Document XzX75ZrqDMrG9gbYjJ44bdnmK

waReMONT f j-\ - n aTIO^ INTER-OFFICE CORRESPONDENCE to: r. A. Hemmelgarn from: a. p. staszak location: pau]ding subject: OSHA/EPA ACTIVITY REPORT FOR MAY 1976 d*te: june 3, 1976 COPIES TO: G. A. Moser R. C. Rogers R. J. Treinen 1. Asbestos waste was sent to Flett Development for marketing evaluation on 5/26/76. 2. "No Trespassing" Signs were installed in addition to the caution signs around the asbestos disposal site. These are necessary to deter access by unauthorized individuals. 3. Results of clinical evaluations of 4 employees has been received. No significant findings were noted in reports. 4. Evaluation of dust collector serving Blanchard grinders has been completed. Re.-ilts to be published in separate report. 5. Additional quotes have been received for modification of existing collector serving the Disc department. Costs quoted range $8,000-$9,000. 6. New respirators were purchased which meet present OSHA requirements. 7. New safety glasses were purchased which provide a better fit, are more durable and are considerably less expensive than previous model used. New glasses meet or exceed all ANSI specifications. 8. Received quote on and demonstration of Nilfisk vacuum unit. Demonstration quite impressive. Unit exceeds all dust and noise performance require ments established by OSHA. Cost per unit approximately $1,300-31,500 depending upon accessories desired. Paulding requirements to be defined by end of June. 9. All OSHA safety projects listed last month were completed with the exception of the following: Project Status 5-2 Replacement of eyefcolzs cn Slab Mill Scheduled to be replaced this month WC-23S3 I*' MAR-495 R. A. Hemmelgarn June 3, 1976 Page Two 5-4 Repair of vacuum used at #3 Block press Died - repair cost exceeds replacement cost. Purchase of new unit(s) to be evaluated. 10. No word received as to status of CEA for electrical rewire. (OSHA violation) Time is running out - abatement date is 8/16/76. A. P. Staszak OSHA and EPA Comp!a