Document YDEGZJpL6eYKOMrz0jQEG8VB0
?
3CG0
South
ATLANTA. GEORGIA 30341
-1
IPuiNwT""
t EXHIBIT ( //# I
January 25, 1984
W.S. Eikenbercy Director/ Market Service Gold Bond Building Products 2001 Bexford Hoad
Charlotte, N.C. 28211
'
Dear Mr. Eikenberry,
Mould you please give us sere imfonration concerning the contents -
of a National Gypsun Co. product called SPBAY-QUICX? The specs are-
attached.
r
This product was used in the construction of Atlanta Baptist college,
Job #6603, July 15, 1966.
An asbestos. removal ccnpany has taken sairples and has surmised that we may have a significant arount of asbestos in our ceiling finish.
Me need to knew what amount of asbestos, if any, was in this SPBAtfQCJIQC finish.
Me merged with Mercer University/Macon in 1972 and are now Mercer University/ Atlanta.
A protpt response would be appreciated.
Sincerely,
Steven D. Lazenby Director/ Physical Plant
3 i * No. SC-4 one q^crr 0 & R. mixing liq id added per go
Safin Egg'j'r.ell Enamel.
n, and fwo cccts 0 & R Velour
jnfericr Concrete Ceilings: Clean concrete of form oil by using 10% muriatic
acid and wafer solution. Patch voids, airbubblesandminorhoneycsmbanddry-
wa!ljc|nt compound. Raw metal showing in the slab shall be spot painted with '
rust-inhib:?ive arimer. `
9A-3
SCHEDULE OF PAINTING - Continued
'`
Finish coat shall be one spray coat of National Gypsum Co. $gray-Quick perlite aggregate texture finish. Apply this material to cover irregularities . in concrete surface caused by misalignment of form joints. Submit 24" x 24" sample board to the Architect for approval of texture prior to application.
TOUCHING-UP - .
`
At the completion of other branches of the work, all painted work shall be
touched up and restored where damaged or defaced, and the entire work left
free from blemishes.
..
PAINTING OF PIPING AND CONDUIT
'
This specification covers a complete paint job on piping in the mechanical equipment rooms, machine rooms, and other service areas of the building where piping is exposed and a complete paint job on all items of mechanical or electrical equipment not factory finished.
CLEANING
.
The contractor shall clean all paint spots, oil and stains, from floors, woodwork, glass, hardware, etc., and leave the entire project in perfect condition upon completion as far as this work is concerned. He shall be responsible for any damage done to other work under this contract and shall, at his own expense, replace any materials which in the opinion of the Architect have become damaged to such an extent that they cannot be restored to their original condition.