Document Xx1Xje51m8gz9bp9eMVym50G
UNITED STATES
*UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
ENVIRONMENT
PROTECTIONBoston, MA 02109-3912
AGENCYReg5 Piosto Ofnfic e S1qua
re, Suite 100
Sent via Electronic Mail (Dated as shown on electronic signature)
Jason Hutchens, President
Raw Seafoods, Inc.
481 Currant Road
Fall River, Massachusetts 02720
jhutchens@rawseafoods.com
Subject: June 6, 2024 EPA Inspection and Request for Follow - up Information
Dear Mr. Hutchens:
On June 6, 2024, the U.S. Environmental Protection Agency (" EPA ") performed an inspection at
Ice Cube Cold Storage and Logistics regarding compliance with the National Pollutant Discharge
Elimination System (" NPDES ") Program of the Clean Water Act (the " Act "). A copy of the
inspection report is enclosed with this letter.
The construction activities taking place at Ice Cube Cold Storage and Logistics, 615 Innovation
Way, Fall River, Massachusetts (the " Site ") fall under the jurisdiction of EPA's 2022
Construction General Permit (" CGP "). EPA notes that the Site was previously covered under the
2017 CGP, but did not reapply for coverage under the 2022 CGP. The 2017 CGP expired on
February 16, 2022. This means that, as currently configured, stormwater discharges from
construction activities at the Site are not authorized, and are being discharged in violation of the
Act, unless and until you obtain permit coverage under the 2022 CGP.
Within 30 calendar days of receipt of this letter, provide the information requested below.
Please answer each question as clearly and completely as possible, and provide a response in an
electronic format to the following technical contact:
Eleanor Horvath, Clean Water Act Inspector
(617) 918-1061
horvath.eleanor@epa.gov
1. General Business Information:
a. Specify the full legal name(s) with exact spelling, the business mailing address,
telephone number, and address (es) of each entity's operations for each of the
following:
i. Hutchens Holding III, LLC
ED_019088A_00005783-00001
ii. Ice Cube Logistics, LLC
iii. Raw Seafoods, Inc.
b. Provide a chart / diagram that illustrates the corporate and management structure of
the three entities listed above, including parent companies, subsidiaries, and
affiliated entities. In addition, explain whether " Ice Cube Cold Storage and
Logistics " is a tradestyle, and its relationship to the three entities listed above.
2. Site Construction Information:
a. Provide the date that construction commenced at the Site (615 Innovation Way,
Fall River, MA).
b. For periods of active construction at the Site:
i. Provide the beginning and end date of each stage of construction, as well
as the specific activities that took place during each stage.
ii. Provide a Site map that shows the areas of the Site that were being
actively worked on during each stage.
iii. Describe the erosion control measures that were used to stabilize the Site
during periods of active construction.
iv. How frequently were erosion control inspections completed during active
construction? Who completed the erosion control inspections?
v. Provide copies of Site erosion control inspection reports or documentation
for, at minimum, the past 3 months of active construction.
c. If there were periods of inactivity at the Site:
i. Provide the beginning and end date of each inactive period.
ii. Describe the erosion control measures that were used to stabilize the Site
during periods of inactivity.
iii. How frequently were erosion control inspections completed during each
period of inactivity? Who completed the erosion control inspections?
iv. Provide copies of Site erosion control inspection reports or documentation
for, at minimum, the past 3 months of Site inactivity.
d. Describe the status of the Site today, including existing erosion control measures
and current construction activities.
2
ED_019088A_00005783-00002
e. During the inspection, EPA identified locations where existing erosion controls
were in poor condition (photos 5-11, 13, 16 in attached photolog). Provide
narrative and photographic evidence that these issues were addressed.
f. Describe the plans for the Site in the future, including planned erosion control
measures and forthcoming construction activities.
g. Provide any available stormwater drainage plans for the Site.
h. Provide any available Site plans detailing future construction.
Please refer any questions related to technical issues in this letter to Eleanor Horvath at (617)
918-1061 or horvath.eleanor@epa.gov. Legal issues may be directed to Jeff Kopf, Senior
Enforcement Counsel, at (617) 918-1796 or kopf.jeff@epa.gov.
Sincerely,
Digitally signed by
Artby ALEX ROSENBERG
www
Date: 2024.06.18
13:41:21 -04'00 '
Alex Rosenberg, Acting Manager
Water Compliance Section 1
Enforcement and Compliance Assurance Division
Enclosures:
Inspection Report for June 6, 2024 EPA Inspection
Inspection Photolog for June 6, 2024 EPA Inspection
CCs (electronic only):
Eleanor Horvath, Clean Water Act Inspector, U.S. EPA
Jeff Kopf, Senior Enforcement Counsel, U.S. EPA
3
ED_019088A_00005783-00003