Document YG5ay5xejw346ZxBZ7pLG4QyE

SPECIALTY CHEMICALS DIVISION SOUTH CHARLESTON PLANT ENGINEERING December 9, 1986 TO: 2) M. G. Dwyer L3488 Danbury CC: G. F. Hayes J. C. Ketcham R. G. Link/C. H. Hancock A. Lynch D. J. McNeil A. B. Williamson SUBJECT: 930-WORK ORDER REQUEST 514-0560 ASBESTOS INSULATION REMOVAL OXTDE ADDUCTS UNIT cniiTH CHARLESTON PLANT The attached Work Order Request has been approved by local management. Please obtain additional approval signatures and process through reaular channels. wdm Attachment 2985G UCC 006417 JL SPECIALTY CHEMICALS DIVISION ENGINEERING DEPARTMENT % "tty 6/% CAPITAL WORK ORDER 930- 20^/a * JOB NUMBER PAGE 1 190321 op 3 v % TITLE: ASBESTOS INSULATION REMOVAL OXIDE ADDUCTS UNIT SOUTH CHARLESTON PLANT OPR.DPT.SYS. 169100 PROFIT CENTER 162 LOCATION 514 BLDG.NO. REQUEST OR JOB NO. 514- 0560 Specialty^cSJerirfcals Div. BUDGET NUMBER DEPT i PROJECT: D.J. McNeil ENDORSEMENT / APPROVAL ROUTING! S6UM003 PROJECT PRIORITY {g>B,C.D. ADMINISTERED BYl t )PLANT(AD.CODE 2) K54464(AO.COOE 1) ( lOISTRIBUTIONCAO.COOE 3) TITLE 124 SPACES) REM ASBESTOS & INSULATE ACCOUNT ORDER NO. OATE UHORnmo 9I3I0I0I0I0 1 1-1 .L. li2.0,1,6 $ 50,0(50 This project Is to provide for removal and replacement of asbestos and temporary insulation at the Oxide Adducts Unit ($100M). Asbestos insulation will be removed from process equipment and lines and replaced with new insulation to minimize the Occupational Health risk caused by Airborne Asbestos Fibers. Temporary insulation will be removed and lines insulated for freeze protection and personnel protection. This project will be administered by the Maintenance Department at South Charleston Plant and the removal work will be performed by an outside contractor.__________________________________________ ______________________________ _______ principle type OF project EnvironmentalImpv h NA , NA % AUDIT REQ.jYESO NO Ell DATE CAPITAL COST iRANGE* 10 X CR ISSUE $50,000 LOCAL ENDORSEMENT sr YFS NO ENVIRONMENTAL JLW X OCC. HEALTH MOS X SAFETY ENERGY MJS TG5-- X X ENERGY CONSERVA. ~TGS X INCLUDES! AIR POLLUTION CONTROL HATER POLLUTION pnNTROl RFSinUFrstt.TRSiniSPOSAl OCC. HEALTH SAFETY NOISE CONTROL TOTAL H.S. 4 EA , RETIREMENT OF PROPERTY fl) 838000 i ^ 41 i 1 $50,000 EXPENSE t REARRANGEMENTS * REVISIONS* ETC.) (2> 838000 J__ I__ I__L CAPITAL EXCLUSION TO PROFIT CENTER EST.CONSTR.COMP-DATE DISTRIBUTION OP APPROVED WORK ORDERI l/. D. BRADBURY, JR. A. WALKER A. LYNCH D. G. MOSHIER G. F. HAYES D. J. McNEIL R. G. LINK J. C. KETCHAM C. H. HANCOCK J. R. DEMENT G. M. ROSENGARTEN,JR(2) J. F. DODD A. B. WILLIAMSON G. R. HATTIANGADI J. L. WORSTELL J. E. McKEON DATE TOTAL ESTIMATE $100,000 APPROVALS ttfs'HiO flirty*4 Vn--j'l. COST SUMMART TOl 'J / .-Ac J. F. Dodd 82-712 (514)(2) ... / V CAD421 10/11/85 UCC 006414 Page 2 of 3 OBJECTIVE OF THE PROJECT The objective of this project is to minimize hazards of airborne asbestos in the Oxide Adducts Unit and upgrade temporary insulation to provide freeze-protection and personnel protection for lines and equipment. JUSTIFICATION The justification of this project is Occupational Health. The proposed OSHA Asbestos Standards, 1910.1001, specifies 0.2 fibers/cc as the maximum allowable exposure over an 8-hour period. Also, many uncovered lines pose a bum hazard for employees. The project also provides freeze-protection to lines during cold weather. ALTERNATIVES TO REMOVAL Continue operations with the present asbestos Insulation., Personnel may be exposed to airborne particulate asbestos or burn hazards. Unit operation may be endangered in sub-freezing temperatures. TECHNICAL RISK There is no technical risk associated with this project. OCCUPATIONAL HEALTH CONSIDERATIONS This project will correct an occupational health concern by removing asbestos insulation from equipment and lines in the Oxide Adducts Unit. When the Insulation is being removed, safety and health guidelines will be followed which includes: installing rope barricades and clearing the area of plant personnel; posting of warning signs; proper bagging and disposal of insulation; and monitoring of surrounding work areas. In addition, assuring that contractor personnel adhere to guidelines such as: wet clean-up; wearing of appropriate respirators; wearing and disposal of proper clothing. ENVIRONMENTAL PROTECTION CONSIDERATIONS This project will be in compliance with all applicable OSHA and EPA Regulations. UCC 006415 Page 3 of 3 PROJECT PLAN This request is for the Oxide Adducts Unit, Specialty Chemicals Division. All work associated with this project will be performed by contractors, therefore, the costs will be controlled by obtaining competitive bids. The bids will be firm-price quotes. Mr. L. B. Hewitt from Maintenance will monitor the work of the contractor to assure completeness of scope and quality of work. PROJECT TEAM Maintenance Dept. Representative Plant Engineering - Monitor Costs L. B. Hewitt A. B. Williamson 2902G UCC 006416