Applied Occupational and Environmental Hygiene Volume 17(1): 55-62,2002 Copyright 2002 Applied Industrial Hygiene 1047-322X/02 $12.00 + .00
Fiber Release During the Removal of Asbestos-Containing Gaskets: A Work Practice Simulation
William E. Longo, William B. Egeland, Richard L. Hatfield, and Larry R. Newton
Materials Analytical Services, Inc., Suwanee, Georgia
Work practice studies were conducted involving the removal of asbestos-containing sheet gaskets from steam flanges. These studies were performed to determine potential exposure levels to individuals who have worked with these types of materials in the past and may still work with these products today. The work practices were conducted inside an exposure characterization laboratory (ECL) and were performed by scraping and wire brush ing, chrysotile-containing (65% to 85%) sheet gaskets from a number of used steam flanges. Airborne asbestos. levels were measured by phase contrast microscopy (PCM) and transmission electron microscopy (TEM) for the person nel and area air samples collected during the study. These workplace simulations showed substantial asbestos fiber re lease using scraping, hand wire brushing, and power wire brushing techniques during the gasket removal process. The range of concentration was 2.1 to 31.0 fibcrs/cc greater than 5 micrometers when measured by PCM. These results con trasted with the few reported results in the published liter ature where lower airborne asbestos levels were reported. In these studies the airborne asbestos fiber levels measured In many of the samples exceeded all current and histori cal Occupational Safety and Health Administration (OSHA) excursion limits (15-30 minutes) and some previous per missible exposure limits (PEL) based on eight-hour timeweighted average (TWA) standards. Also, individuals who performed this type of work in the past may have had expo sures higher than previously suspected. The results demon strated that employees who remove dry asbestos-containing gaskets with no localized ventilation should wear a full face supplied air respirator with a HEPA escape canister and the work area should be designated a regulated area.
Keywords Asbestos, Gasket, Removal, Exposure
Asbestos-containing sheet gaskets have been used in almost every type of industry for the last 60 years. These gaskets had
the ability to prevent leakage between different types of cou
plings, particularly at elevated temperature and pressure.*1) These
types of gaskets normally contained 70 percent to 80 percent
chrysotile asbestos by weight. In some cases crocidolite asbestos
was used for special applications, that is, sealing flanges in acid
lines. The remaining non-asbestos component of the gasket was
usually constructed of synthetic rubber material that consisted
of either neoprene, styrene butadiene rubber (SBR), or a nitrile
polymer.*2-4^
*
Most companies replaced asbestos fibers in their gasket prod
ucts with other nonmineral fibers in the late 1980s or early
1990s. This coincided with the Environmental Protection
Agency's (EPA) 1989 ban on the manufacture, importation, pro
cessing, and distribution of these types of products.*5) However,
the United States Fifth Circuit Court of Appeals vacated most
of the asbestos ban and Phase Out Rule and remanded it back to
EPA in October 1991. Although the court vacated and remanded
most of the rule, it left intact the portion that regulated asbestos
products that were not being manufactured, produced, or im
ported when the rule was published in December 1989. Since
asbestos-containing sheet gaskets were still being imported into
this country, they were exempt from the ban and can still be
manufactured, purchased, and used in the United States.
Fowler recently described the problem with the use of these
products when he demonstrated that the application of asbestos-
containing gaskets had the potential to release respirable
asbestos fibers well above current OSHA standards. Fowler rec
ommended that these products should not be used in today's
industry and that only non-asbestos gaskets should be used in
their place.*6)
An issue that faces many former industrial workers is the
past use of these types of gaskets. Workers were not informed
in most cases that the products they were using had the poten
tial to release elevated levels ofrespirable asbestos fibers. Legal
issues concerning past exposures pose this basic question: Did
handling and performing maintenance activities on these gaskets
contribute to their asbestos exposure history? Industrial hygien
ists must rely on a retrospective exposure assessment to make
PLAINTIFF'S EXHIBIT
55
6 fSPL-M~)
56 W. E. LONGO ET AL.
this determination.^ In this approach the individual's work his tory is compared to the results of retrospective exposure assess ment studies that replicate their work activities.
A review of the peer-reviewed literature found very few pub lished studies involving exposure assessments during the dry removal of asbestos sheet gaskets from flanges.*7-95 The stud ies of Cheng, Millette, and McKinery were somewhat-limited in the information reported. Millette used only a small num ber of flanges. Cheng's work did not verify that all the gaskets contained asbestos. Additionally, there was only limited infor mation provided in all three studies concerning the size and the history of the flanges used or the length of time required for the gasket removal process.
The most comprehensive study to date was by Spence et al/10) However, the authors used wetting to control the airborne release of asbestos fibers. This limited the study's value for any retro spective exposure assessment since dust control methods were not used in the workplace historically.
In contrast to the previous studies, the goal of these new work practice studies was to estimate a worker's asbestos fiber exposure during the removal of asbestos-containing sheet gas kets using common removal techniques such as scraping, hand wire brushing, and power wire brushing. The studies were con ducted on a large population of steam line flanges and valve assemblies. The compilation of several studies discussed in this article allows a more accurate retrospective exposure assessment for individuals who worked with these products in the past and the assessment of potential exposure to workers who may be removing asbestos-containing gaskets today using these same work practices.
High-intensity lighting and videotaping techniques were used inside an exposure characterization laboratory (ECL) during the work practice studies to visually document the pathway of ex posure during the gasket removal process and to help determine what activities produce the airborne asbestos dust.
The methods and procedures described in this report can be applied to assessing past and present industrial hygiene expo sures to other dusts, fumes, and fibers besides asbestos. The videotaping of dust, fume, and fiber exposures under highintensity light can be used as a training tool in visualizing the importance and effectiveness of engineering and administrative controls and respiratory protection.
MATERIALS AND METHODS A number of valve and flange assemblies were' collected in
1994 from a paper mill powerhouse in Oregon and stored under ambient conditions in a protective environment until their use in ;these studies. A sampling of these flange and valve assemblies was partially opened to confirm the presence of asbestos in the sheet gaskets using polarized light microscopy (PLM) prior to the work practice study/115 Any opened flanges were reassem bled and the outside surfaces ofall the flanges were cleaned, sand blasted, and repainted. Interviews with former machinists and
pipefitters determined that the most common techniques.for re moving gasket material tightly adhered to the flange surface were hand scraping, hand wire brushing, and/or electric wire brushing.
The work practice simulations were conducted inside an ex posure characterization laboratory (ECL) that was constructed as a containment area to prevent the release of asbestos to the Outside environment. The dimensions of this containment area were 6.0 m (length) x 4.5 m (width) x 2.4 m (height). The ECL also contained two viewing ports for videotaping purposes and had a decontamination area for contaminated clothing disposal, an air lock for sample removal, and showers to further control fugitive emissions.
Fresh air was produced by a high efficiency particulate ab solute (HEPA) filtered negative air machine manufactured by Aramsco (model #55011) and pulled through the ECL at a venti lation rate of5.7 cubic meters per minute. This unit was operated at an air exchange rate of five times per hour (ACH) during the work practice studies. The air in the chamber was flushed be tween studies by increasing the fresh air ventilation to 28.3 cubic meters per minute for a minimum of 24 hours. At the end of the first scraping and hand wire brushing study (Study 1), the-ECL was completely decontaminated by HEPA vacuuming all dust and debris and then wet wiping. Also, all inside surfaces were repainted after the decontamination procedure.
High-intensity lighting (700-1000 watts) was used inside the chamber during videotaping of the work practice to document dust generated by various tasks and to observe pathways of ex posure to respirable dust. In previous studies the use of highintensity lighting was found to be an effective tool to display respirable airborne dust released from asbestos-containing prod ucts during work activities/12,13) The authors performed these studies wearing normal work clothes over disposable protective suits and were equipped with supplied air respiratory protection with HEPA escape filters.
Personal and area air samples were collected during the studies using nonconductive three-piece cassettes. The cas settes contained mixed cellulose ester (MCE) filters that were 25 millimeters in diameter and had a 0.8 micrometer pore size. These filters rested on a MCE backing filter (5.0 micrometer pores). The personal and area air sampling pumps were cali brated before and after the completion of each study against a DryCal primary flow meter to air flow rates of two and ten liters perminute, respectively. High-volume air-samplingpumps (Dawson 110 volt) were used for collecting area air samples dur ing the studies. Four area samples were located in four equidis tant quadrants at a distance of 2.1 meters from a work bench placed in the center of the ECL. The area sample cassettes were placed on sampling stands at a height of 1.5 meters. The four calibrated high-volume air sampling pumps were placed outside the chamber and each pump was connected to an area air cassette by TVgon tubing passing through the wall of the ECL.
The two investigators performing the studies were each fitted with two calibrated personal GilAir air sampling pumps with the air-sampling cassettes attached to each shoulder and within their
j,-
FIBER RELEASE DURING REMOVAL OF ASBESTOS
57
breathing zones. Background area samples were collected inside and outside the ECL before each study. The air samples were collected in general accordance with the NIOSH 7400 method entitled, "Asbestos and Other Fibers by PCM."(l4) Two air sam pling cassettes were opened for 30 seconds inside the ECL to serve as personal field blanks at the end of each study.
Surface morphology of new and used gasket material was examined using a Hitachi S-800 field emission scanning electron microscope (SEM). Photomicrographs were taken of the gasket surfaces to document the degree of gasket degradation and the relative amount of asbestos fibers present on the surface.
Study 1--Scraping and Hand Wire Brushing of Small Flange Assemblies
Seven small flange assemblies were used in this study. The gaskets had outside diameters of approximately 69 mm and working widths ofapproximately 19 mm. Gaskets were removed from one flange on the first four valve assemblies and then from two flanges on each side ofthe remaining three valve assemblies for a total often gaskets. The flange assemblies were first opened and then the gaskets were scraped using a stiff, four-inch-wide putty knife. Any residual gasket material that could not be re moved from the flange faces by scraping was removed by hand wire brushing. Some of the gaskets required repetitive scraping and wire brushing to remove the gasket and to polish the flange face. The sheet gaskets were removed sequentially from each of the 10 flanges.
One ofthe investigators in the ECL simulated the worker who did all of the gasket removal while the other acted as a "helper." The helper changed the area and personal air sample cassettes periodically throughout the study. Each gasket was collected and retained for analysis to determine both asbestos content and matrix identification after removal. The investigators were in the ECL for 194 minutes. All air sample cassettes in the ECL were exchanged every 15 to 30 minutes. A total of seven sets of air samples were collected.
Study 2--Scraping and Hand Wire Brushing of Large Flange Assemblies
Four large flange assemblies were used for this study. The outside diameter ofthese gaskets varied from 125 mm to 200mm and the gaskets were 19 mm to 25 mm wide. The gaskets were removed and collected from the four flanges as described in Study 1. The investigators were in the ECL for 113 minutes. All air sample cassettes in the ECL were exchanged every 15 to 30 minutes. A total of five sets of air samples were taken during Otis work practice simulation.
Study 3--Power Wife Brushing of Large Flange Assembly An electric wire brush (Skil electric drill 0.3 Hp with a
Columbian 10.2 cm crimped wire wheel) was used during this study to remove gasket residue that could not be removed during the scraping and hand wire brushing of the first flange assembly
used in Study 2. The electric wire brush was also used to polish the flange face surfaces. This study was conducted one day after Study 2. The ECL was not decontaminated between the stud ies. The two flange surfaces were electric wire brushed until the gasket residue was visibly removed. As previously described in Study 1, the two investigators were in the ECL performing the study.
One person did the removal work while the other assisted as the helper. The residual gasket material was notretained since the bulk of the material was collected in Study 2. The investigators were in the ECL for 42 minutes. The air cassettes in the ECL were exchanged every 10 minutes. A total of four sets of air samples were taken during the electric wire brushing activity.
All air filters collected were analyzed by PCM in general ac cordance with the NIOSH 7400 method using the "A" counting rules. Additionally, all air samples were prepared for TEM ex amination using the indirect preparation method.(15) The indirect TEM preparation method was chosen because filter overloading rendered the samples unsuitable for direct preparation despite frequent changing of the air sample cassettes. Also, the indirect TEM preparation method enabled data comparisons to other published and unpublished studies previously performed that also used the indirect TEM method/16-18) The TEM air sam ples were then analyzed by a modified EPA Level II protocol/19) Cloth swatches from the work clothing worn by the investiga tors during the studies were analyzed by the recommended EPA method/20) Surface dust samples were collected from the work table after each gasket removal study and analyzed according to the ASTM protocol/13) Background samples from the clothing and the work table surface were also collected before each study was started. The removed gaskets were analyzed for asbestos type and content by the standard PLM method/11)
RESULTS
It was determined by PLM that the gaskets removed in these studies contained 65 percent to 85 percent chrysotile asbestos (Table I). Table II and Table III, respectively, illustrate the PCM and TEM results for Study 1. The worker in Study 1 had a peak exposure level of 10.1 fibers per cubic centimeter (f/ce) and an 8-hour TWA exposure of 1.5 f/cc. The area air samples were voided after the completion of Study 1 when it was determined that the air-sampling fines into the ECL were obstructed. The
Studies
Study 1 Study 2 Study 3
TABLEI PLM analysis of removed gaskets
Number of gaskets analyzed
Asbestos type
Concentration of asbestos in
volume percent
10 Chrysotile 65-80%
4
Chrysotile
75-85%
1 Chrysotile
85%
58 W. E. LONGO ET AL.
TABLE II Study 1--Scraping and hand wire brushing: small flanges. PCM airborne
exposure levels (fibers greater than 5 micrometers)
Sample type
No. of air
Sample time weighed 8-hrTWA
samples analyzed Range (f/cc)
average (f/cc)
(f/cc)
Background Worker Assistant Area samples'*1
4 14 14 36
0.0 1.5-10.1 1.2-4.2
--
0.0 3.7 2.4
--
N/A 1.5 1.0 --
Total air-sampling time= 194 minutes. AThc air-sampling lines into the ECL were obstructed, voiding the area air samples in this study.
results for Study 2 are shown in Tables IV and V. The worker in this study had a . peak exposure level of 24.0 f/cc and an 8-hour TWA of 3.6 f/cc. Thble VI and Table VH list results for Study 3. The peak exposure level found while power wire brushing was 31.0 f/cc and the calculated 8-hour TWA was 2.3 f/cc. The results for the surface dust samples taken from the work table and the fabric samples are shown in Table VIII. All PCM and TEM data in the tables are expressed for compar ison purposes as fibers per cubic centimeter (f/cc) greater than 5.0 micrometers in length.
DISCUSSION
The asbestos concentrations measured in these studies were higher on average than other previously published studies for similar work practices.*7-9* It is believed that the higher concen trations found in these studies were due largely to the gaskets adhering more tightly to the flanges. Tightly adhered gaskets require higher energy for removal. As described by Fowler, the friability ofthe product is always relative to the energy applied.*6* Only two of the fourteen gaskets removed could have been de scribed as easily detached. The other twelve required extensive effort on one or both of the flange faces. Machinists, pipefit ters, steamfitters, and others commonly described sheet gaskets as tightly adhering to flange surfaces and requiring substantial work to remove the gasket material. Unfortunately, the various conditions and the amount of adhesion of the gaskets in the pre viously published studies were not reported.*7-9* The adhesion of gasket materials generally has been related to its length in
TABLE ID Study 1--Scraping and hand wire brushing: small flanges.
TEM airborne exposure levels (asbestos fibers greater than 5 micrometers)
Sample type
No. of air samples analyzed
Range (fibers/cc)
Background Worker Assistant '
4 14 14
0.0 29.9-144.2
2.2-29.5
Total air-sampling time =194 minutes.
service and the conditions of service such as temperature and pressure. The high temperature steam flanges used in this study were from a steam powerhouse that operated for a number of years. The last steamfitter who maintained the steam system in dicated that gasket replacement was rare due to infrequent plant downtime and few leaks. Gaskets that could be easily removed would not be expected to produce airborne levels comparable to what was found in these studies. None of the previous studies described the level of difficulty of removing the gaskets from the flange surfaces.
The air samples collected were analyzed by both PCM and TEM during the gasket removal activities in these studies. The two basic types of sample preparation for TEM air analysis are the direct and indirect methods.*13,16'21-23* Some scientists have suggested that the indirect sample preparation method, particu larly the sonication step, causes large complex asbestos struc tures such as fiber bundles and clusters to break up and bias fiber counts to higher concentrations.*24,23* However, studies per formed by the EPA and others have shown that this criticism is not valid and that the indirect technique is an acceptable method to analyze overloaded air samples.*26-2**
The overloading of other particulates on an air filter will ob scure fibers that are collected. This condition can lead to the undercounting of asbestos fibers if a direct preparation method is used. Controlling the particulate loading on a filter can be dif ficult when the disturbance ofmaterials generates large amounts of both fibrous and nonfibrous airborne particulates. The gen eral approach to reduce or eliminate overloading conditions is to alter flow rates and sampling times. However, particulate load ing can be controlled by using the indirect preparation method without compromising sampling times. The overloading prob lem can also affect the direct examination of air filter samples by PCM (NIOSH 7400 method). This was noted in Study 1. The asbestos air concentrations measured by PCM in Study 1 decreased as the study progressed. This would not be consistent with the continued activities that took place inside the ECL dur ing the study. This effect wasxlue to particulate overloading on the filters. However, according to the TEM data from Study 1, the asbestos fiber concentrations tended to increase as the work progressed. The sampling times for Studies 2 and 3 werereduced in an effort to minimize overloading on the PCM air samples.
FIBER RELEASE DURING REMOVAL OF ASBESTOS
59
TABLE IY Study 2--Scraping and hand wire brushing: large flanges. PCM airborne
exposure levels (fibers greater than 5 micrometers)
Sample type
No. of air samples analyzed
Range (f/cc)
Sample time-weighted 8-hrTWA
average (f/cc)
(f/cc)
Background
4 0.0
Worker
10 9.3-24.0
Assistant
10 5.2-15.7
Area samples'*
24
2.1-8.4
0.0 15.3 8.8 --
N/A 3.6 2.0 --
Total air-sampling time =113 minutes. ATWA not calculated for area or "bystander" samples.
However, any further reduction in the sampling time would have had an impact on the work activities. Therefore, the air-sampling times were not decreased any further.
The current OSHA asbestos exposure standards are based on the NIOSH 7400 method. This method measures only fibers longer than 5 micrometers in length and greater than 0.25 micrometers in width. However, these fiber dimensions were not implemented by OSHA with regard to health issues. The minimum dimensions were implemented solely due to the fiber resolution limitations of the PCM technique/29* OSHA has long recognized that PCM is not fiber-specific or able to resolve fibers that are less than 0.25 micrometers in width. The TEM analysis performed in these studies augmented the PCM measurements by obtaining more complete and accurate mea surements of the airborne asbestos concentrations.
A comparison of the air data collected from the PCM and TEM analyses showed fiber concentrations approximately 30 times greater in the TEM analysis. The differences between TEM and PCM measurements have been recognized by others and are primarily due to the resolution limitations of the opti cal microscope/30-31* The deficiencies of PCM measurements are especially acute when products such as sheet gasket mate rials that contain high percentages of chrysotile fibers are the source of the airborne fibers. It has been shown that free res pirable chrysotile fibers are released when asbestos-containing products are abraded in some manner/6*
Work by the EPA demonstrated that single chrysotile fibers have an average diameter of between 0.03 and 0.07 micro
TABLE V Scraping and hand brushing: large flanges. TEM airborne exposure levels (asbestos fibers greater than 5 micrometers)
Sample type
No. of air samples analyzed
Background Worker Assistant Area samples
4 14 14 24
Total air-sampling time = 113 minutes.
Range (fibers/cc)
0.0 199.6-842.7
13.6rl01.0 3.3-108.8
meters/32* This average diameter is approximately five times below the resolution of a phase contrast microscope. Therefore, single chiysotile fibers cannot be seen or counted using the PCM method, irrespective of their lengths. Because of the inherent errors in PCM analysis, it was suggested by the director of the Health Effects Institute forAsbestos Research that OSHA should consider changing to TEM air sample analyses for occupational workplace compliance to adequately protect workers' health.133*
An SEM examination of the sheet gaskets was performed to better understand the relationship between the physical activity of removal and the measured asbestos air levels found in this study. Generally, sheet gaskets are comprised of approximately 70 percent chrysotile asbestos bundles in a synthetic rubber ma trix. The SEM micrograph (Figure 1) shows large bundles of asbestos protruding from the matrix of new sheet gasket ma terial. Any minimal disturbance or abrasion of these bundles can release asbestos fibers into the air. Another problem with asbestos gaskets is that the synthetic rubber matrix begins to de teriorate after installation. In most cases installed sheet gaskets are subjected to high temperature and pressure that will increase the rate ofthermal decomposition of the rubber matrix. This pro duces cross-linking ofthe polymer molecules. The cross-linking process increases the gasket material's friability by causing the rubber matrix to degrade and become brittle/34*
A comparison of the surface of a new gasket (Figure 1) to that of a used gasket removed from one of the flanges in Study 2 (Figure 2) demonstrates how the rubber matrix material is de graded. This degradation provides more opportunity for the re lease of asbestos fibers during the removal process. The fiber concentrations measured in Study 2 were higher than those mea sured in Study 1 even though more gaskets were removed in the first study. Factors believed to lead to these results were as follows: (1) The total gasket surface area removed in Study 2 was much larger than in Study 1, (2) The gaskets in Study 2 were observed to be more friable and more deteriorated, and (3) All the gaskets in Study 2 tore apart and remained adhered or attached to both of the flange faces when the flanges were opened.
An electric powered drill equipped with a wire brush was used to remove some residual gasket material from two flange faces in Study 3. The resulting exposures during the work activities
60 W.E. LONGOETAL.
TABLE VI Study 3--Power wire brushing. PCM airborne exposure levels
(fibers greater than 5 micrometers)
Sample type
No. of air samples analyzed
Range (f/cc)
Sample time-weighted 8-hrTWA
average (f/cc)
(f/cc)
Background Worker Assistant Area samples'*1
4 0.09-0.12 7 14.9-31.0 8 12.8-21.2 16 7.6-15.7
Total air-sampling time = 42 minutes. ATWA not calculated for area or "bystander" samples.
0.11 21.8 15.9 --
N/A 2.3 2.0 --
were higher even though the residual gasket material was far less than the gasket materials removed in Study 1 and Study 2. It was observed in Study 3 that the mechanical action gener ated from the power wire brush tore loose more asbestos fibers and propelled them greater distances into the air. This observa tion supported the higher asbestos air concentrations of the area samples measured in Study 3 compared to those measured in Study 2. The results from the surface dust and fabric samples (Table VIII) showed that the surface asbestos levels measured can be classified as "highly contaminated" and pose additional exposure problems to the worker throughout the workday. Addi tional asbestos exposure can occur to both the worker and other family members if the clothes are worn away from the job or taken home.(33)
CONCLUSIONS AND RECOMMENDATIONS
These studies, as well as the other studies previously dis cussed, demonstrate that therecan be wide variability in airborne asbestos fiber levels generated during the removal of asbestoscontaining gaskets from flanges. The variability of fiber levels released is most likely dependent on the condition ofthe asbestos gasket, the size of the gasket surface area and the method of re moval. The condition to which a gasket is subjected determines the degree of adhesion of the gasket to the flange surface and the friability of the gasket. This impacts the amount of energy required to remove the gasket and release asbestos fibers. The determining factors that seem to affect the condition ofthe gasket
. TABLE VII Study 3--Power wire brushing. TEM airborne exposure
levels (asbestos fibers greater than 5 micrometers)
Sample type
No. of air samples analyzed
Range-fibers/cc
are: length of service, temperature and pressure conditions, and composition of the gasket matrix.
Our data show that dry removal methods typically used by machinists and pipefitters (past and present) result in significant airborne asbestos fiber exposures. For retrospective asbestos ex posure assessments, the exposures measured by PCM in Studies 1,2, and 3 exceed all historical OSHA excursion limits and some previous permissible exposure limits (PEL) based on an eighthour TWA. The exposures also far exceed current OSHA levels. Therefore, former machinists and pipefitters that performed this type ofwork as part of theirjob activities would have had signifi cant airborne asbestos exposures when removing tightly adhered gaskets on flange surfaces.
Under normal lighting, airborne dust is invisible even though the asbestos levels measured are above OSHA excursion limits. Therefore, an individual removing asbestos-containing gaskets will be unaware of any airborne exposure problems under nor mal working conditions. High-intensity lighting (Tyndall Effect) was used by the investigators in these studies to observe expo sure mechanisms for workers performing normal work activities. The Tyndall Effect documented fiber release mechanisms and the pathways of exposure to the individuals removing the gas kets. Tyndall lighting is an alternative technique that industrial hygienists can use to check potential airborne dust emissions in the workplace. The Tyndall lighting technique can visually demonstrate to workers and employers if there is a need for air sampling, additional ventilation, respiratory protection, and/or special work practices.
There are still significant numbers of asbestos gaskets cur rently being used in the United States. OSHA classifies the
TABLE VIII TEM fabric and surface dust contamination levels
Studies
Fabric-fibers/cm2 Surface dust-fibers/cm2
Background Worker Assistant Area samples
4 7 8 16
Total air-sampling time = 42 minutes.
0.O-0.2 877.1-1636.1
60.4-364.4 56.9-801.9
Study 1 Study 2 Study 3
981 thousand 3.2 million 19.3 million
8.5 million 27.8 million 57.4 million
All background control samples and field blanks analyzed were be low the analytical detection limit.
FIBER RELEASE DURING REMOVAL OF ASBESTOS
61
FIGURE 1 Scanning electron micrograph of the surface of a new asbestos-containing gasket. Both the chrysotile fibers and
polymer matrix are visible. Magnification lOOOx.
FIGURE 2 Scanning electron micrograph of the surface of a used asbestos-containing gasket. The majority of the material present is only chrysotile asbestos. Magnification lOOOx.
removal of asbestos-containing gaskets as Class II work of short duration.*365 This specification by OSHA only addresses a sin gle gasket removal project However, interviews with pipefit ters and machinists indicate that only removing one gasket at a time was not a typical occurrence. Under current OSHA reg ulations, the removal of asbestos-containing gaskets requires the use of a glove bag and wetting methods to contain the re lease of asbestos fibers into the workplace. Unfortunately, the glove bag and wetting methods are not always practical in an actual workplace due to production and maintenance sched ule pressures and the difficulty in wetting a rubber based gasket.
Theresults ofthese studies indicate that employers need to de termine ifasbestos-containing gaskets are present in their equip ment The employer must immediately comply with OSHA's Class II provisions by implementing a safe operating proce dure that includes employee training, assessment/monitoring, containment, and good work practices. The following actions are recommended if asbestos-containing gaskets are removed without a glove bag and wetting: (1) A negative pressure en closure should be used, (2) The enclosure should have a HEPA filtering/air blower system, (3) A HEPA vacuum cleaner and wetting agents should be used, and (4) The worker should wear
a respirator appropriate for the airborne asbestos concentrations generated by the activities.
The data presented here demonstrate that the work surfaces in these studies as well as the clothing worn by the investigators were highly contaminated with asbestos fibers. An asbestoscontaminated workplace can lead to additional asbestos expo sures. The disturbance of the dust around the work area by other work activities and housekeeping activities will re-entrain as bestos fibers into the air.*355 The wearing, changing, and washing of the contaminated clothing can also lead to asbestos exposures for both a worker and family members.
REFERENCES 1. Bowler, WJ.: Hows and Whys of Packing of Gaskets, Paper Trade Journal. Oct. (1965). 2. Garlock Industrial Products Catalog. (1969). 3. Klinger Compressed Gasket Materials Catalog. (1983). 4. Crane Packing Company, Catalog 60-R-2. (1954). 5. Environmental Protection Agency (EPA): 40 CFR Part 763, As bestos: Manufacture, Importation, Processing and Distribution in Commerce Prohibitions; Final Rule. Title 40, Code ofFederal Reg ulations, Part 763, Fed. Reg. 54(132), July (1989).
62 W. E. Lt)NGO ET AL
^Fpwler, D.P.: Exposure to-Asbestos Arising from .Bandsaw 23. International Organization for Standardization (ISO): Ambient Air,
ing Gasket Material. Appl'Occup Environ Hyg 15(5):404- . Determination of Asbestos Fibers, Indirect-Transfer Transmission
408(2000).
Electron Microscopy. Method, ISC) 13794. ISO (1999).
7. Cheng, R.T.;`McDermott, HJ.: Exposure Xq Asbestos from As 24. Sahlc, W.; Laszlo, I.: Airborne Inorganic Fibre Level Monitoring by
. i bestbi Gaskets. Appl Qccup Environ Hyg 6(7):588^-591 (1991).
Transmission Electron Microscopy (TEM). Comparison ofDirect
g'v MeKinery, W.N.; Moore, RTW: Evaluation of Airlaornc Asbestos
and Indirect Sample TransferMethods. Ann Occup Hyg 40(1 ):29-
Fiber Levels During Removal and Insulation of Valve Gaskets and
44(1996). ,
. v.
Packing. Amer Indus Hyg Assoc J 53(8):531-532 (1992).
. 25. Lee, R. J.; Dagenhaut, T.V.; Dunmyre, G.R.; et al.: Effect ofIndirect
9. Millette, jjL; Mount, M.D.; Hays SJvl.: Releasability of Asbestos
Sample Preparation Procedures on the Apparent Concentration of
Fibers from Asbestos Containing Gaskets. Environ Choices--Tech . Asbestos in Settled Dusts. Environ Sci Technol 29(7):1728-1738
Supp 2:10-15 (1995).
''
(1996)! '
.
... .
10. Spence, S.K.; Rocchi, P.SJ.: Exposure to Asbestos Fibers During 26. Environmental Protection Agency (EPA):. Comparison of. Air
Gasket Removal Ann Occtrp Hyg 40(5):583-588 (1996). "
borne Asbestos Levels Determined by Transmission Electron
11. Environmental Protection Agency (EPA): Method for the Determi
Microscopy (TEM) UsingDirect and IndirectTransfer Techniques.
nation of Asbestos in Bulk Building Materials. EPA/60Q/R93-116.
EPA 560/5-89-004. EPA, Washington, DC (1990).'
EPA, Washington, DC (1993).
. 27. Crankshaw, O.S.; Perkins, L.R.; Beard, MJ5.> Quantitative Eval-
12. Chambers. D.T.: Dust Control Development In: Asbestos, ' nation of; the Relative Effectiveness of Various Methods for the
S. Chissickj R. Derricott, Eds. vol. 2, Properties, Applications and ' Analysis of Asbestos in Settled Dust. Environ Choices--Tech
Hazards,' pp. 193-211, John Wiley & Sons, New York (1983).
Supp 4:6-12 (1996).
13! Seiikoff, IJ.: Insulation Hygiene Progress Report 3(4):'iWinter 28. Hatfield, R^; Krewer, J_A.; Longo, W.E.: A Study of the Rc-
. (1971).
"'V- .
prodOcibility of the Micro-Vac Technique as a Tool for the
14. National Institute for Occupational Safety and Health. (NIOSH):
Assessment ofSurface Contamination in Buildings with Asbestos-
. Asbestos and Other Fibers by PCM--Method 7400. NIOSH Man
Containing Materials. In: Advances in Environmental Measure
ual of Analytical Methods 4th ed., DHHS (NIOSH) Publ. No. 94
ment Methods forAsbestos, M.E. Beard, H.L. Rook, Eds., pp. 301
113, NIOSH, Cincinnati. OH (1994).
312. American Society for Testing Materials (2000).
15. American Society for Testing Materials (ASTM): Standard Test 29. Occupational Safety and Health Administration (OSHA): Oc
Method for Microvacuum Sampling and Indirect Analysis of
cupational Exposure to Asbestos, Tremolitc, Anthophytiite, and
Dust by Transmission Electron Microscopy for Asbestos Struc
Actinolite;'Final Rules. Federal Register 51:119 p. 22680 (1986)..
ture Number Concentration. D5755-95. ASTM, (1995).
30. Snyder, J.G.; Virta, R.L.; Segreti, JM.: Evaluation of the Phase
16. Keyes, D.L.; Chesson, J.; Ewing, W.M.; et a!.: Exposure to Air
Contrast Microscopy Method for the Detection of -Fibrous and
borne Asbestos Associated with Simulated Cable Installation
OtherElongated Mineral Particulates by Comparison with a STEM
Above a Suspended Ceiling. Amer Indus Hyg Assoc J 52(11 ):479-
Technique, Amer Indus Hyg Assoc J 48(5):471-477 (1987).
484(1991).
31. Maccoui, A.; Menichini, E.; Paoletti, L.: A Comparison of Light
17. Keyes, D.L.; Ewing, W. M.; Hayes, M.S.; et al.: Baseline Studies of
Microscopy and Transmission Electron Microscopy Results in the
Asbestos ExposureDuring Operations and Maintenance Activities.
Evaluation of the Occupational Exposure to Airborne Chrysotile
Appl Occup Environ Hyg 9(11):853-860 (1994).
Fibers. Ann Occup Hyg 28(3):321-331 (1984)..
18. Ewing, W.M.; Chesson, J.; Dawson, T.A.; et al.: Asbestos Expo 32. Environmental Protection Agency (EPA): Environmental Release
sure During and Following Cable Installation in the Vicinity of
of Asbestos from Commercial Product Shaping. EPA 1600/S2-
Fireproofing. Environ Choices--Tech Supp 2:23-18 (1993).
85/044. Cincinnati, OH (1985).
19. Environmental Protection Agency (EPA): Methodology for the 33. Communication between Mr. Archibald Cox, Chairman, Board of
Measurement of Airborne Asbestos by Electron Microscopy. EPA
Directors for the Health Effects Institute Asbestos Research; and
Draft Report, Contract No. 68-02-3266. EPA, Washington, DC
Mr. David Zeigler, Acting Assistant Secretary for the Occupational
(1984).
Safety and Health Administration, August (1993).-
20. Chatfield, EJ.: Analytical Protocol for Determination of Asbestos 34. Sommer, J.G.: Rubber Molding Methods. In: Handbook of Poly
Contamination ofClothing and OtherFabrics.Microscope38:221-
mer Science & Technology, N.P. Cheremisinoff, Ed. vol. 3, Appli
222(1990).
cations and Processing Operations, pp. 311-372. Marccll Decker,
21. Environmental Protection Agency (EPA): Asbestos-Containing
New York (1989).
Materials in Schools: Interim Transmission Electron Microscopy 35. Millette, J.R.; Hays, S.M.: Settled Asbestos Dust Sampling and
Methods, Title 40. Code ofFederal Regulations. Part 763, Subpart
Analysis. Lewis Publishers, CRC Press, Boca Roton, FL (1994).
E, Appendix A (1987).
36. Occupational Safety and Health Administration (OSHA): As
22. Environmental Protection Agency (EPA): Electron Microscope
bestos, Construction Standard, Title 29, Code of Federal Regula
Measurement of Airborne Concentrations. EPA-600/2-77-178.
tions, Part 1926.1101. General Industry Standard, Title 29, Code
EPA, Washington, DC (1978).
of Federal Regulations, Part 1910.1001 (1999).