ASBESTOS ESTIMATE } TO: Cellulose FROM: Ron Lee DATE: July 23, 1990 REFERANCE: Asbestos Project THE FOLLOWING IS AN ESTIMATE ON TIME AND MATERIAL* THE ESTIMATE DOES NOT INCLUDE SCAFFOLDING OR EQUIPMENT RENTAL. IT DOES INCLUDE THE MATERIAL AND LABOR COST FOR YOUR PROJECT, WHICH IS: ASBESTOS REMOVAL AND ASBESTOS ENCAPSULATION: ON VARIOUS SIZE PIPING THROUGHOUT THE BLOCK. A. MATERIAL PRICE $653.00 B. ENCAPSULATION $1634.00 C.MANHOURS 84 D.TOTAL JOB COST $2287.00 IF WE MAY BE OF SERVICE, DO NOT HESITATE TO CONTACT ME ON EXTENTION 6300. DO 074?M CONFTDFNTTAl