Document Y9M9YkqzV8No8Xq9G1z8w3oKO
Worksheet
pany: DOW ce-^: SLURRY HDPE/CATALYST DECANT
HAZOP-PC 1.00
Node: 1 Page: 1
Node: 1 DECANT(D-260A/B)/HOLD(D-202C) TANKS
rameter: Flow
Intention: 2000#/HR INTERMITENT
DEWORD DEVIATION POSSIBLE CAUSES
CONSEQUENCES
RECOMMENDATIONS BY
No Flow PLUGGED LINE
INABILITY TO MAKE/ OPERATOR TRAINING RF CATALYST
POOR SEPARATION
PLANT SHUTDOWN
PREPARE SYSTEM FOR LINE OPENING
OVER FILL VESSEL IF OUTLET LINE PLUGS
DAMAGE PUMP IF INLET/OUTLET PLUGGED
INSTRUMENT MALFUNCTION
OPERATIONS ERROR
CONTAMINATION
EVALUATE
GC
REDUNDANT LEVEL
INDICATION D-202C
5 REDUNDANT LEVEL INDICATION ON D-260A/B
*
Y EVALUATE NEED FOR GC P-251 FLOW INDICATION
5 FLUSH LINES AFTER * USE
A More Flow OPERATION ERROR OVERFILL VESSELS q, OPERATIONS TRAINING
RF
PROGRAMMING ERROR CATALYST LOSS INTO REVIEW MOD V
D-202C
7 PROGRAM
EC
INSTRUMENTATION MALFUNCTION
CATALYST IN VENT $ EVALUATE FAIL
HEADER
POSITION OF
VALVES
*
DO A 120914 CONFIDENTIAL
Worksheet
Company: DOW Process: SLURRY HDPE/CATALYST DECANT
HAZOP-PC 1.00
Node: 1 Page: 3
Node: 1 DECANT(D-260A/B)/HOLD(D-202C) TANKS
Parameter: Temperature
Intention: AMBIENT TEMPERATURE
GUIDEWORD DEVIATION POSSIBLE CAUSES
CONSEQUENCES
RECOMMENDATIONS BY
Mor
Higher Temp
D -235 WET SOLVENT OVER PRESSURE DRUM/ N2 PURGE PSV LINE
FLOW FROM VENT HEADER TO DRUMS
POOR QUALITY
OPERATOR TRAINING RF
CATALYST IN D-260
DEAD HEAD PUMPS
P-251 CAVITATE
3 EVALUATE MINIMUM FLOW LINE FOR P-251 WITH SUFFICIENT INSTRUMENTATION TO ENSURE NO BACKFLOW FROM D-202A TO D-202C.
GC
FIRE
ADEQUATE SPRINKLER COVERAGE
GC
OPERATOR ERROR
$ ALARM AND BLOCK EC FEEDS ON D-260A/B AND D-202C ON HIGH TEMP.
DO A 120915 CONFIDENTIAL
Worksheet
Company: DOW "ocess: SLURRY HDPE/CATALYST DECANT
HAZOP-PC 1.00
Node: 1 Page: 4
Node: 1 DECANT(D-26OA/B)/HOLD(D-202C) TANKS
Parameter: Pressure
Intention: CONTROL PRESSURE AS REQ'D
GUIDEWORD DEVIATION POSSIBLE CAUSES
More
Higher
FIRE
Pressure
CONSEQUENCES PSV OPENS
RECOMMENDATIONS
/ OPERATIONS TRAINING
BY RF
Less
INSTRUMENT MALFUNCTION
BACKFLOW/TRANSFER % SEE REVERSE FLOW *
PROBLEMS
THIS NODE
OPERATIONS ERROR
'b ADD HIGH PRESSURE * ALARMS TO BOTH
TANKS
Lower
PAD SYSTEM
Pressure FAILURE
SEE REVERSE FLOW f- SEE REVERSE FLOW *
THIS NODE
THIS MODE
OPERATIONS ERROR
Oo
CONF
6
t^NTia,
Worksheet
Company: DOW T"-ocess: SLURRY HDPE/CATALYST DECANT
HAZOP-PC 1.00
Node: 1 Page: 5
Node: 1 DECANT(D-260A/B)/HOLD(D-202C) TANKS
Parameter: Level
Intention: SUFFICIENT TO RUN PUMP
GUIDEWORD DEVIATION POSSIBLE CAUSES
Less
Less Level
INSTRUMENT FAILURE
CONSEQUENCES
RECOMMENDATIONS BY
P-251 CAVITATION / REDUNDANT LOW
EC
LEVEL INDICATION/
ALARM WITH MOD V
PUMP SHUTDOWN
LOGIC.
OPERATIONS ERROR
7s OPERATIONS TRAINING
RF
LEAK
LOCATE GAS DETECTOR IN AREA PER TC RECOMMENDATIONS
RF
DO A 120917 CONFIDENTIAL