Document Xz5Qjw2JmY4r3QVEKoK03Gxkd

Region 2 Enforcement & Compliance Assurance Division Air Compliance Branch CAA Inspection Report Inspection Date: Facility Name: Facility Address: ICIS-Air ID #: EPA Lead Inspector: EPA Asst. Inspector: Facility Contact: Facility Contact: State Inspector(s): 5/30/2024 Gouverneur Gardens 305 Madison St, New York, NY 10002 3601664213 Christopher Collins Victor Tu Qasim Lezama, qlezama@prestigemgt.com Mo Diop, mad@dbiprojects.com Other inspector name, title, phone number. Background "Gouverneur Gardens is a Mitchell-Lama Co-op that was built in the early 1960's for the benefit of New Yorkers with low to middle incomes." - per Google. The New York City Department of Environmental Protection (NYCDEP) has been investigating complaints of improper asbestos abatement during renovations at Gouverneur Gardens. The complex includes six buildings at several addresses. US EPA Inspected previously on 5/14/2024. Pertinent Regulatory Requirements 40 CFR Part 61 Subpart M - Asbestos NESHAPs Summary of Onsite Observations: On Thursday 5/30 at roughly 10:45 am, Victor Tu and Christopher Collins ("US EPA") arrived at the Gouverneur Gardens co-op. US EPA quickly inspected the buildings' exteriors, observing ongoing soil excavation between buildings 5 and 6. This inspection was occurring near the location where EPA had taken samples from a dumpster during their previous inspection. US EPA then proceeded to the front office where they met with the owner's representative Mo Diop (DBI Projects), and Qasim Lezama (Property Manager for Prestige Management). Mo Diop informed US EPA that Carol Rowley, the previous Property Manager, had left and that Qasim was the new Property Manager. During Gouverneur Gardens - 3601664213 1 5/30/2024 this meeting, US EPA shared with both parties the positive results from the asbestos samples taken during their previous inspection. In addition, US EPA outlined the necessary requirements for proper waste containment and disposal of asbestos containing waste material. The group agreed that the US EPA would receive reports from the general contractor. These reports will include evidence of compliance with the discussed waste disposal requirements until the dumpster is removed from the site. US EPA also requested previous asbestos surveys and waste manifests. The soil excavation observed was also discussed. Mo Diop informed US EPA that this work was being carried out for the installation of the generators. The inspection concluded at 11:30. Gouverneur Gardens - 3601664213 2 5/30/2024 Lead Inspector's Name: Christopher Collins CHRISTOPH CHRISTOPHER COLLINS Digitally signed by X ER COLLINS -04'00' Date: 2024.07.19 13:43:55 Lead Inspector Assisting Inspector's Name: Victor Tu Digitally signed by X VICTOR TU Date: 2024.07.19 VICTOR TU 14:07:00 -04'00' Assisting Inspector Supervisor's Name: Ralph Lonergan Digitally signed by RALPH RALPH LONERGAN Date: 2024.08.02 LONERGAN X 15:09:31 -04'00' Supervisor Gouverneur Gardens - 3601664213 3 5/30/2024