PROJECT TITLE
Mfq. of Monochloroblphenyl in Aroclor Dept.
LOCATIONKrunanrich Plantcompany
MIC
Estimate Description
This Evaluation Estimate is mada to show tha cost to increase the capabilities of the Aroclor Department to manufacture both Aroclor 1016 and Monochloroblphenyl in the same equipment train via block
operations.
Removal, modification, and replacement of equipment and systems, as well as new capital equipment are required. New, revised and
relocated pressure, and electronic instrumentation is required.
Modification of the Column (1301) is considered to be performed under a Lump Sum contract.
Information Sources
Preliminary Plant Project Scope for manufacture of Monochloroblphenyl in the Aroclor Department at 8fi Lb./Yr. rate, by K. E. Boucher dated 24 March 1975, and Drawings TS-D-12287, 88, 89, 90, 91, 92, 93, 94
and 12338.
Capital Directs
Capital directs were estimated using Cost Engineering Manuals and vendor catalogs.
Contingency
'
A 1074 Contingency is included in this estimate.
Cost Escalation Allowance
Escalation has been included for the last quarter 1975 time frame. A 1.3 Labor Index has been included for construction and installation labor.
Estimate Accuracy
Based upon present information, this estimate is believed accurate within +15 to -15 percent.