Document XznOB9n8k2bnEbkB7Q47Mgdk4
Eaton Corporation
Inter-Office Correspondence
Date To Division & Plant From Division & Plant Copy to Subject
December 2, 1985 Prcd Kovalik Axle & Brake - Galesburg Tom Bruggeman Axle & Brake - Galesburg See List PROPOSED PROCRAM TO DEPLETE RESULTING PROM NON-ASBESTOS
rv\
Oy
% vj
EXCESS R3L
SROk'EOTENTORY
DEMAND IN THlP]
PEACE.
' At your request a recent review was -made tlfi^emrfSifeStlie total quantity
of excess R31 shoe assemblies generated wha^hasfn&V&i non-asbestos
lining.
%A
AN J
Several assumptions were made In formhlatinfr-*\jlan to minimize the amount of additional labor put into the* raeiXer aPerb' and utilizing the maximum quantity of loose R31 shoes whileNalflisingAin'non-asbestos. They are as
follows:
. "old style" bracke^cesIJpCWailer axle inventory to be
depleted fir^C^j
, ^V1
'0*v
v'vv
. MarketinawCyt pha^e |re-\on-asbestos 'by customer' rather
than an "z^nrtSss the''board" approach.
. AOX-vnf^aleaf'ijOfen-asbestos.
. RAM'-wLLyba nblc to supply April '86 requirements with axles b.ttfkesh
f|y^Eatt^EnginEering to approve the use of Italian manufactured
iCT 3JiQJQV67 non-asbestos on RABA supplied trailer axles by Jan'86.
^ jw^RjliBA will supply 3030-67 non-asbestos axles to satisfy June'86 Scales requirements.
A r^^ew of the attached spread sheets with Marketing resulted in a realization t^xadditanal excess Inventory of R31 shoe assemblies will accumulate fp^model #1009096 because the phase in of non-asbestos on this model lags ^yj^four to five months behind other models. Wc will have to switch out , approximately 3000 axles in order to meet a suggested target date of O^Vi''v September - October 1986 for a complete phase out of asbestos. The ' additional shoe inventory resulting from this model is included in the following summary:
2.880 p
For inier-ollice and inter-plant correspondence only Fotm 3M] IRna 4-11)
EXHIBIT
SCF-EC-3025
EAB 046164
Page Two Fred Kovallk December 2, 1985
58,200 9,672
38,603 12,916
1,366 31,196
151,953 ( 9,700)
142,253
loose shoes at RABA
shoes on axles at RABA
0,
shoes to be returned to RABA for rework
shoes shipped early October to RABA
current shoe inventory in Gallatin ^ W'O'
... v .shoe inventory generated from Nov'&^'V \
through Sept*86.
\t
CC'v\O'1
Current schedules top&BA whfeli^will require
R31 lined assys'
^ KVj
Total nsscrahlle^ja^ba ^n^feeted.
'
The attached spread sheets do not address dTlC^delftflmJers referenced In
the profit plan (Exhibit I) or the report rejP-ectin^'vffiUlA Month-End Inventory
Quantities (Exhibit 2).
_aV 'oOsrO * N
1
. Models 1009101 and 1009102 do^a$6 haVeQtay forecasted sales
requirements. Lonnie Dye^apqO' Bugl^&that if no requirements
exist by mid*86 shoes be pjhl-il&d ft^m these axles and sold lu the
the aftermarket.
. **^0" >P'
Model 30V requiremenfq^iare hd^TVlearly defined.
. Other models notjjl^&n
plan (Exhibit 1) are either obsolete
or potentia^^Qjltased^jJv
.
I suggest that tdic foll&nMg stops be taken in order chat the phase in
of non-asbest6^ wLningidfqposing of R31 shoe assemblies and the depletion o"f existing \|^iler. axie^iinventory transpire in a manner most economical to the div^gepn. -4 ^
* ,*OT^eceiijJje\2, ^ilogram^\.
Hi designate me as the coordinator for this
A\J
X^
v Hce^ite hold by December 5 with all disciplines involved in ^X^tuting this program to discuss the following!
c>
1% The general concents and logic behind the development of the attached spread sheets.
- Suggested target date of Sept-Oct',86 for a complete phase out of asbestos lined trailer axles.
- Service parts program for marketing R31 shoe assemblies in the
aftermarket.
*
- Approximate monthly or quarterly volumes of shoe assemblies necessary to support marketing program which must begin in Jan'86.
EAB 046165
Page Three Fred Kovalik December 2, 1985
- Aftermarket target price for H31 shoe assembly.
Notify MBA of the following by no later than December 18, - April and May trailer axle receipts to be less brakes
O-V'
- June trailer axle receipts to have non-asbestos lined brakes
{current test results indicate Italian manufactured 309>j5^!&7 most
favored material.) .
w r>v
s' ***
ftyy..
- Suggest RABA secure a quote from Abex (Frenfln). kJOl
- Eaton requests a delivered price of^ip^perf*npS6 assembly on 58,200 manufactured by RABA with<iut>hktonns^a$t1i.ority.
; ^ryO
- Return loose H.3L Lining block tto\CarLlsey&rfr the following schedule: X:
45,000 January)*' vC\* 45,000 ApjS> 'fcAv 45,000 jaay 4 N 47,328% f^8dtoberO>/r
; ; 1
- A tentative shl^ih#'' sch&mlie on the 58,200 shoe assemblies
will be forwan^^jimme^iat^feiy if our requested price Is met.
This shippin^VdhedjiM^mjht coordinate with the accumulation
of shoe iay&jbry jgi QhtLlatin and Service Parts projected sales
volumes.
^^
. At theEafe^i^i^ineering approves Italian manufactured 3030-67
RABA M|o&ld be nSt'fflad immediately so that releasea can be issued
to Rodnbo.
*.
' ,v\ v
An aggressive i^arfceFlng program 1b absolutely necessary as the demand
for aab^cos lined shoe assemblies is rapidly diminishing. Current Information
IntiiCitefes t1iatNjO%-70% of the aftermarket requirments are for non-asbestos.
I recqipnpiiJiJthat the coordinator of this program publish a detailed monthly updatfe ^'implementation and completion of the above action items is aan^cldl.
<JEjj?s]nlust be realized that the success of the above program will be determined the market place and its demand for non-asbestos.
r
TB/
cc: G. Cotter, D. Bryant, L. Dye, W. Hoenea, R. Ille, P. Johnstun, J. Lilly,
I. O'Boyle, D. Sims,
R. Young
.
EAB 046166