Document Y9g8o7ejojGJmdRRqb8G48Eby
frazer faint company
2475 Hubberd Avenue Detroit, Michigan
SCHEDULE I
TRADE LAKE; CATEGORY: COLOR: QUALITY:
X-90 Stipple Interior Elat Wall Paint White Second
Pigment: 78%
Lithopcne Calcium Carbonate Asbestine Calcium Linoleate
*
Vehicle: 22% Stainfess Raw Linseed
. ' Oil Heavy Bodied Linseed Oil Varnish Mineral Spirits Drier
lbs.______ Yield in Callor.s______ Unit Cost
Total Cost
550 27C
70 14
* 47
Weight
.045
24.75
per .01 2.70
gallon
.01
.30
finished
.075 -i.BS
product. Storage & handling cost
Laboratory through loss - 1%
records
17.3 lbs.
28.80 .29
.105
'
6.35
53
.147
'7.58
70 .14 4.20
105
.015
1.58
6 .07 --*42 20.13
Storage 4 handling cost
through loss - 3%
.60
Calculated Yield Manufacturing Loss - 2iX Actual Yield
1105
83.9 1.6
62.3
Cost Analysis:
..
Material cost-per gallon "
Direct labor cost per gallon
Factory overhead per gallon
Bulk cost per gallon
.
Complete package cost per gallon, including filling charge
Factory cost in package per gallon
FRICES
(a) To a company owned or controlled outlet
CD) To an independent wholesaler
.
(O By comrany owned or controlled cutlet to retail customer
(d) To er. independent retailer-( Dealer)
fe) To ether ( Industrial )
(Ccrtrac . ..-r)
49.82
.60
.13
.95 .19 1.17
' Non , Nor.
2.75
None - 2.34
1.70
OPA 16227
N 5125