I
Close-up of (he new Elliott 7 500-kw turbine-generator unit.
The turbine, designed for 400 psi, 7 50 F inlet steam, is equipped with three extraction openings, only one now used.
Below right, another view of this unit.
The coal storage area and equipment, including
a Caterpillar bulldozer, was increased so as to pro
vide more adequate storage facilities.
l! In March, 1944, a survey of adjacent industries
was begun to determine the feasibility of supplying
steam to the major local industries located within
a half mile radius of the power plant. It had become
evident by this time that as the profit margin per
unit sold decreased, due to fixed sale prices and
rising costs, sales would have to be increased in
order to maintain a safe operational margin.
The steam survey indicated that the power plant
could sell industrial steam in a limited area in order
to increase plant load factor and efficiency, and to
reduce the unit labor cost per kilowatt. This busi
ness, which now has a gross revenue of over $114,000
per year is mutually profitable to the Power Plant and the local industries. Steam distribution pro
The new 7500-kw turbine-generator unit with its Elliott surface condenser visible immediately below it.
vides a service at reasonable cost, with man-power
savings; and abatement of a local smoke nuisance. basis provided the foundation for the long range
Since 1946 the Piqua Plant had supplied approxi expansion program.
mately 60 per cent of the energy requirements of the
In 1943 a study of street lighting conditions was
Pioneer Rural Electric Co-operative, Inc., which begun, although new fixtures and luminaries were
organization supplies rural areas in three adjacent not available at that time. To date every street has
counties. Now all their requirements are supplied, been mapped and the engineering completed. Over
Pioneer having just constructed a 33-kv trans 600 new street lights have been installed and 1000
mission system which made distribution of the more will be placed in service during the next three
energy economically feasible.
years to give the City better lighting service.
The acquisition of the Pioneer contract and the
Engineering on a new plant addition was official
sale of industrial steam on a long-term contractual ly begun in July, 1944. The general program was