ANNUAL REVIEW
ABERDEEN CHEMICAL PLANT APRIL 9, 1984
IDRK I. SAFETY
II. CASH FLOW PROGRAM
III. ENERGY CONSERVATION
IV. NEW PRODUCTS
V. MANUFACTURING IMPROVEMENTS c VI. MAINTENANCE IMPROVEMENT
PRESENTED BY AL SATHER C. R. MILLER VELDON MESSICK PAUL KOBER PETE MARKEY RICK SNOWDEN
DTH 000099925
DTH 000099926
r
70-1
-INJURY .DATA
ABERDEEN CHEMICAL PLANT
NUMBER OF INJURIES
-4-- H- -I
1976
1977
1978
1979
1980
1981
1982
1983
YEAR
DTH 000099927
ABERDEEN CHEMICAL PLANT INJURY PERFORMANCE
1ST.QTR.
FIRST AID OSHA RECORDABLE RESTRICTED LOST TIME
1981 1982
38 30
36 03
_GL __L
1983
28 4
1 0
1984
7
O 0 0
TOTAL
41 36 32
LAST LOST TIME INJURY - JULY 5, 1979
INJURY FREQUENCY x 1 0 0
FREQUENCY
12 MONTH ROLLING AVERAGE OF INJURIES (FA OR OSHA)
TOTAL EMPLOYEES
DTH 000099928
SAFETY 1983 HIGHLIGHTS
DECREASED INJURIES 4 YEARS - NO LOST TIME INJURY FIRE PROTECTION IMPROVEMENTS SAFETY EMPHASIS SHIFT FROM STAFF TO LINE
DTH 000099929
SAFETY PROGRAM IMPROVEMENTS
PROGRAM ANALYSIS - LINE INVOLVEMENT - DEPARTMENTAL PROGRAM CONCEPT - SAFETY MEETINGS / SUPERVISORY LEADERSHIP - SAFETY COMMITTEE
EMPLOYEE INVOLVEMENT - ESAR PROGRAM - TEAM INVESTIGATIONS - PROJECT FIELD REVIEWS
DTH 000099930
SAFETY 1984 PLANS
LINE MANAGEMENT RESFONSIBILTY / EMPLOYEE INVOLVEMENT SAFETY CONTROL SYSTEMS IMPROVEMENT CONTRACTOR PROGRAM IMPLEMENTATION EXPANSION OF EMERGENCY SYSTEMS PM PROGRAM
DTH 000099931
PERSONNEL DOSIMETRY SUMMARY
% OF SAMPLES GREATER THAN
PEL
%> PEL WITHOUT RESPIRATORY PROTECTION
VCM 1982 1983
LEAD 1982 1983
TOTAL PARTICULATES
1982 1983
10.0 6.0
4.7 5.5
2.0 1.8
5.4 1.3
0.0 0.6
0.0 0.0
DTH 000099932
1983 VCM OVEREXPOSURE
% OF PERSONNEL DOSIMETERS -o*IoOCoo*Oo1Oo>o^Oo9o<0oO
o
m a
DTH 000099933
o<0
INDUSTRIAL HYGIENE PROGRAM HIGHLIGHTS
EMPHASIS ON IMMEDIATE LEAK RESPONSE ELIMINATION OF NEGATIVE PRESSURE
RESPIRATORS IMPLEMENTATION OF IMPROVED VCM
DOSIMETERS
DTH 000099934
DTH 000099935
CASH FLOW IMPROVEMENT PROGRAM CAPITAL EXPENDITURES - 1983
1983 PROFIT OBJECTIVE ACTUAL CAPITAL EXPENDITURES CASH FLOW IMPROVEMENT
$5779M $2995M $2784M
PR0dEGtLJNllEBIWNS^AS~fiC3aggREl^
MAJOR PROJECT EXPENDITURE DEFERRALS LINE I MODERNIZATION BULK CTA STORAGE AND HANDLING
MAJOR PROJECT DELETIONS LINE V SURGE BLENDER 6-10 TM STORAGE FACILITIES BULK LEAD STABILIZER ADDITION BOTTLE COMPOUND PRODUCTION
$1769M $ 135M
* iK
$ 230M $ 120M $ 300M $ 200M $ 850M
DTH 000099936
1983 CASH FLOW IMPROVEMENT PROGRAM
FIXED COSTS VARIABLE EFFICIENCIES INVENTORY CONTROLS CAPITAL EXPENDITURES
VARIANCE FROM PROFIT OBJECTIVES
(OVER)/UNDER
TARGET
ACTUAL
$200M
$458M
$ 1786M
$45781*
- $403M
$2200M
S2784M
TOTAL S4186M
$8223M
DTH 000099937
CASH FLOW IMPROVEMENT PROGRAM FIXED COSTS - 1983
ACTUAL VARIAMCE
PAYROLL AND BENEFITS
$404M
MAINTENANCE MATERIALS AND CONTRACTS
($ 70M)
TAXES , INSURANCE AND DEPRECIATION
$ 62M
MISCELLANEOUS
S 62M
TOTAL
S4S8M
DTH 000099938
CASH FLOW IMPROVEMENT PROGRAM VARIABLE COST EFFICIENCY VARIANCE
1983
RAW MATERIAL/OFF-GRADE
PRODUCT MIX
UTILITIES
TOTAL
$979M $2970M
$629M $4578M
DTH 000099939
CASH FLOW IMPROVEMENT PROGRAM MATERIALS AND SUPPLIES INVENTORIES
1983
1 2/83 TARGET
BOOK AVAILABLE
0739 WAREHOUSE
$ 1500M $ 1580M $ 1579M
SUPPLIES (PARTS) 0744 PROCESSING
$1100M $ 617M $ 832M
SUPPLIES
TOTAL INVENTORIES
S2600M
S2197M
$2411M
IMPROVEMENT
$ 403M
DTH 000099940
CASH FLOW IMPROVEMENT PROGRAM CAPITAL EXPENDITURES - 1983
1983 PROFIT OBJECTIVE ACTUAL CAPITAL EXPENDITURES CASH FLOW IMPROVEMENT
$5779M $2995111 $2784M
MAJOR PROJECT EXPENDITURE DEFERRALS LINE 1 MODERNIZATION BULK CTA STORAGE AND HANDLING TOTAL
MAJOR PROJECT DELETIONS LINE 5 SURGE BLENDER 6-10 TM STORAGE FACILITIES BULK LEAD STABILIZER ADDITION BOTTLE COMPOUND PRODUCTION
DTH 000099941
$1769M $ 135M $1904M
$ 230M $ 120M $ 300M $ 200M
$ 850M
1984 CASH FLOW IMPROVEMENT PROGRAM
INVENTORY CONTROL OPERATING PLAN RESIN COST STUDY FIXED COST VARIABLE EFFICIENCY COST INVENTORY REDUCTION CAPITAL EXPENDITURES
DTH 000099942
1984 CAPITAL EXPENDITURES
PROFIT OBJECTIVE REFORECAST 2/10/84 REFORECAST (VISTA)
$MM 4.2 4.2 2.4
VISTA BASIS LIMIT ABERDEEN EXPENDITURES TO $2MM DEFERRAL OF PROJECTS DELAYED CONSTRUCTION PROJECT DELETION
DTH 000099943
DTH 000099944
ENERGY PERFORMANCE
ABERDEEN CHEMICAL PLANT
I
1983 PERFORMANCE vs BUDGET
ABERDEEN CHEMICAL PLANT
INCREMENTAL MMM
btu/yr _3L
1983 BUDGEtED ENERGY PERFORMANCE (2/2/83)
(PRODUCTION BASIS:493.4 MM lbs)
PRODUCT MIX AND PRODUCTION LEVEL EFFECTS
(2.3)
0.1
^-11 CENTRATE HEAT RECOVERY COMPLETION DELAY
16.1
(0.7)
INCREASED FLUID BED DRYER THROUGHPUT
(23.9)
1.1
ADMINISTRATIVE PROGRAMS AND MISCELLANEOUS
(143.7) (153.8)
6.5 7.0
% ADJ
cma
44.1
1983 ACTUAL ENERGY PERFORMANCE
(ACTUAL PR0DUCTI0N:481.8 MM lbs)
51.1
DTH 000099946
MONTHLY ENERGY PERFORMANCE 1982-1984
ABERDEEN ENERGY PROGRAM
KEY ELEMENTS SUPERVISOR AND EMPLOYEE AWARENESS REDUCED RATE OPERATIONS PLAN BOILER OPERATIONS AIR CONSERVATION STEAM AND AIR LEAK PROGRAMS INSULATION AND STEAM TRAP PROGRAMS
1984 EMPHASIS ITEMS CONTINUED ROTARY DRYER UPGRADE PROJECT STEAM AND DRYER NATURAL GAS MONITORING PROJECTS V-11 CENTRATE HEAT RECOVERY
DTH 000099948
1984 ENERGY CONSERVATION FORECAST
INCREMENTAL
MMM
btu/yr
%
%ADJ QMA
1983 ENERGY REDUCTION vs 1972 (CMA ADJUSTED BASIS)
51.1
PRODUCT MIX EFFECT
13.3
(0.6)
PRODUCTION LEVEL EFFECT
(13.3)
0.6
,--11 CENTRATE HEAT RECOVERY (9 MONTHS FULL OPERATION)
(29.4)
1.3
OTHER PROJECTS & MISC.
(17.4) (46.8)
0.8 2.1
1984 FORECASTED ENERGY REDUCTION 1984 BUDGETED ENERGY REDUCTION
53.2 49.5
DTH 000099949
DTH 000099950
NEW PRODUCTS
ABERDEEN CHEMICAL PLANT 1984
NEW DRY BLEND APPLICATIONS COMPOUNDS AND PLASTICIZERS FITTINGS APPLICATIONS
DTH 000099951
NEW DRY BLEND APPLICATIONS
IMPACT MODIFIED PIPE BLEND
SPECIAL APPLICATION-TRUSS PIPE 5426-42A ARMCO
SHEET BLEND
RP-420
RIGID PROFILE PRODUCTS
TWIN SCREW BLEND-PVC WINDOWS
SINGLE SCREW BLEND
SPECIAL BLENDS
FURNITURE
PURGE
DTH 000099952
COMPOUNDS AND PLASTICIZERS
EXPERIMENTAL COMPOUNDS 34642 COMPOUND
CABLE INSULATION
LINEAR ALCOHOL PLASTICIZERS
610P 108P 810P
DTH 000099953
FITTINGS PRODUCTS
5265 RESIN
LOW MOLECULAR WEIGHT COMMERCIAL VALUE ADDED PRODUCTION
CT A
FITTINGS BLEND
90172B
DTH 000099954
DTH 000099955
9NimL0Ydnn*(
MANUFACTURING IMPROVEMENTS
DOING A BETTER JOB WITH WHAT WE HAVE
IMPROVING ADMINISTRATIVE CONTROLS PERFORMING OPTIMIZATION TEST RUNS DEVELOPING NEW PROCEDURES TRAINING OPERATORS DEVELOPING LOWER COST RAW MATERIAL
SUBSTITUTES
DTH 000099956
PRODUCTION,M M LBS
ABERDEEN RESIN PRODUCTION MMlbs PVC/YR.
415MM
plH 000099957
ABERDEEN VCM EFFICIENCY LBS.VCM/LBS.PVC
1.02072
DTH 000099958
ABERDEEN RESIN VARIABLE ENERGY COST 4/LB PVC (CONSTANT PRICING)
1.48287
DTH 000099959
ABERDEEN RESIN PRODUCTION % PRIME PRODUCT
97.1
TARGET 97.8
PRIME PRODUCT
DTH 000099960
ABERDEEN PVC RESIN VARIABLE COST. <fc/LB (CONSTANT PRICING)
20.6429
PVC RESIN VAR IABLE CO ST, $ /L B
1980
1981
1982
1983
1984
DTH 000099961
MANUFACTURING RESIN IMPROVEMENTS
PVC VARIABLE COST DIFFERENCES 1980 VS 1984
AT CURRENT PRICING & 1984 PRODUCTION VOLUME
A $1.54MM
MAJOR
OPERATIONS IMPROVEMENTS
DTH 000099962
CO M PLAINTS/YR
^ ABERDEEN PLANT JUSTIFIED RESIN COMPLAINTS
17
DTH 000099963
AVAILABLE RESIN RAW MATERIAL INVENTORY VALUES
(EXCLUDING MONOMER)
($M)
S26SM
$26SM
FUTURE MANUFACTURING IMPROVEMENT
MTS OPERATOR TRAINING PROGRAM RESIN COST STUDY ADDITIONAL TECHNICAL SUPPORT FOR
PROCESS OPTIMIZATION UTILIZE NEW PLANT COMPUTER
- IMPROVE TIME MANAGEMENT - PROVIDE IMPROVED DATA
MANAGEMENT FINE TUNE NEW AUTOMATED ADDITIVE
ADDITION SYSTEM CONTINUE TO OPTIMIZE RAW MATERIAL
& FINISHED PRODUCT INVENTORIES
DTH 000099965
0V0))i
JZ
0)
i/>
uLO
J5*
Q)
JD
O
-w
JCZO
3o
>>
(T3
2
JVQ0Ds)-)
(0
(0
><1/05.
U
20)
JZ
-4--
VV0i
CO
ns-*--I
JZ
a H*##
"Oco
c00))
JD
fO 5(0
DTH 000099966
DTH 000099967
MAINTENANCE IMPROVEMENT
DTH 000099968
1983 MAJOR POINTS
TRAINING I&E MECHANICAL OPERATIONS
SUPERVISORY SKILLS CRAFT DELAY STUDY WORK ORDER PLANNING
PREVENTIVE MAINTENANCE
DTH 000099969
TRAINING
I&E <'>2200 MANHOURS OF IN PLANT TRAINING MED INSTRUMENT TRAILER
MECHANICAL
PONCA CITY COURSES - SIX SUPERVISORS - SIX MECHANICS
ALIGNMENT VENDOR
- BOSTON GEAR BOX - RELIEF VALVES - RUPTURE DISCS
OPERATIONS
DTH 000099970
MED INSTRUMENT TRAILER
SUPERVISORY SKILLS
SUPERVISORS PLAN WORK ORDERS USEFUL WORK CONOCO AVERAGE-2.4 HOURS/DAY ABERDEEN BEFORE- 2.5 HOURS/DAY ABERDEEN AFTER- 3.1 HOURS/DAY
DTH 000099971
PREVENTIVE MAINTENANCE
AUTOMOTIVE FIRE PUMPS
DTH 000099972
1984 PROGRAM
SYSTEM RELIABILITY I&E MECHANICAL
CRAFT PRODUCTIVITY
DTH 000099973
SYSTEM RELIABILITY
I&E CONTINUED TRAINING INTERLOCK/ALARM PM PROGRAM MINOR INSTRUMENT REPAIR LOGREPETITIVE REPAIRS
MECHANICAL IDENTIFY TARGET EQUIPMENT - OPERATIONS - MAINTENANCE - ENGINEERING DEVELOP PH-1 PROGRAM TARGETED TRAINING MAINTENANCE ENGINEERING
r DTH 000099974
CRAFT PRODUCTIVITY
SUPERVISORY TRAINING TPG COURSE 100 HOURS PER/SUPERVISOR NUTS AND BOLTS "HOW TO' - PLANNING - SCHEDULING - WORKLOAD
CREW MIX CROSS TRAINING CHANGING HISTORIC ROLES MIXING CREWS
MAINTAINING THE BACKLOG
OTH 000099975