Document YD6qeGod2JKpxwrBbr9B5O4zV
1994 CHLOR-ALKALIII CONSOLIDATED AUDIT
AUDIT RECOMMENDATIONS AND ACTION ELAN DATABASE
'This book is to reside in the Safety Compliance Checklist Files (Old C-9) and to be removed with the Safety & Training Coordinator's approval only."
OO A 046?06 CONFTDFNTTAl
APPENDIX A. SAFETY QUESTIONNAIRE
DIVISION: PLANT/DEPARTMENT: BUILDING: REVIEW DATE/TIME:
SAFETY AUDIT TEAM Safety Superintendent/Director/Engineer: Safety Functional Team Leader: Process S&LP (Audit) Specialist: Technology Center Representative:
Other Audit Team Members:
SAFETY AUDITEES Superintendent/Department Head: Plant/Department Personnel: Major Manager
Page 1
Dow Confidential
DO A 04A?07 OONF T DFNT I Al
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
TABLE OF CONTENTS
APPENDIX A. SAFETY QUESTIONNAIRE
A-1. PROGRAM STRUCTURE AND PLANNING................................................................2
A-2. EMPLOYEE PARTICIPATION........................................................................................4
A-3. CONTRACTOR SAFETY.................................................................................................5
A-4. ACCIDENT/INCIDENT INVESTIGATION AND REPORTING................................ 6
A-5. AUDITS............................................................................................................................... 8
A-6. SAFE WORK PRACTICES.................
10
Safe Work Permits...................................................................................................... 10
Hot Work Permits....................................................................................................... 10
Line and Equipment Opening.................................................................................... 11
Confined Space Entry.................................................................................................12
Lockout and Tagout Procedures................................................................................ 13
Guarding and Interlocking..........................................................................................14
Fall Protection............................................................................................................. 14
A -7. EMERGENCY PLANNING AND MEANS OF EGRESS............................................ 15
A-8. EMPLOYEE TRAINING................................................................................................. 15
A-9. SAFE OPERATION OF MOTOR VEHICLES AND MOTORIZED HANDLING EQUIPMENT...................................................................17
A-10. OFF-THE-JOB SAFETY..................................................................................................18
A-11. PROCESS SAFETY MANAGEMENT LISTS................................................................19
APPENDIX B. EMPLOYEE SURVEY......................................................................................21
APPENDIX C. DOCUMENTATION REVIEW....................................................................... 23
APPENDIX D. FIELD INSPECTION.......................................................................................34
APPENDIX E EMPLOYEE/CONTRACTOR INTERVIEWS............................................... 51
00 A 046208 G0NFTDFNTTAI
Page 2
Dow Confidential
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
Question Identification for a Limited Audit: A = Dow rule or regulation B = Good practice/training
C = Hazard Analysis A-l. PROGRAM STRUCTURE AND PLANNING
B 1. Describe your plant/department safety organization. Include its relationship with the overall organization. (List teams and committees.)
A
Team/
Composition
Committee
Freq. of meetings
OT7L-
Minutes Published
7^
Pre-pub. Agenda
p)
/
Pre-Est Charter
B 2. Does the Superintendent/Department Head show visible support/
involvement for safety (policy, communications, letters to employees,
intervention, MBWA, etc.)?
Yes [*}--No []
If: yes, provide several exxaammppllp. '/wfe /P
,
w
B Are safety expectations defined? hit-t/e
Page 3
Dow Confidential
ed ^
Yes [] No
DO A 046709 OONFTDFNTIAl
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
A 'Are there consequences for non-compliance with safety rules and
procedures?
Yes G^o []
If yes, provide several examples.
ssd UP/> s
B 3. Do the safety committee and/or natural work teams have mission /
statements?
Yes H^No []
If yes, please attach.
A 4. Do employees attend safety meetings on a regular basis? YesiDH^^NNool[]
B Are meetings held at least monthly? B quarterly?
Yes G No H-'"' YesfH^oQ
A Is there documentation of the meeting showing content of the
meeting, name of the instructor, and who attended?
Yes No G
1B B
Is there a mechanism to insure 100% participation or follow-up on sa-fe-ty---m--e--e^tings?Yes[^No[]
Is documentation being kept for 3 years?
Yes ir No []
A 5. Do safety objectives, goals, plans exist in written form for your
plant/department?
Yes No []
B Who developed theOGPs?
SfcfFtSMffr
B How are they measured?
-- Up>A^S drJ
How often is the status reviewed? As/ Mad/A, B
' 77 Mr&s,
B Is your reward/recognition tied to the achievemenit of vyour 0O<GFs? Va- tV'KTrt. n
B 6. Do you use SPIP (Safety Performance Improvement Process) or DSIS (Dow Safety Improvement System) to evaluate your safety program? Yes [if'-flo G
If no, then describe what you are using.
Page 4
Dow Confidential
9/93 hrw/dsj
DO A 046?10 GONFTDFNTTAl
APPENDIX A. SAFETY QUESTIONNAIRE
C 7. Is there a written suggestion system in effect for safety suggestion^?
(jSd&Jp&A Aufti/e
h Yes
[]
C If yes, how are suggestions followed up?
^AcUxJp, //a^
<2^ Mahf /fee*.
B What is the normal response time?
$
B What percent of employees participate in your suggestion program?
JbSfA______ ni- '93
4 us<ue-
44% - <yr/>'<?<-)
B 8. Do you have a safety recognition system?
Yes |*rNo (]
B 9. Do you communicate safety information?
YesfpNo^T
If yes, what methods do you use?
F&rt-cs M. 77S,
Ad 7%. 1
77
1?
A-2. EMPLOYEE PARTICIPATION
Reference: "Dow Minimum Requirements", and OSHA 1910.119 (C)
A 1. Do you have a process to assure that each individual clearly understands his/her responsibility for safety (new employee orientation, safety meetings, annual one-on-one performance reviews, etc.)? Yes0^No[]
B 2. Are annual personal safety goals required for employees? Yes H^No []
A 3. Have employees been informed of their responsibility to report hazards and injuries to their immediate supervisor in a timely manper? Yes OKNo []
A 4. Do employees participate in plant/department safety programs or activities as outlined in List 2 on page 19 of this questionnaire? Yes BKNo []
Page 5
Dow Confidential
9/93 hrw/dsj
00 A 046211 OONFTDFNTIAl
APPENDIX A. SAFETY QUESTIONNAIRE
A. Are employees consulted with on conducting and developing process hazard analyzes such as outlined in List 1 page 19 of this questionnaire? 2 Sr % Y
11
B. Are employees consulted with on the development of other PSM
Elements as outlined in List 3 on page 20 of this questionnaire? Yesfl^oH
A-3. CONTRACTOR SAFETY
REFERENCE: "Dow Guidelines for a Contractor Safety and Loss Prevention Program" and OSHA 1910.119(H)
A 1. Are contractors given plant specific safety orientation covering known potential for fire, explosion, or toxic release hazards? Yes H^No []
B 2. Do contractor supervisors attend and conduct contractor safety ,
investigations?
Yes a NoO
B Does a Dow representative attend also?
Yes [fUo []
B Are contractor incidents documented and tracked
to completion?
Yes sH5o[]
A 3. Is contractor safety performance audited during jobs in
your plant?
Yes 0'/No [J
B If yes, how is it audited?,
_/ fin
f&rc> c
A 4. Are pre-job safety meetings held prior to on-site contractor
^
activity?
Yes ft^No []
Page 6
Dow Confidential
DO A 04671? CONFTDFNTTAl
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
B 5. Do "service" contractors (i.e., computer, telephone, copier, air
conditioning, etc.) receive safety training''
/ Yes [] No [if
*7sO^eWty-^Si^ibc^l,rri^on*an3^roc^sf/^fe^rges stiar^wfth lafAfec' ted
A 6.
contractors?
Yes H^5o [J
7. Are contract employees informed of the plant/department
,
emergency plan?
Yes [tjyNo [J
A 8. Do you assure that contract maintenance people are adequately
trained?
Yes W'-No (]
A 9. Are contract employees provided access to plant
process hazard analysis on request?
uYes
A 10. When selecting contractors do you obtain and evaluate Yes information regarding that contractors safety performance and programs? (site). aCjs
[]
A 11. Do you maintain a contractor injury/illness log related Yes [] No
to work covered by the PSM standard? tAoA (
#/oc_ U
A-4. ACCIDENT/INCIDENT INVESTIGATION AND REPORTING
REFERENCES: "Dow Guidelines for Accident Investigation" and "Dow Guidelines for S/LP/S Reporting", Division Safety Standard and OSHA 1910.119 (M)
Accidents and incidents involving or having significant potential for causing personal injury, property damage or loss, business interruption and all crimes or fraud against the Company shall be promptly investigated. Each incident shall be thoroughly analyzed and a corrective action plan implemented. Appropriate communications shall be made to Management and to all involved parties.
Page 7
Dow Confidential
DO A 046013 CONFTDFNTTAl.
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
Type Incident
DAWCs RWCs RMTCs
Total OSHA record ables
OSHA Incident Rate
Total Injuries (first aid included)
Near-Misses - PSA Others (Define) Spills & Leaks Process Safety Incidents Env. Incidents Motor Vehicle
199__
Dow Contractor
|
199__
Dow Contractor
199__YTD
Dow Contractor
1
i
i |
\
j
j
I
jt||j
i
A 1. Do you have a notification procedure for accidents or incidents within
your facility?
Yes n No []
A 2. Do you have a process for investigating accidents/incidents?
Yes 0"No []
B Who participates? ttlnJ S-ZO!T
A Are contractor employees included in the investigation team if the
incident involved the work of the contractor?
Yes fT^o[]
Page 8
Dow Confidential
DO A coDF T
A
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
B
Does yoi -------- ' ' '
-------------- ice link analysis0
A *Are all incident investigations initiated within 48 hours following
the incident?
YYeessHffi'SNo []
A 3. Is there a system in place to assure completion of correct* within the specified recommended time?
B *What is the percent completion of corrective actions by the commit
date?
%
A 4. Are incident findings and corrective actions communicated to affected
workers via an incident investigation report?
Yes [f []
A Are communications documented?
Yes 0^No []
B 5. Do you encourage the reporting of near-miss type incidents? Yes 0<tfo []
A-5. AUDITS
REFERENCE: "Dow Guidelines for Safety, Loss Prevention and Security Audits", "North American Consolidated Audit Process" and OSHA 1910.119 (O)
C 1. Are internal audits or inspections conducted (sight glasses, expansion joints, housekeeping, guarding, mock OSHA, emergency signals, eye showers, etc.) ?
B If yes, who conducts audits?
OrJtZ _ / S
^
Page 9
Dow Confidential
DO A 046?;K CONFTDFNTIAI
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
A 2. Do you have a process in place to assure compliance with Safety
Standards and Minimum Requirements (TX - SR #14, LA - ,C9,
MI - S-005)?
,
Yes []
If ves, please describe,
^66/^0,
(L~ *9
A Are there any exceptions/variances? B If yes, please descirbe.
Yes H^No [1
A 3. Has your plant had an audit for compliance with Process Safety
Management (PSM) Standards in the last 3 years? (Consolidated^
Audit)
Yes DKwot]
Date of last Consolidated Audit:
A 4. Are audit findings documented? A Are corrective actions accomplished?
Yes (TNo [] Yes [rtfo []
A Are corrective actions documented? A Are corrective actions communicated?
Yes [^Ho U Yes [ifo []
B 5. Is management informed of appropriate audit findings? Yes
[]
Do programs exists for inspecting the following:
B The use of quick opening valves on "end of the line service"? Yes [] No
B Open ended lines capped and plugged?
Yes [] No tf-"''
B Cross connections between utility lines (i.e., N2 to air)? Yes [] No
B Cross connections between process and service or utility lines
(i.e., service water and caustic)?
a
Yes [] No B-~--
Pag 10
(J Dow Confidential
9/93hrw/dsj
DO A 04A71A OONPTDFNTT Al
APPENDIX A. SAFETY QUESTIONNAIRE
B Backflow preventers tested and maintained? Field hazard identification?
Yes [] No Yes [4-No [J
A-6, SAFE WORK PRACTICES
Safe Work Permits
REFERENCE: "US. Area Standard #4"
A 1. Are safe work permits used for all jobs in the process area? Yes ^No []
B If no, please explain. CjJ A.
XV /
mf r Is.
A 2. Are on-site inspections done for each permit? B If no, please explain. :
Yes B^Nof]
A 3. Is training provided for the use of safe work permits? Yes
[1
B 4. Do you monitor safe work permits for accuracy and completeness?^ Yes [f'No [1
A 5. Are annual performance audits conducted?
B Ho% are deviations handled?. Pjh -ZT" fp(LM ou+JU
Yes [J No [] / AsP/ 7*~
'
Page 11
Dow Confidential
00 A 046717 OONFTDFNTTAl
9/93 hrw/dsi
APPENDIX A. SAFETY QUESTIONNAIRE
Hot Work Permits
REFERENCE: "U.S. Area Standard #4", OSHA 1910.119 (K) and OSHA 1910.252(A)
A 1. Do you have a plant procedure for hot work?
_________B Who can perform hot work in the plant? (2?jja /1
Yes [jKNo []
1 _0 AJr~.
A 2. Are hot work permits issued for all hot work operations in or neartbe
process?
Yes H
A 3. Is authorization of hot work preceeded by site inspection and
designation of appropriate precautions?
Yes H'rlo 11
B Who can authorize hot work?
B What training is necessary? 0,
A 4. Are areas requiring a hot work permit identified?
Yes [`Tfio []
A Has management established areas and procedures for safe welding
and cutting based on fire potential? .. .
Yes0^No[]
(Ui/j
B 5. Are employees trained to identify sources of ignition? Yes [^No []
B 6. Do you require a fire watch on all hot work jobs?
Yes [] No
A Have fire watch personnel completed fire extinguisher training? Yes fiTNo []
B 7. Do you have a procedure for hot work if the fire protection system is
down? y
B 8. Do you have procedures and training for powder activate*! devices
(Hilti guns, etc.)?
Yes [] No
Page 12
Dow Confidential
DO A 046718 CONFIDENT! A1
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
B 9. Are permits retained until completion of hot work operations? Yes TNo [J
B 10. Are permits audited on a regular basis?
Yes
Line and Equipment Opening
B 1. Have you categorized your line openings and addressed the minimum
protective equipment for each?
Yes [^No []
B 2. Are line opening tie points initialed by operations and maintenanpe'T Yes ff No []
B 3. For routine line openings, do written procedures exist in lieu of
writing permits.
Yes [] No f
B 4. Is training provided on line and equipment opening?
Yes erf^h
Is training documented? ^
k
,,
Yes n No [1
Confined Space Entry
REFERENCE: "U.S. Area "Standard #5" and 29CFR 1910.146
A 1. Do you have a plant procedure for confined space entry? Yes 0"No (]
B 2. Who can authorize a confined entry permit? 40
A -What training is required to authorize a permit?
7* fa F ti fa,
A Do you have documentation of training?
Yes tp-Nol]
A 3. Is basic and plant training given to employees who use the
,
explosimeter/oxygen analyzer?
Yes tJ^Ko []
Page 13
Dow Confidential
DO A 046019 OONFTDFNTTAI
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
A Do confined space rescue procedures exist iunwritten form for
designated confined spaces?*
Yes [] No
B Are employees trained in rescue techniques?
Yes [] No
A 5. Are there any variances to the confined space standard? Yes ['f'No [] If yes, please describe.
,v t
.
A 6. Is training provided for safety observers? A 7. Are annual performance audits conducted? B *How are deviations handled?
Yes rfiS [] Yes [] No 0-'"'''
A 8. Are permits retained one year after completion of job? Yes GK^o []
A 9. Are permits posted ai entrances are they made available Yes Hr^oi)
to entrants?
fi-Tf.
&v
Lockout and Tagout Procedures
REFERENCE: "U.S. Area Standard #3" and 29CFR 1910.147
C 1. Are there any areas where the concept of exclusive control is used? Yes [] NofT
B If yes, please describe them.
A 2. Are plant employees trained and is the training documented? Yes [rtfo []
A Is the training documented?
Yes [f^o []
00 A 046770 OONFTDFNTTAl.
Page 14
Dow Confidential
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
B 3. W o is responsible for locking and tagging equipment? f____ ____________________
'fed^S'
A 4. Are annual performance audits conducted? B *How are deviations handled?
Yes[] No [t"-
A 5. Are there any variances to this standard? If yes, what steps were taken?
Yes 0 NoH
B 6. Is there a central location for communication of lockout/tagout? Yes tK No []
B 7. Have there been any incidents due to improper lockout/tagout?
Yes [} ,
B If yes, please describe. > t\Apfigj)gp-
\fi^/i/g(gJbUJ
A 8. Do you have lockout/tagout procedures for all major pieces of
equipment?
Yes [^No []
A *Are they kept up to date?
Yes H'-'No []
Page 15
Dow Confidential
00 A 04b??! CONFTDFNTTAl
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
Guarding and Interlocking
REFERENCE: Dow "Minimum Requirements"
A f, l.Dp you have a program inplace to assure that all guairds are replaced befltore ec Zr fio Q
B 2. Do interlocks play an imporrtant role in proct--ecting employees?
.
Yes [] No
Fall Protection
REFERENCE: U.S. Area Standard #6
A 1. Have employees been trained in fall prevention equipment use? Yes B"Non
A 2. Have you identified areas where fall prevention is necessary and
required?
Yes [iJ^No []
A 3. Are there any variances to this Standard.
If yes, please describe.
HI
Yes [] NoH
A 4. Do you have a policy regarding roof access?
gs up HeF-
A 5. Are annualperformance audits conducted?
B
How are deviations handled?
AvVt1
7
Yes [] No Yes [] No
A-7. EMERGENCY PLANNING AND MEANS OF EGRESS
REFERENCE: "Dow Guidelines for Emergency Planning", OSHA 1910.119 (N)
A 1. Do you have a plant/department emergency plan?
Yes tfkNcTn
B -Does the plan include in-place sheltering?
Yes KK$oH
Page 16
Dow Confidential
9/93 hrw/dsj
00 A 04h97? OONFTDFNTTAl
APPENDIX A. SAFETY QUESTIONNAIRE
A 2. Are plant/department emergency plan drills conducted?
B Have local emergency crews participated in drills? (See page on fire
fighting in Loss Prevention section.)
Yes [] No
B Does each employee participate in at least one hypothetical
emergency each year?
Yes [\--No f)
A *Are deficiencies corrected and communicated?
Yes [] No
A #Are changes made and communicated?
Yes[] No
A 3. Do new employees receive emergency plan information? Yes 0^No []
B 4. Is the emergency plan information communicated to visitors? Yes H^No []
B 5. Are there at least two ways out from all process areas? Yes 0--Ffo []
A 6. Do exit doors open in the direction of travel from more hazardous to
less hazardous areas?
Yes [f'No f]
A 7. Are bump bars provided on exit doors for areas which could have^-
more than 50 people?
Yes H^No []
A-8. EMPLOYEE TRAINING
Reference: "Dow USA. Operating Training Standard", OSHA 1910.119 (G)
A 1. Is training provided for supervision involved with hazardous chemicals?
Yes [iT No [J
A 2. Is training provided for maintenance staff involved with hazardous chemicals?
A 3. Is training provided for operating personnel involved with hazardous chemicals?
Page 17
Dow Confidential
9/93 hrw/dsj
DO A 046??3 DONFTDFNTTA!
APPENDIX A. SAFETY QUESTIONNAIRE
A Initial ?
Yes
A Refresher ?
A Do you have a list of skills and knowledge required for each
operating job?
Yes f No[l
Does training for operating personnel include:
B -Use of check-off lists? B -Supervisory involvement?
Yes H^'NoJJ Yes [tKtfoT]
B -Experienced operator involvement?
Yes [I
B -Written testing? A -Up-to-date operating procedures?
Yes ftyo [] Yes fl^Np []
A -Emergency procedures? A -Reactive chemicals training?
Yes YesfK^oJ]
A -Safety Standards?
Yes H^fio []
A -Step for each operating phase?
Yes []
Initial startup, normal operations, temporary operations,
emergency shutdown, emergency operations, normal shutdown,
and startup following a turnaround or emergency shutdown
A -Operating limits?
Yes n-"No []
A Consequences of deviations and steps required to avoid 0TM8 deviations.
A -Safety and health considerations?
Yes [t"TJo []
A Properties and hazards of chemicals used and precautions for
preventing exposure.
Yes y-"No []
A -Safety systems and their functions?
A
A 4. B
Is there Written certification in lieu of documentation for employee-"'
involved in operation the process before 5/26/92?
Yes []
Is refresher training given? If yes, how often?
Yes PKtfST]
Page 18
Dow Confidential
9/93 hrw/dsj no A OONFTDFNTTAl
APPENDIX A. SAFETY QUESTIONNAIRE
A Have the employees operating the process been
consulted?
Yes \^No []
A 5. Do you have a post-training evaluation for new employees?
7Yes [r^n
A 6. Do temporary employees receive training?
Yes No []
A 7. Are plant superintendents and technical employees new to a plant
trained in details of the process?
Yes fcp'No []
A 8. For PSM initial training include: Overview of process and operating procedures. Specific safety and health hazards. Emergency operations including shutdown. Safe work practices applicable to job task. ,, .. .
A 9 Is there a record documenting traioning for PSM?
Yes
A-9. SAFE OPERATION OF MOTOR VEHICLES AND MOTORIZED HANDLING EQUIPMENT
B 1. Is driver's training provided?
Yes [] No []
A 2. Is powered industrial truck training conducted?
Yes H'-'No []
B What; types of powered industrial trucks do you use?
____ 2___L,
...
/JoB Where is fuel stored?
A 3. Is documentation of training kept?
phuA 4. Is Daily Inspection documentation maintaliined?
A If yes is it current (daily)?
YesfF^U
Yes [] No Yes [] NofcJ^
Page 19
Dow Confidential
9/93 hrw/dsj
DO A CONFTDFNTTAL
APPENDIX A. SAFETY QUESTIONNAIRE
A 5. Are employees trained in the plant rules and regulations? Yes ft'-'No []
B 6. Is truck tractor training provided?
Yes []
B Do you have vehicles which require the operator to have a
commercial driver's license?
Yes [] No
B If yes, please describe. ________ ___________________________________
B 7. Do you use manlifts, baskets or beam extenders on your fork truck? Yes [] No
B Have you considered the reduced capacity of the unit when using
these items?
Yes [] No
A-10. OFF-THE-JOB SAFETY
B 1. Is there a formal program for reporting of off-the-job injuries to Dpw
personnel?
Yes H^No []
B 2. Are the results of Dow employee off-the-job injuries collected and^
published for learning value?
Yes [^No []
B 3. Are off-the-job statistics and learning situations utilized in plant safety
meetings or discussions?
Yes KKNo []
B 4. Are off-the-job programs made available to employees' families s
(e.g., defensive driving)? ,
Yes P^No []
B 5. Are safety communications mailed to employees' homes?
Yes [] No
B 6.
Page 20
Are off-the-job, home activity topics, etc., covered in safety meetings?
List some of your most successful "off-the-job" oriented safety
meeting topics.
Yes ffwo []
*2<,*^2,
`7'A^ s
CL+^ 5>--v
, / Dow Confidential
9/93 hrw/dsi
n A 046??6 ^onfidfnttai
APPENDIX A. SAFETY QUESTIONNAIRE
A ll. PROCESS SAFETY MANAGEMENT LISTS
LIST 1
*Fire and Explosion Index and Risk Analysis *Chemical Exposure Index and Risk Analysis Reactive Chemical Reviews and Risk Analysis Project Reviews (Safety, Health, Environmental, and Loss
Prevention Reviews) Technology Center Reviews Insurance Inspections (Dow and Outside) Consolidated Audit Questionnaire ---' Process Hazard Analysis Section Process Control Reviews (MOD Computer Reviews)-""
HAZO'OP Warehouse Risk Analysis Other Qualitative and Quantitative Risk Assessments
LIST 2
Safety Committees Safety Advisory Group
Safety Meetings ^ Consolidated Audti Participation ""
Project Review "" Pre-Start up Audits Incident Investigation Hazard Identification/Safety Suggestion Emergency Drills Safe Work Procedures^ Management Of Change Process Hazard Analysis (Reactive Chemical Review, F&EI, CEI)
Page 21
Dow Confidential
00 A 046?07 CONFTDFNT TAl,
9/93 hrw/dsj
APPENDIX A. SAFETY QUESTIONNAIRE
A-11. PROCESS SAFETY MANAGEMENT LISTS
LIST 3
(c) Employee Participation' /
(d) Process Safety Information '
(e) Process Hazard Analysis
(0 Operating Procedures J
(g) Training t ,
/
(h) Contractors ^
/
(i) Pre-start Safety Review
(j) Mechanical Integrity / /
J(k) Hot Work Pennit J
(l) Management of Change (m) Incident Investigation7
/
(n) Emergency Planning and Response J
(o) Compliance Audit
(P) Trade Secrets
Page 22
Dow Confidential
DO A OONF IDF NTT A1
9/93 hrw/dsj
lad caustic i
1994 CONSOLIDATED AUDIT ACTION STEPS
RECOMMENDATION OCCUPATIONAL HEALTH AUDIT Clean refrigerator.in control room and microwave in 1 warehouse 2 Label degreaser vat and post MSDS 3 Unlabeled 5 gallon conlainef at degreaser 4 Unlabeled containers in oil slorage Add lab and supply chemicals 1o hazard chemical list in 5 Hazcom Manual 6 Review Planl Hearing Prolection program
7 Cleaning supplies needed at respirator cleaning station 8 Conduct a respirator effectiveness inspection
9 Maintain hood certification in old lab
RESPONSIBILITY
Lemelte/Spears Boudreaux Boudreaux Boudreaux Douglas
Douglas Boudreaux
Sumly
Boudreaux
10 Repair leak on sandblaslrng cabinet
11 Welding rod conlainer have no hazard warning label 12 Vacuum ledge under gasket storage area
REACTIVE CHEMICAL AUDIT 13 Survey user plants
HAZARDOUS MATERIALS TRANSPORTATION REVIEW (HMTR) 14 Loader wilhin 25* of the truck (In the Procedure)
15 No "Caution Signs" at TC rack entrance 16 Grease "Chick-san* swivel joints
Boudreaux
Boudreaux Boudreaux
Harrison
Butler Yelverlon Yelverlon
17 Spill containment at Tank Car Loading area
Heins
ELECTRICAL
LOSS PREVENTION
IB Electrical Emphasis group recommendations
19 MCC upgrade
Evaluate upgrade of smoke detector syslem in MCC in 20
conlrol room CRITICAL INSTRUMENTS
Heins Heins Goudreaux
ECD
ACD
Action Taken
Reason for Overdue?
2/24/94 2/24/94 2/24/94 3/1/94
4/30/94
4/30/94 |
2/23/94 2/24/94 2/24/94 4X/S4
4/4/94
5/16/94
4/10/94 6/1/94
6/1/94
4/1/94 6/1/94
3/15/95
6/1/94
6/1/94 5/1/94
7/1/94
S/30/94 4/5/94
Refrigerator and microwave were cleaned Done as stated. Done as stated. Done as stated.
Done as stated. Program reviewed. Done as stated. Done as stated. Laboratory hood certification will be maintained only if the hood is put back in service.
Done as stated.
Done as stated. Done as stated.
N/A
N/A N/A More time needed than alotted to complete task.
N/A
More time needed than alotted to complete task.
N/A
N/A
More time needed than alotted 1o complete task.
Submitted as a routine maintenance work request. Due to maintenance backlog, action item not completed by ECD.
N/A
6/1/94
6/1/94
Done as staled.
N/A
S/1/94 S/1/94 2/18/94
199S-96
5/31/94 6/13/94 2/18/94
6/1/94
Done as slaled.
Done as slated. Done as slated.
More time needed than alotted 1o complete task. Signs look longer to make than anticipated. N/A
No action wilt be taken in the foreseeable future. No mandatory environmental requirements exist. WeVe been able to historicatly manage spill potential via operating discipline. This has no economic driver.
N/A
1995-96 1995-96 12/31/94
11/27/96 11/27/96 9/22/94
Duplicate recommendation. See Electrical Reliability Audit section below. Duplicate recommendation. See Efectricat Reliability Audit section below. Smoke delectors nol added. This is a risk management tssue.
N/A N/A N/A
94audaet.xls
Pg* 1
no A n4^?29 CONFTnFNTTAI
1/21/97 10: to AM
LAD CAUSTIC 1 1994 CONSOLIDATED AUDIT ACTION STEPS
RECOMMENDATION
21 Review "Fail Safe* plant valves and ESVs
STORAGE TANKS 22 Review tank overflow and vent lines
PRESSURE VESSELS / RELIEF DEVICES
23 PSV design and documentation records
FIRE PROTECTION Develop a plan for each group for a worst cast fire 24 scenario PROJECT PREVIEWS Pre-starl up action steps to be documented, closed and 25 verified ELECTRICAL RELIABILITY AUDIT
26 No 1 hour fire barrier in conlrol room MCC's
RESPONStBILITY Pankow
ECO 6/1/94
Butler
5/31/94
Pankow
12/31/94
Boudreaux
6/30/94
Boudreaux / Sumly
On going
Heins / Pankow
3/31/97
27 South MCC does not have 24" min. clearance
Heins / Pankow
28 Doors do not have panic hardware and some open inward
Pankow
29 No smoke detectors in switch gear
Boudreaux
3/31/97 61/95 12/31/94
30 Square "0* switch gear does not meet design
Heins/Pa nkow
31 SEOLD* needs updated and to be posted 32 Train block electrical personnel on cable tray requirements
Boudreaux / Fair Boudreaux t Fair
1995-96
7/1/94 7/1/94
33 Add grounding conductors to cable trays
34 Have Meter & Relay verify ground grid on a recommended schedule SAFETY AUDIT
35 Develop plan to improve completion on USCR's 36 Inspect cross ties on utility lines 1o process lines
Conduct audits of safe work permits, confined space entry 37
and LOfTO
38 Develop LO/TO procedures for major pieces of equipment
Heins / Fair
r
Boudreaux / Fair
Sumly Spears / lemelle
Sumly
Spears / Morgan
39 Upgrade documentation of drills and follow up action steps
Boudreau*
9/1/94
9/1/94
3/31/94 3/31/94 7/31/94 12/31/94 4/31/94
ACD 9/1/95
4/29/94
Action Taken
Reason for Overdue?
Some of the automatic valves were reviewed and
documented. We will update as needed per the More time needed than alotted to
MOC process.
complete task.
Done as staled.
N/A
3/16/95
Responsibility for updating relief design calculations/documentalion was assumed by plant engineering and completed as required by Division goals.
Ownership of action Kern transferred to Engineering department. ECD no longer valid.
6/17/94
Developed/conducted drills on this scenario and pcformed one drill per shift on the worst case fire N/A scenario.
On going
Handled through Ihe MOC process - at a level 6
per Operating Discipline
N/A
6/1/95 9/22/94
11/27/96 4/22/94 9/28/94
3/16/95
8/1/94
3/29/94 2/22/94 10/31/94 6/1/95 4/4/94
Re-evafuale options during next electrical reliability audH.
Need 1o evaluate real risk. Did nol gel to problem solution and cost phase.
Cannot physically alter the wall without great expense. Re-evaluate options via next electrical reliability audit.
All doors adjusted to open outward. No panic hardware installed (not required).
Duplicate recommendation. See Electrical Section under Loss Prevention for action taken (#20).
Spent extra time trying 1o determine alternate plan. A new MCC could not be justified. N/A
N/A
Could not justify the cost of this replacement at N/A the time. Plartwill take responsibility for timing.
Done as stated.
N/A
Done as stated.
More time needed than alotted 1o complete task.
Most of Ihe conductors installed. Impacf on electrical reliability/safety was minimal.
Submitted as a routine maintenance work request. Due to maintenance backlog, action Hem not completed by ECO.
Done as slated. Schedule in place and managed N/A
by the Electrical function.
Improvement plan in place. Done as slated. Implemented BBS audit program.
Done for major unit operations/equipmenl.
N/A N/A Waiting on division audit forms to be doveloped.
N/A
Drill documentation sheets developed
N/A
94sudact.xls
Page 2
DO A 046330 CONFTDENTTAl
1/21/97 10:t0AM
LAD CAUSTIC 1 1994 CONSOLIDATED AUDIT ACTION STEPS
RECOMMENDATION 40 Upgrade documentation of pre-startup reviews
RESPONSIBILITY Sumly
41 Upgrade C-9 inspection deficiencies documentation 42 Modify safety meeling documentation sheet
Sumly Boudreaux
43 Assure training documentation is property completed.
Boudreaux
FIELD INSPECTION #1 44 Place covers on panels behind the board. 45 Housekeeping problem in conference room
46 Repair emergency light by O.P office (has burned out bulb)
47 Pul tool rest al or above centerline on grinder 48 Ensure protective equip, is available for grinder 49 Communicate not to sharpen soft materials on grinder
wheel
50 Post inslruction/warning signs on threading machine
51 Ensure protective equip, is available for drill press
52 Post instructionAvaming signs on horiz. band saw
Communicate need for store harnesses and lanyards 53
property Evaluate flammable and oxygen storage area for 20* 54 separation
55 Replace bulb on exit sigh north door of maintenance shop
56 Review improper/proper use of manlift baskels FIELD INSPECTION #2
57 Install "Contad Loader Before Entering" signs on T/C rack
Jefferson Boudreaux Boudreaux Boudreaux Boudreaux Boudreaux
Boudreaux Boudreaux Boudreaux
Boudreaux
Boudreaux
Boudreaux Boudreaux
Yetverton
58 Paint Tank Car rack
Butter
59 Replace broken glass on analyzer house
60 Audit all permanent ladders for gales and chains 61 Install gates and chains on permanent ladders as needed 62 Repair hole in steps near T-26 63 Remove ladder #15 from service 64 Communicate 1o the need to wear hearing prot. with
impact wrenches
65 Ground the drums in oil slorage area
Boudreaux
Sumly Sumly Butter Boudreaux Boudreaux
Boudreaux
94 *ud ftct.xls
ECO 7/1/94 9/30/94 3/31/94 4/30/94
3/31/94 4/15/94 6/1/94 5/1/94 5/1/94 5/1/94 5/1/94 5/1/94 5/1/94 5/1/94 5/1/94 5/1/94 5/1/94
6/1/94
12/31/94
ACD 7/22/94
7/31/94 3/15/94 12/31/94
3/31/94 3/31/94 5/30/94 4/16/94 4/31/94 4/8/94 6/14/94 3/31/94 6/14&4 4/8/94 4/1/94 5/1/94 5/1/94
6/13/94
12/10/96
4/30/94
3/31/94 7/1/94 9/1/94 2/28/94 4/30/94
5/1/94
7/20/94
3/31/94 7/1/94 5/20/94 2/10/94 6/30/94
5/25/94
Pag* 3
Action Taken Using S&LP form and following MOC process.
Done as slated. Done as slated. Done as slated.
Reason for Overdue? More time needed lhan slotted to complete task.
N/A N/A Waited unlil year-end to confirm atl training needing documentation was complete.
Done as staled. Done as staled. Done as stated Done as stated. Done as staled. Done as stated.
Signs installed. Done as stated. Signs installed.
Communication made.
N/A N/A
N/A
N/A N/A
N/A
Signs delivery took longer than anticipated. N/A Signs delivery took longer than anticipated.
N/A
Evaluation complete and acceptable.
N/A
Bulb replaced. Done as staled.
N/A N/A
Signs installed.
Signs delivery took longer lhan anlici paled.
Painlrng in 1996 deferred due 1o other significant, Painting in 1996 deferred due to other
significant, unexpected maintenance
unexpected maintenance costs. Will paint if
maintenance % available in 1997.
costs. Will paint if maintenance $
available in 1997.
Done as slated. Done as stated.
Submitted as a routine maintenance work request. Due 1o maintenance backlog, action item not completed by ECD.
N/A
Done as stated.
N/A
Done as stated. Done as slated. Done as slated.
Done as slated.
N/A N/A More time needed than a lotted to complete task.
Submitted as a routine maintenance work request. Due 1o maintenance backlog, action Hem not completed by ECD.
do a 04f03i OONFTDFNT T AL
1/21/97 10:10 AM
RECOMMENDATION
66 Verify grounding of flammable storage cabinet by lab
FIELD INSPECTION #2 67 Label load limits on beam and hoists m planl 68 Improve house keeping in lank car loading area
LAD CAUSTIC 1 1994 CONSOLIDATED AUDIT ACTION STEPS
RESPONSIBILITY Boudreaux
ECD 5/1/94
ACD
Action Taken
5/30/94
Done as staled.
Harrison Spears/Lemelle
6/1/94 on-Qoinq
5/31/96 On going
Done as staled.
Reason for Overdue? Submitted as a routine maintenance work request. Due 1o maintenance backlog, action item not completed by ECO.
N/A
B4ud*ctrxls
P-0* 4
no. no/vp-
1/21/97 10:10 AM
DOW U.S. AREA CONSOLIDATED AUDIT PROGRAM
CHLOR-ALKALIII PLANT
.F
Date of Report:
January 26, 1995
Superintendent:
Gretchen LeBlanc, Bldg. 3601
cc: Monty Heins, Bldg. 3601, LAD Roddey Peebles, Bldg. 1601, LAD Chris Messelt, Bldg. 3502W, LAD John Gallamore, B-101, Freeport, TX
Buck Bailey, Bldg. 3301W, LAD Terry Leigh, Bldg. 1601, LAD Bill Cook, A-1230, Freeport, TX
Enclosed are the recommendations from the various audits for your response. According to the Dow U.S. Area Consolidated Audit Program Guidelines and the OSHA Process Safety Management (PSM) standard 1910.119, you must develop an implementation plan as a response to the recommendations. The plan must include the name(s) of the employee(s) assigned to each action item along with an expected completion date for each item. Your plan must be reviewed and approved by the area Major Manager by March 15, 1995.
Please note that efforts have been made by the Functional Audit Teams to help prioritize each recommendation. They will be identified as: M = Must Do, (based on compliance issues, government regulations, Dow policies or S&LP) and HR = Highly Recommended, (necessary to mitigate an anticipated or potential hazard).
It is the responsibility of the plant/department supervision to communicate the results of the consolidated audit to all employees. Communication must include the results of the Process Hazard Analysis. PHA's include the Reactive Chemicals, Chemical Exposure Index (CEI), Process Safety and Loss Prevention/Fire/Burner Management audit and the Employee Survey Results. This must be completed within 90 days after the audit and documented.
Please send your approved implementation plans to Connie Kalencki, Bldg. 3502W by March 29, 1995. We will forward a copy to members of the Core Audit Team and the appropriate section to the Functional Team Leaders.
Enclosed Audit Recommendations:
1. Occupational Health Audit 2. Laboratory Audit 3. Electrical Reliability Audit 4. Reactive Chemical Audit 5. Security Audit 6. Hazardous Materials Transportation Audit 7. Loss Prevention/Fire Audit
M = Must-Do
DOW CONFIDENTIAL
Page 1
QO A OAft?--5 C.ONFTDFNTT Al
HR = Highly Recommended
8. Safety Audit
Howard Wilkinson, Administrator LAD Consolidated Audit Program
M = Must-Do
DOW CONFIDENTIAL Page 2
DO A 046334 CONF I OF NT t Al
HR = Highly Recommended
1994 CA II Consolidated Air " Summary
Project No. RC-01
Action Item Description Develop chemical compatability chart
RC-02
Review E-205/D-227 reactive chemical issues
RC-03
Chlorine Expansion Pot Concerns
RC-04
C-205 Booster Compressor Issues
RC-05
Review Titanium Storage Policy
RC-06
CFC Reactive Chemical Review Documentation
RC-07
Review positive ID test for H2S04
RC-08
Review electricai heating tracing system on CI2 lines
RC-09
Nitrogen Compound Analysis For Brine
RC-10
Update Reactive Chemicals Documentation for Bicarb reaction
RC-11
Investigate/address MDEA contamination potential in raw brine
RC-12
Define Reactive Chemicals training levels
RC-13
Taffy Pot NCI3 analysis
RC-14
Liquid CI2 pump EBV protection
RC-15
Add S02 liberation reactions to Reactive Chem Packet
Person Responsible Heins, Monty Haun, Elaine Harrison, Jeff Harrison, Jeff Gravouilla, Rocky LeBlanc, Gretchen Harrison, Jeff Fair, Leonard Caldwell, Steve Harrison, Jeff Caldwell, Steve Landry, Donnie Haun, Elaine Mellieon, Harold Harrison, Jeff
Page 1
Expected Comp. Date 8/31/96 3/31/96 4/1/95 12/31/95 04/15/96 5/31/95 12/15/94 6/15/95 05/31/95 12/20/94 05/31/95 8/1/96 05/31/95 12/31/95 12/15/95
Actual Comp. Date 8/14/96 3/6/96 3/27/95 12/31/94 9/30/95 10/31/94 12/9/94 10/8/95 11/18/94 1/5/95 3/1/96 12/31/95 7/29/96 12/20/95
1/9/95
Status complete complete complete complete complete complete complete complete complete complete complete complete complete complete complete
OO A 046235 C ONFTDFNTTAL
1994 CAII Consolidated Au ' Summary
Project No. RC-16
Action Item Description Policy for Extinguishing a C/E trap hydrogen fire
RC-17
Review oil/insulation fire potential in GT area
RC-18
Hydrogen Collection Area Issues
RC-19
Reactive Chemicals test data for absorbents
RC-20
Update plants approved leak repair sealants list
RC-21
Review procedures for lubricants and cleaning agents
RC-22
Review lubricants and cleaning agents for Power area
RC-23
Review T-201 startup procedures
RC-24
Address user plant backflow potential in caustic lines
RC-25
Review maint procedures for caustic service cleaning agents
RC-26
Centralized location for Reactive Chem Hazard Eval data
MISC-01
Communicate results of consolidated audit
r
OH-01
Lab does not have ownership
OH-02
Work procedures need evaluation in pump seal room
OH-03
Corroded safety can in oil storage area
Person Responsible Pittman, Ed Kolder, Roy Haun, Elaine Douglas, Charles Heins, Monty Campbell, Floyd Kolder, Roy Mellieon, Harold Harrison, Jeff Campbell, Floyd Heins, Monty Heins, Monty Lively, Bill Campbell, Floyd Douglas, Charles
Page 2
Expected Comp. Date 7/15/96 5/15/96 12/31/96 1/31/95 05/31/95 05/31/95 3/31/96 2/28/95 12/31/94 ; 6/1/96 3/31/95 12/31/95 05/31/95 3/31/95 12/31/94
Actual Comp. Date 1/23/96 3/31/96 10/30/96 1/31/95 8/31/95 5/30/95 3/29/96 2/15/95 6/1/94 4/15/95 2/15/95
10/31/95 5/1/95 3/28/95 12/20/94
Status complete complete complete complete complete complete complete complete complete complete complete complete complete complete complete
DO A CONFTDFNTTAL
1994 CAII Consolidated Au ' Summary
Project No. OH-04
Action Item Description Need to examine structural integrity of oil storage drum rack
OH-05
Cell rodding cabinet needs new door sign
OH-06
Labeling deficiencies need to be addressed
OH-07
Review hazard chemical list
OH-08
Communicate results of exposure monitoring
OH-09
Flammable containers not in flammable cabinet
OH-10
MSDS sheets need updating
OH-11
Grinder needs hearing protection sign
OH-12
Breathing air mask in control room needs secondary plastic bag
OH-13
Breathing air masks on shop floor
OH-14
Respirator training documentation records need to be dated
OH-15
Acid suits found in plant
OH-16
Need to move heavy valves from top shelves
OH-17
Need to replace static pressure operating parameter tape
OH-18
Sandblasting cabinet needs repairs
Person Responsible Heins, Monty Armstrong, Steve Douglas, Charles Douglas, Charles Douglas, Charles Spears, Tony Douglas, Charles Campbell, Floyd Douglas, Charles Douglas, Charles Douglas, Charles Lively, Bill Campbell, Floyd Douglas, Charles Campbell, Floyd
Expected Comp. Date 12/31/94 01/31/95 12/31/94 06/30/95 06/30/95 05/31/95 06/30/95 3/31/95 06/30/95 12/31/94 12/31/94 06/15/95 05/31/95 06/30/95 09/30/95
Actual Comp. Date
12/15/94
Status complete
1/15/95
complete
12/20/94
complete
4/30/95
complete
8/31/95
complete
3/7/95
complete
3/15/96
complete
3/28/95
complete
6/30/95
complete
12/31/94
complete
12/20/94
complete
6/15/95
complete
5/1/95
complete
4/28/95
complete
4/19/95
complete
D0 A 04A237
1994 CA II Consolidated Aik* Summary
Project No. OH-19
Action Item Description Need to remove welding warning signs for cadmium
OH-20
Update the asbestos inventory
OH-21
Bags of ACM waste not property sealed
OH-22
Needs to wash down dried asbestos on pulp trailer
OH-23
Need to bag material in asbestos waste drum
OH-24
Need to store asbestos gaskets in designated area
OH-25
Need to update inventory to include sludge acidification process
OH-26
Need to replace deteriorated radiation label
LAB-01
Need mercury spill procedure
LAB-02
Need to register chlorine sample cylinder
LAB-03
Need housekeeping inspections
ELEC-01
Motors not properly identified
ELEC-02
Need to add smoke detectors
ELEC-03
Equipment stored in required clearance zone
ELEC-04
Identify and remove abandoned conduit
Person Responsible Campbell, Floyd Douglas, Charles Douglas, Charles Armstrong, Steve Armstrong, Steve Douglas, Charles Douglas, Charles Douglas, Charles Caldwell, Steve Breaux, Kevin Myer, Edie Fair, Leonard Heins, Monty Fair, Leonard Heins, Monty
Page 4
Expected Comp. Date 05/30/95 09/30/95 12/31/94 12/31/94 12/31/94 12/31/94 12/31/94 12/31/94 07/31/95 07/31/95 07/31/95 06/30/95 06/30/96 06/30/95 09/30/95
Actual Comp. Date 5/18/95 12/31/95 12/20/94 12/20/94 12/20/94 12/20/94 12/20/94 12/31/94 9/18/95 7/23/95 7/31/95 8/15/95 4/30/96 6/10/95 1/15/95
Status complete complete complete complete complete complete complete complete complete complete complete complete complete complete complete
00 A 04fc?38 OONFTDFNTTAL
1994 CA II Consolidated Aik" Summary
Project No. ELEC-05
Action Item Description SEOLO's posted are not current
ELEC-06
Conduits not grounded at cabie tray
DFA-01
All lines and valves need to be identified
DFA-02
Display caution signs
0 FA-03
Need to recommend safety procedure for sodium bisulfite
DFA-04
Hydrogen transfer hoses be put into Pressure Vessel Program
DFA-05
Emergency block valves be installed on hydrogen system
D FA-06
Need to conduct hydrogen trailer inspection
DFA-07
Need training for personnel off-loading hazardous materials
DFA-08
When off-loading must be attended by qualified person
LP-01
Need update of office area air intake procedure
LP-02
Inspect and correct interior fire wall design
LP-03
Wooden hot box not acceptable
LP-04
Need to review electrical area classifications plot plan drawings
LP-05
Need to review fire extinguisher distribution and type
Person Responsible Fair, Leonard Fair, Leonard Spears, Tony Mellieon, Harold MelNeon, Harold Kolder, Roy Kolder, Roy Kolder, Roy Landry, Donnie Douglas, Charles Landry, Donnie Kolder, Roy Beck, Mike Fair, Leonard Landry, Donnie
Expected Comp, Date 06/30/95 12/31/95 07/31/95 07/31/95 06/30/95 6/30/96 08/15/95 03/30/96 12/31/94 06/30/95 12/31/94 12/31/96 5/1/96 07/31/95 8/1/96
Actual Comp. Date 6/30/95 1/15/95 4/15/95 7/31/95 3/28/96 6/15/96 11/15/95 3/18/96 12/20/94 3/15/96 12/31/94 7/26/96 4/15/96 6/30/95 6/30/95
Status complete complete complete complete compiete complete complete complete complete complete complete complete complete compiete complete
00 A 04>?39 CONFIDENTIAL
1994 CA II Consolidated AuC Summary
Project No LP-06
Action Item Description Review the critical instruments list
LP-07
Determine ioop tests
LP-08
Review the hydrogen area for EBV's
LP-09
Vendor supplied vessels need to meet pressure vessel program
LP-10
Need to include recommendations of MOC audit
LP-11
Project reviews need to be documented
LP-12
Inspect liquid chlorine line
LP-13
Conduct risk assessment study
SAF-01
Develop a department safety policy statement
SAF-02
Conduct annual performance audits
SAF-03
Identify deviations from standard
SAF-04
Supervisors read the answers to questions with no opinions
SAF-05
Have all employees set personal safety goals
SAF-06
Review emergency drills
SAF-07
AH employees need to participate in annual emergency drills
Person Responsible Long. Keith Heins, Monty Kolder, Roy Kolder, Roy Landry, Donnie Heins, Monty Haun, Elaine Haun, Elaine LeBlanc, Gretchen Landry, Donnie Landry, Donnie Heins, Monty Heins, Monty Landry, Donnie Landry, Donnie
Page 6
Expected Comp. Date 8/30/96 3/1/97 07/31/95 07/31/96 12/31/94 06/30/95 05/01/95 12/31/96 12/05/94 12/31/94 6/01/96 06/30/95 05/15/95 3/31/96 12/31/95
Actual Comp. Date
8/15/96
Status complete
12/1/96
complete
12/31/94
complete
3/31/96
complete
12/31/94
complete
12/31/94
complete
5/1/95
complete
9/19/96
complete
12/5/94
complete
12/31/94
complete
12/31/95
complete
12/31/94
complete
3/15/95
complete
2/15/96
complete
12/31/95
complete
00 A 046,040 l.nNFTDFNTTAI.
1994 CA II Consolidated Aik" Summary
Project No. SAF-08
Action Item Description PHA's to be reviewed with employees
SAF-09
Inform employees of rights under OSHA Star Program
SAF-10
Drill results must be critiqued
SAF-11
Update department emergency plan
SAF-12
Keep up-to-date completion dates on incidents
SAF-13
Keep up-to-date completion dates on safety suggestions
SAF-14
Perform checks on C-9 checklist
SAF-15
Document deficiencies during C-9 inspections
SAF-16
Update indoctrination video
SAF-17
Enter required info on training documentation
SAF-18
Covers left off panefs
SAF-19
Housekeeping needs in training room and printer room
SAF-20
Improper use of pedestal grinder
SAF-21
Pipe threading machine needs larger signs
SAF-22
Drill press needs signs
Person Responsible Heins, Monty Landry, Donnie Landry, Donnie Landry, Donnie Landry, Donnie Landry, Donnie Landry, Donnie Landry, Donnie Douglas, Charles Landry, Donnie Beck, Mike Landry, Donnie Campbell, Floyd Campbell, Floyd Campbell, Floyd
Page 7
Expected Comp. Date 11/1/95 04/30/96 12/31/95 12/31/94 8/1/96 8/1/96 12/31/95 8/1/96 8/31/96 8/1/96 12/31/94 06/30/96 05/31/95 06/30/95 06/30/95
Actual Comp. Date
10/31/95
Status complete
4/30/96
complete
12/31/95
complete
12/31/94
complete
8/1/96
complete
8/1/96
complete
12/20/95
complete
11/4/96
complete
8/19/96
complete
8/1/96
complete
12/31/94
complete
4/30/96
complete
5/1/95
complete
3/28/95
complete
3/28/95
complete
DO A 046241 r.ONFTDFNTTAl
1994 CAII Consolidated Au '4 Summary
Project No. SAF-23
Action Item Description Need shield around welding and cutting area
SAF-24
Eyewashes with no covers
SAF-25
Old eyewashes not capable of using covers
SAF-26
Safety showers dripping with algae underneath
SAF-27
Lots of safety showers leaking
SAF-28
Fire extinguisher stations not labeled.
SAF-29
Utility stations not color coded
SAF-30
Nitrogen station by P-301 has no backboard
SAF-31
MP-306-B guard needs to be replaced
SAF-32
Modified coupling guards on some pumps
SAF-33
Heat tracing exposed next to D-320 & D-317
SAF-34
Lots of unplugged quick opening valves in area
SAF-35
Fire extinguisher not properly hung
SAF-36
Fire extinguisher station not numbered
SAF-37
Need to discard wooden ladder
Person Responsible Campbell, Floyd Spears, Tony Lively, Bill Moniotte, Bobby Kolder, Roy Spears, Tony Kolder, Roy Kolder, Roy Lemelie, Rick Lemelle, Rick Moniotte, Bobby Lively, Bill Spears, Tony Lively, Bill Spears, Tony
Page 8
Expected Comp. Date 05/31/95 03/31/95 03/31/95 11/30/95 06/30/95 06/30/95 06/30/95 06/30/95 10/31/95 ' 08/31/96 11/30/95 05/31/95 06/30/95 06/30/95 05/31/95
Actual Comp. Date
3/28/95
Status complete
3/31/95
complete
3/31/95
complete
11/30/95
complete
12/31/94
complete
3/30/95
complete
12/30/94
complete
12/30/94
complete
10/10/95
complete
8/19/96
complete
11/30/95
* complete
5/30/95
complete
3/15/95
complete
11/1/95
complete
1/19/95
complete
00 A 04674;
CONF rDFNTTAI
1994 CA II Consolidated Air" Summary
Project No. SAF-38
Action Item Description Feet missing on step (adder
SAF-39
Handrail needs to be replaced
SAF-40
No cover in 110V outlet
SAF-41
Drainage sumps filled with dirt
SAF-42
Safety shower needs painting
SAF-43
Grating and hand rails need painting
SAF-44
Demo area needs housekeeping
SAF-45
MCC-106 needs housekeeping attention.
SAF-46
CTW basin drain line corroded through
SAF-47
Low level piping with head injury hazard
SAF-48
Trolley at cooling tower in bad shape
SAF-49
No handrails to platform
SAF-50
P-350 D&C with no MCC label
SAF-51
Stepladder with feet missing
SAF-52
Uneven water flow to eyewash nozzles
Person Responsible Lively, Bill Lemelle, Rick Lemeile, Rick Kolder, Roy Lemelle, Rick Lemelle, Rick Tedeschi, Steve Lively, Bill Kolder, Roy Kolder, Roy Kolder, Roy Moniotte, Bobby Fair, Leonard Spears, Tony Lively, Bill
Page 9
Expected Comp. Date 05/31/95 06/30/95 10/31/95 06/30/96 10/31/95 10/31/95 12/31/94 05/31/95 07/31/95 06/30/96 06/30/96 11/30/95 07/1/95 05/31/95 03/31/95
Actual Comp. Date
5/1/95
Status complete
6/30/95
complete
9/29/95
complete
6/15/96
complete
10/10/95
complete
10/10/95
complete
12/31/94
complete
5/1/95
complete
3/31/95
complete
6/15/96
complete
6/15/96
complete
10/15/95
complete
6/25/95
complete
1/19/95
complete
3/31/95
complete
no a 04a;m.i CONFTDFNTTAi
1994 CA II Consolidated AiC Summary
Project No. SAF-53
Action item Description No labe! for circuit for P-357-B
SAF-54
No ladder gate going up to platform
SAF-55
Cylinders tied with rope
SAF-56
Un labeled containers found throughout plant
SAF-57
Safety shower eyewash with one cap missing
SAF-58
Maul with taped handle
SAF-59
Homemade tools found
SAF-60
Fiberglass buildings full of fittings and wire
SAF-61
Fire extinguisher with expired sticker
SAF-62
Fire extinguisher has expired sticker and broken bracket
SAF-63
Millwright area discrepancies
SAF-64
Welding area tool cabinet discrepancies
SAF-65
Acetylene cart without T-handle
SAF-66
D-803 area needs housekeeping
SAF-67
Close handle broken off flammable storage cabinet
Person Responsible Fair, Leonard Landry, Donnie Mellieon, Harold Lively, Bill Spears, Tony Campbell, Floyd Campbell, Floyd Fair, Leonard Lively, Bill Gravouilla, Rocky Campbell, Floyd Campbell, Floyd Campbell, Floyd Spears, Tony Lively, Bill
Page 10
Expected Comp, Date 05/31/95 8/1/96 05/31/95 12/31/95 03/31/95 05/31/95 05/31/95 05/31/95 05/31/95 05/31/95 06/30/95 05/31/95 05/31/95 05/31/95 06/30/95
Actual Comp. Date 5/31/95 7/1/96 5/31/95 11/1/95 3/31/95 2/1/95 2/10/95 3/28/95 3/15/95 3/31/95
5/1/95 3/31/95 3/28/96 1/19/95 6/5/95
Status complete complete complete complete complete complete complete complete complete complete complete complete complete complete complete
DO A 04ft?44 CONFIDENTIAL
1994 CA II Consolidated AuA Summary
Project No. SAF-68
Action Item Description DAK pack full of water
SAF-69
Flammable storage cabinet needs housekeeping
SAF-70
Entry requirements not posted on shack
SAF-71
Utility station not labeled
SAF-72
Platform by taffy pot needs housekeeping
SAF-73
Air station west of taffy pot not labeled
SAF-74
Area around taffy pots needs housekeeping
SAF-75
Air utility needs labeling
SAF-76
T-205 deck needs housekeeping
SAF-77
Escape pack has yellow reading
SAF-78
New compressor foundation area needs housekeeping
SAF-79
Utility station needs labeling
SAF-80
Ftousekeeping needs inside D-228 dike area
SAF-81
Housekeeping needs around TC-201
SAF-82
Red light on oxygen monitor is lit.
Person Responsible Spears, Tony Lively, Bill Landry, Donnie Kolder, Roy Spears, Tony Kolder, Roy Spears, Tony Kolder, Roy Spears, Tony Lively, Bill Spears, Tony Kolder, Roy Spears, Tony Lively, Bill Neyland, Wayne
Page 11
Expected Comp. Date
05/31/95
Actual Comp. Da
2/22/95
Status complete
06/30/95
5/15/95
complete
06/30/95
6/1/95
complete
06/30/95
12/30/94
complete
05/31/95
1/20/95
complete
03/29/96
3/28/96
complete
05/31/95
1/20/95
complete
03/29/96
3/28/96
complete
05/31/95
1/20/95
complete
05/31/95
5/15/95
complete
05/31/95
1/20/95
complete
06/30/95
12/31/94
complete
05/31/95
1/20/95
complete
05/31/95
5/15/95
complete
05/31/95
4/30/95
complete
D0 ^ conf^>fNT1A
1994 CA II Consolidated AiC Summary
Project No. SAF-83
Action Item Description Hazardous waste under D-208
SAF-84
Caps not on eyewashes
SAF-85
Compressed gas cylinder secured with cloth straps
SAF-86
Liquefaction area has tripping hazards
SAF-87
Nitrogen station not labeled
SAF-88
Fire extinguishers sitting on ground
SAF-89
Area full of old eyewashes without covers
SAF-90
Unlabefed containers in oil storage area
SAF-91
Oil storage area needs housekeeping
SAF-92
Check chain security on block valves
SAF-93
Escape pack needs replacing
SAF-94
Oxygen sensor not working inside IH #12
SAF-95
No meter light indication IH #10 & 11
SAF-96
Nitrogen station on E-526 deck not labeled
SAF-97
E-526, D-511 area needs housekeeping
Person Responsible Lively, Bil! Lively, Bill Neyland, Wayne Lively, Bill Kolder, Roy Lively, Bill Lively, Bill Spears, Tony Lively, Bill Spears, Tony Lively, Bill Neyland, Wayne Neyland, Wayne Kolder, Roy Lively, Bill
Page 12
Expected Comp. Date
05/31/95
Actual Comp. Date
5/15/95
Status complete
03/31/95
3/31/95
complete
05/31/95
5/25/96
complete
05/31/95
5/15/95
complete
06/30/95
12/31/94
complete
05/31/95
5/15/95
complete
03/31/95
3/31/95
complete
05/31/95
1/25/95
complete
05/31/95
5/15/95
complete
05/31/95
2/3/95
complete
05/31/95
5/15/95
complete
05/31/95
4/30/95
complete
05/31/95
4/30/95
complete
03/29/96
3/28/96
complete
05/31/95
5/15/95
complete
HO A 04fc7>4fc CONFIDENTIAL
1994 CA II Consolidated Au Summary
Project No. SAF-98
Action Item Description Ground wire off skid
SAF-99
Area around C02 skid needs housekeeping
SAF-100
Quick opening valves not plugged
SAF-101
Quick opening valves not plugged
SAF-102
Label skirt for vessel entry required
SAF-103
Need ladder gate on platform
SAF-104
Fire extinguisher sitting on ground
SAF-105
Utility stations not labeled
SAF-106
Hoses strung out on deck walkway
SAF-107
Algae causing slipping hazard
SAF-108
Hoses on ground
SAF-109
Algae at stairway entrance
SAF-110
Hoses and rope on deck
SAF-111
Gas cylinder tied with rope
SAF-112
Escape packs condition not good
Person Responsible Fair, Leonard Spears, Tony Lively, Bill Spears, Tony Landry, Donnie Mellieon, Harold Spears, Tony Kolder, Roy Lively, Bill Kolder, Roy Spears, Tony Lively, Bill Lively, Bill Neyland, Wayne Landry, Donnie
Page 13
Expected Comp. Date 7/31/95 05/31/95 05/31/95 05/31/95 4/30/96 06/30/95 05/31/95 06/30/95 05/31/95 06/30/95 . 05/31/95 05/31/95 05/31/95 05/31/95 8/1/96
Actual Comp. Date
6/30/95
Status complete
3/15/95
complete
5/15/95
complete
1/26/95
complete
4/30/96
complete
5/1/95
complete
2/8/95
complete
12/30/94
complete
5/15/95
complete
3/9/95
complete
2/4/95
complete
5/15/95
complete
5/15/95
complete
4/30/95
complete
8/1/96
complete
DO A 046?47 OONF TDFNTT AL
1994 CA II Consolidated Au ' Summary
Project No. SAF-113
Action item Description Platform gates are not closing
LP-09
Vendor supplied vessels need to meet pressure vessel program
SAF-15
Update indoctrination video
Person Responsible Landry, Donnie
Mellieon, Harold
Landry, Donnie
Expected Comp. Date 07/31/95
07/31/95
8/31/96
Actual Comp. Date 6/15/95
6/30/96
8/19/96
Status complete
complete complete
/
Page !4
DO A 046048 OONFTDFNTTAi