1 Definitions 2 Indemnity 3 Insurance 4 Abbreviitions S Correlation of Documents Intent 6 Copies of Documents
Additional Instructions
23 Correction of Work Before 2 a Final Payment 3 24 Warranty and Guaranty 4 25 Deductions for Unconected Work 5 26 Delays and Extotsions of Time
27 Monsanto's Right to Do Work
11 12 12 12 12
S 2S Monsanto's Right to Terminate Contract 13
7 Working Schedule - Overtime
S 29 Inepection Testing
14
S Drawings and Specifications
5 30 Cleaning Up
14
9 Monsanto's Confidential Information
6
31 Cutting - Patching
14
10 Shop and Setting Drawings Review and Approval
32 Protection of Work, 6 Property and Persons
14
11 Subcontracts
6 33 Prosecution of the Work
15
12 Relations of Contractor and Subcontractor
13 Separate Contracts 14 Mutual Responsibility of Contractors 15 Engineer's Status 16 Surveys . Concealed Devices -
Permits Taxes Law 17 Use of Premises. Employes
7 7 7 7
S
a
34 Cash Allowances 35 Bonds 36 liens and Claims 37 Title to Work 38 Assignment 39 Patent Infringement 40 Waiver Modification - Amendment
15 IS IS 16 16 16 16
16 Product Approval Substitutions 19 Construction Items and Requirements 20 Approval of Payments - Acceptance
Final Payment 21 Withholding of Payments to Contractor 22 Changei a Work
9 9
10 10 11
41 Conflicts in the Contract
42 Time Entire Agreement Captions
43 Contractor's Status Responsibility
44 Survival of Obligations Succeasors and Assigns
45 Stop Work Order
C 001303
16 16 16
17 17
mn *
LAM022527
AJBflCLg 1.0 DEFINITIONS
1.1 The term "Engineer" him the employee of Monsanto authorized to represent it on the work.
e
1.2 Contractor and the Engineer are referred to throughout the Contract Docuaeots as if each were of singular number and masculine genders Monsanto is referred to as if it were singular and neuter.
1.3 Onless otherwise expressly stated in the Contract, any authorization, approval, or acceptance of Monsanto or the Engineer required under the Contract Bust be in writing.
1.4 Onless otherwise specifically set forth in the Contract, the tezB "work" includes all labor, materials, equipment and all things (Including, but not limited to, all items, tools, supplies, articles, appurtenances, apparatus, machinery, appliances, scaffolding, utilities, services, sanitary facilities, supervision, transportation, incidentals and expenses) necessary for the proper performance of the services or construction of the facilities outlined in the Contract, whether they be described, listed, mentioned or scheduled in the Contract Documents or any revisions thereof.
1.5 The term "Subcontractor" means those individuals (other than employees of Contractor), firms or corporations having a direct contract with Contractor to perform any of the Work at the Plant.
1.6 Whenever in the Contract the words "or equal," "similar and equal" or words or phrases of like import are used in conjunction with the brand or trade name of any proprietary item of materials or equipment, such words shall mean that the brand- or trade-named item will be used as a basis of comparison and that all makes of purported similar or equal items will be considered so long as they have equal or better qualities in the opinion of the Engineer whose decision shall be final and conclusive.
i
1.7 Whenever in the Contract the words "furnish," "install," "provide" or words of similar import are used, they shall mean, unless otherwise expressly stated in the Contract, that Contractor shall fabricate, cos^lete, deliver, furnish, erect and install the item and shall include mil labor, materials, equipment and all things (ineluding all items, tools, supplies, articles, appurtenances, apparatus, machinery, appliances, scaffolding, utilities, services, supervision, transporta tion, incidentals and expenses) necessary to complete the item inplaee, ready for operation or use, under the terms, conditions and provisions of the Contract.
General Conditions - Page 2
c 001304
LAM022528
y
* I
l.t Whenever la the contract the Words "as shown," "as indicated," 'u detailed," "as noted" or words or phrases of similar import are used, they shall be onderstood to refer to the Drawings and Specifications.
1.9 WhAnever in the Contract the*words "as ordered," "as directed," as required," "as permitted," '* allowed," "as approved" or words or phrases of similar import are used, they shall mean that the order, direction, requirement, permission, allowance or approval of the engineer is intended.
1.10 Whenever in the Contract the word "or" is used, it shall be interpreted to mean "and/or" unless a contrary meaning is clearly intended from the context.
1.11 Whenever in the Contract the words "architect," "owner," or any word of similar import appears, such word shall be deemed to mean the Engineer or Monsanto.
1.12 The term "Project Site" shall mean those areas of the Plant where Work related to the Projects covered by a Monsanto Contract is performed.
ARTICLE2.0 INDEMNITY
2.1 Except as set forth in paragraph 2.3 hereof, Contractor agrees to indemnify and save Monsanto and its employees harmless against any and all liabilities, penalties, demands, claims, causes of action, suits, losses, damages, costs and expenses (including cost of defense, settlement and reasonable attorneys' fees) which any or all of them may hereafter suffer, incur, be responsible for or pay out (whether the same arise out of or in connection with the Work, or from any operations under or in connection with the Contract) as a result of bodily injury (including death) to any person or damage (including loss of use) to the property of others occurring to, or caused in whole or in part by. Contractor (or any of his employees), any of his Subcontractors (or any employee thereof), or any person, firm or corporation (or any employee thereof) directly or indirectly employed or engaged by either Contractor or any of his Subcontractors. Upon the request of Monsanto, Contractor shall promptly defend any such demand, claim, cause of action or suit.
2.2 Except as set forth in paragraph 2.3 hereof. Contractor agrees to make reimbursement for any damage, including loss of use, to existing
property or property being installed which may arise out of or in connection with the Work or from operations under or in connection with the Contract, and is caused, in whole or in part, by Contractor (or any of'his employees), any of his Subcontractors (or afl? employee thereof), or any person, firm or corporation (or any employee thereof) directly or indirectly employed or engaged by either Contractor or -any of his Subcontractors.
Ceneral Conditions - Page 2a 072883
C 001305
LAM022529
2.3 Monsanto agrees Contractor shall not ba liable to Monsanto fori
3.3.1 Loss of.use resulting fro damage to property of Monsanto
under Contractor's cars, custody or control.
o".
3.3.2 Liabilities, penalties, demands, clains, causes of action, nits, losses, daaages, costs and expenses arising out of bodily injury (including death) to any person or daaage (including less of use) to any property eaused by or resulting froa the sole negligence of Monsanto, its eaployees or its agents.
2.4 With respect to Contractor's Indemnification under Article 2.0, Contractor's liability to Monsanto shall be limited to the amounts and coverages of the insurance required to be provided by Monsanto or carried by Contractor under this Agreement.
ABTICLE 3.0 INSURANCE
3.1 Insurance by Monsanto. Monsanto has procured Insurance for Contractor and all Subcontractors as insured parties with limits and coverages of insurance as described in the following subparagraphs.
3.1.1 Workers' Compensation Insurance. Such insurance shall be in accordance with the statutory requirements of the Workers' Compensation laws of the State where the Plant is located (including coverage for the benefits provided under the United States Longshoremen's and Harbor Workers' Act) and shall include Employer's Liability - Coverage B, in the amount of $500,000, endorsed to include Maritime (Jones Act) coverage. Contractor, his Subcontractors, and each lower tier of subcontractors will be Issued their own Workers' Compensation Policy in their own name and using their individual experience modification factor. This policy will provide coverage for Work performed at the Project Site or ways immediately adjoining the Project Site. The policy will include the Broad Fora All States Endorsement.
3.1.2 Liability Insurance (Excluding Automobile Liability). Such insurance shall be in a form providing coverage not less than that of the Comprehensive General Liability Insurance Policy and insuring the Contractor and all Subcontractors. The coverage shall include coverage for all operations exposures including coverage for explosion, collapse and underground, independent contractors, products and completed operations for two (2) years following final acceptance of the Work by Monsanto, contractual liability coverage, and personal injury coverage. Such insurance shall have limits of liability of $20,000,000 per occurrence, with an annual aggregate of <20,000,000. This insurance shall also include employer's liability coverage in an amount of $20,000,000 which is excess of the amount provided under the Workers' Compensation Policy described in subparagraph 3.1.1 hereof. This policy will provide coverage only for those operations of the insured parties at the Project Site or the ways immediately adjoining the Project Site.
1 (continued on pages 3a thru 3e)
General Conditions - Page 3 052284
C 001306
LAM022530
j.l.j Builder's klsk/All Bisk Insurance. such insurance shall pretact Contractor and Monsanto, as thalr intarasts say appear, gainst nil physical loss or danage to tha Work, or any part thereof, end to the aaterials, equipaent and other ltens incorporatsd into or.intended for incorporation into any part f the Work while in transit to the site, while at tha site, and
and until completion and acceptance thereof by Monsanto
having an aggregate limit equal to the replacement cost of the Work less the site grading, foundations and engineering costs applicable in any one loss, disaster or casualty. This insurance applies only to materials, apparatus, equipment an.d supplies purchased for the Work and to in-place and relocated facilities (ineluding equipment, materials and supplies) owned by Monsanto and used by Contractor in the performance of the Work. Notwithstanding the foregoing:
3.1.3.1 Instead of purchasing such insurance from others, Monsanto, at its option, may self-insure such coverage, in whole or in part. In this event, should a loss occur which would have been covered by such insurance had it been purchased from an insurance company, Monsanto will pay to Contractor any amount which would have been paid to Contractor by such insurance company. Nothing in this subparagraph 3.1.3.1, however^ shall be construed to provide any payment to Contractor for loss of or damage to any item, the cost of which has been or will be reimbursed to Contractor by Monsanto.
3.1.3.2 In the event Monsanto elects to self-insure such coverage, in whole or in part, Monsanto may require Contractor to obtain rigging and hoisting coverage when appropriate and obtainable. Monsanto acknowledges that it has the respons ibility for determining when such coverage is advisable; however, Contractor agrees to advise Monsanto when, in Contractor's opinion, it would be sound business and construction practice to obtain such rigging and hoisting
coverage.
Insurance procured by Monsanto pursuant to this paragraph 3.1, shall
be excess of any valid and collectible insurance for loss caused by or
resulting from the operation, maintenance, use, loading or unloading of
automobiles. Vendors, suppliers, material dealers or others who merely
transport, pick-up, deliver or carry materials, personnel, parts or
equipment or other items to or from the Project Site shall not be
considered contractors or subcontractors for purposes of the insurance
coverage provided by Monsanto.
r
3.2 Monsanto assumes no obligations to provide insurance coverage other than that as evidenced by the previously described policies. Monsanto,
General Conditions - Page 3a 030982
C 001307
LAM022531
howvr, reserves the right to furnish insurance coverage of various types and limits provided that such coverage shall not be less than that Opacified in paragraph 3.1 hereof, and provided that the cost of such insurance shall be borne by Monsanto.
e e
3.3 Alternative Insurance. If.Monsanto cancels the insurance specified la paragraph 3.1 hereof, it will provide at least thirty (30) days' prior written notice to the Contractor and Subcontractors. They ehall then secure and maintain until final payment for work performed under this Agreement, the limits and coverage of insurance as prescribed by Monsanto as a substitute for such Monsanto-provided insurance. The cost to Contractor and Subcontractors of this additional insurance will be paid by Monsanto. Monsanto reserves the right to approve the form, content, cost and company for this insurance.
3.4 Insurance by Contractor. Contractor shall take out and maintain throughout the progress of the Work insurance as described in the following subparagraphs. If the Work is performed on a lump-sum, maximum cost or unit-price basis, the cost of such insurance shall be borne by Contractori if performed on a cost-plus-a-fee basis, Monsanto hall reimburse Contractor for the cost of such insurance up to the minimum limits and coverages prescribed herein and in accordance with the provisions of the applicable Agreement (the cost of any insurance coverage in excess of the minimum limits or coverages shall be borne by Contractor).
3.4.1 Workers' Compensation Insurance - Workers' Compensation Insurance shall be procured for all Work except for Work performed at the Project Site or the ways immediately adjoining the Project Site. Such insurance shall be in an amount egual to the limit of liability and in the form and amount prescribed by the laws of each State where any portion of the Work is performed, for all of Con tractor's and his Subcontractors1 employees employed on the Work, including, if the Work involves navigable waters, an endorsement covering United States Longshoremen's and Harbor Workers' Act.
364.2 . Employer's Liability Insurance - Such insurance shall be procured for all operations except for Work performed at the Project Site or the ways immediately adjoining the Project Site. Such insurance shall be provided in an amount not less than 1500,000 for bodily injury by accident or disease, including death at any time resulting therefrom, and shall be endorsed to include Maritime (Jones Act) coverage.
General Conditions - Page 3b 030982
LAM022532
C 001303
3.4.3 Liability Insurance (Excluding Automobile Liability) Such insure i ahall be procured for all oi ations except for Work performed at the Project Site or the ways immediately adjoining the Project Site. Such insurance shall be in a fora providing coverage aot less than that of the Comprehensive General Liability Insurance Policy and insuring Monsanto, the Contractor and all Subcontractors. The coverage shall include coverage for all operations exposures Including coverage for explosion, collapse and underground, independent contractors, products and completed operations for two (2) years following final acceptance of the Work by Monsanto, cantractaral liability coverage, and personal injury coverage. ueh Insurance shall have limits of liability of $1,500,000 per occurrence, with an annual aggregate of $1,500,000.
3.4.4 Monsanto agrees, however, that such liability insurance need not cover:
3.4.4.1 Damage, or loss of use resulting from such damage, to property of Monsanto under Contractor's care, custody or control;
3.4.4.2 Liabilities, penalties, demands, claims, causes of action, suits, losses, damages, costs and expenses arising out of bodily injury (including death) to any person or damage to any property caused by or resulting from the sole negligence of Monsanto, its employees or its agents.
3.4.5 Automobile Liability Insurance - Such insurance shall cover all owned, non-ovned, hired and rented automotive equipment used in the performance of the Work. Zt shall include bodily injury coverage in an amount not less than $500,000 on account of any one occurrence. Property damage coverage shall be in an amount not less than $100,000 for each occurrence.
3.4.6 Umbrella Liability Insurance - Such insurance shall provide excess coverage over the underlying primary insurance required by subparagraphs 3.4.2, 3.4.3 and 3.4.5 hereof in the amount of $5,000,000.
3.4.7 Equipment Floater Insurance. Such insurance shall protect all mobile construction equipment used in the performance of the Vork against physical damage. Notwithstanding the foregoing, Monsanto (at its option) may self-insure such risk, in whole or in part. Zn such event, Monsanto agrees to reimburse Contractor for the costs of repair or replacement which Contractor incurs or becomes liable for in the event of physical damage to such mobile construction equipment.
The insurance described in this paragraph 3.4 sets forth minimum amounts and coverages and is not to be construed in any way as a limitation on Contractor's liability under the Contract.
General Conditions - Page 3c 052284
C 001309
LAM022533
jtj Contractor shall sot bt^in tha Work until ha has obtained all the jjurarance required by paragraph 3.4 hereof and certificates evidencing gggb coverage have been furnished to and approved by Monsanto.
9.C Contractor shall node such arrangeaants as are necessary to insure that every contract of Insurance providing the coverages required by paragraph 3.4 of these General Conditions shall contain the following dauset
"Mo reduction, cancellation or expiration of this policy Shall become effective until thirty (30) days after the date written notice is actually nailed to" (followed by the nane and address of the individual designated in the Agreement as the recipient of notices to Monsanto).
9.7 All policies of insurance providing the coverages required by paragraph 3.4 hereof shall be countersigned by a duly authorised and accredited agent or agents of the carrier residing in the State or States where any portion of the Work is performed. All sueh insurance Shall be carried with insurance companies authorized to do business in such State or States and in such companies which, in the case of mutual companies, have a surplus to policyholders in excess of $5,000,000 and which, in the ease of stock companies, have a total capital and surplus in excess of $5,000,000.
3.S For insurance purposes, Contractor agrees and shall require all his Subcontractors and lower tier subcontractors to agree to:
3.8.1 Keep and maintain accurate records of payroll segregated as respects their operations at the Project Site;
3.8.2 Furnish to Monsanto or its authorized representative accurate payroll data as required by Monsanto's Insurance Company; end
3.8.3 Allow Monsanto's Insurance Company to audit their payroll records as required by sueh Insurance Company for the purposes of determining the insurance costs to Monsanto.
3.9 Contractor will furnish and require his Subcontractor and all lower tier subcontractors to furnish Monsanto or its authorized representative, a schedule of projected payroll listed by Standard Workers' Compensation Classifications, for operations to be incurred in connection with operations at the Project Site.
General Conditions - Page 3d 031682
001310
LAM022534
9.10 Contractor shall solicit and shall require his Subcontractors and all lower tier subcontractors to solicit all bids and submit same on the basis that no costs are included for insurance coverages provided by Monsanto as described in paragraph 3.1 of these General Conditions.
e e
9.11 The cost of the insurance.specified in paragraph 3.1 hereof as being provided by Monsanto shall be paid for by Monsanto and Monsanto hall receive or pay. as the case may be. all adjustments in such costs, whether by way of dividends or otherwise. Where required. Contractor agrees to and shall require his Subcontractors and all lower tier subcontractors to execute instruments of assignment as may be necessary to permit Monsanto's receipt of such adjustments.
3.12 All policies of insurance provided by Monsanto pursuant to paragraph 3.1 hereof shall contain a Waiver of Subrogation waiving the rights of underwriters of the insurance company of subrogation against Contractor or his Subcontractors or lower tier subcontractors. All policies of insurance provided by Contractor or his subcontractors or lower tier subcontractors, pursuant to paragraph 3.4 hereof shall contain a Waiver of Subrogation waiving the rights of underwriters of the insurance company of subrogation against Monsanto.
(End of text for page 3e)
*
General Conditions - Page 3e 031682
C 001311
LAM0225,J5
ARTICLE 4.0 ABBREVIATIONS
4.1 The following listed abbreviations may be found in the Contract Documents.
AASHO ACI
ACRMA AISC API
ASHRAE ASME ASTM AWMA AWPA AWPI AWS AWWA BOCA
ra
IEEE FS
MSS NBS NEC NEMA NFPA
PCA
SPR SSPC
UL USAS
American Association of State Highway Officials American Concrete Institute Air Conditioning and Refrigerating Machinery Association American Institute of Steel Construction American Petroleum Institute American Society of Heating, Refrigerating and Air Conditioning Engineers ' American Society of Mechanical Engineers American Society for Testing and Materials Aluminum Window Manufacturers' Association American Wood Preservers Association American Wood Preservers Institute American Welding Society American Water Works Association Building Officials Conference of America Factory Insurance Association Institute of Electrical and Electronics Engineers Federal Specification Manufacturers Standardization Society of the Valve and Fittings Industry National Bureau of Standards (Dept, of Commerce) National Electric Code National Electrical Manufacturers' Association National Fire Protection Association Portland Cement Association Simplified Practice Recommendation Steel Structures Painting Council Underwriters' Laboratories, Inc. USA Standard (designation of the USA Standards Institute)
4J Unless otherwise specifically provided, such abbreviations when used in connection with a standard, code, speci
fication or recommendation refer to the issue current as of the date of the Specification or Drawing containing such abbreviation.
rw ten
c 001312
LAM022536
ARTICLE 5-0 CORRELATION OF DOCUMENTS -- INTENT
5.1 The Contract Documents me complementary and what b called for by any one b as binding as if called for by alL There are certain operations, labor, equipment, materials and things reasonably inferable from the Drawings and Speci fications as bang necessary to produce the intended results; even though no mention thereof b made in said Docu ments, such tuntts^n shall not relieve Contractor from his obligation to provide all such operations, labor, equipment, materials and things. Parts of the Work described in words which, when applied, have a well-known technical or trade meaning shall be furnished or performed in accordance with the recognised standards applicable to such meaning.
5.2 The Work hn be
in strict accordance with the Contract Documents and no deviations from the re
quirements thereof shall be made without the prior approval of Monsanto.
5.3 Contractor assumes full responsibility for having familiarised himself with the nsture and extent of the Contract Documents, the Work (including the site thereof) and local conditions that may in any way affect his performance under the Contract.
5.4 To provide convenience of reference and to facilitate the letting of subcontracts, the Specifications may be sep arated into sections. Such separation, if any, shall not operate to make the Engineer or Monsanto the arbiter in estab lishing the limits of subcontract obligations between Contractor and his subcontractors, nor to relieve the Contractor of any of his obligations under the Contract.
ARTICLE 6.0 COPIES OF DOCUMENTS -- ADDITIONAL INSTRUCTIONS
6.1 Unless otherwise provided in the Contract, Monsanto will, subject to the terms, conditions and provisions of the Contract, furnish free of charge such sets of Drawings, sets of details and sets of Specifications as are reasonably necessary for the performance of the Work. Upon Contractor's request sufficiently in advance of his need, Monsanto shall furnish with reasonable promptness such additional iistructions, by means of Drawings or otherwise, as are necessary for the proper performance of the Work. Such instructions shall be consistent with and reasonably inferable from the Contract Documents.
6.2 Contractor shall do no Work without proper Specifications, Drawings or instructions and all Work shall be executed in conformity therewith.
6.3 If the Specifications or Drawings appear to call for things which make it impossible to perform the Work in a first-class manner, if ambiguities or conflicts appear in the Specifications or Drawings, or if detailed information has been omitted, Contractor shall request interpretation, clarification and/or additional instructions before proceeding with the WTork. If Contractor fails to make such request, no excuse will be entertained for failure to cany out all Work in a satisfactory manner. Should conflicts occur in or between the Drawings and Specifications, causing an increase in Contractor's cost of performing the Work, Contractor shall be deemed to have estimated on the more expensive way of performing the Work, unless before executing the Contract he shall have asked for and obtained a written decision with respect thereto.
ARTICLE 7.0 WORKING SCHEDULE -- OVERTIME
7.1 Within two weeks of notice to proceed with the Work, Contractor shall submit a proposed working schedule to the Engineer in order to permit scheduling of interrelated Monsanto and Contractor activities. The schedule shall be subject to the approval of the Engineer and shall show the dates of commencement and completion of each subdivi sion of the Work. Any necessary revisions of this schedule will be arranged by mutual agreement of the Engineer and Contractor.
7.2 It is intended that Contractor perform the Work on the basis of the standard workweek for the ares where the Plant is located. Contractor shall perform scheduled overtime in connection with the Work only at the written request, or with the prior written approval of Monsanto. When overtime is requested by Monsanto under a lump-sum type contract (or when the Work involved is on a maximum cost or unit-price basis), Monsanto will be liable beyond the contract price (maximum cost or unit price, as the case may be) only for the premium time over and above straight time, plus the additional payroll burden applicable to such premium time; provided, however, that Monsanto shall not be liable if such overtime is caused or necessitated by some failure of Contractor to fulfill any obligation under the Contract. Mere assent by Monsanto to the scheduling of overtime by Contractor shall not be construed as a request to schedule.
ARTICLE 8.0 DRAWINGS AND SPECIFICATIONS 5.1 Contractor shall keep in good order and available to the Engineer at the site of the Work current sets of all Drawings and Specifications.
c 001313
LAM022537
S.2 All Drawings (including sketches, shop drawings and setting drawings) and Specifications, including all copies thereof, furnished to Contractor, or obtained or prepared by Contractor for the Work, shall be delivered to Monsanto wbes no longer required for performance of the Work or when requested by Monsanto, but in any event upon comple tion of Work; except that one copy of each may be retained by Contractor with the permission of Monsanto. AD such Drawings and Specifications shall be the property of Monsanto at all times and shall not be used for any other work by Contractor, nor h*n Contractor permit such use by others. Contractor shall execute receipts, in a form acceptable to and at any time requested by Monsanto, for all such Drawings and Specifications in his possession.
rearticle
Monsanto's confidential information
9.1 Contractor agrees that he and his employes shall treat as Monsanto's confidential property and shall not use
or to others during or subsequent to the performance of the Work (except as is necessary to perform the
Work and
only with the prior approval of Monsanto and on a. confidential basis satisfactory to Monsanto) any
information (including any technical information, experience or data) regarding Monsanto's methods, designs, tech
niques, plans, programs, plants, processes, systems, products, costs, equipment, operations or customers (including any
similar information Monsanto has received or may receive from third parties) which may come within the knowledge
of. or which may be developed by, Contractor or bis employes in the performance of or in connection with the Work
without in each instance securing the prior written consent of Monsanto.
9.2 The provisions of paragraph 9.1 shall not prevent Contractor from disclosing to others or using in any manner any information which Contractor can show:
9.2.1 Has been published and has become part of th? public domain other than by acts or omissions of Contrac tor or his employes:
9.2.2. Has been furnished or made known to Contractor by third parties (other than in connection with the Work) as a matter of right and without restriction on disclosure or use; or
9.2.3 Was in Contractor's possession on the date of the Contract and was not acquired by Contractor or his employes directly or indirectly from Monsanto or its employes.
For the purpose of this paragraph 9.2, no information obtained by Contractor or his employes from Monsanto shall be deemed to be in the public domain or in the prior possession of Contractor or his employes merely because it is em braced by more general information in the public domain or by more general information in the prior possession of Contractor or his employes.
9J Contractor shall restrict the knowledge of aU information regarding the Work to as few as possible of his employes who are directly connected with performance of the Work and have a definite need for such knowledge. Upon request bv Monsanto, Contractor shall cause such persons or groups of persons involved in the Work on Contractor's behalf as Monsanto may designate to sign individual secrecy agreements in a form satisfactory to Monsanto.
ARTICLE 10.0 SHOP AND SETTING DRAWINGS -- REVIEW AND APPROVAL
10.1 Contractor shall check and verify all field measurements and shall submit, with such promptness as to cause no delay in the Work or in the work of any other contractor, three copies, checked and approved by him, of all shop or setting drawings and schedules required for the work of the various trades. Such drawings and schedules shall be complete and detailed. The Engineer shall review them with reasonable promptness, making desired corrections; Con tractor shall make all corrections required by the Engineer, file with him two corrected copies and furnish such other copies as may be needed. If Contractor considers any correction indicated on such drawings and schedules to con stitute a change to the Drawings or Specifications, notice as required under Article 22.0 hereof shall be given to the Engineer.
10.2 The Engineer's review and/or approval of such drawings or schedules shall not be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory. Approval of such drawings or schedules will not relieve Contractor of the responsibility for any error which may exist as Contractor shall be responsible for the dimensions and design of adequate connections, details and satisfactory performance of the Work.
ARTICLE 11. SUBCONTRACTS
11.1 Contractor shall sublet to Subcontractors accepted by Monsanto all portions of the Work that Contractor's organization has not been accustomed to performing, that Monsanto may specify and that Monsanto and Contractor may
-rii*iiin om
c 001314
LAM022538
agree upon. Monsanto reserves the right to review and approve all subcontracts as to scope of the work to be per formed and dements of cost. Such acceptance, review or approval or the failure to accept, review, or approve shall not be construed as relieving Contractor of any responsibility under the Contract.
11.2 Contractor shall have full directing authority over and responsibility for the performance of all portions of the Work he sublets and shall not be relieved of his full responsibility for the proper performance and completion of the Work because of such subletting.
11J As soon as practicable, and before making a commitment to any Subcontractor, Contractor shall notify the Engineer in writing of the names of the Subcontractors proposed for all parts of the Work and he shall not employ any Subcontractor concerning whom the Engineer has a reasonable objection.
11.4 If, before or after the execution of the Contract, Contractor has submitted a list of proposed Subcontractors which Subcontractors have been accepted by the Engineer and the change of any Subcontractor on such list is re quested by Monsanto after such acceptance, any contract price, maximum cost or unit price involved shall be increased or decreased by the difference in cost reasonably occasioned by such change.
11.5 The Engineer may furnish to any Subcontractor evidence of the amounts paid or approved for payment to Contractor on account of the Subcontractor's work.
11.6 Nothing contained in the Contract is intended to nor shall the same create any contractual relation between any Subcontractor and Monsanto or any obligation on the part of Monsanto to pay or see to the payment of any moneys due any Subcontractor.
ARTICLE 12.0 RELATIONS OF CONTRACTOR AND SUBCONTRACTOR
12.1 Contractor agrees to bind every Subcontractor by the terms, conditions and provisions of the Contract applicable to his work, unless otherwise specifically agreed to in writing by Monsanto.
12.2 Contractor further agrees to be bound to the Subcontractor by all the obligations applicable to the Subcon tractor's work that Monsanto assumes to Contractor under the Contract and by all the terms, conditions and provi sions thereof affording remedies and redress to Contractor from Monsanto.
ARTICLE 13.0 SEPARATE CONTRACTS
13.1 Contractor agrees to cooperate fully with all other contractors and suppliers and to conform to all directions of the Engineer regarding the progress of the Work. Contractor shall afford such other contractors and suppliers reason able opportunity for the delivery and storage of their equipment and materials and the execution of their work and shall properly connect and coordinate the Work with than.
13.2 If any pan of the Work depends upon the work of another contractor or of Monsanto for proper execution or results, Contractor shall inspect said work and promptly inform the Engineer of any defects that render it unsuitable or of any discrepancies between it and the requironents of the Contract. His failure to repon such defects or dis crepancies shall C9nstitute an acceptance by Contractor of the work of such other contractor or of Monsanto and an acknowledgment that the same is fit, suitable and proper for the reception of the Work, except as to defects which develop in the other work after the performance of the Work.
ARTICLE 14.0 MUTUAL RESPONSIBILITY OF CONTRACTORS
14.1 Should Contractor cause damage to any separate contractor or the work of such contractor. Contractor agrees, upon due notice, to settle with such contractor by agreement or arbitration, if the separate contractor will so settle. If such separate contractor institutes any action against Monsanto on account of any damage alleged to have been sustained, Monsanto shall notify Contractor who shall promptly defend such proceedings, if and to the extent Mon santo so requests. If any judgment against Monsanto arises therefrom, Contractor shall, at Monsanto's election, pay or satisfy it and reimburse Monsanto for all costs and expenses incurred on account of such proceedings.
ARTICLE 15.0 ENGINEER'S STATUS
15.1 The Engineer will be Monsanto's representative during construction and until final acceptance of the Work.
The Engineer will provide general administration of the Contract and he will have authority to act on' behalf of
Monsanto to the extent provided in the Contract.
001315
LAM022539
15.2 The Engineer will not be required to nuke exhaustive or continuous on-site inspections to check the quality or quantity of the Work. Contractor, not the Engineer or Monsanto, will be responsible for the construction means, methods, techniques, sequences and procedures and for safety precautions and programs.
15.3 Neither the Engineer's authority to act under the Contract, nor any decision made by him either to exercise or not to exercise such authority, shall give rise to any duty or responsibility of the Engineer to Contractor (or any of his employes), any of Ms Subcontractors (or any employe thereof), or any person, firm or corporation (or any employe thereof) directly or indirectly employed or engaged by either Contractor or any of his Subcontractors.
15.4 The Engineer will not be responsible for the errors, acts or omissions of Contractor (or any of his employes), any of his Subcontractors (or any employe thereof), or any person, firm or corporation (or any employe thereof) directly or indirectly employed or engaged by either Contractor or any oi his Subcontractors.
ARTICLE 16.0 SURVEYS - CONCEALED DEVICES PERMITS TAXES - LAW 16.1 A base line and grade datum will be furnished to Contractor. Contractor shall locate and lay out the construc tion in accordance with the Drawings; field establish and maintain grades, lines, levels and locations required; and be responsible for the accuracy of the Work. Contractor shall, at his earliest opportunity but in any event prior to com mencement of any construction, verify grades, lines, levels, locations and dimensions shown on the Drawings and report any errors or inconsistencies to the Engineer. Contractor shall furnish all surveys unless otherwise specified.
16.2 Contractor shall physically verify the locations of any subterranean or otherwise concealed devices shown on the Drawing; or mentioned in the Specifications before commencing any portion of the Work which might endanger same. Contractor shall pay all costs, expenses and fees for damage to any such concealed devices shown on the Draw ings or mentioned in the Specifications or of which Contractor has knowledge, or to any sidewalks, streets or other visible public or private property, and shall repair or replace all of such concealed devices and visible property at his expense. Contractor shall, upon request of Monsanto and as an addition to the Work, repair or replace any damaged concealed devices not shown on the Drawings or mentioned in the Specifications or not discoverable by Contractor in the exercise of ordinary care.
16.3 Permits (except Building Permits unless specifically provided for in the Contract), governmental fees and licenses shall be secured and paid for by Contractor.
16.4 Unless otherwise specified, Contractor shall give all legal notices.
16.5 Contractor shall comply with all Federal, State, county and local statutes, laws, ordinances, codes, rules and regulations bearing on the conduct of the Work. Contractor shall indemnify and save Monsanto harmless against any and all liabilities, penalties, demands, claims, causes of action, suits, losses, damages, costs and expenses which Mon santo may suffer, incur, be responsible for or pay out by reason of Contractor's failure to comply with any such statutes, laws, ordinances, codes, rules or regulations.
16.6 If Contractor observes that the Specifications or Drawings are at variance with any statutes, laws, ordinances, codes, rules or regulations, the Engineer shall be notified in writing and the necessary changes shall then be made as provided for in the Contract.
16.7 Contractor shall pay all applicable sales, consumer, use, service, occupation, privilege or other similar taxes re quired by law (including interest and penalties, if any) without reimbursement by Monsanto, unless otherwise speci fically set forth in the Agreement. Contractor shall pay all Federal income, excise and all other Federal taxes and all State and Local income and property taxes, if any, arising in connection with the Work without reimbursement by Monsanto.
16.8 The Contract shall be construed and interpreted in accordance with the laws and judicial decisions of the place of construction.
ARTICLE 17.0 USE OF PREMISES - EMPLOYES
17.1 Contractor shall confine his apparatus, operations, workmen and the storage of his materials and equipment to limits indicated by statutes, laws, ordinances, codes, rules, regulations, permits and directions of the Engineer so as not to unreasonably encumber the premises.
17.2 Contractor shall confine his activities to the areas set aside for him to do his work and shall not interfere with any of Monsanto's activities or with work of other contractors. Unless specifically authorized by the Engineer, all persons engaged on the Work are prohibited from entering any Plant areas except those areas to which they are assigned.
Omni rwllHM . he I W IT o MS Bn. 1
c 001316
LAM022540
17J Should any disturbance of
installations be necessary, Contractor shall so inform the Fnginrtr well in
advance of the time contemplated for such disturbance. After a plan acceptable to the Engineer has been formulated.
Contractor shall keep in doae contact with the Work to see that it is executed in accordance with the agreed pro
cedure; at no time shall this pitg be entrusted to a foreman.
17.4 Contractor shall not load or permit any part of the construction to be loaded with a weight that will its safety.
17.5 Contractor shall make proper provisions to receive, unload and store all materials, equipment and other things provided by him and said materials, equipment and other things shall be stored at his risk.
17.6 Contractor shall abide by and enforce the Engineer's instructions regarding signs, advertisements, fires, smoking, etc.
17.7 Contractor shall abide by and enforce Monsanto's rule which prohibits both the possession of a camera and the taking of pictures on Monsanto's property.
17.8 Persons considered by Monsanto to be under the influence of intoxicating beverages will not be admitted onto Monsanto's property nor shall intoxicating beverages be carried onto, or consumed within the limits of, Monsanto's property. Violation of this regulation will result in immediate and permanent removal of the individual from Mon santo's property.
17.9 Contractor shall at all times enforce strict discipline and good order among his employes, and shall not employ on the Work any unfit person or anyone not skilled in the work assigned to him. Contractor shall, upon notice from the Engineer, remove from the Work any employe objectionable to Monsanto.
17.10 Contractor agrees to advise and confer with Monsanto with regard to agreements with and/or obligations to labor organizations before commitments are made, and thereafter with regard to action in or settlement of pending work force interruptions, controversies, disputes and the like. Contractor agrees to abide by any disapprovals of Contractor's proposed actions which Monsanto makes known to the Contractor.
ARTICLE 18.0 PRODUCT APPROVAL SUBSTITUTIONS
18.1 To afford time for proper investigation and checking, Contractor shall, within fifteen days after the execution of the Contract, submit to Monsanto for approval the names of all manufacturers, materialmen and dealers whom be proposes furnish materials or equipment. No manufacturer will be approved for furnishing any item in connection with the Work unless, in the opinion of Monsanto, he is of good reputation, has a plant of ample capacity, is a suc cessful producer of such item and. in the case of a cost-plus contract between Monsanto and Contractor, submits prices and terms of payment acceptable to Monsanto.
18.2 In requesting prices, Contractor, subject to the provisions of Article 9.0 hereof, shall provide the manufacturer, materialman or dealer with all pertinent information from the Drawings and Specifications, plus all other pertinent in formation as to the requirements of the Contract.
18.3 Without causing delay in the Work, Contractor shall submit samples to the Engineer as specified or required and shall execute the Work in accordance with only such samples as are approved. Where the Specifications require the manufacturer's printed directions for installation, Contractor shall provide such directions with all samples or drawings submitted for approval. Contractor shall prepay transportation charges on all samples forwarded to the En gineer's office for approval.
18.4 Contractor shall not order any items for which samples are required nor shall he make any substitutions in such items until he has received the Engineer's approval, and be shall furnish items equal in every respect to the approved samples.
18.5 Where several items are specified by name for one use, Contractor may select any specified item. Whenever an item or class of material is specified exclusively by brand name, manufacturer's name or catalog reference, only such item shall be used, unless the Engineer's written approval for substitution is secured. Should Contractor desire to substitute another item for the one or more specified, he shall apply in writing to the Engineer for permission, stating his reasons for desiring to make such substitution and describing with particularity the addition or deduction involved.
18.6 No such approval shall relieve Contractor from responsibility for deviations from the requirements of the Con tract or for the proper performance of the Work.
ARTICLE 19.0 CONSTRUCTION ITEMS AND REQUIREMENTS
19.1 Unless otherwise expressly stated in the Contract, Contractor shall provide and pay for all operations, labor, equipment, materials and all things (including, but not limited to, all items, tools, supplies, articles, appurtenances ap-
C 001317
--i on suu run mn om in. i-m
LAM022541
pmtiis machinery, appliances, scaffolding, utilities, services, sanitary facilities, supervision, transportation, incident als and expenses) necessary for the proper performance of the services or construction of the facilities outlined
in the Contract.
192 Unless otherwise expressly stated in the Contract, a'l materials and equipment shall be new and of good work manship and quality. Contractor shall, if required, provide satisfactory evidence as to the kind and quality of the
and equipment he will furnish.
19.3 Unless otherwise expressly stated in the Contract, all materials and equipment shall be applied, installed, con nected, erected, used, cleaned and conditioned as directed by the manufacturer.
19.4 rtm items in the Drawings and Specifications may be noted as being furnished by Monsanto. Contractor, as pan of the Work, shall provide approved storage facilities, unload, provide receipts for and store all materials, equip ment and other items furnished by Monsanto or others for installation or erection by Contractor; if such items are already in storage, Contractor shall take custody of them when directed by the Engineer. Contractor shall check, ac count for, care for and protect such items in the same manner as if such items were to be furnished by him under the Contract.
19.5 As part of the Work, Contractor shall "rough-in", provide pipe or electrical connections and prepare the con struction in every way for all items indicated to be subsequently provided by Monsanto.
19.6 Contractor agrees that Monsanto may receive such material, equipment and other items during the progress of the Work as it sees fit (even though various parts of the Work are not completed) without extra cost to Monsanto. Contractor further agrees to permit the placing of such equipment into operation by Monsanto's employes or repre sentatives, and that such action shall not constitute acceptance of the Work or any part thereof or a waiver of any claims by Monsanto, nor shall it relieve Contractor of any of his responsibilities under the Contract.
ARTICLE 20.0 APPROVAL OF PAYMENTS ACCEPTANCE FINAL PAYMENT 20.1 If Contractor has made application for payment as set forth in the Agreement, the Engineer shall, within the time specified, approve for payment to Contractor such amount as the Engineer decides to be properly due, or give his reasons for withholding approval in accordance with Article 21.0 hereof.
20.2 Should Monsanto fail to pay the sum approved for payment by the Engineer within thirty days of such approval. Contractor, upon prompt request, shall receive, in addition to the sum approved, interest thereon at six percent per annum.
20.3 When Contractor considers the Work fully completed, he shall advise the Engineer in writing and request in spection and acceptance of the Work. Promptly thereafter, the Engineer shall make such inspection. When the Engineer finds the Work to be completed and acceptable, he shall promptly advise Contractor in writing that the Work has been fully completed and is accepted by him on behalf of Monsanto.
20.4 After such written acceptance of the Work, Contractor shall submit an appropriate application for final payment and Monsanto shall then make final payment within thirty days after receipt of such application. Such final payment shall not be due, however, until Contractor has, if requested by Monsanto, submitted evidence satisfactory to Mon santo that all payrolls, materials bills and other indebtedness connected with the Work have been paid.
20.5 If the Work has been substantially completed by Contractor, but full completion thereof is materiallydelayed through no fault of Contractor, Monsanto shall, without terminating Contractor's obligations under the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. Contractor shall make application for such payment, itemised and supported by evidence, as set forth in the Agreement.
20.6 Neither the making of partial payment to Contractor, nor the partial or entireuse or occupancy of the Work by Monsanto, shall constitute an acceptance of the Work or any part thereof.
ARTICLE 21.0 WITHHOLDING OF PAYMENTS TO CONTRACTOR 21.1 Monsanto may withhold payment to Contractor to such extent as may be necessary to protect Monsanto from loss on account of:
21.1.1 Defective work not remedied; 21.1.2 Claims filed or evidence reasonably indicating the probable filing of claims; 21.1.3 The failure of Contractor to either make payments properly to Subcontractors, or for equipment, ma terial or labor, or to provide evidence that such payments have been made; 21.1.4 Damage to another;
m> U W n O 4M In. M
c 001318
LAM022542
21.1.5 Any cost for which Contractor is liable under the Contract; or 21.1.6 A breach by Contractor of any term, condition or provision of the Contract. 21.2 When the grounds for withholding payment are removed, payment of such withheld amounts shall be made.
ARTICLE tM CHANGES IN WORK
22.1 MTM***"*". without invalidating the Contract, may nuke changes in the Drawings or Specifications, issue addi
tional instructions, let separate contracts to others for portions of the Work, designate itself as a supplier of labor,
equipment or materials or require additions to or deduction: from the Work (herein referred to as "changes"); and
the contract price, the contract fee or the maximum cost, if any, shall be adjusted accordingly. The terms, conditions
and provisions of the Contract
apply to all such changes with the same effect as if such changes were a part of
the Contract from the outset, except that any claim for an extension of time caused thereby shall be adjusted at the
time such change is ordered.
22.2 In giving oral instructions, the Engineer shall have authority to make minor changes in the Work not involving extra cost and not inconsistent with the purposes of the Work; but otherwise, except in an emergency endangering life or property, no changes in the Work shall be made except pursuant to a written order from the Engineer and no claim for additional payment or reimbursement shall be valid without such an order.
22.3 If Contractor claims that written instructions from the Engineer, whether by Drawings, Specifications or other wise, involve extra cost under the Contract (when the Work is on a lump-sum,'maximum cost or unit-price basis), he shall give Monsanto written notice of such extra cost within ten days following the receipt of such instructions and, except in an emergency endangering life or property, before proceeding to carry out the instructions. No such claim shall be valid where the aforementioned procedure is not followed by Contractor.
22.4 The value of any such change in the Work (under a lump-sum, maximum cost or unit-price type contract) shall be determined in one or more of the following ways:
22.4.1 By estimate and acceptance in a lump sum; 22.4.2 By unit prices named in the Contract or subsequently agreed upon; 22.4.3 By cost-plus-a-fixed fee;
22.4.4 By cost-plus-a-percentage fee as set forth in the Agreement or as may be subsequently agreed upon.
22.5 When Contractor receives a written order as set forth herein, he shall proceed with the change. When the value is to be determined as set forth in subparagraphs 22.4.2, 22.4.3 or 22.4.4, Contractor shall keep a correct account of all quantities of labor, equipment, materials, etc., and costs therefor, itemized in such form and supported by such evidence as stated in the Agreement, and shall present it to the Engineer who shall approve such amounts as be determines to be due to Contractor.
22.6 Contractor shall promptly, and before such conditions are disturbed, notify the Engineer in writing of: (a) subsurface or latent physical conditions at the site differing materially from those indicated in the Contract, or (b) unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encoun tered and generally recognized as inherent in work of the character provided for in the Contract. The Engineer shall promptly investigate the conditions, and if he finds that such conditions do so materially differ and cause an increase or decrease in Contractor's cost of, or time required for, performance of the Work, an equitable adjustment shall be made and the Contract modified in writing accordingly. No claim of Contractor for adjustment hereunder shall be allowed unless he has given notice as herein required.
ARTICLE 23.0 CORRECTION OF WORK BEFORE FINAL PAYMENT
23.1 Contractor shall promptly remove from the Plant all Work condemned by the Engineer as failing to conform to the Contract. Contractor shall promptly replace and re-execute such condemned Work in accordance with the Con tract and without expense to Monsanto. Contractor shall also bear the expense of making good all work of other con tractors which has been destroyed or damaged by such removal, replacement or re-execution.
23.2 If Contractor does not remove such condemned Work within ten days, or such longer time as may be fixed by written notice from Monsanto to Contractor, Monsanto may remove said Work and may store the material or equip ment at the expense of Contractor. If Contractor does not pay the expenses of such removal and storage within ten days' time thereafter, Monsanto may, upon ten days' prior written notice, sell such materials or equipment at auction
Ownil 0--SWIm . hp U at IT a MS
c 001319
or at private sale; provided, ho...ver, that Monsan'o shall account to Contr.. .or for the net proceeds thereof, after deducting all the costs and expenses that should have been borne by Contractor. In the event that such costs and expenses exceed the proceeds of the auction or private sale, Contractor shall promptly pay such < to Monsanto upon its request.
ARTICLE 4.0 WARRANTY AND GUARANTY
24.1 Contractor warrants that he shall use sound engineering and construction principles and practices in the per formance of the Work and that be shall apply to the Work that degree of skill, care, judgment and supervision neces sary to assure that the Work shall be of the highest quality, with workmanship proper, fit, suitable and sufficient for the purpose contemplated and in accordance with the best trade practices. Contractor further warrants that the Work shall fulfill the terms of all special guaranties established by the Contract and that the Work dull be free from defects due to faulty materials, equipment or workmanship until the expiration of one year from the date of final payment under the Contract or such longer period as may be either provided in the Contract or as may be available to Con tractor without additional cost to Monsanto. In the event that any of the aforesaid warranties are not fulfilled. Contractor guarantees that he shall promptly reimburse Monsanto for its cost in making suitable repairs or replace ments or, at Monsanto's option, promptly make suitable repairs or replacements at his own expense. In either case, Contractor shall also pay for any resulting damage to other property and work occasioned by his breach of any of the aforementioned warranties or guaranties.
24.2 Monsanto's rights under paragraph 24.1 are in addition to and without limitation or waiver of any other rights or remedies, at law or in equity, which it may either have under the Contract or to which it may otherwise be entitled.
ARTICLE 25.0 DEDUCTIONS FOR UNCORRECTED WORK
25.1 If Monsanto deems it inexpedient to correct damaged or defective Work, an equitable deduction from any amounts otherwise due Contractor shall be made therefor.
ARTICLE 6.0 DELAYS AND EXTENSIONS OF TIME
26.1 If, in the opinion of the Engineer, Contractor is delayed at any time in the progress of the Work by any act or neglect of Monsanto, other than such acts as relate to changes in the Work as provided for in Article 22.0 hereof, or by separate contractor employed by Monsanto, then the time of completion shall be extended for such reasonable time as the Engineer may decide and Contractor shall be reimbursed for any direct damages which Contractor can show were incurred as a direct result of such delay.
26.2 No such extension, nor reimbursement for any direct damage, shall be made for delay or damage occurring more than seven days before a claim therefor is made in writing to the Engineer. In the case of a continuing cause of delay, only one claim is necessary.
26.3 If no schedule or agreement is made stating the dates upon which Drawings shall be furnished by Monsanto, then no claim for delay shall be allowed on account of failure to furnish Drawings; provided, however, that if such Drawings have not been furnished within two weeks after a demand therefor, then only such claim as is reasonable for delay in excess of said two weeks shall be allowed.
r
26.4 No delay in performance by either party hereto shall constitute default hereunder or give rise to any claims for damage if, and to the extent, such delay is caused by occurrences beyond the control and without the fault or negli gence of the party affected, including, but not limited to, acts of God or the public enemy, expropriation or confisca tion of facilities, compliance with any order of any governmental authority, acts of war, rebellion or sabotage, fires, floods, explosions, riots, strikes, unusual delay in transportation or unavoidable casualties.
26.5 Thu Article 26-0 does not preclude the recovery of damages for delay occasioned by Contractor's fault or negligence under the Contract.
ARTICLE 7.0 MONSANTO'S RIGHT TO DO WORK
27.1 If, in the opinion of the Engineer, Contractor neglects to prosecute the Work property or fails to perform any term, condition or provision of the Contract, Monsanto, after three days' written notice to Contractor, may, without prejudice to any other available remedy, make good such deficiencies and deduct the cost thereof from payment either then or thereafter due Contractor.
O--OTl IWIWm hd It IT O Mt In. l-m
c 001320
LAM022544
ARTICLE 28.0 MON'SAN. J'S RIGHT TO TERMINATE CONTEXT
28.1 If Contractor should be adjudged bankrupt or insolvent; if he makes a general assignment for the benefit of his creditors; if a trustee or receiver should be appointed on account of his insolvency or for any of his property; if he files a petition to take advantage of any debtors' act or to reorganise under bankruptcy or similar laws; if he persistently or repeatedly refuses or fails (except fat cues for which extension of time is provided) to supply enough properly skilled workmen or proper materials or equipment; if he should fail to make prompt payment to Subcontractors or for labor, material or equipment; if he should persistently disregard statutes, laws, ordinances, codes, rules or regulations; or if he should otherwise be guilty of substantial violation of any term, condition or pro vision of the Contract, then Monsanto, without prejudice to any other right or remedy and after giving the Contractor seven days' written notice, may terminate the Contract, take possession of the premises and all materials, equipment and all else thereon, and finish tLs Work by whatever method Monsanto deems expedient. In the event any of the aforementioned events occur, payment shall be handled in the following manner:
28.1.1 Under a lump-sum or unit-price type contract, Contractor shall not be entitled to receive further pay ment until the Work b finished; if the unpaid balance of the contract price exceeds Monsanto's expense of finishing the Work, including compensation for additional engineering, managerial, administrative and legal ser vices, such excess shall be paid to Contractor; if such Monsanto expenses exceed such unpaid balance, Con tractor shall promptly pay the difference to Monsanto upon it; request.
28.1.2 Under a cost-plus type contract, Contractor shall be paid for the balance of all payments reimbursable to him under the Contract, but no additional payments will be made on account of fee except unpaid installments of fee accrued prior to the month of termination; Monsanto shall also pay to Contractor fair compensation, either by purchase or rental at the election of Monsanto, for any construction equipment retained.
28.2 By giving written notice to Contractor, Monsanto may also at any time terminate the Contract for its con venience even though none of the instances set forth in paragraph 28.1 have occurred and, as part of said notice or within a reasonable time thereafter, may order Contractor to stop the Work, to sell at auction or private sale any unincorpo rated material; or equipment at the site of the Work, and to remove his tools and equipment from said site. In the event Monsanto elects to terminate the Contract for its convenience, payment shall be handled in the following manner.
28.2.1 Under a lump-sum or unit-price type contract, Contractor shall be entitled to receive prompt payment from Monsanto for all costs actually and necessarily incurred by Contractor in performing the Work up to the effective date of the termination notice, less amounts previously paid and less amounts recovered through sale of materials, equipment and all other items not yet incorporated into the Work, plus actual and necessary cancellation penalties for undelivered materials or equipment on order, plus such reasonable fee on the portion of the Work completed as shall be decided by mutual agreement between Monsanto and Contractor; provided, however, that Contractor's fee shall not be less than one percent of the Contract Price or $200.00, whichever b smaller.
28.2.2 Under a cost-plus type contract, Contractor shall be paid for the balance of all payments reimbursable to him under the Contract, plus a fee computed upon the cost of the Work to date at the rate of percentage named in the Contract; or if Contractor's fee is stated as a fixed sum, Monsanto shall pay Contractor such an amount as will increase the payments on account of his fee to a sum which bears the same ratio to the said fixed sum as the cost of the Work at the time of termination bears to a reasonable estimate of the cost of the Work had it been completed: provided, however, that Contractor's fee shall not be less than one percent of the anti cipated job cost or $200.00, whichever b smaller.
In either case under thb paragraph 28.2, Monsanto shall assume and become liable for all contracts, obligations and commitments that Contractor has, in good faith, undertaken or incurred in connection with the Work prior to receiving any notice of termination.
28.3 Contractor shall, as a condition precedent to receiving the payments mentioned in thb Article 28.0, execute and deliver all such papers and take all such steps, including the legal assignment of hb contractual rights, as Mon santo may require for the purpose of fully vesting in it the rights and benefits of Contractor under such contracts, obligations or commitments which Contractor has undertaken or incurred in connection with the Work and which Monsanto b assuming.
28.4 Upon any termination as set forth herein, Monsanto shall be entitled to defer payment to Contractor to the extent of all bona fide claims it or others may have against Contractor arising out of or in connection with the Con-
OM*nl CMlln - hit Ualll SMI |m. 14*
c 001321
LAM022545
tract or the Work until such claims have been settled. No payment shall be due until Contractor has .iihtnittrd evidence satisfactory to the Engineer that ail payrolls, materials bilk and other indebtedness connected with the Work have been paid.
ARTICLE *9.0 INSPECTION - TESTING
29.1 Monsanto and its representatives shall at all times have access to the Work wherever it k in preparation or progress and Contractor shall provide safe and proper facilities for both access and inspection.
29.2 If the Specifications, the Engineer's instructions, or any statutes, laws, ordinances, codes, rules or regulations, or any public authorities require the Work, or any part thereof, to be specially tested or approved, Contractor hn give the Engineer timely notice of its readiness for inspection and, if the inspection b by an authority other than the Engineer, of the date fixed for such inspection; and Contractor shall secure all required certificates of inspection. Inspections by the Engineer shall be made promptly and, where practicable, at the source of supply. If any Work should be covered without the approval or consent of the Engineer, said Work must, if required by the Engineer, be uncovered for examination at Contractor's expense.
29.3 Re-examination of questioned Work may be ordered by the Engineer; and if so ordered, such Work must be uncovered by Contractor. If such Work k found to be in accordance with the Contract, Monsanto shall pay the cost of uncovering, re-examination and replacement. If such Work k found not to be in accordance with the Contract, Contractor shall pay all such costs, unless it k found that the defect in the Work was caused by another contractor separately employed by Monsanto; in which event Monsanto shall pay such costs.
ARTICLE SO.O CLEANING CP
30.1 Contractor shall at all times keep all areas of the Work free from accumulations of waste materials or rubbish; and at the completion of the Work he shall remove all rubbish, took, scaffolding and surplus materials from and about said areas and shall leave the Work "broom-clean" or its equivalent, unless more exactly specified.
30.2 If Contractor at any stage of the Work faik to clean up as required herein, Monsanto may remove the rub bish and charge to Contractor the entire cost or such portion thereof as the Engineer considers proper.
ARTICLE 31.0 CUTTING - PATCHING
31.1 Contractor shall do all cutting, fitting or patching of the Work that may be required to make its several parts come together properly and shall fit such Work to receive or be received by work of other contractors shown upon, or reasonably implied from, the Drawings and Specifications, and he shall patch and repair after the work of other contractors as the Engineer may specify.
31.2 Any cost caused by defective or ill-timed work shall be borne by the party who, in the opinion of the Engineer, is responsible therefor.
31.3 Contractor shall not endanger the Work or the work of any other contractor by cutting or otherwise altering either without the consent of the Engineer.
ARTICLE 32.6 PROTECTION OF WORK, PROPERTY AND PERSONS
32.1 Contractor shall continuously maintain adequate protection of the Work from damage and he shall protect property at the site of the Work and adjacent thereto from injury or loss arising in connection with the Work.
32.2 Contractor shall provide for the safety of all personnel on the Work and others who may be affected thereby; comply with Monsanto's policies, practices and rules for the Plant; comply with Federal, State, county and municipal or local safety laws and building codes to prevent accidents, injury to persons or damage to property; erect and maintain necessary safeguards for protection of workmen and the public; and post danger signs warning against hazards created by construction features such as protruding nails, hod hoists, well holes, elevator hatchways, scaf folding, openings, stairways and falling materiak. Contractor shall protect excavations, trenches and construction from damage from rain water, spring water, ground water, backing up of drains, sewers or any other water, and shall provide such pumps, equipment or enclosures as are needed. Contractor shall construct and maintain necessary temporary drainage and shall pump as necessary to keep the excavation or lowest level of the construction waterfree. Contractor shall remove snow or ice as necessary for the safety of persons and property and for the proper protection of the Work.
oam rraew.il - rii uen o t*
C 001322
LAM022546
32.3 Contractor hli designate a responsible member of bis organisation on the Work to prevent accidents and ii.ii give Monsanto the --t of the man so designated. In the event of any accident, Contractor shall assist the Fji|hiiw b completing Monsanto's Accident Report Form for its Safety Department and shall within thirty days of MU~tl accident, furnish Monsanto with a copy of all othir accident reports.
32.4 In an emergency affecting the safety of life, the Work or adjoining property, Contractor, without special in structions or authorisation from Monsanto, shall act at Ms own discretion to prevent threatened injury or loss. Com pensation claimed by Contractor on account of any emergency work shall be agreed upon promptly by negotiation.
32J Contractor shall remove any Work damaged by his failure to provide proper protection and shall replace the Work so damaged with new Work, all at no cost to Monsanto.
ARTICLE 33.0 PROSECUTION OF THE WORK 33.1 Contractor shall supervise and direct the Work with efficiency and with his best skill and attention. Con tractor shall be solely responsible for construction means, methods, techniques, sequences and procedures end for safety precautions and programs.
33.2 Contractor shall assign key personnel to direct and manage the Work on a continuing basis and shall maintain at the site of the Work the necessary material, construction equipment in good operating condition, skilled workmen and all other things required to properly, safely and expeditiously prosecute the Work to completion.
33.3 Contractor shall keep on the Work during all stages of its progress a competent superintendent and any necessary assistants, all satisfactory to the Engineer. The superintendent shall not be changed except with the con sent of the Engineer, unless the superintendent proves to be unsatisfactory to Contractor or ceases to be in his employ. The superintendent shall be Contractor's representative and shall have authority to act on behalf of Contractor. All directions, notices and instructions given to the superintendent shall be as binding as if given to Contractor.
ARTICLE 34.0 CASH ALLOWANCES
34.1 The Contract Price or Maximum Cost shall include all cash allowances named in the Contract for supplying cer tain materials for the Work, subject to adjustment after final selection by Monsanto with respect to quality and type of materials to be supplied. Any difference between the cash allowances and the actual cost to Contractor of the materials shall be debited or credited, as the case may be. to the account of Monsanto.
34.2 Contractor agrees that the Contract Price or Maximum Cost includes sums for expenses and profit on account of such cash allowances as he deems proper and that no adjustments for expenses and profit shall be made on account of such adjustments of the cash allowances.
ARTICLE 35.0 BONDS
35.1 Contractor, if required by Monsanto at any time during the term of the Contract, shall furnish bonds covering the faithful performance of the Contract and the payment of all obligations arising in connection therewith, said bonds to be in such form and amount as Monsanto prescribes and with sureties which it approves. Under a lump-sum, maxi mum cost or unit-price type contract, if such bonds are required by instructions given prior to the submission of bids, the premiums shall be borne by Contractor; if subsequent thereto, they shall be borne by Monsanto. Each such bond shall contain a provision to the effect that changes in the Work and/or modifications to the Contract shall in no way relieve the surety of its obligations.
ARTICLE 36.0 URNS AND CLAIMS
36.1 No payment under the Contract shall become due and payable until Contractor, if required, has delivered to Monsanto complete releases of all liens and all other claims of whatever nature which have arisen or which could arise as a result of any operations related to the Work or the Contract, or receipts in full in lieu thereof, and if required in either case, an affidavit that so far as Contractor has knowledge or information the releases and receipts include all operations, labor, equipment, materials and all things for which a lien or other claim could be filed or made. Said releases shall be effective as to liens and claims existing as of the date payment is requested. If any Ken or other claim remains unsatisfied after all payments are made. Contractor shall refund to Monsanto all moneys that Monsanto may be compelled to pay in discharging such a Ken or claim, including all costs and reasonable attorneys' fees.
On mil m . mo uwn a m* m. m
c 001323
LAM022547
ARTICLE 37-0 TITLE 1 WORK
37.1 The title to all Work completed or in the course of construction at the site of the Work shall be in Monsanto; and title to all materials, equipment and all other things intended for incorporation into the Work shall pass to Mon santo upon delivery at the Plant. Such passage of title shall not, however, relieve Contractor of any of his obligations under the Contract
ARTICLE n.1 ASSIGNMENT
38.1 Contractor shall not assign the Contract in whole or in part or sublet it as a whole, nor shall Contractor assign any moneys due or to become due to him hereunder, without the prior written consent of Monsanto. Any attempt to so assign or sublet shall be void. Assignment or subletting with such consent shall in no way relieve Contractor of any of his obligations under the Contract.
ARTICLE 39.0 PATENT INFRINGEMENT 39.1 Contractor shall defend all suits or claims for infringement of any patent rights arising out of the Work and shall save Monsanto harmless from loss on account thereof ; provided, however, that:
39.1.1 Monsanto shall be responsible for all such loss when it or the Engineer specifies any particular equip ment, material, the product of a particular manufacturer or a Monsanto process, which is an infringement of a patent; provided, further, however, that if the Contractor has information indicating that any such designated equipment, material, the product of a particular manufacturer or a Monsanto process, or the use thereof, might constitute an infringement of a patent. Contractor shall promptly inform the Engineer in writing and unless Contractor does so inform the Engineer, Contractor shall be responsible for any loss suffered by Monsanto as a result of such omission.
ARTICLE 40.0 WAIVER - MODIFICATION - AMENDMENT 40.1 Except as otherwise specifically provided in the Contract, no waiver, modification or amendment of any term, condition or provision of the Contract shall be valid or of any force or effect unless made in writing, signed by the parties hereto or their duly authorized representatives, and specifying with particularity the nature and extent of such waiver, modification or amendment. No such waiver, modification or amendment shall, in any event, be construed to be a general waiver, abandonment, modification or amendment of any of the terms, conditions or provisions of the Contract, but the same shall be strictly limited and restricted to the extent and occasion specified in such writing.
ARTICLE 41.0 CONFLICTS IN THE CONTRACT 41.1 In the event of conflicts in the Contract, the parts thereof shall take precedence and control in the following order:
41.1.1 Agreement;
41.1.2 General Conditions:
41.1.3 Drawings and Specifications.
Figure dimensions on the Drawings shall govern over scale dimensions, and detail Drawings shall govern over general Drawings.
ARTICLE 42.0 TIME - ENTIRE AGREEMENT CAPTIONS 42.1 All time limits stated in the Contract are of the essence thereof.
42.2 The Contract sets forth the entire agreement between Contractor and Monsanto with respect to the subject matter thereof. All prior negotiations and dealings regarding the subject matter thereof are superseded by and merged into the Contract..
42.3 Captions used in the Agreement and General Conditions are inserted for convenience of reference only and shall not affect the construction of the Article captioned.
ARTICLE 43.9 CONTRACTOR'S STATUS RESPONSIBILITY 43.1 Contractor is and shall remain an independent contractor in the performance of the Work, maintaining com plete control of his workmen and operations. Neither Contractor nor anyone employed or engaged by him shall be come an agent, representative, servant or employe of Monsanto in the performance of the Work or any part thereof.
Owm o--mw - rati uen ow an. i-w
LAM022548
C 001334
43.2 Contractor afreet that ha ia fully responsible to Monsanto for the anon, acts and omissions of his employes, b Subcontractors (and the employsa thereof) and of all persons, firms and corporations (and the employes thereof) directly or indirectly employed or tnpgsii by him or any of his Subcontractors, all as if such errors, acts and omissions seer* his
ARTICLE 44.0
SURVIVAL OF OBLIGATIONS - SUCCESSORS AND ASSIGNS
44.1 The obligations of Contractor and the rights of Monsanto then accrued as trail as those under Article 6.0 of the Cost-Plus Agreement and Articles 2.0, 8.0, 9.0, 12.0, 14.0, 16.0, 20.0, 24.0, 28.0, 36.0, 38.0, 39.0, 43.0, and 44.0 of
General Conditions shall sunrise any termination of the Contract, or the suspension, completion and/or acceptance of the Work or any part thereof, or final payment to Contractor, it being agreed between Contractor and Monsanto that said obligations and rights are and shall be of a continuing nature and effect.
44.2 Contractor and Monsanto for themselees, their successors, executors, administrators and assigns sgree to the full performance of their respective covenants and obligations under the Contract.
ARTICLE 45.0 STOP WORK ORDER 45.1 Monsanto may, at any time, by written order to Contractor, require Contractor to stop all, or any part, of the Work for a period of 90 days after the order is delivered to Contractor, and for any further period to which the parties may agree. Any such order shall be specifically identified as a Stop Work Order issued pursuant to this Article. Upon receipt of such an order. Contractor shall forthwith comply with its terms and take all reasonable steps to mmimi the incurrence of costs allocsble to the Work covered by the order during the period of work stoppage. Within the aforementioned 90 day period of work stoppage, or any extension thereof to which the psrties shall have agreed, Monsanto shall either:
45.1.1 cancel the Stop Woik Order, or
45.1.2 terminate the Work covered by such order pursuant to paragraph 28.2 hereof.
45.2 If a Stop Work Order issued under this Article is canceled or the period of the order or any extension thereof expires. Contractor shall resume the Work.
45.2.1 Under a lump-sum, maximum cost or unit price type contract, an equitable adjustment shall be made in the completion date and/or the Contract Price.
45.2.2 Under a cost-plus type contract, an equitable adjustment shall be made in the completion date and/or Contractor's fixed fee, if any; and in addition. Contractor shall be paid for reimbursable costs as defined in Article 3.0 of the Agreement.
In any case, however, the Contract shall be adjusted and modified in writing accordingly under this Article only if and to the extent that:
45.2.3 the Stop Work Order results in an increase in the time required for, or in Contractor's cost properly allocable to, the performance of the Work, and
45.2.4 Contractor asserts s claim for such adjustment within thirty (30) days after the end of the period of work stoppage.
45.3 If a Stop Work Order is not canceled and the Work covered by such order is terminsted pursuant to paragraph 28.2 hereof, the reasonable costs resulting from the Stop Work Order shall be allowed in arriving at any settlement under said paragraph 28.2.
iTactT saae s.u-ti
c 001325
LAM022549
r\j* 1
ieral ccr:nirrc::s cr the co:.Tt t
umcu. 46.0 PREFABRICATED items
..
46.1 Contractor agrees tc install prefabricated or factory assembled units
and/or materials where specified or supplied by Monsanto.
46.2 Contractor agrees to purchase prefabricated or factory assembled units, materials, and equipment to obtain the best cost/quality alternative.
ARTICLE <7.0 LASOR P.ELATICMS
47.1 Contractor agrees to make every reasonable effort to employ the maximum number of apprentices, or trainees or both, in each craft during the performance of the work, unless specifically, excused by Monsanto.
47.2 Contractor shall exercise his management rights which include, but are not limited to, the right to hire, discharge, promote and transfer employees, to select and remove foremen or other levels of supervision, to establish and enforce reasonable standards of production, to introduce, where feasible, laborsaving equipment and materials, to determine the number of employees required to perform the Work, and to establish, 'maintain and enforce rules and regulations conducive to efficient and productive operations.
47.3 Within two weeks of notice to proceed with the Work, Contractor shall
submit a manpower plan to Monsanto which shall include:
47.3.1 A projection of the manpower required by classification,
on a month-by-month basis until completion of the Work.
47.3.2 A determination of the actual number* of craftsmen and appren
tices available for the Work in the appropriate geographical area
throughout its duration.
LAM022550
Addendum - General Conditions - Lump Sum Contracts 10/74 0S0S82
C 001326
Face laf 2
ADDENDUM f!Q. 1 cemctal cc::dit:c?:s of the ccrrnAcr
47*3.3 A court* of action to *nabl* Contractor to nan th* Work, specially during periods of projected labor shortages. This my include, but need not be United to training prograns, or hiring workmen directly when union referral agreements, if any, fail to provide sufficient manpower.
Addendum - General Conditions - Lump Sum Contracts 10/74
C 001327
0S0S82
Pag* 2 of 3
LAM022551
ADDENDUH NO. 2 TO THE
GENERAL CCr.'DITICNS OF TOE CONTRACT
ARTICLE 48.0 ECUAL OPPORTUNITY 4.l xt is Monsanto's desira that females and parsons of minority classifica tions ba afforded an aqual opportunity with other persons to be part of the workforce associated with Monsanto's capital-projects. Zn the furtherance of this objective. Contractor shall comply with the following listed requireswnts in his performance of this Contract.
e
48.1.1 Contractor will not discriminate against any employe or Applicant for employment because of race, creed, color, religion, sex, or national origin. Contractor will employ applicants and treat employes, during employment, without regard to their race, creed, color, religion, sex, or national origin. This requirement shall apply to, but not be limited to: employment, upgrading, demotion or transfer; layoff or termination; rates of pay or other forms of compensation; and selection for training, including Apprentice ship.
48.1.2 Contractor will, in all solicitations or advertisements for esployes placed by or on behalf of Contractor, state that all qualified applicants will receive consideration for employment without regard to face, creed, color, religion, sex, or national origin or state that Contractor is "An Equal Opportunity toployer".
48.1.3 Contractor shall submit to Monsanto monthly (or periodically upon Monsanto's request) a written report in the form of Attachment 1 hereto setting forth (a) the total number of employes engaged and used
C 001328
LAM022552
1 of 3
by Contractor . his performance of this Con. .ct, end (b) the total number of his female employes end minority employes of each minority Classification engaged and used by Contractor in his performance of this Contract.
48.2 10 the extent consistent with and not in violation of the foregoing pro visions of this Article 48.0 and any applicable law. Contractor (in his perfor mance of the Contract) will make a good-faith effort to:
48.2.1 Seek out females and persons of siinority classifications as applicants for employment; and 48.2.2 Engage and utilize females and persons of minority classifications to the extent reasonably possible.
48.3 In the event of the Contractor's noncompliance with this EQUAL OPPORTUNITY requirement, this Contract may be cancelled, terminated or suspended in whole or in part.
48.4 For purposes of this Article 48.0, the term "minority" shall mean a person who's a member of a siinority classification, and each of the following shall constitute a minority classification: Blacks (not of Hispanic origin), lispanic-Americans, Americans who are Asians or Pacific Islanders, American Indians and Alaskan natives.
ARTICLE 49.0 USE OF MINORITY BUSINESS ENTERPRISES 49.1 It is Honsanto's desire that minority business enterprises shall have the maximum practicable opportunity to participate in the Work. To carry out this desire* Contractor agrees to axtend to known, qualified minority business enter
prises an equitable opportunity to compete for subcontracts and purchase orders
applicable to the work, and in the award of his subcontracts and purchase orders,
to use qualified competitive minority business enterprises to the fullest extent
consistent with efficient performance of the Work.
n( 0013__2_9_ -
Page 2 of 3 LAM022553
49.2 As used in thi Article 49.0, the term "minor, .y business enterprise" means a business, at least 50 percent of which is owned by minority group embers or. in case of publlely owned businesses, at least 51 percent of the stock of which is owned by minority group members. Tor the purpose of this definition, minority group members are Blacks, Spanish-Americans, AmericanCrlentals, American-Indians, Ameriean-Eskimos, and American Aleuts. Contractor My rely on written representations by subcontractors regarding their status as minority business enterprises in lieu of an independent investigation.
ARTICLE SO.O SU3C0?rTRACTS
.50.1 Contractor agrees to furnish Monsanto with a list of all subcontractors prior to awarding the work as stated in Article 11.0-Subcontracts.
ARTICLE S1.0 SPECIAL E?tVIR0?y.MTAL REQUIREMENTS
r\ 51,1 If materials or soil known to be contaminated by hazardous chemicals is excavated, Monsanto will provide instructions for protection against exposure
. and instructions for disposition of excavated material ineluding the hazardous waste disposal site and will be responsible for the material or soil. If, during excavation, material or soil suspected of being contaminated by hazardous Mterials are encountered, the Engineer sha~. be notified. The Engineer shall contact a Plant representative who will determine the nature and extent of contamination, if any, and issue the appropriate instructions for handling the Mterial or soil.
SI.2 Monsanto shall provide environmental monitoring for the work. The results Of such environmental monitoring, such as air sampling, performed by Monsanto during the execution of this Work shall be provided to Contractor.
LAM022554
r\
C 001330
Sage 3 of S
**
f)
OPPORTUNITY
" (Moncn/xcar;
monthly report, contractor minority hiring
CONTRACTOR
-------------------------------- --------- ---------------------
CONSTRUCTION SITE ______________ ____ _____________ ____ _______________________________
PAYROLL PERIOD
' - ................................................................ ...............
.
Wl cmsoaxu
Officials and Kr.inri
Professionals
pacSaieiaaa
S
as Corkers
tftiei and Clerical
Craft Workers (Skilled)
Overall Totals (Sun of Col. thru X)
A
O
s0 --5c --c
0
mo So
0 *1--1
a sc
--
S*
0
e
S
OW
*a. o
C
*115
o
eat e * Ss eeaatt
0
Wo o be
--ee<--wo
e
e
-
a
aaiH
S
XUKBER OF EMPLOYEES
|
C CO me m > um
U El SJ
e cux 0 9 9 z
r
F
' i
-3
--i%aa c-c,>
441 X
S
M
0
Ot
e
FEMALE
o
e ei ; *
*-d2_~9*
o
eat c
u =o 2a "o
s.
*
aX
o
eat d id o
cCO-3
* Co <9
mm Khm
OH
a
c
n
e
aos l 1
eMX <
9
r
i
Operatives (SealSkilled) laborers (Qaskilled) Service Corkers
tOUL
. . . ........ *
....................
1 -
t
e
%
C 001331
LAM022555
zeeioo
f
r. ,v;^
APPENDIXES
'A'-'-Jh. >'*.r. '1
LAM022556 ft
eccioo
h;i swrr^r- o --
*->'? *
vVi-;
i
LAM022557
frEEIOO 0
i: .5-
SUPPLEMENTAL
Revised 10-4-79
SUPPLEMENTARY GENERAL CONDITIONS
'ICLEl. Job Site Location
1.1 Monsanto Corr.par.y, Luling, Louisiana
ARTICLE 2. Shipping Instructions
1
2.1 All contractor supplied material shall be consigned to the Contractor, attention cf his representative, c/o Monsanto Company, The Luling Plant. A]1 deliveries will enter plant through Gate 11.
2.2 Deliveries accepted 8:00A.M. to 3:00 P.M. - Monday through Friday only.
ARTICLE 3. Interferer.ee with Plant Operation
3.1 The Contractor shall confine his activities to the areas set aside for him to do has work and shall net interfere with any cf Monsanto's activities. Unless speci fically authorised by the Engineer, the Contractor's employees are prohibited from entering any plant area except those areas to which they are assigned. Work areas wiil be kept neat and clean at all times; daily cleanup is mandatory.
3.2 Should any disturbance of existing installations be necessary, the Contractor shall so inform the Engineer well in advance of the time contemplated for the disturbance. After a plan acceptable to the Engineer has been formulated, the Contractor shall keep in close contact with the work to see that it is executed in accordance with the agreed procedure. At no time shall this'planning be entrusted to a foreman.
3.3 Due to the necessity of insuring against interruption of the continuous operation of operating plant activities, the Contractor will be required to have a competent responsible supervisor in charge at the site at all hours on which his mechanics cr those cf has subcontractors are employed on the work.
.--'.TITLE 4 , Services by Company
4.1 During the progress of the work, Monsanto, upon written request from the Contractor or his authorized representatives, may furnish at the option of Monsanto, certain services to the Contractor. Services by Monsanto, excepting those specified to be furnished free of charge, will be billed to the Contractor at cost plus thirty-five percent.
RETICLE 5. Monsanto's Eruinment
5.1 Monsanto's equipment will not be loaned to the Contractor's employees, except as authorized by the Engineer.
ARTICLE 6. Cost Recorts
61 The Contractor shall furnish cost reports satisfactory to the Engineer so that the contract costs may be broken ccwn in accordance with Monsanto's Project Control Manual.
Luling
C 001335
LAM022559
Page 2
s u? ? i iz.; ta yco:; d i r r c:;s
:ICLE 7. Telephone
7.1 Telephone service, if desired, must be arranged and paid for by the Contractor, except where prior arrangements with the engineer have been made.
ARTICLE 3. Toilet Facilities
8.1 Job toilet facilities must be provided by the Contractor. These facilities shall be constructed and used in a manner that will not violate any sanitary regulations or cause any inconvenience or nuisance to Monsanto, its representative or employeesThe .type of toilet facilities provided by the Contractor will be subject to the approval of the Engineer. Under r.o condition will plant sanitary facilities be useby contractor personnel.
ARTICLE 9. Change Rooms
9.1 Clothes chancing facilities fcr contractor employees, if required, will be pro vided by the Contractor. Should a trailor, shed, etc., be furnished by the Contractor for this service, it will be located in an area designated by the Engineer.
ARTICLE10. Parking Facilities
.1 Parking space will be available at the plant site in an area designated by the Engineer.
ARTICLE II. Water
11.1 V.'ater. for construction purposes will be available. The Contractor shall supply his own apparatus such as hose, buckets, connections, etc.
ARTICLE 12. Power and Lighting
12.1
Electric light and power will be made available for the Contractor within reasonable demands. The Contractor will be required to provide his own panel board, extension cords, welding receptacles, etc. Connection to the supply will be made by Monsanto-
12.2 All electrical equipment will be properly grounded.
12.3 Electrical characteristics are: a. Power - 440 V - 3 phase - 60 cycles AC - 30 AMP Max. (1 circuit available) b. Lighting - 110 V - Single phase - 60 cycles AC - 20 AMP Max. (1 circuit available)
TCLE 13. Compressed Air 13.1 The Contractor shall be responsible for furnishing his own compressed air.
Luling
C 001336
LAM022560
Page 3
SUPPLEMENTARY CONDITIONS
'.TICLS 14. Temporary Heat and Air Conditioning
14.1
The Contractor shall supply his own temporary heat and air conditioning. The type of equipment to be used must be approved by the Engineer and the use of the equipment must be in accordance with Article 23, "Fire Protection".
ARTICLE 15. Identification Badges
15.1
Each employee of the Contractor working in The Luling Plant will'be required to wear contractor's identification badge. The Contractor will furnish Mon santo with a list of persons employed by him or by his subcontractors and will keep this list current taking particular care to remove from this list the names of those persons r.o longer employed by the Contractor on this work. The Contractor will arrange to have his employees enter and leave the plant only through the gate specified by the Engineer.
ARTICLE 16. Watchman Service
16.1
Watchman will be on the premises and will exercise reasonable care to prevent the loss of the Contractor's materials, however, it is the contractor's responsi bility to take precautions against theft and shall be responsible for all material, tools and equipment, either personally owned or issued by Monsanto.
RTICLE 17. Railroad Clearances
*7.1
When it is necessary to. work adjacent to a switch track, ,care must be taken that equipment and material do not encroach on the clearance area required by law. This is 8'6" on both sides of the track. Overhead clearance is 22'6" above the top of the rail. All equipment and materials must be removed from these clear ances at the end of each work day unless other arrangements have been made ar.d approved by the Engineer. Proper notification must be given to the railroad company. Contractor must get approval from the Engineer before any work or equip ment can be operated on/or near the railroad tracks.
ARTICLE 18. Safety
13.1
All work or operations must conform with established Monsanto practices in order to insure the maximum in safety and fire precautions. Information concerning such practices in each area will be secured from the Engineer.
13.2 18.3
All safety and security-regulations of Monsanto's Luling Plant shall be observed without deviation by all the Contractor's employees. Some of these regulations are listed herein, and the Contractor will be issued a complete copy of The Luling Plant Safety Rules and Requirements prior to the start of any work in the plant.
*
All safety and protective equipment required to meet The Luling Plant safety requirements will be furnished by the,Contractor.
1.4Special emphasis is placed on use and movement of heavy equipment, especially crane type equipment, onto and within The Luling Plant. Without exception, no heavy equipment is to brought onto plant property without prior notification to the Engineer and review of such hazards as electrical power lines, etc.
Lulin<J
C 001337
LAM022561
Page 4
su CNS
.5 All contractors employees shall wear as a minimum, hard hats and safety glasses. (Safety shoes are highly recommended.)
13.6 Lc.ig hair shall be secured under the hard hat to. prevent it getting entangled with any moving or rotating parts.
18.7
VThenever welding or burning must be conducted at high elevations, wherein hot slag or sparks could fall through grating to lower floors, a fire watch with water hose am.c/cr fire extinguisher will be required on each floor through 'which sparks could fall.
i"r"^ i g
i--.r mia"r. l.o
19.1
Construction work is not to be started in any Operating Department without the prior knowledge of and clearance with the Operating Foreman, who must see that the equipment is safe to work c.n. HOME OF .YC.YS ALTO1 S ECYIP.YEYT SHALL BE STABLED OR STIRRED BY CCYCBACTIE1S OR STBCCLTBA.CTCR' S EYBLCYZZ. VALVES IY AMY CBEBATIYI DEBAB.THEYT SHALL BE OPERATED E'.LLYS IVELY BY kCYSAYTO PE.ASOYYEL.
ARTICLE 20. Smoking
20.1
Smoking is prohibited in the plant except in designated posted smoking areas. These specific areas will be designated by the Monsanto Field Engineer. At the discretion of the Contractor, smoking time may be allowed the workmen, but they shall extinguish butts in sand buckets or containers provided before they leave the smoking area.
ARTICLE 21. Aisles and Exits
21.1 Aisles, operations areas, safety showers, fire equipment, alleys, streets and exits must be keot free of obstructions.
ARTICLE 22. Traffic Rules
22.1 The speed limit is 20 MPH. 22.2 Vehicles shall stop at all step signs.
22.3 Vehicle and equipment operators shall.observe all railroad crossings and switch signs .and follow the instructions on them.
22.4 Vehicles shall slow down and sound horn at all blind corners and building entrances.
22.5
Some plant passageways are restricted to the passage of motor vehicles. The Engineer will secure clearance on passages through which Contractor's vehicles may operate.
ARTICLE 23. Fire Protection
23.1 The Contractor shall, in all of his operations, conform to all fire regulations in effect for The Luling Plant. He shall do no burning, welding, grinding or any other flame or spark-producing operation, operate equipment of any kind or
Lulina
C 001038
LAM022562
supple: v"-r
:d:tions
Page 5
VRTICLE 23. Fire Protection
(Cont'd.)
23.1
proceed with any work requiring the use of the inflammable substances (such as gasoline, kerosene, paint thir.ners, or any liquids with closed-up flashpoint below 100 F.) without first securing written permission from the Engineer to perform such operations.
23.2
Should a change in work location from the area designated on the permit be made during the day, a new permit and light-up will be required. Tarpaulins for fire protection curtains, for covering cr isolating equipment, and for other purposes, shall be furnished by the Contractor sr.c shall be made of fire-resistant material
23.3
Should a hazardous condition develop in the area, the Contractor shall, at the request of any .Monsanto employee, stop all cutting, welding, or other sparkprccucir.g activities and shall, whenever possible, assign the mar. affected to ether tasks. The Contractor -will be responsible for the first two hours of any delay. Claims of extra cost entailed by shutdowns of any nature may be allowed after the first two (2) hours of the impending condition and shall be immediately discussed with the Engineers.
ARTICLE 24. Fire
'4.1 The Contractor shall familiarize all personnel working directly or indirectly under him with the following rules to be followed in case of fire:
a. To report a fire - go to any plant telephone, dial Station 333 and give the designation of the building or area in which the fire is located.
b. If the fire alarm (siren) sounds while personnel are driving in the plant, they shall pull over to the side of the road and stop.
c. Visiting at the scene of a fire or accident by personnel other than members of fire cr emergency crews is prohibited.
d. In case cf a fire on the job site for which the fire department is called, all personnel other than the Contractor's Supervisors shall immediately leave the area and assemble at the designated "safe area". The Supervisors shall keep themselves available to assist the fire department if requested by the Engineer.
ARTICLE 25. First Aid
25.1
The treatment and care of injuries sustained by Contractor's employees shall be
and will remain the responsibility of the Contractor. In the event of a serious
injury, an ambulance is available for transporting an injured employee to the hospital and a Registered Nurse is on duty at the Plant Dispensary during the day
on week days. Monsanto shall incur no liability for, and Contractor hereby agrees to indemnify Monsanto against any causes of action, claim; liability, or cost in cluding attorney's fees arising in whole or in part out of furnishing of such First
Aid Facilities to Contractor's employees or out of the failure to furnish such facilities.
25.2 Prior to the initiation of any work in the Plant, the Contractor shall meet with
the Engineer and discuss the proper procedure to use in the event any of the Con
tractor's employees are injured.
Luling
c 001339
LAM022563
supplementary conditions
Page 6
ARTICLE 26. Industrial Hazards
26.1 The Contractor shall acquaint himself with the industrial hazards, if any, to be encountered in each particular area. Information pertaining to such hazards shal be obtained through the Engineer.
ARTICLE 27. Pices
27.1
Process piping and conduit shall never be used either to support an individual worker or to support staging. If it is necessary for a ladder to be leaned against a pipe to accomplish some work- permission of the Engineer shall first be secured.
ARTICLE 28. Miring
23.1
ho-wiring should be cut without consulting the Engineer. Any wire accidentally broken shall be reported immediately to the Engineer or the Plant Maintenance Supervisor.
ARTICLE 29. Equipment
29.1
All scaffolding, ladders, staging, equipment, etc. shall bear the Contractor's identification mark before they are carried into the plant. No gate pass is necessary to bring equipment into the plant. A cate pass will be required when any -scaffolding, ladders, staging, equipment, tools, personal tools, esc. are taken from the plant. The required gate pass may be obtained from Monsanto's Construction Engineer. This must be presented to Monsanto's guard at the entrance.
ARTICLE 30. Safeguards
30.1
Guards must never be removed from machinery whole it is operating. Guards must be replaced before starting machinery. Workmen shall never roach through or around guards on moving machinery.
20.2 All high pressure bottles must be in racks or securely tied in vertical position at all timer.
ARTICLE 31. Goggles, Etc.
31.1 Goggles, gloves, and other body, face, and head protection must be used, as directed by the Engineer, when working on any process lines.
,'RTICLE 32. Danger Tags
32.1
Danger tags must be placed on switches, valves and other controls whenever work i being done on a piece of equipment. Before workin? on electrical equipment, the switch must be thrown and locked, fuses pulled|^||nd a danger tag bearing the
* C 001340
LAF/1022564
Page 7
cc::~ino>:s
jtTICLS 32. Dancer Tags
{Cont'd.)
32.1 worker's name affixed to the switch; on other types of equipment, control valves, clutch levers, etc., must be locked and similarly tagged, h'o fags shall be so placed unless clearance has first been secured from the Engineer.
llir.g
c 001341
LAM022565
LAM022524
S t. Time 0. T.
S t. Time 0 . T.
S t. Time O.T.
S t. Time 0. T.
BY JOB CLASSIFICATION - $ /H r
S t. Time 0 . T.
n--
X ##
fl3
MW
n _
0 08
Dc
H XC
a
Hw
8
H 08 4
8
3
0 nas
% t 15
2
8uuy i? E 3 h
8. % g
*H Cni tOMv OUM Sit*i
&.
n>oo 6m
o
x
9
j
S 8
4i H
s 0,
W
1 X n s
co
i
I 0| 1
C 001301
LAM022525