Document XzD0emmLjmMBkM3vde0dpVmoK

Region 6 Compliance Assurance and Enforcement Division INSPECTION REPORT Inspection Date(s): Media: Regulatory Program(s) Comoanv Name: Facility Name: Facility Physical Location: city, state zip code) Mailing Address: cit', state zip code) County/Parish: Facility Contact FRS Number: Identification/Permit Number: Media Number: NAICS: (5 digit number) SIC: (4 digit number) Facility Representatives: EPA Inspectors: State lnspector(s): Other lnspector(s) Title: ~ ro r+ Author: Q) 0. Q) Subject: r+ Q) Keywords: April 22 2014 CWA 311 SPCC ~nderground Injection Control- Brine Rebel Production LLC SE/4 Section 11-T18S-R14W SE/4 Section 11-T18S-R14W Eldorado AR 366 Burnside Farm Road Spearsville LA 71277 Union, Arkansas N/A N/A IN/A N/A N/A N/A 21111 1311 N/A N/A N/A N/A Kent Sanborn N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 6EN-WR N/A N/A N/A N/A N/A N/A 870-312-2520 N/A N/A N/A 918-557-1615 N/A NLA N/A N/A N/A N/A Rebel Production LLC SE/4 Section 11-T18S-R14W EI dorado Union County Arkansas US EPA Region 6 Compliance Assurance and Enforcement Division Dallas TX Safe Drinking Water Act SDWA Underground Injection Control Groundwater Brine Injection Well Oil Gas EPA Lead Inspector Signature/Date Supervisor Signature/Date Sanborn, Kent Kent Sanborn Digllaii)'SSgMdbySonbaH\Kcnt ON.cn~S.IIbom.Kentemaii"'S.IIbotnX.:nt_,epa;gov Ookl0l406.()912.lB.S80S'OO' Lane, Willie Dlgitally~lgnedbylane,Will!e ON: (fi"Lane, Willie. emaii.. LaM.WI!ll~epa.gov Oate:2014.06.0912:51:5105'00' Willie Lane, Jr Chief, Water Resources Section (6EN-WR) Date Date Rebel Production LLC I SE/4 Section 11-T18S-R14W April 22, 2014 Section I - INTRODUCTION PURPOSE OF THE INSPECTION EPA Region 6 inspector Kent Sanborn visited the Rebel Production LLC oil production facility located in the SE/4 Section 11-T18S-R14W near Eldorado, Arkansas on April 22, 2014. No representative of Rebel Production LLC was present for the inspection. The inspection was conducted by authority of the Clean Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION The facility has 2- steel 200 barrel tanks, 1- steel open top tank, 2- gun barrels, and 1-250 bbl steel tank. Section II- OBSERVATIONS There is a drain on the west side of the battery. I observed oil staining toward creek. No brine detected. Section Ill - AREAS OF CONCERN The area needs cleanup before heavy rain. There is still 1-2 feet of water inside the containment. Section IV - FOLLOW UP Operator was contacted and said he will clean. Section V- LIST OF APPENDICES There are no attachments to this report.