIST AND SUMMARY .! APPROX. DIM. /o'bft1 V fa* IGftf, (,'6 "DM v '/V " NOMINAL PATINO Sooo <si. Sooo Sal. NIP OP ON HAND /V ITEM NO. 8/o NAME A/MUi,/; SJo/iASK /Avr A/ 6/! S~$60-//d& &/**,/: 7/t) $' & S'W/CjIx A& `tint 900 */Ay /OHO A/ Af Af $fy6'v 41 Mt d'yf'y'f ~ 'p/K y d" f ' &H//14 v ZtA/6 3'vd'x 'A** Z/V6 % B/tt ~ //a t/y /(90<5 OAL. SOSO *//r Stir Af At A/ At A/ Af Af d'*d'y9'//t<S// UttOL.. *) B/ti'. /non 3//P A! A/ A/ Pi "uiDr x 3e `itn< /`fr* re' At,* Zoo 48 MAy Af A/ Af 4~try>i AoPs/s Af V. f.'V ' . N rtp /too ftPm Af 4ScrM PoPcMi A SffP PfooPPM Af OH G/z /IAmu-iA Av.rt.yrx; Q/oool 8/f'Oaz. B/Z-OC& A/ercy 6/3 Artis''/"*'*'f\' ' 6/4 AAiAUh rt'i fyvir 6/S 6/6 ^v/y/^/v W, 7%+a< BlAMc*, YL A~vyyf/$ &i-06\ 6/7 O/qk'a t/F ^Qr'fJjr/\ 6/S K'D/zct^xv Baa P/u/ri 6/? Firtrrrrjen- e/9-06i A'hraH @20 @i) 6/tli PtM/VMYaK 6>tue AOi^KrtL/Dv. 6-43 Chfck SfAvtr 633 f/UtZ>f2pas'* >'<d$'.y/x m-ooi A-jo/nrtt &Z4 PfuiD/x-x/O //>A BvHntrfi. 639-06! A/oAoA. --............... 1 BPs ' f/V** &CAJ. , /* J&* # /tW/Lr/J V C ' f^'* 0725870 TOWOLDMONOQ44956 RCV. NO. / / MV. NO. OAT* OCSCNlOTlON / e-su? 4*nr /r 027,03$, 03? MONSANK C<MTRAc. ST. LOU! nkmaAks j OOCNATINO TOMA. 0 AMISS. /)%* - OPMAT INI AH : construction f/t-t&n rtr'i !/Jtm JiH) FP Ahv Cr. i v. IfJirtt Jttb FP/>** srsc* /.; . . One t)P (t,oLK< - Soft /oh* /, kltru rm FP /M> itT Xo * / / /' e * it- ii '* TCFC TfFC 3*4 1 - . " . 'V 7*Ft 1WC TlFC Tere Tefc 304 S3 : 3*4 S3 ; ,' S4 SS j' Che&n) &TttL. 7TFC . . {..... ---------- ------------- i 0725871 TOWOLDMONOQ44957 C>NS*NTO COMPANY ENT UAL ENGINEERING department T. U)UI*, MISSOURI PROJECT... us->*tT_. /*/ HvS, PLANT____ . .teffatni'm ____ LOCATION..-OVMi&*L. / 7%Sl__ PROJ. NO. W3e>" PREPARED B v.~-, DATeg^^J^SHceT --^,. qpJtL ;y/ - Ol APPROX. OIM. -- C W'b y 6 /2 "y /o ` Suv'. 1?"X 2/tl '/ti/v' i tut /%"*/ Vtvrt -- EQUIPMENT LIST AND SUMMARY NOMINAL PATINO NtW OR ON HAND w ITEM NO. SZ6 NAME 73(8 siuvL /SHF N 821-00! . Cfeog____________________ 8? 7 Obvfeu.c ( favCrA a! 8 23 Sutr/tirj Cti $Hf~ 8&a A/o'0*`. Si 7 6Ant Siu-t. 4> a! 030 A&Htvrii. $ooi> StePif o'rt>N a! ez/ I2&8 TpAH'orcH HimA 3HF /e&j'V'fy N 83PM Aiiv/on. Sof,Prt So' TbH /V 3. HP /HooRfri A! 032 81pH SkA-n, A'/nrofi, Hm/i Cf:/> ce/nA 3HP A/ $33 5//V a! . 634 w 631-M AfescH Yok A/ &3S /7 (d (cwYcyw 3HF 4L- 83S-C0I AHfoii A/ eao . P./PH /'it, vf Ymc SHF a! Sos/h1 so 'n>H N 3//P ftooRM // 63/-Ml 837 Ts/frtjlfCH Hvmp 837-001 A/uro \ 7So (Fh\ *Ahp // dsg t/ucr /iiLCe'oit N faS-coi Afore*; /coo CM /)/ 83 7 SivCT/fto Bm>vCa! &/l ----S---l.o--T-c-v--i---. ---*--a--- ?rcai*A>- ///?,r. V* &i* }' 0725872 TOWOLDMONOQ44958 OKtCRIPTiON MONSANK CENTRAL ST. LOUIS RIV. RCMARKI . , iJt/l t y< > BathivZ* Vs" AferW i * V/i" h/lfc P'SO ft >fi"S'ifaP./,c AvS Mo , Srze3vZ-/o, Ttn> EP ORKRATINO TfMR. * RRtU. 0St An* es c /ifilA t MATERIALS Or ' CONITRUCTtOM Sl&tL &t',r rta. 7trc Sfclltr V/t * IV/M /!>0/T tkrAt'Xe' r'Sckto P.fxU/ 2tto*t Zco'P 4r#i (Atii&H Srtti esv Am Swt. CaA'^-n Cftfi. Sfoi} t*-tyfo f W/tfi /oc I t */' tAuchbet. 4tH* Kctx,rt*< Ten: esC Mm (a A/3CH Sref L- CWL AyS ASO ,S/2S 3y /'4-to, Jtrz> EP rerc &s*c Qnr Stcil If/lTH S S K Art A30, Sue ~/3 7PEC >So`C SPi> /Sot (/fiPiUfy SpfL 7>vtrii /Row 2)/&.cie/'%j>5i. A 58 $ S< SfoivKi 7]'f/V TEEC Crru. Tubes Htfc Safe/ rrpc iso'c sps/ Mljyy Av$ ,430, 5/aff 3*<!'/3 >5oC s PS/ &h^6am Srtt L /Sit Therite Mt* rpre 7ftiteft, Svetme&co * C~3 P'A'/t^irr X. "txjnfr Wme- /4t*e*. nA/*r RA**** ^/rr/A*t 0725873 TOWOLDMONOQ44959 MONSANTO COMPANY CENTRAL ENGINEERING DEPARTMENT ST. LOUIS, MISSOURI [PROJECT.. SUBJECT,, fort d!S AeHnvr /Art* ' . JSr&uuii:^.. /foUmUA^., PROJ.'NO CvE . NO /600 PREPARED B vAlU/yt^f; -7~~DT i'fo/^'6^ i-E f T .----/ -- OP-- /!<*/ O! PLANT.._____ LOCATION__. EQUIPMENT LIST AND SUMMARY >p NEW ON >k APPROX. OIM. NOMINAL PATINO ON HANO ITEM NO. NAME 'fL 26 '2>//V * 519 ' /OO.OO 0 (ZsIL a! 4o> B>P*e*, r<. roHA6e 1. A^r// Ajrrh' r)j,, /oaZHrt 00 'rOH A/ rfoz /HArvi/Wi 7\iv/J $1///* /tooi'fttt A/ Sol'toV Afm/k HI /o'6%>a k4o '6 " Z&dOO OH /oz S/ff/tr* Yi Sra^AriJ* Ht v '?' 2j?JX>. frtlL /V fo'i e* ri Afi), 7Ayji /2S A'fi'Al // 103-001 ve . Ji"""!//) A, *.' ,* r. fiL /?r A Hoi fifi fol-OOZ Ao/TA?or< // / A , /tiooKfi*! At foi-ocz /%'S*. . . . < ft- /*/"*//* * '/V " 2 &>'> OAL A/ 406 ft/Waj Yc ft/rtra ftiA/*. /< `5 /\ Pa( At fol-OO! // L>ve '' //) T'u 'V t.'AvA a. /?S~ RHpt A/ foi-oaz Ao/rArafi AHA rtco A-rtri a! fon-m Afo/aH A/r*/ /)}('+ v 760f-H to'TPH aJ for S/f>/4 fti P/j ft's 'j/rt f/%//* AHA. /oo??M A/ for-oof /info*. fL *7>*1 v ' /ZOO 6/1 A> i foo Ctftt tz A/o 6 OtV Wpm filer* St'AL ZsfofoAi /co'/OH A/ 4o7 <^3 CtfU/tZ A/JW/J e\e'*i' fCH/' /foeArh! aJ /j/00,06J ^U/*K * foy-ou S'fcraH 4o& /to 6 'CrtloH fiooLOK 2 AH /?K>*AH a! 4oS-oot sft/orz e-i N fo>7 A/q > Ctii-vA. f1/,jr /ffofi/K/Sy/i/l Hi. 4'PiA f Zo ' noo tsAi a! 4/0 A Mr* filer* Se/,L 266 6m A TM a/ 4// Afi 7 Chuh Toturt /Slip /&oof$Prt N fot-oct AleraH. r OH /0! &"* Stok/ics 7rntvi/*r,< FOri '3 . 3/1H fidooHm OH /Ol-Ool /Ion* , . . .. ___ - //OAn.L'V C /vttr 0725874 TOWOLDMONOQ44960 REV. OATS DESCRIPTION m6nsanto central, t ST. LOUIS. ' REV. NO. REMARKS We* #/-?,8 S3?. BK'hkz, Type OPERATINO TEMP, t PRESS. MATERIALS PP CONSTRUCTION /5o"f SoK/ /Ua/M &A/Z Sere /5bt 5Kt Srm khrn $ "Spa Ate* 4./S 4 So . $n 3,2- /3 0/Wr* * A 'i 3 S 3 2 . )S(fl S/i.i ?C.t /Sift 7>utnL //ten rrn /SoC St>rV.i Sro-u AlvM TfFC Tujsti A/* * ffe/Hid 7\-,%r ISlfC SPSI Mint S.S. $/>Aficn 4/5 A3o, S,zt 3*2->3 V/ut.y n /-ZB 5 3; /St/C. SPu /So^C Atrne /Sun rsFC Taktz ISft S&Pi/ /kufA AwPA/^i 7Va* t'W" \Nitf* 3 u t, ^r7 /rj TfPC /soc ski 0,/lb?N &ICL /Sc/C. Amt 6)pdc*v S/t-ft 4/S 450.3/ic B/l%~ SO Mt_____ Sfe/l + 4tn< tz X" me ~~~ . //SOO* : 6SC As 4 So, Sne 3y/>i-/o /oo1^ //otrae /fav CaA>Ahn St&-L 2>uenu /fou me KJf/My***# A- 401.4 */4t &*/ * TV . >*T * i/Attr ) /5qC 7sP:/ CliP&OtV ' _ 0725675 TOWOLDMONOQ44961 >NSANTO COMPANY SNTRAl. ENGINEERING DEPARTMENT LOUIS, MISSOURI 40M /B A/Arsr . _ P_ANT________ ............................................. ........... .1--------- LOCATION. T.J--- ------------- --------- DESIGN MANUAL SECTION mO - ________ _ paoi no'------- f. e. &. wft PREPAREO . i-iatb Wl?*47VurgT _fC* A>_ equipment list and summary APPROX. OIM. -- e'y8'x ' NOMINAL RATINO ! ,/oo.aoa 2MP Kto RP*> Ntft OR ON HAND ITEM MO. NAME A/ 4'Z 4^ ~7 Chco*- N 4/2-6*t /ihnp a 4/3 A^d.7 4 't'fi 2(i 1 torn /fern &-.U e'*#'* ^' /2aO lift // 2C66P# Jto'rPH A/ /?#!* S&Kit.'PM A/ f,jb0,tooitu//Hft Ar 2PP /?oo PP*I A/ A/& & 4//7 At/a 6 CfeoP Aoai/* 4/S>eoi //<?// 4/6 *0 8 C/fi-oA . CoolCf 4A6-co/ A/erop A/ 4/7 A/oft CPt-ati /h 5/ A~J.,sh,A/Art>A. ''A* y ?2> ' Mr# Aft.:* Cc/l 6\8'y/, ' /ZOO fi/U A/ ZSoCpa) /ec'TW A/ /SHP /Bui Rpm A/ h/Oil,060 Aj 24P l?0O%Prtl A/ A/ 4/S CpMA A/a f 4a9 A/o 9 Ch/ha Aim/- 4/9-cot /Iona 470 A^O &<//.*_ ' 426-0:,! A/oroP 47/ A/a 9 Cr/mn A/,sr ATj/u/neorpp C *2>/# x/0 * 42/ $Uw 7/bvi Mr* /ice# 2szr,n /o'rDA/ A/ 47 S 77i/h\/5*~*l /1AtoH/S 3//P /dooPPtf * 423-co, Afe/oP H"tA y2H ' /i'OOD 6*1 A/ 424 //\aTF*, S>caM/>jr 7/TaaK tor# fie/n l>e#e. /006P* 6o`7P// A/ 42S 7p/*MJ-/t/t /~u,\,p> Sf/P /fro'KPM A/ ref 8 ''Sirft y 8 blSfP 2`t>p> * /z'ior/% 42.5/*-C)\ zP>UA*rr . a/ A/ Izf-oo) Afo/BP 426 SeAbBSerP 427 Off Oas CtH'vFfs-.e/i 1 " /!/<?*>/* V" .*></ 8 0725676 TOWOLDMONOQ44962 Rev. NO. OATI DESCRIPTION / 9-23-6? &>t>eb fr 43 3 j 4Z4 RIV. NO. REMARKS ORCRATINO TEMP. A PRESS. A vs A 30 i 3>^- )Z -VC fS/rAttrintt --'AV/L** k/i't Us a oF 2 "Sri tfo tffc * A, 1 SV00 * ' obC m $k>Ki T'ffie AvS A 60 , S/a Sv2-/o 4o*C 5PCI bt Tfrc MATIRIALS OR ` : CONSTRUCTION hut rue Aw CMStu Cn.r.i. fa/tSen S/e/i. hufnuc /(!5(V / &-K St<S,Mc*t &4oH / M A30. S,ze ov 2-/3 / Ttre. Tpfc fcl " ni'inreti it* Tuj /finv Xt'g- M 0725877 TOWOLDMONOQ44963 MONSANTO COMPANY _ CENTRAL ENGINEERING DEPARTMENT ST. LOUH MISSOURI PROJECT. OBJECT, PLANT-- _____ A/M __________ LOCATION.J. SauAZr'7jJdA:t!i.^ PREPARED 6 . . t-------OATg`m>`fl/<ngtT l&tcL EQUIPMENT LIST AND SUMMARY APPROX. DIM. NOMINAL. RATING NEW OR ON HAND ITEM NO. NAME bj/r>, n>rr* Zc/n. Y MS &&Cvc/irzaaS /shf /gooKw A/ te,9~oal AfvTQA. '\Jk- Yi"bm *8'7" 3 ooo 'S^L A/ r.i fj /. . tSo6r*i 7o'TPH Aj 4*9 4't> OrA (i/fi 57ne 7Aas A' Sfw sfi'Af/A/AtoA 7&//A' /Bcn'KA# A/ 43/-4r.i A4or6P>. 4 /oPt/ti A/ 433 /too*?* A/ 933-Oot A4ara*>* rft M'kver //?''>/*(# etocrn A/ Wirt* M?.** /`Aj Sot.vZM AV >&y 4 433 434 Sep,, diM Mft&p /i/rf/A^ /o//P ScoA^s.l Af 434-00! Afonin __________ 4{ ; .. \ 11 - > \ ' '1 feetj/jiM-.C' 7k*.__ i. 0725876 TOWOLDMONOQ44964 rev. HO. DATS DESCRIPTION / 6-7z-a S6& i St>R .S/S' , REV. NO. REMARKS fiiTtFi'F #6 CM $/- Airr ft,SI'S Sium a a /r Sqo St*aei *& >'Sfb Thk 4/00 * A/t AAo , Size 4yZ-/3 ORCRATINO TEMP. ft PRESS. &5C /5PSI UPxJSfst. m"t /v ZStft MATERIAL! OP CONSTRUCTION OiHhi Snffi (a&/* Sm-L Sm&oxi Srcu 5iitm f /At*, T/TFC T^5~F^^7P~y~7^(i^~TWnx/uo~/i7Sel ' fyM-f&n'tJuH r,rfir Zo,rT______________________ ZSfft SfK/ St/h iwjrt Z Street. / M "inter 2 /i " .urn T //ttzi-C gz-lY.`'/bylL 6A * & 'em* fu/nFo. / AAeA -fooFrkintl r, F /rF Jo,t7 ?ac 2Sc,Jc rv rv Srfet sFru. lit net crAl Fua.s.nti 'ZGTtieiriir^JYFfC / Hern 4oft or/li '/ft An* e.u H.nCl Mr 4-100if /5o`C rv tftuei 6 A Al WrArHiH/iTOH 2.'/%tkA 2 Xt *//TH litl,CL tuCtZlX j-T. Btur A/C A SO . Site i//'4t.~/o . /x>"t 3/icz Se/Hcz, Srb vka 4/oo* bhrHM'HjLIT & /&''ount.r iVtZZeE 9Zrl/.Ut>*./6 6A X S'enui ruOmz M*A /OO rr*- Him Fy F jfhr Zorn r Tsre SS/ft FV &/}&*, Crete ?(>C astfe /V Ay CiFit*, Sen SrxCi. t/Hf**. At ,fit*/!. cA Mes HJ> w sente i V /'/// K77TR FMmil V/t ! io FT of /At' /Fi Pi/ZT c*,L zzoon AMW(trw t/x OFF S '1 Him /Vo ~*e> SrAO/m 4/S ASP, Site 3* / % -/o /OoC tfc>Ui. tA Ait. 0),rl A/fiXie ct e.br i/i ss fytu/t ir>obti_ fA/H 7FFS Sk.j, rtt&F-s /oe'e SoFU Ai r,e/S T/CFC its-* CnndoR Sreee 0725879 TOWOLDMONOQ44965 NSANTO COMPANY NTRAL. ENGINEERING DEPARTMENT LPU'S. MISSONI PROJECT farif* __________ ujbct__ ____________ -l.~,______ U6&.' _____ LOCATION J aZ-4^4fjl/______ DESIGN MANUAL SECTION N0.____________________ ^ PROj, NO - ,, JfAHfl PREPARto Bv&3aU----------- -------- n*Tpy-<* ft/iHfFT 7 or X.____ EQUIPMENT LIST AND SUMMARY APPROX. OIM. NOMINAL PATINO NEW OR ON HANO ITEM NO. NAME . v /' /" 3 O&fa a/ SOO CZepAvP Suir-i 8"b'A *1*7* "Id fyPAi a) Sol Cacaaa/P /7lJ/i 'r* *y9" ZmSM* At Soz Snj.L Por //- / 3mrn, /oc'Tbh A/ Soz Sr/tL # / C/Stc Sa)/3 le/t. /'s "b/A / /?' 70 HP /(tuoRW -V CSOOTA *UA(. A! SIS-001 /%/0p soq Stui Syr ffcnr 3lC'2>m v/O'OAP 3So/, */* a/ . /'4"J>>A v/2 ' Soafco ^/pa At So s Sy'ftQA//? 'SC/V)$/*("**; Srui tiystr^'^K So 7 (/IA/eFLlP6 y ^' ? * 7000 &PL A/ SoB / 'Y/V v/r >* * f ......-fi> fit > A/ So? S/iLL a / Jjjron.-i tooSpai &>'n>p At S/o TAaaaS nr*< tv*) r S/tf- /foo %7-0u /</ S/O-OO/ A)ors ftf'H/A* t " Zoo O SAi Z At S/I Still Pot # S's'ivA y /o'oAH BSfiO */fi* // a? Cy(Lotjt- SePAppro-L flBil t'l'D/A * # ' 400000 * a/ S/S) Sr/LL tC*y O Ftv SF-i SlA Si> "b)A V i ' 9 * /to'-) &At aJ AO `B/aa 7ir ~ So Art/A At S/S Spill . Profiven t -2 S/C SrtLL * < SjFcnOti /OoSPa) . to `TOP At S/7 7&Aas S,*/r*i. /{Jv*. j f9 SPA /&C.KPM z*3'\ S'f TB&ooo ^//tn. t 1 1 4w 3'%A >,fS* . 306 Oai. ~ At At At At 077-00! S/ii ?#><! *9/4*ii- . Stf-oo/ /f'jTiH S/9 /prp A! 'V3L SyjT)r,f 7/)yjy 0725380 TOWOLDMONOQ44966 NO. OATS DESCRIPTION . k/nvd W 6St,*t/-&t,f39 , [ / g-23~67 <$W Mte StS, * ' AJ4r4-// sss, fz 6 Q-m-' i$fA4v'tf /r Ss&sys MONSAN1 centrai ST. LO'JI REV. NO. AVS REMARKS ) 5,'2/r 3y/'/z-/(> / / / / / Avt> /Ho, S/c 3 -1& ?2* 9ZV / /-?o- *V+A9 x/i<fp ft '*ts mbry. / .font A7l W/TPFt r OP JQHjr OPERATINO TEMP. A PRESS. /a?c Tire MATERIALS OP CONSTRUCTION 2>ucn/P 4vvv ;_ / /ttft /V (%#&>*/ rPcz . /#' A/ Cn/i&ttj Succ. . ' 2>ik7iu //sum Tf/e ' ^s/ sypfi A/a?; g:speu Wtrn SK>rr eg 2'/PS Pip* 6ml-3it*i/n 4 M-x, /)/ Wr /POO# fau< dfanti. HWd fetHAte* /feAr 4m /kl*/M/vv>W ' ' 3usl espApr Ac KPb^r 7rc VuOurfif-KV'Zbd i2 "iiitri 1/iCft W/f* - WohPM 4k>t #&/*>! 7TFC V//7/ /A">iP >/t>" Gtfiie Ato**tX - r Z &PA>Ar f%Arft ~______________________ 6PC Ax/Pst SfvtAKLt*' A /(9 /* z M,r/t 4Vr. x s'V>i bAdtui Si/** >*/** ^ u a ,, wsr/t * *" /**+ /*?/<? ?'* z **' > * *mc , Ays ASCMe S/lK'/o ~~ 'kw* tSC oFs,l 3/6 S 3 !. 3/6M -' ss 1 /UmaAut/t/iX 3/i" is z \i//7tt Sc'rrvr x*//>sApjz /)/ p/t dun.- StiP/ti > ' /,(,* /vux /lust. tieiHd 'AScbutta 7l/C 47... tefc ai /JlisHt/KWAi 3/^.5 &+AAT A A Tvfi &, A,# 0725881 TOWOLDMONOQ44967 3NSA.NTO COMPANY CNVRAL ENGINEERING DEPART MEWT '. LOL/lS MISSOURI PROJECT...d&eMH^A`>&b V.jge'._________ _____ 7PI ANT_________ ________________ LOCATION-jSau&II-,________________ PREPARED 0 __ D AT ^-/Q'C 7 0./&QQ... 7*gLo7J2L:Z EQUIPMENT LIST AND SUMMARY APPROX. OIM. NOMINAL RATING NCR OR ON HAND ITEM NO. NAME Hut nuftA Sfttt. /oof>AA! (o'ri>,v A/ Sic ThSfiAU^itK Ct <t A)jA)^ J-- A///3 ------ -------------------------------------- V/-W A/ fgO-ixjf Afore*. s*t Cr>teu.m .. ' CAA,rsu.Ci. 3'/ rD'd xV 'c?//____ r SAn. 4 3i"2>/* *'<? * 8a:'; i>i/. AJ 5 SoaSH/n Aoo'riH Af Slit S3 4 Sis C^TtH tyrOtrCft S> SruL 01 C*c SjnP tU. / <" 'i;/ v ' XoNt-' ASooAPfll Af -gnr, 6 6c? iV'C- AA H 4 & ''&//) y i '9 '' 36 "ititi rutin,s/r SrtA/T 'Y-'OO rV/ti. /to /ao /?/"//) A) HA /Boo iKYf a! A/ aa A/ SiC-aoi A}on* S~-Z 97- s*rr Stall far $S>? Afor Uiea S3o Sufi(>c Mk re* fUZ S3c-ccJ it* n,ir S3q-go% As/mrit* SSn^xii A1or0tt 37gP/t) AooPi- / Af JoHP A&oXPAj /V 43/ fAAvzrtP ftKtP SS/'OOi So 2>/A x /S/ fit*, - Af y>'A* C'r v /Z*v- /StiA*) Af CS'2A x f'9 ' %'JOO 6/Jip ' Af 4'"bM > '/9 * /S*z 7/ bf/n* Afee* -HA-. twifiw ~(u' 7b77 Af SSI SS2. S3 9 S3S SZ& ffStMAiA'< Aohi AS S &i.hJ*tA/r0 filpfXf SuAAtS /SapV Son S?4Z& . Ouf?/f //istsAS /&.*<. /** , ---- Sj, ''tA r `J ` SAP 70to gPTI Af 1 /Ai><y Hai. , a/ S36-MI ssr R*.'4iWK-V*V/iv4; SAB'JLL.^ '<w .. .. JL^ Sg7^o) Aforvn. 'S'tAfKfZtr1 7ftAsf\ /foyVivi v ?" ` ^S // ' 0725882 TOWOLDMONOQ44968 REV. NO. OAT C DESCRIPTION ' Z 7#??{ <5t3*cr/ Yey>ttfg4 3 i-ZS-i7 4&->n- StMiro trSi'Jj-Hf, &( MV. NO. REMARKS 2 Z z X <^.06, '2,,v<r &2>/r&y WtrH -*-/?// Kj h>,er/oA, x AVW* 4*0 z z Sec Hem S'iZ z rc/&#) rt z S/ymK/,eK * H,l>Z See Hem S'iH 2 See He* SSt ' a 4vS y $f2tf $y /^i '/o z St /!r. 5 MW 4* /OftATZCvti / ftf *> /r S*Z * *r . ' ssg " " " cse 'v /<v ASO.S/zf 3,Z->3 "x y/9 * JTf ' ' 3 Ai% A30, S/ze^Z'/S V' ' .V e*-iM <-( OPSWATINO MATERIALS OP TEMP. A PRESS. CONSTRUCTION rfiVMtvu*\ /Vr?<3/Ar i '6> -' v- /*A*+- Tefc /tt'r /oor~.i 3// S C T/r^c SSt M?-! {> s V /(><> ' B/S Z* Z/i ? S04CS it />xi /h V Hi'M/rt/ Zac . " 3/< s s Trrc iSV /:/. , 3/i Ss * .\ *st /V^j/ at !hp$< m Xt*r isr Hint ISY >f>5/ rflvMWVM flt+At/A/VM At\iMif,e,i) //XV/I i'Ar t/iM to>"f &>*/ TfC /tot Sofa rt*e 3//^ 3//i 0725083 TOWOLDMONOQ44969 ONSANTO COMPANY ENTRAL ENGINEERING DEPART ME NT T. LOUIS, MISSOURI reojtc-r Ajiott. .u.ctL J&ffj,,*Ok.r.._______ PLANT..___ - V\i5^S----------------------- ---------------------- LOCAYtON_*gj4ir.. _______ OeSIGN MANUAL SECTION NO_________________________ PROJ: no. r e. a. no /VCK>. ... PREPAREO BY ABSAAtrert, DTE<22l2.HHT_fe_Of.XlZ EQUIPMENT LIST AND SUMMARY APPROX. OIM. `a^t b` Im S/tgir NOMINAL RATINO NEW OR ON HANO ITEM NO. NAME __ /ooilt'A___ _// _ Sly-coi. 4-i,rf,Tok AO/tP ASo'-pfH A -- 3ASfat /no ft: / At 3 J-acP, 36 /OffP /StO\!PA 1 At ' sag-act AluroP 3b*'%iA v ' Au,; -At) <-V/ /V S3? S'>\ /% 3,i"h,f > AC ' f/t u. /a // 540 *4^ -C-*ft C i'ty At/<i. //-c> o' *Y'b>s x s '/' /V Si/ /oLK,fht/'\ S/t.rgH 6<S`bM v f'?' V.tr>fi --P // Sis Svt/t\' Sx.' fj4 A/ SAB i\trts,Y- 7a*,a /V-4 ^ r 1i V^ ji ** ! vc Mt/t Alt ft; Cl At 9'6'itA X AS ' tobifo! Atct TtH St* /A/A't/f F* tM " /O < A/ ,v A> tZihZ/A t 24 * U'6"l>A IZ'/'lvA *Zi' /i'(* t/A * <i ' /JVV'/ *<?V ' ZZ boo Gtu *? ? 6*5 0 i-'srooo 6Ak Yioao tS/U 2*000 &At. H At At At ' At A'/tf/Aliff S(ak frsfnv /co'rtt/t ASHP /SmK-P/I i ty/rtt Alan. Ctai 2*0 ^t Aoo'AbH ASMS /6t&XM r;y ' ?*!/. '-.I At ft At At Si 4 sa-oat Ait K S4S /!&pti'?ri? /"i-A /v^O Tyc - SSJ see /ttttcriib C/sni'A AB4Z SSI So Srhka*, f AZ4Z F/rvtskSC> &o/tA4i' /2 s<u S/f/iif/rtt SrnKfoa >2/O s&z S/A-tstfAo A A'c-Kf- ir /'24S f 3 OtA-eiiLec, S64 7/>aa/$/',*ft/*, t* S/i-oot AitTeK. s/s ThA*,z*1 Ait, nn ,'i *,I' " 'fe&f'iil... t ' fStZAi- 072S884 TOWOLDMONOQ44970 RNEOV.. DATE DESCRIPTION MONSANT1 CENTRAL ST LOUIS REV. NO. REMARKS 3 A SO 1 O?*- 2^- A3 3 Avc~ A30, 3y3-/3 OPERATINO TEMP. S PRESS. /A)tr Sifci 7Jm we Sofo 7ESC MATERIALS OP CONSTRUCTION 3/6 so 3MSS a/& /?S"6 4AZ.nr' F&k Fn.?:*i; ftfirb /// P4ALt - Mr/-' * /0 tfjfh'A Sec Mem 67 "" " " 6? /Oft SoPO/ WC So?`it , We so > Wt Sof-i./ <S1 *> S/i SO 3/iOS ii/ S O JBkemd Aft, /oZ /J&>z< M/rtf 3t>fr c* 3 `//>r, &tL T/i&ttf fa#? SIS'? 75fz i ?V /)'*> &E </ Cf>ea$'r* Sreti Cast Crsu TSfC Bf>tn*:s.v#/T - ->W /Ti ft>zrr#< (,A/rIM/Tft # /* /rj-r/r*/T /a/C /6Pc> ' 0725665 TOWOLDMONOQ44971 <SA|,T(J COMPANY <TRAL ENGINEERING DEPARTMENT LOUIS. MISSOURI PROJECT... ..AfieUi >'Mr_ *#48 nfir___ .L A/.T.__,, ___ LOCATIONS fJlUMe.f.ii--,. DESIGN MANUAL SECTION NO._ Ipnoj. no._ PREPARED BY............... DATE&ed2.SHEET. iJe.es... EQUIPMENT LIST AND SUMMARY APPROX. OlM. NOMINAL RATINO Zk/PM AJo'TM NEW OR ON HANO sV ITEM NO. S/% NAME /SpP /BcpRPaI V &f-06/ pidn/i Ztoew /oe `n>H Si7 ~7f<`/*A/esjrJ> y'itu /SPP /SeoK'Px fi 527-cal /e \ 5 '' y 6"/ A1 c. /# 7 * - sw &A f/Fs* fi o /!/ S<f? //0WT A/ / 4.; // S/O // S'// /'P.ie.^r; Surj; //?" y r'/tv-: fj / v ^ ' -W'S A<Kyj.bor J S'o ''hA x /e `up o !5v0 SAL // SSOCPnl /iS'7t>H a! Softp /tea*?**/ // f i /'S */ '3 * 4Soo 'st* cu s/z. f\>CvO Fh-ifu S79 - A/ur Kvt 77tc^A>-Ait. /JlArr*. S&4 *<1/A/ZL. ytsK-m 7s*A/.< SS 7 AJi/^Mtm1 ft <?L: ' lpV/^ ' ser-tot msm s/o Cnu*if,c Pf'-ir op t l * ' ' . r i. i , fe V; . ` -v'1 ' ' ., . ............... "- n-., .. ;1,1 ; iJi 0725886 TOWOLDMONOQ44972 CEA 1430 Date: August 28, 1967 By: H. D. Gabelman SCOPE OF WORK Aroclor Expansion at Anniston Storms Tank Farm and Mixing Station Appendix "D" 072S887 TOWOLDMONOQ44973 Appendix D CEA 1430 Date: August 28, 1967 By: H. D. Gabelman Page 1 General: The facilities included in this project are intended to: 1. Assure storage capacity for minimum inventories of the various Aroclors and blends so that bulk shipments can be made on demand. .2 Provide for blending of several Aroclors with other components without holding up primary production facilities. 3. Minimize the potential for cross contamination of products. 4. Provide loading facilities for tank cars, tank trucks and unload ing facilities for raw materials in tank cars. Major Equipment Includes 2 - 27,000gallon Aluminum Storage Tanks for 1242. 2 - 27,000gallon Aluminum Storage Tanks for 1254. 1 - 18,000gallon Aluminum Storage Tank for 1248. 1 - 18,000 gallon Aluminum Storage Tank for 1221/1232. 1 - 18,000gallon Aluminum Storage Tank for 1260. 1 - 18,000gallon Aluminum Storage Tank for 1262. 1 - 12,000gallon Steel Storage Tank for TCB. 1 - 12,000gallon Steel Storage Tank for TTCB. 1 - 11,500gallon Aluminum Day Tank for 1242 (Existing), 1 - 11,500gallon Aluminum Day Tank for 1254 (Existing). 1 - 12,000gallon Aluminum Blend Tank for A13B. 1 - 18,000 gallon Aluminum Storage Tank for KA-PPO. 1 - Existing and relocated 2,000 gallon Aluminum Blend Tank for Toluene and Xylene Blends. All storage tanks to have plate coil heaters and to be insulated on lower half. Existing day tanks will be left "as is". The 2,000 gallon blend tank will be left "as is" except it will be relocated. The 12,000 gallon Aluminum Blend Tank for A13B will have plate coils, heaters, insulation and an agitator. The 18,000 gallon Aluminum Blend Tank will have plate coil heaters and insulation. 0725888 TOWOLDMONOQ44974 Appendix D CEA 1430 Page 2 Pumps All 316 SS except TCB and TTCB which are cast iron. 1242 - Common loading pump for 2 storage tanks to loading spots; existing transfer pump from day tank to storage. See Code 93 paragraph 5 concerning pumps. 1254 - Common loading pump for 2 storage tanks to loading spots; existing transfer pump from day tank to storage. See Code 93 paragraph 5 concerning pumps. 1248/1221 - Existing transfer pump from receiver to storage - common pump. See Code 93 paragraph 5 concerning pumps. 1262 - Existing transfer pump from receiver to storage. See Code 93 paragraph 5 concerning pumps. 1248/1221/1232/1262 - Common loading pump from storage to loading spot. 1260 - Existing transfer pump from receiver to storage - loading pump from storage to loading spot. See Code 93 paragraph 5 concern ing pumps. TCB and TTCB have one common pump for unloading from tank cars and one common pump for transfer to blend tanks. Blend tank for A13B and storage tank for KA-PPO will have common trans fer pump from tanks to loading spot or drumming. Blend tank for Toluene and Xylene blends will have a transfer pump from tank to drumming. Filters . All 316 SS or 304 SS. Separate filters (Alsop) are provided for 1242, 1254, 1260 and 1248/ 1262/1221/1232. A new filter (Sparkler) is provided for A13B/KA-PPO from mix and finished blend storage tanks. An existing Sparkler filter will be relocated for the Toluene and Xylene blends. Piping Separate transfer lines are provided for: 1242 - From day tank to storage to loading docks 1254 - From day tank to storage to loading docks 1260 - From receiver to storage to loading docks 0725889 TOWOLDMONOQ44975 Appendix D CEA 1430 Page 3 1262 - From receiver to storage to loading docks. 1221/1248 - Common line from receiver to storage to loading docks. All above lines are 3" aluminum, traced and insulated. Piping is provided for circulating the contents of each finished goods tank. Piping from tank cars for TCB and TTCB to storage and from storage to mix tanks will be steel. Utilities 1. Spur track from main track to 5th Street with 2 covered loading docks for tank cars. One of these will be used for unloading TCB and TTCB. 2. One covered loading dock on 5th Street for loading tank trucks. 3. 6" steam main from Building 27 to tank farm. 4. 2" N- transfer line from existing N_ storage tank to tank farm (all tanks except TCB and TTCB are Nj blanketed.) 5. Electrical: Existing HB40 transformer will be dismantled and scrapped; HB40 load will be picked up on Aroclor motor control center. New load in the tank farm-warehouse area will be supplied from pole line transformer supplied from the existing HB40 overhead feeder. Roads An approximate 80' X 15' wide loading area at side of 5th Street will be provided as a loading area for tank trucks. Structures and Foundations Two tank car spots and one tank truck loading spot are weather protected by roofing. All storage tanks will be on ring walls with compacted sand fill except the 2000 gallon blend tank which will be on a concrete pad. Area be tween tanks will be covered with chat. 0725890 TOWOLDMONOQ44976 Appendix D CEA 1430 Page 4 01 - Equipment As per Equipment List and Summary. 02 - Instruments As per Instrument List and Summary. 03 - Setting and Testing Equipment Tank farm is immediately adjacent to 5th Street and east of Aroclor office. Truck deliveries can be made directly to site. 04 - Setting and Testing Instruments Nothing unusual. 05 - Piling None allowed for. 06 - Excavation For railroad spur track Tank foundations - 12 9-1/4r yd3 each Tank pad for 2000 gallon mix tank 3 Pump foundations - 8 1 yd each Filter foundations - 6 2/3 yd3 each 2 Tank car loading docks 2 yd3 each 1 Tank truck loading dock Pipe support foundations = 7,000 yd3 = 111 yd3 = 15 yd3 = 8 yd3 = 4 yd3 = 4 yd3 = 2 yd3 = 15 yd3 All excavated earth will be spoiled in immediate area. 07 - Foundations Tanks 12 ring walls 3 yd3 each 2 Forms 155 ft each Crushed rock and sand fill Pad for mix tank Form 36 yd^ cone. I860 ft2 95 yd3 3 15 yd cone. 80 ft2 Pipe Support Foundations 6 2-1/2 yd3 each 2 Forms @ 100 ft each 15 yd3 600 ft2 0725891 TOWOLDMONOQ44977 3 Loading Docks Forms 8 Pump Foundations @ 1 yd"* each Forms @ 60 ft2 6 Filter Foundations @ 2/3 yd2 each Forms @> 20 ft^ each Appendix D CEA 1430 Page 5 = 6 yd3 cone = 120 ft2 8 .3 y<3 cone = 480 ft2 = 4 yd3 cone = 120 ft2 Approximately 6 borings for soil bearing determination will be made. 08 - Supports, Platforms and Structures 1 Pipe bridge over 5th Street = Pole supports to loading dock structure = Miscellaneous steel at ground level pipe supports 2-20' high ladders with safety cages. 3-1/2 ton steel 3 ton steel 2 ton steel Platforms over tanks in farm Platform Stair Treads Grating Double pipe hand rail Toe plate . 3 loading docks (with covers over) Galbestos roofing = 5 ton steel 50 = 1050 ft2 * 750 ft = 700 ft = 6 ton steel = 600 ft2 10 - Sprinklers and Fire Protection None 0725892 TOWOLDMONOQ44978 Appendix D CEA 1430 Page 6 11 - Piping - Process and Service 750' - For 1242 - From Bldg. 27 to storage tanks to loading docks A-ll const. - 3" Sch. 40 - I.P.S. - Aluminum 750' - For 1254 - From Bldg. 27 to storage tanks to loading docks A-ll const. - 3" Sch. 40 - I.P.S. - Aluminum 750' - For 1260 - From Bldg. 27 to storage tanks to loading docks A-ll const. - 3" Sch. 40 - I.P.S. - Aluminum 600' - For 1262 - From Bldg. 27 to storage tanks to loading docks A-ll const. - 3" Sch. 40 - I.P.S. - Aluminum 700' - 1221/1248/1232 - From Bldg. 27 to storage tanks to loading docks All above 3" aluminum pipe to be single traced with 1/2" ~^~.o]per tubing. Trap condensate each 200' of tracing. *S'oSo A uni w/si Pitt'OCtS 300' - 125# steam from Bldg. 27 - F-41 const. - 6" Sch. 40 steel pipe 300' 125# steam F-41 const. - 2" Sch. 40 steel pipe 500' N, Nitrogen unit east of Chlorine - 2" vinyl covered ^ Sch. 40 steel For TCB and TTCB from loading dock to storage - F-ll const. 350' Sch. 40 3" steel pipe For TCB and TTCB from storage to mix tanks - F-ll const. - 100' Sch. 40 3" steel pipe Toluene to mix tank - A-ll const. - 20' - 3" Sch. 40 I.P.S. Aluminum Xylene to mix tank - A-ll const. - 20' - 3" Sch. 40 I.P.S. Aluminum KA-PPO to loading dock A-ll const. - 320' - 3" Sch. 40 I.P.S. Aluminum i--( <1 A13B to loading dock const. - 320' - 3" Sch. 40 I.P.S. Aluminum 12 - Ductwork None 0725893 TOWOLDMONOQ44979 Appendix D CEA 1430 Page 7 13 - Electrical Yard lighting for tank farm area - 13 tanks - approx. 60' X 100' area. Lighting for two tank car loading docks and one tank truck loading dock area. 6 - Street light type Mercury Arc fixtures for loading dock and tank farm perimeter plus 8 - 175 watt Mercury Arc lighting fixtures over tank farm area. 8 - 15 HP motors on pumps 2 - 7>s HP motors on agitators Pushbuttons at each pump and at remote location. Install 300 KVA pole type transformer for warehouse and tank farm load. 14 - Site Preparation Grade area east of Aroclor office to an elevation of 746't. Area equals approx. 120' north from 5th Street X 60' east of Aroclor office. Terrace down from 746' elevation to 742' immediately to east of leveled area. 3 Earth moved approximates 300 yd and will be spoiled in immediate area. 15 - Sewers and Drains None required. 16 - Underground Mains None required. 17 - Yards and Roads 1. Establish tank truck loading spot on 5th Street adjacent to tank farm. Area approx. 1200 ft (80' X 15'). 3 Grade off approx. 50 yd earth. Crushed rock ballast for loading spot (8" thick) = 35 yd^ 1200 ft^ 2" thick asphalt paving. 2. Tank Farm Area (120' X 60') Crushed Rock = 70 ydJ ' 0725894 TOWOLDMONOQ44980 Appendix D CEA 1430 Page 8 3. Repair construction damage to,,5th Street. Assume resurfacing of 3000 ft^ (30' X 100') 2" asphalt paving. 18 - Railroads Install approximately 1700' rail spur from main line at north side of plant. Spur to extend along west side of Parkwin to 7th Street. Then offset to west approximately 130' and extend to 5th Street. This includes switch, bumper, ties, track, ballast and 4 crossings. Excavation for this spur is included in Code 06. 19 - Insulation Tank insulation to be 1-1/2" thick calcium silicate - Std Kll.2 Std 100 with weather barrier. Tanks as follows: 4-13' 5-12' 2-11' diameter @ 600 diameter @ 400i diameter 300 ft2 ft2 ft2 each = each = each = 2400 2000 600 ft2 ft2 ft2 Pipe insulation to be the same spec Std as tanks For 1242 1-1/2" - 100 - 750' - 4" pipe For 1254 1-1/2" - 100 - 750' - 4" pipe For 1260 1-1/2" - 100 - 750' - 4" pipe For 1262 1-1/2" - 100 '- 600' - 4" pipe For 1221/1248 1-1/2" - 100 - 700' - 4" pipe For Steam 1-1/2" - 100 '- 300' - 6" pipe For Steam 1-1/2" - 100 - 300' - 2" pipe Pump and filter insulation to be same Kll.2 Std 100 insulating system with weather barrier. 6 - Pumps to be traced and insulated. 5 - Filters to be traced and insulated @ 25 ft2 = 125 ft2 20 - Painting All structural steel to be hot dipped galvanized. Touch-up damaged areas with inorganic zinc coatings in field. (Carbo zinc #11) 0725895 TOWOLDMONOQ44981 Appendix D CEA 1430 Page 9 90 - Dismantling Remove and scrap 3 X 15,000 gallon and 1 X 11,000 gallon horizontal storage tanks and 1 X 10,000 gallon vertical mix tank: Item No. Eguipment No. Description 201 22-0077 10' X 26' long horizontal tank 202 22-0089 8' X 30' long horizontal tank 203 22-0076-01 10' X 26' long horizontal tank 204 - 10' X 26' long horizontal tank 205 22-0108 14' X 10' high tank 208 - Taber vertical subm. pump 209 - Taber vertical subm. pump 214 - Taber vertical subm. pump 215 - Taber vertical subm. pump Remove and scrap existing HB-40 transformer. 93 - Relocations and Modifications Expense 1. Existing feeder cable from existing HB-40 transformer to Aroclor motor control center. 2. 360' of 8' high cyclone fencing. 3. Existing Sparkler filter (18"), from building 27 to new tank farm. 4. Existing 2000 gallon jacketed SS mix tank with agitator, from building 27 to new tank farm. 5. Money for replacing three existing transfer pumps is to be included in this scope. The existing pumps referred to are those noted in the "General" section of this scope under "Pumps" for transferring 1248/1221,1262 and 1260 from exist ing day tanks and/or receivers to. new storage facilities. 0725896 TOWOLDMONOQ44982 CEA 1430 Date: August 28, 1967 By: H. D. Gabelraan SCOPE OF WORK Aroclor Expansion at Anniston Drumming and Flaking Appendix "E' 0725897 TOWOLDMONOQ44983 Appendix E CEA 1430 Page 1 General This scope covers the installation of drumming and flaking facilities in a new prefab structure north of 5th Street and at eastern boundary of block 4 (east of tank farm, see Appendix D). Space and detail de sign will allow for attaching a warehouse to the north of this struc ture. The warehouse is a separate project covered by CEA 1452. These facilities are intended to 1. Provide for drumming and flaking in an area, removed, but adja cent to the manufacturing area, so as to allow for greater effi ciency in use of manpower, both in the manufacturing area and in packaging and warehousing. 2. Rail and truck loading and unloading facilities at point of packag ing to minimize handling will be provided (see Appendix D). 3. Provide storage space for bags and a limited number of drums both empty and full. 01 - Equipment See Drumming and Flaking equipment lists. 02 - Instruments See Instrument list. 03 - Set and Test Equipment 04 - Set and Test Instruments 05 - Piling None 06 - Excavation Buildina foundation Intermediate buildinq foundations Pipe Supports 15 @ 2-1/3 yd3 each City Water - 50' @6 ft3/ft = 300 ft3 C.T.W. - 30' @ 12 ft3/l = 360 Fire Water - 120' @ 6 ft3/l - 720 ft3 l-t.ft CO 80 yd = 40 yd: = 35 yd' = 11 yd = 14 yd = 45 yd: 0725898 TOWOLDMONOQ44984 Appendix E CEA 1430 Page 2 Backfill (CW, CTW, FW) - 70 yd3 Spoil in immediate area - 177 yd3 (use for building fill) Building fill - 1600 yd^ (needed fill available from ) (R.R. excavation for tank farm) Excatation and backfill for 500' of 4" pressure sewer - 225 yd3 each 3 Excavation for sewage ejector - 14' deep - 52 yd Excavation and backfill for 4" connecting sewers - 93 yd3 each 07 - Foundations Building Foundations and Floor Forms _ 300 yd3 concrete - 5000 ft2 Pipe Supports Forms - - 35 750 ^ft22 concrete 6 Borings for soil bearing analysis. Drumming: Air Compressor Pad for sewage ejector Concrete fill around ejector - 2 yd3 concrete - 1.5 yd3 - 2000 psi concrete 7 yd Supports, Platforms and Structures Flakinq: - Structural Steel - Grating - Stair Treads - Double Pipe Handrail - Toe Plate . - Miscellaneous Steel Drumming Miscellaneous Steel - 30 ton - 1800 ft2 - 80 - 150 ft. - 90 ft. - 2 ton - 2 ton All structural steel to be hot dipped galvanized; building steel to be painted (see Code 20). 09 - Building A 120' clear span structure 60' long with 23' eave height will be provided. A canopy will be extended over the railroad tracks. The side next to tracks will be open for loading and unloading rail cars. One half of south side will be open to serve as a truck loading and unloading dock. East, north and part of south side will be covered with corrugated transite and corrugated vinyl. Walls Corrugated transite ' Corrugated vinyl - 5000 ft2 - 1200 ft2 0726899 TOWOLDMONOQ44985 Appendix E CEA 1430 Page 3 Roof and Roofing Corrugated "Galbestos" and Vinyl panels with 8' overhang over rail road tracks and 6' canopy over truck loading area. Corrugated Galbestos Corrugated Vinyl = 7500 ft^ = 1000 ft^ Gutters and Downspouts 240' - 6" Aluminum guttering 120' - 6" Aluminum downspouts 10 - Sprinklers and Fire Protection Structure - Provide an automatic dry pipe sprinkler fire protec tion system designed for extra hazard spacing and pipe sizing for approximately 7200 ft^ (1 head each 100 ft*) = 72 heads. 11 - Piping Drumming 2" parallel traced and insulated aluminum for 1242, 1254, 1248/1221/1232/1262, 1260, blend A13B, blend KA-PPO all originating at battery limits (connected to lines running to loading docks) - 6 lines @ 120' each = 720'. ' 2" parallel traced and insulated aluminum for Xylene and Toluene blends - 1 line = 300' 3" steel insulated line for HB-40 = 600' 4" steel insulated line for steam = 200' 2" steel miscellaneous piping (for Jet, air comp.etc.) = 200' assumed Flaking -3" X 2" jacketed steel line for 1168 & 5460 2" steeltraced and insulated for Biji "3" steel insulated line for Therminol 4" steel for CTW, S&R - 2 lines @ 150' each 2" steel insulated steam for Bi^ surgetank 2" steel insulated steam for Miscellaneouspiping = 450' = 500' = 900' = 300' = 200' = 200' 12 - Ductwork Flaking 100 ft. 0725900 TOWOLDMONOQ44986 Appendix E CEA 1430 Page 4 13 - Electrical Power from pole line transformer into motor control center in building (approx. 50' distance). Power from motor control center to following motors: Drumming: 1 - 25 HP Air Compressor Motor Flaking: 1 - 15 HP 1268 Mill 1 - 10 HP Aroclor Flaker Motor 1 - 5 HP Bi(j) Flaker Motor 1 - 3 HP Bag Flattener Motor 2 - 5 HP Fluidizing Air Blower Motors 2 - 5 HP Suction Blower Motors ' 2 - 3 HP Transfer Pump Motors 3 - 3 HP Conveyor Motors 1 - V4 HP Shaker Motor 2 - 1*5 HP Ejector Compressor Motors 2 Lighting for ground level - area 120' X 60' (7200 ft ) 18 - 175 watt mercury arc lights Lighting for 14* level - area 30' X 60' (1800 ft^) 5 - 175 watt mercury arc lights 14 - Site Preparation Grade truck loading and unloading area at southeast corner of drumming and flaking structure. 3 40' X 50' area - Move approx. 80 yd earth. 15 - Sewers and Drains 300' - 12" V.C. storm sewer (Along east side of structure to Snow creek) 200' - 8" V.C; storm sewer for gutters 3 - Floor Drains 200' - 4" V.C. connecting sewers to floor drains. Provide 30 GPM sewage ejector with tank, controls, etc. 500 lineal feet 4" Cl pressure sewage line from ejector to pipe shop service line. 140 lineal feet of 4" Cl sewer to connect existing sewers to ejector. 1 manhole at ejector, 10' deep with cover, 1 manhole at pipe shop, 5' deep with cover. 0725901 TOWOLDMONOQ44987 Appendix ?. CEA 1430 Page 5 16 - Underground Mains 50' 2" C.I. City Water Main 60' 12'' C.I. Fire Main 60' 6" C.I. Fire Main 60' 4" Steel C.T.W. - Supply and Return 17 - Yards and Roads 2000 ft 2 X 8" thick concrete truck pad = 50 yd3 concrete. 2 700 ft asphalt - street repair at sewage ejector. 18 - Railroads None 19 - Insulation Pipe insulation to be 1*5" thick calcium silicate K11.2 Std 100 with weather barrier. Quantities as follows: Drumming: 4" - 200' 3" - 1620' 2" - 200' Flaking: 3" - 1400' 2" - 400' 20 - Painting Building steel to have 3 coat vinyl system. 90 - Dismantling Disconnect and remove 4 septic tanks. Item No. Eguipment No. ______________Description 631 22-0700 Flaker hold tank with agitator, drive and motor. 690 14-0031 Model VMG 5-56, Flaker, size 24" X 48" with 5HP motor. - - Biphenyl Flaker 646 17-0027 2dh Micro Pulverizer with 1/3HP motor 0725902 TOWOLDMONOQ44988 Appendix E CEA 1430 Page 6 Relocation 1. Relocate 520' of existing 24" acid sewer. Excavate and in stall new V.C. sewer between two existing manholes. 2. Relocate parking lot, extend to north of existing parking lot, 70' X 120', 8400 ft.4 of asphalt paving with parking stalls. 072*903 TOWOLDMONOQ44989 CEA 1800 Date: August 28, 1967 By: R. S. Yates SCOPE OF WORK Aroclor Expansion at W. G. Krummrich New 40 M lbs./yr. Plant Appendix "F 0725904 TOWOLDMONOQ44990 Appendix F CEft 1800 Page 1 General The facilities included in this project are 1. Installation of a new continuous chlorination system. 2. Installation of two distillation units with a capacity of 25 M lbs./yr. in each system. 3. Poroce1/bauxite treatment for four different Aroclors. 4. Replacement of present off-gas recovery system with a new system. Major Equipment Includes A biphenyl mix (2000 gallon) and feed tank (2000 gallon) to supply continuous chlorinator line. 4 - 1200 gallon (41 Dia. X 20') chlorinator units with attached coolers, pumps and entrainment system. 1 - 2500 gallon continuous blow tank. 1 - 15,000 gallon intermediate storage tank. 2 - Flash distillation systems consisting of still pot, entrainment separator, condenser, receiver, and external therminol heater. Off-gas system consisting of gas cooler-condenser, surge tank (3000 gallon). Therminol cooling system for still condensers. 4 - Fixed bed absorbers (31 Dia. X 15') with associated tankage, filters and pumps. External therminol heating system for supplying therminol to the still pot heaters. 0725905 TOWOLDMONOQ44991 Appendix F CEA 1800 Page 2 01 - Equipment See Equipment List and Summary. 02 - Instrument Items See Instrument List and Summary. 03 - Setting and Testing Equipment Area is accessible for truck and train unloading. High lift can be used advantageously. 04 - Setting and Testing Instruments A control room is available for the instruments and panel. 05 - Piling For Structural Steel 14 Concrete piles X 3 cu.yds. Size 24" dia. X 25' long 42 cu.yds. For Blow Tank, Item 422 4 Concrete piles X 3 cu.yds. 12 cu.yds. For Inter Storage Tank, Item 424 7 Concrete piles X 3 cu.yds. 21 cu.yds. For Aroclor Surge Tank, Item 586 4 Concrete piles X 3 cu.yds. 12 cu.yds. 06 - Excavation For Floor of Operating Area 2300 ft2 X 1' deep 85 cu.yds. For Motor Control Center and Foreman1 Office 5 cu.yds. 6' deep X 5' wide X 40' 07 - Foundations For Structural Steel 4.2 cu.yds. 14- 20" square pads 3' deep 0725906 TOWOLDMONOQ44992 Appendix F CEA 1800 Page 3 For Blow Tank 1.75 cu.yds. 1 - 1' X 3' high X T long support 1 - 1*5' X 2' deep X 8' long support For Inter Storage Tank, Item 424 6.4 cu.yds. 18" thick X 12' dia. For Floors 85 cu.yds. Miscellaneous Supports, etc. 5 cu.yds. Pipe Supports 6 X 2 cu. yds. 12 cu.yds. For Motor Control Center & Foreman's Office Support 5' X 1.5' X 80' = 600 ft2 Floor 800 ft2 6 cu.yds. Supports Structure Supports 65 tons Grating 4500 sq.ft. Handrail Toe Plate 500 ft. 500 ft. Stairway (15 ft. elev.) 4 For Motor Control Center & Foreman's Office 5 tons For Item 545 5 tons 09 - Building Items 5 unit heaters with associated piping for operating structure. For Motor Control Center and Foreman's office 2 personnel doors (3' x 6'8") Windows for office, 3 units 4' X 10' 10 Sprinklers None 072S907 TOWOLDMON0044993 Appendix F CEA 1800 Page 4 Piping Note: * With 2 - 1/2" O.D. copper tracers and insulated - 1-1/2" thick insulation. ** With 1 - 1/2" O.D. copper tracer and insulated - 1-1/2" thick insulation. Item 403 - Biphenyl Mix * Charge - 50 ft. of 2" IPS C.S. pipe with 2 No. CD3 valves. * Overflow - 50 ft. of 3" IPS C.S. pipe. * Vent - 15 ft. of 3" IPS C.S. pipe with spark arrestor jacketed. Steam - 30 ft. of 1" IPS C.S. pipe to coil with 2 valves. - 30 ft. of 1" IPS C.S. pipe from coil with 2 valves. Item 404 - Biphenyl Feed * Charge - 20 ft. of 2" IPS C.S. pipe with 1 No. CD3 valve. * Overflow - 25 ft. of 2" IPS C.S. pipe. * To Item 405 - 20 ft. of 3" IPS C.S. pipe with 2 No. CD3 valves. Items 406, 410, 414 and 418 - Continuous Chlorinators Chlorine Charge Line 200 ft. of 4" IPS C.S. pipe with 6 DE6 valves. * Circ. lines 280 ft. of 3" IPS C.S. pipe with 28 CD3 valves. * Transfer to Item 422 75 ft. of 3" IPS C.S. pipe with 4 CD3 valves. Vent Lines 50 ft. of 3" IPS C.S. pipe with 2 CD3 valves. Trace chlorinators to allow for winter operation - 400 ft. of 1/2' copper tracing per chlorinator. Item 405 - Biphenyl Feed Pump * Chlorinator Charge - 80 ft. of 2" IPS C.S. pipe with 4 No. CD3 valves. * Chlorinator Return - 70 ft. of 2" IPS C.S. pipe with 1 NO. CD3 valve. 0725908 TOWOLDMONOQ44994 Appendix F CEA 1800 Page 5 Item 422 - Blow Tank Charge 30 ft. of 4" IPS C.S. pipe with 1 No. CD3 valve. Vent 35 ft. of 6" IPS Saran lined steel Pipe- Blow Line 30 ft. of 2" IPS C.S. pipe with 4 valves. To Item 423 10 ft. of 3" IPS C. S. pipe with 1 No. CD3 valve Item 424 - Intermediate Storage ** From Item 423 75 ft. of 2" IPS C.S. pipe with 1 No ** Overflow 25 ft. of 3" IPS C.S. pipe. Vent ** To Item 425 10 ft. of 3" IPS C.S. pipe. 10 ft. of 3" IPS C.S. pipe. Item 425 - Transfer Pump ** To Item 502 & 511 - 50 ft. of 2" IPS C.S. pipe with 2 No. CD3 valves. ** To Existing Chlorinators - 75 ft. of 2" IPS C.S. pipe with 3 No. CD3 valves. Off-Gas System Present HC1 header at southwest section of 12 ft. level to be modified and new line run from this header to new off-gas con denser, Item 427. ** Piping Required 30 ft. of 6" IPS C.S. pipe. ** From Chlor. 6-9 100 ft. of 6" IPS C.S.. pipe with 2 CD3 valves Circ. Water System 75 ft. of 3" IPS C.S.. pipe. Drain From Item 427 15 ft. of 4" IPS C.S.. pipe. To HC1 Recovery 40 ft. of 6" IPS C.S,. pipe. HC1 Transfer 1300 ft., of 8" IPS C.S. pipe. from Dept. 246 to Dept.. 218. Steam to Item 429 ** To Item 431 ** From Item 431 60 ft. Of 2" IPS C.S,. pipe. 20 ft., of 3" IPS C.S.. pipe. 90 ft., of 2" IPS C.S,. pipe. 0725909 TOWOLDMONOQ44995 Appendix F CEA 1800 Page 6 Aroclor Circulating System To Items 504 & 526 125 ft. of 4" IPS C.S. pipe. From Items 504 & 526 125 ft. of 4" IPS C.S. pipe With 4 valves. Item 502 - Still Pot Item 511 - Still Pot Montar Drawoff 2-15 ft. of 2" IPS C.S. pipe = 30 ft. With 4 valves To Items 505 & 512 2-15 ft. of 14" IPS C.S. pipe = 30 ft. From Items 505 & 512 2-25 ft. of 10" IPS C.S. pipe = 50 ft. Above lines insulated with 2" thick insulation. Item 506 - Still Condenser Item 513 - Still Condenser To Item 508 & 515 2-15 ft. of 3" IPS S.S. pipe = 30 ft. Item 508 & 515 - Still Receivers To Items 523 & 524 2-30 ft. of 4" IPS C.S. pipe = 60 ft. with 2 valves ** To Items 510 & 517 2 - 15 ft. of 3" IPS S.S. pipe = 30 ft. with 1 valve Item 523 & 524 - Catch Tanks Drain Lines To Ejectors ) Items 509 & 516 ) 2-35 ft. of 2" IPS C.S. pipe = 70 ft. with 2 valves 2-15 ft. of 4" IPS C.S. pipe = 30 ft. with 2 valves. Item 509 & 516 - Ejectors Steam Lines 60 ft. of 1-1/2" IPS C.S. pipe Drain Line 30 ft. of 3" IPS C.S. pipe 0725910 TOWOLDMONOQ44996 Appendix F CEA 1800 Page 7 Item 518. 519 & 520 - Aroclor Cooling System From Item 519 to Item 520 30 ft. of 2" IPS C.S. pipe with 2 valves. From Item 520 to Items 506 & 513 60 ft. of 2" IPS C.S. pipe with 2 valves. From Items 506 & 513 to Item 518 30 ft. of 2" IPS C.S. pipe From Item 518 to Item 519 30 ft. of 2" IPS C.S. pipe Item 503 & 525 - Circulating Pumps **2-15 ft. of 4" IPS C.S. pipe = 30 ft. with 4 valves **2-10 ft. of 4" IPS C.S. pipe = 20 ft. with 2 valves * 1 - 150 ft. of 2" IPS C.S. pipe for transfer to Still No. 2. Item 530 & 537 - Surge Tanks ** From Items 510 & 517 ** To Items 531 & 538 Water/Steam Overflow From #2 Still Receiver 2 - 25 ft. of 2'' IPS Al pipe with 2 valves 2 - 20 ft. of 2'1 IPS Al pipe with 2 valves 100 ft. of 2' 1 IPS C. S. pipe 2 - 15 ft. of 3' 1 IPS Al pipe 200 ft. of 2'' IPS Al pipe with 2 valves Items 532* 539 & 540 - Absorbers * To Absorbers 100 ft. of 2 " IPS A1 pipe with 5 valves ' * From Absorbers 100 ft. of 2 " IPS A1 pipe with 5 valves Items 541 & 533 - Filters ** 75 ft. of 2" IPS A1 pipe with 4 valves Items 534 & 535 - Surge Tanks * Vent Lines * To Item 544 * To Item 536 * From Item 544 * From Item 536 Steam Lin? 2 - 25 ft. of 3" IPS Al pipe 20 ft. of 3" IPS A1 pipe 20 ft. of 3" IPS Al pipe 100 ft. of 3" IPS Al pipe 125 ft. of 3" IPS Al pipe 100 ft. of 1-1/2" IPS C.S, Pipe Items 426 & 433 - Scrubbers Water Inlet Drain Line 100 ft. of 2" C.S. pipe with 3 valves 30 ft. of 8" Saran lined steel pipe 30 ft. of 12 " Saran lined steel pipe 0725911 TOWOLDMONOQ44997 Appendix F CEA 1800 Page 8 Miscellaneous Feed line from batch blow tank to Items 502 & 511 ** 125 ft. of 2" C.S. pipe with 4 valves To Item 434 - 20 ft. of 3" C.S. pipe with 1 valve 12 - Ductwork . None required. 13 - Electrical Motors to be installed and wired 5 - 2 HP 1 - 3 HP 7 - 5 HP 1 - 7*s HP 7 - 10 HP 6 - 15 HP 2 - 20 HP 1 - 50 HP Allow for remote pushbuttons and alarms for 15 motors. Lighting required: Operating area: 16 - 20 ft. X 20 ft. bays Foreman's office: o 225 ft2 2 Motor Control Center: 225 ft Install 600 ampere breaker in Sub. No. 17. Install fans in Sub. No. 17 transformer. Transfer feeder 8-1 from Sub. #8 to #17. Install overhead feeder cable from Sub. #17 to Bldg. CF, capacity 600 amperes, length 400 ft. Install 400 ft. of feeder cable from breaker 8-1 to Dept. 246, capacity 600 amperes. 14 - Site Preparation None allowed for. 0725912 TOWOLDMONOQ44998 Appendix F CEA 1800 Page 9 15 - Sewers Floor drains - 6 surface drains. Sewer pipe 130 ft. of 4" permanite sewer pipe with two tie-ins to existing 8" sewer which runs directly south of Dept. 246. Excavation 2 ft. X 4 ft. X 130 ft. = 40 cu.yds. Sewer tie-in Two for scrubbers. Drinking fountains - Two required. 16 - Underground Mains None allowed for. 17 - Yards 2 Allow for gravel surfacing approximately 2000 ft of access areas. 18 - Railroads None allowed for. 19 - Insulation Piping Equipment - Refer to Code 11. - As below - Material Std #100, Weather-proof Std #65. Item 403 404 422 424 429 430 500 501 502 505 508 511 512 515 519 Area 235 ft2 235 ft2 540 ft2 855 ft2 428 ft2 100 ft2 20 ft2 20 ft2 330 ft2 130 ft2 205 ft2 330 ft2 130 ft2 205 ft2 100 ft2 Thickness iy iy iy iy iy iy iy iy 2" 2" iy 2" 2" iy iy 0725913 TOWOLDMONOQ44999 Appendix P CEA 1800 Page 10 Item 537 539 540 541 542 543 530 532 533 534 535 585 586 409 413 417 421 504 526 545 ) Pumps Area 205 ft2 160 ft2 160 ft2 50 ft2 330 ft2 330 ft2 205 ft2 160 ft2 50 ft2 330 ft2 330 ft2 120 ft2 200 ft2 60 ft2 60 ft2 60 ft2 60 ft2 100 ft2 100 ft2 160 ft2 -- Thickness 1*5" 1*5" IV IV IV 1*S" IV IV IV IV 1*5" 3" 2V iv IV IV iv iv iv iv IV 20 - Painting Coating Std #502, Epoxy system Supports for Items 408, 412, 416, 420, 426, 433, 427, 509, 516, 518, 523 and 524. Items 406, 410, 414, and 418 Uninsulated piping - air, water, gas ' 21 - Walls, Masonry, Roofs Concrete block structure attached to existing control room. Allow for 4 walls 15' X 20' high, total area - 1200 ft . 2 Concrete roof deck with tar paper coating - area 250 ft . 0725914 TOWOLDMON0045QOO Appendix F CEA 1800 Page 11 90 - Dismantling Item No. 172 173 Eauipment No. 21-5150 38-5588 Description IMist eliminator, 30" X 13' Brinks unit 1Heat exchanger, 16" o.D. X 8' long Present 6" HC1 line to Dept 218 will be dismantled. 93 - Relocations and Modifications Expense Move and relocate one power line pole and electric wires now in conflict with the new structure. Move and relocate the following pipe lines which are south of the existing plant and which will interfere with the new struc ture. ' Air line - 40 ft. of 4" C.S. pipe Chlorine line - 40 ft. of 4" c.s. pipe Instrument air line - 40 ft. of 1*5' ' c.s. Pipe Water line - 40 ft. of 3" city water line 0725915 TOWOLDMON0045001 CEA 1800 Date: August 28, 1967 By: R. S. Yates SCOPE OF WORK Aroclor Expansion at W. G. Krumxnrich Storage Tank Farm Appendix "G" 0725916 TOWOLDMON0045002 Appendix G CEA 1800 Date: August 28, By: R. S. Yates Page 1 1967 General The facilities included in this project are intended to: 1. Insure adequate supply of biphenyl. 2. Assure storage capacity for minimum inventories of various Aroclors so that bulk shipments can be made on demand. 3. Minimize the potential for cross contamination. 4. Provide additional unloading facilities for biphenyl. 5. Remove existing underground storage tanks. Major Equipment Includes 1 - 100,000 gallon Steel Tank for Biphenyl. 2 - 22,000 gallon Aluminum Tanks for Aroclor 1242. 1 - 22,000 gallon Aluminum Tank for Aroclor 1254. 1 - 22,000 gallon Aluminum Tank fpr Aroclor 1260. 1 - 22,000 gallon Aluminum Tank for Aroclor 1248. All storage tanks to have plate coil heaters and to be insulated over the lower half. Tank for 1260 to be completely insulated. Pumps All 316 SS. 1242 - Common pump for two storage tanks. 1254 - pump for two storage tanks. 1260 - Pump for one storage tank. 1248 - Pump for one storage tank. Filters All 316 SS. Separate filters for 1242, 1254, 1260. Piping Separate transfer lines from existing transfer pump (Item 144) to each tank and to truck dock as follows: 0725917 TOWOLDMON0045003 Appendix G CEA 3 800 Page 2 1,42 - From day tank to storage - to manifold station 1254 - From day tank to storage - to manifold station 3260 - From day tank to storage - to manifold station 1248 - From day tank to storage - to manifold station Separate circulating lines on each tank. Lines to be 2" & 3" IPS aluminum with single 1/2" copper tracer and insulated. Railroad 1. Extend spur track #10A, 125 feet and tie into existing track 10. 01 Equipment See Equipment List and Summary 02 Instrument Items See Instrument List and Summary 03 Setting and Testing Equipment Area is accessible for truck and train unloading. High lift can be used advantageously. 01 Setting and Testing Instruments . Normal conditions. 06 Excavations For 100,000 gallon tank - 25' x 30' high For good soil (3O'0 x 15 feet deep) Ring Wall (25'0) Sandfill 400 cu yds 10 cu yds 19 cu yds Pump Foundations 3 x 2 cu yds 6 cu yds Pipe Supports 9 3 cu yds 27 cu yds 0725916 TOWOLDMON0045004 Appendix G CEA 1800 Page 3 For 5 storage tanks For good soil 35' x 35' x 15' 18,400 ft3 20' x 18' x 15' = 5,400 ft3 23,800 Total Excavation Spoil Backfill 07 Foundations Pumps 4 x 2' x 3' x 2' Pipe Supports 9 x 2-1/2 cu yds Loading Dock Miscellaneous Base for 5 tanks 5 x .78 x 142 x 10/12 - 635 ft2 5 x 3.14 x 14 x 4' x 10/12 = 735 ft, 1370 ft3 880 cu yds 1,369 cu yds 1,300 cu yds 2 cu yds 25 cu yds 5 cu yds 5 cu yds 55 cu yds Soil tests will be required. 06 Supports, Platforms and Structures Loading Dock - (2 required for biphenyl cars) Tank Platforms Ladder to top of biphenyl storage tank - 30 ft Grating Handrail Toe Plate 0_ Building Items None J.1 Sprinkler s and Fire Protection None required. 2 ton 4 ton 700 sq ft350 1in ft 350 lin ft 0725919 TOWOLDMQN0045005 A;4:*undix ? ^T.A Page 4 I> i.oina Item 401 - Mphenyl Storage Tank 3 5 ft of 4" IPS CS pipe for pump suction with re valve. <0 ft of 2" IPS CS pipe for circ. line with :re valve. LOO ft of 2' IPS CS pipe from unloading spot to tank with two 7 a*'*1 s ?C ' ft \.f 2" IPS CS pipe from pump discharge tc Item 1C2, ex. c:r -. tiphenyl storage tank, with two valves. 200 ft cf 1" IPS CS pipe from Building CP to storage tank wutn two valves for stesm supply. 200 ft cf 1" IPS CS pipe for miscellaneous steam services at storage tank. Pr >c .*>s Piping -lx 1/2" OD copper tubing tracers with 2-1/2" insulation, 2" thick. Stourr piping - 2" thick insulation. Stc v q :: e ranks (Item 558-562) 5 C.rc, Lines - 2 50 ft of 2" IPS A12 pipe with 5 AL valves. 5 Vent Lures - 5j ft of-3" IPS Al2 pipe with 5 AL valves. 200 ft of 1-1/2" IPS CS pipe for steam to plate coils with .16 vulveb. Piping - i. x 1/2" OD copper tubing tracer with 2~i/2" & ?-l/2" diameter insulation 2" thick. Steam piping - 2" insu lation. Nitrogen Piping 250 ft of 1-1/2" IPS CS pipe with 10 valves from existing nitrogen station. Instrument Air Piping 200 ft of 1-1/2" IPS galvanized pipe with 16 valves. Transfer Piping to Storage Tanks Tie into existing lines at Tanks 9, 10, 11, (items 117, 118, 119). Piping required: 200 ft of 2" IPS aluminum pipe with 8 valves. (Note for 1254, 1242, 1262) 0726920 ' TOWOLDMON0045006 Appendix G CEA 1800 Page 5 New 1248 line from existing transfer pump (Item 144) piping required: 150 ft of 2" IPS aluminum pipe with 2 valves. Piping: 1 x 1/2" OD copper tubing tracer with 2-1/2" diameter insulation 2" thick. Transfer Piping to Loading Station (Tank Car) For 1242s 225 ft of 3" IPS aluminum pipe with 3 valves and aluminum loading arm for tank cars. For 1254; 225 ft of 3" IPS aluminum pipe with 3 valves and aluminum loading arm for tank cars. For 1260: 250 ft of 3" IPS aluminum pipe with 3 valves. For 1248: 250 ft of 3" IPS aluminum pipe with 3 valves. Pipings 1 x 1/2" OD copper tubing tracer with 3-1/2" diameter insulation 2" thick. Transfer Piping to Loading Station (Truck Dock) For 1242s 100 ft of 3" IPS aluminum pipe with 1 valve. For 1254: 100 ft of 3" IPS aluminum pipe with 1 valve. For 1260: 100 ft of 3" IPS aluminum pipe with 1 valve. For 1248: 100 ft of 3" IPS aluminum pipe with 1 valve. Pipings 1 X 1/2" OD copper tubing tracer with 3-1/2" diameter insulation thick. Transfer Piping to Drumming Station Fop_ 1242: 100 ft of 2" IPS aluminum pipe with 2 valves. For_ 1254; 100 ft of 2" IPS aluminum pipe with 2 valves. For 1260: 100 ft of 2" IPS aluminum pipe with 2 valves. Fqr_.1248 i 100 ft of 2" IPS aluminum pipe with 2 valves Pipings 1 x 1/2" OD copper tubing tracer with 2-1/2" diameter insulation 2" thick. 12__ D'.ct Work None 0725921 TOWOLDMON0045007 Appendix G CEA 18CC Page 6 13 Electrical Install 4 x 15 HP motors for pumps. No interlocks or alarms required. Install 8 street light type, 400 watt mercury arc fixtures for load ing dock, tank farm perimeter and area lighting. install 8-175 watt mercury arc fixtures over tank farm area. 14 Site Preparation None 15 Sewers and Drains None 16 Underqround Mains None 17 Yards, Roads, Fencinq Chat will be placed around storage tank area, depth 12". For Item 401 2,500 ft2 For 5 Storage Tanks 1,600 ft2 18 Railroads Spur track #10A will be extended 125 ft and a switch installed at the end to bring the spur back into main track #10. Existing bumper will be removed. 19 Insulation Pipinq: insulation is covered in the category #11 - piping. Tanks t Item 401 - Thick, 1-1/2", Insul. Spec. No. 100 (Calc, Silicate with weather barrier. Side Wall - 7TDH * 3.14 x 25' x 3300*' - 2,360 ft2 Top = 3.14 x (25)2 = 490 ft2 44 2,850 ft2 Item 558 - Thick, 1-1/2", Insul. Spec. No. 100 (Calc. Silicate'/ with weather barrier. Side Wall - TfDH = 3.14 x 131 x 12' - 490 ft2 Remaining area to be spray covered with cork filled asphalt mastic, Spec. No. 700 0723922 TOWOLDMON0045008 ' Side Wall - Top 77b .78 4 x , (13)z Appendix G CEA 1800 Page 7 490 ft? 132 ft* 2 622 ft Item 559 - Same as Item 558 Item 560 - Same as Item 558 Item 562 - Same as Item 558 Item 561 - Thick, 1-1/2", Insul. Spec. No. 100 (Calcium Silicate) with weather barrier. Side Wall - 77bH = 3.14 X 13 X 24 = 980 ft2 Top area to be spray covered with cork filled asphalt mastic. Spec, #700, Top 132 ft2 20 Painting Spec 502 for all steel items. 90 Dismantling Remove pump 4247 and motor 9905 now on Tank #10,(Item 118). Dismantle 3 X 14,000 gallon underground storage tanks and associated equipment: Item No. Equipment No. 148 149 21-0768 19-0585, 66-0853 150 21-0769 151 19-0584, 66-1501 152 21-1310 153 19-0929, 66-0856 Description 10' Dia. X 26' long U.G. Hor. Tank Pump and Motor 10' Dia. X 26' long U.G. Hor. Tank Pump and Motor 10' Dia. X 26' long U.G. Hor. Tank Pump and Motor Relocation Replace two existing pipe supports going out to present tank car loading dock. 072*923 TOWOLDMON0045009 TOWOLDMONOQ45010 TOWOLDMONOQ45011 TOWOLDMONOQ45012 ? 1 f-4 S"r -A*ks . mgetC^ ' i | '---t--t.......... j--J---I--A ^/^JivTr-^t'TP T7VT?^ , *r*fam *,+. . : ! : . ~l, /*\m s\r-:\ SrUifr/,b> lA-i-tS ; ,' 5r*>*bi**//c<rrftapv/., **A \ I ^*Cr *t4J* S II JArPtT4 X*iA/#/j(6 rpms t4 S*SS.X-S\ -O r*Acn)4 '>fsuCr <fc avoyc*:-*- erts t rst/CAd. 2>*vcs \ wj <rc/^f/tr dyv&s 1&XC/rPJff/Cs*et tCteOVrTtAC raff ' ---------/--/vsrAtt ft C 1 1 1 1 .... i ---------r-- o PRELIMINARY Oti'OH DA'tlHC MO(UtE>ENl LlCtNO ^....................... ........ . CONDUCTION O1-"""'"O MSMAINT flOAT ----------------------------- A7/#57^VP PPOJECr SC*Pl/_it C. A NO. '*PO .. TITLE.*?***! AeoCi cE_ BBT | ^li h |l!l.{ J iPPA/2>.'f /V 072-592? TOWOLDMONOQ45013 Monsanto W. B. Howard - St. Louis J Tt August 28, 1967 ' KtrenCNCl PROJECT LOSS PREVENTION REPORT 67-65 CEA-1800 /TTO S. Yates (Project Manager) R. E. Doerr R. E. Howard J. L. Mathews H. B. Patrick - WGK S&PP Project File S&PP Location File COPIES TO THOSE PRESENT J. R. Fullgraf H. D. Gabelman R. J. Green W. B. Howard J. MacPherson - Anniston M. J. Pistek - WGK H. F. Ray - WGK R. P. Stevens R. S. Yates DATE AND PLACE OF MEETING August 15, 1967, Creve Coeur, Missouri. CEA-1800 Increase Liquid Aroclors' Capacity, WGK Plant, Sauget, Illinois. This project is for installing a new aroclor manufacturing plant and a tank farm. The capacity will be 40M ppy. The capital is approximately $1.4M; completion target is approximately January, 1969. The project includes installation of a 100M gallon biphenyl storage tank and extension of trackage for access to this tank. Two biphenyl unloading docks will be provided. The drainage from the 100M gallon biphenyl tank will be away from the process. PROCESS1 1. Biphenyl Storage Tank This storage tank will be air blan keted; it was stated that contact of the biphenyl with air will not result in deleterious effects on the biphenyl. The flash point of biphenyl is 235F. It was therefore , agreed that low pressure steam (5 psig max.) would be used for heating the large storage tank, the 25,000 gallon tank, and tank cars, in order to avoid heating above the flash point. AA , J- CO 0725928 IN IO CV. 1165 TOWOLDMONOQ45014 2 2. Addition of Ferric Chloride to Biphenyl Mix Tanks The ferric chloride is added batchwise to the mix tanks by opening the tanks and dropping in the solid. It was agreed that, in order to prevent formation of any flammable mix tures above the biphenyl in these tanks (Nos. 403 and 404), the temperature of material in the mix tanks will be held below the flash point. 3. Chlorination System The chlorination proceeds at a tempera ture of about 150C; approximately 550 BTU's are evolved per pound of chlorine added. Heat removal is accomplished by circulating batch material through an external air cooler and back into the chlorinator. Safety provisions include the following: (a) A high temperature sensing element in the chlorinator mass detects high temperature, shuts off chlorine, and alarms. (b) Circulating pump shutdown (motor circuit detection) shuts off chlorine feed. (c) A temperature detector in the circulating line is used for temperature control in the system. When this ele ment detects low temperature it alarms and also shuts off the air cooler fan. (d) A temperature detector in the chlorinator mass (separate from No. a_;_ above) alarms at a high temperature which is lower than the temperature at which the element in a alarms and shuts off chlorine. FIRE PROTECTION A new open type structure will be erected adjacent to Building CR. No automatic sprinkler protection is required for this structure. It should be noted, however, that a spill of biphenyl at a tem perature above its flash point (235F) has resulted in fires. The existing hydrant protection is considered adequate to extin guish such a fire. LOSS EXPOSURE The therrainol furnace consists primarily of a cylindrical combustion chamber containing finned tubes. Although an explosion in the combustion chamber is possible, the combustion chamber could in all probability contain the explosion pressure. There appears to be no major hazard from this source. The stack might of course be blown off. ft (-Z) ' 0725929 TOWOLDMONOQ45015 3 A more likely source of loss exposure would appear to be the burning of a tube in the therminol furnace. A tube could be replaced within about two days if one is in stock. On a soldout basis the business interruption loss would be approximately $20M. The repair cost was approximated at $3M. LOSS PREVENTION GUIDE Attached to R. S. Yates' copy of this report is a copy of Form G-1425, Loss Prevention Review Guide, which can be used as a safety checklist for this project. LOSS PREVENTION REVIEW BY PLANT The S&PP Branch of CED does not plan a complete review of design prints for safety provisions. S&PP requests plant personnel, including plant safety personnel, to follow the development of design prints and to check the pro gress of construction with particular emphasis on personnel safety and loss prevention. SAFETY MANAGER R. J. Green will be Safety Manager for this project. Please contact him for reviews during the design phase of this project. bO-h. H W. B. Howard js 0725930 TOWOLDMONOQ45016 Monsanto W. B. Howard - General offices August 29, 1967 c PROJECT LOSS PREVENTION REPORT 67-64 CEA-1430 TO : Mr. R. S. Yates (Project Manager) yf R. E. Doerr R. E. Howard J. L. Mathews P. K. Ward - Anniston S&PP Project File S&PP Location File COPIES TO THOSE PRESENT J. R. Fullgraf H. D. Gabelraan R. J. Green W. B. Howard J. MacPherson - Anniston M. J. Pistek - WGK H. F. Ray - WGK R. P. Stevens R. S. Yates DATE AND PLACE OF MEETING Missouri. August 15, 1967, Creve Coeur, CEA-1430 Increase Liquid Aroclors Capacity, Anniston Plant, Anniston, Alabama. This project is for a new tank farm, mixing area, flaking areax and drumming area. Capital will be approximately $1.6M; completion target is January, 1969. Although no additional capacity is claimed under this project, the operation will be changed from three shift, seven day, to one shift, seven day. A flaker will be added for solid aroclors and another flaker for biphenyl. Exhaust systems will be provided to remove fumes from the flakers. PROCESS 1. Mix Tank Solutions of aroclors are prepared in toluene and xylene in a mix tank. The toluene and xylene used for this purpose are pumped from drums directly into the 2,000 gallon mix tank. This tank is jacketed for steam and for water. The tank will be nitrogen padded. 2. Biphenyl Surge Tank The flash point of biphenyl is 235F. The biphenyl surge tank in the flaking area will be heated, but only to approximately 80C. The biphenyl will thus be below the flash point. r (vj 0725931 TOWOLDMONOQ45017 Mr. R'. S. Yates -2- August 29, 1967 3. Scale-up of Flaker Size The new flakers will be of significantly larger size than the present flakers. The aroclors are expected to perform on the new flakers as well as, or better than, they do on the present flakers. The biphenyl gives some problems in flaking with the present flakers, and some of these problems may continue with the new flakers. Although there is a scale-up factor with the new flakers, no significant scale-up problems are anticipated. FIRE PROTECTION A 120' x 60' x 1 story metal siding on steel frame prefabricated type building will be erected north of Bldg. 27 for flaking and drumming of aroclors. It is recommended that this building be provided with an ordinary hazard wet pipe system of automatic sprinklers. The system should be supplied from a feed connected to the fire main in Fifth Street with a post indicator type shut-off valve located at least 25 ft. from the proposed building. LOSS EXPOSURE The maximum probable loss is anticipated to occur from the scarring of an aroclor flaker roll. Re surfacing of the roll would require about one month. On this basis the BI loss would be approximately $100M. Equip ment repair costs for the resurfacing would be approximately $4,000. LOSS PREVENTION GUIDE Attached to R. S. Yates' copy of this report is a copy of Form G-1425, Loss prevention Review Guide, which can be used as a safety check list for this project. LOSS PREVENTION REVIEW BY PLANT The S&PP Branch of CED does not plan a complete review of design prints for safety provisions. S&PP requests plant personnel, including plant safety personnel, to follow the development of design prints and to check the progress of construction with particular emphasis on personnel safety and loss prevention. SAFETY MANAGER R. J. Green will be Safety Manager for this project. Please contact him for reviews during the design phase of this project. R. J. Green W. B. Howard ps 0725932 TOWOLDMONOQ45018