Document Xoa8m2vmmxvNb8xNNKvO2nRy

/.0 . -)U |H*M| . L.cv.n, . T. pcaii - r-*u tUBACT MCMDINCI August 24, 1971 Monthly Report, August, 1971 Waste & Water Servicer. TO ; Wj- K I^rago&c.t ij/.S. ct .' .. pc \*> - !'* fi J; T. Aronson M. E. baez D. K. J. A. Sauer s * - t c_ SUMMARY At Pensacola, no change is seen in the data from deep monitor wells. The secondary sewage- treatment system is back in operation. Surface con* denser Installations in Intermediates have reduced total flow of water in the west ditch and have cut the B01) and nitrate discharge. Preliminary data on a test oxidation pond treating vest ditch effluent arc not encouraging. FCB monitoring shows a lov? level of Aroclor still going to the river from the south outfall. Cleaning of the chilled water lines is sLill proceeding. Dr. Wuttz is on the plant for a quarterly macro-invcrtcbrate river survey. Oil removal in the outfall is looking generally good, work is under way on a proposed program of study iu connection with development of alternative waste disposal systems. At Decatur, Afghan Brown dye waste was tested in the lab anaerobic unit, and acceptable color reduction was achieved. A pilot plant has been set up for testing cf a sludge conditioner for possible use on Decatur treatment plant sludge. A literature search is being made on cadmium toxicity in connection with pre-project board work on the unicell. At Greenwood, a new pollution control coordinator has been appointed. The first air audit reports have been received arid are being forwarded to CED. Part B of Corps of Engineers'permit application forms are being prepared by all plants for October 1 submission. HONS 096269 i PENSACOLA Poop V?ell Di r.posr.l of Acid llcstcs The monitoring program is still active, with no change seen in the data this period. Secondary Trentment of domestic Sewage The system was in continuous service this period with acceptable transfer pump performance. I.one, Ranr.c Waste Disposal Plan ' y f\ Installation of surface condensers and changes in river cooling water flow rites in Buildings 436 and 476 have reduced the total flow in the West Ditch considerably. Approximately 330 gpm of condensate nov; flowing into the pi West Ditch could be routed to cooling tower makeup. This would leave about 7000 gpm containing about 10.00 ppd TOC to be treated. Preliminary data on o test oxidation pond unit are not encouraging. Only 5 days of holdup is being " provided in the test., and perhaps a longer residence will give better results. Further work will.be done before a recommendation is made. - PCH Monitoring Samples taken on several days during the period from 7/7 through 8/2 show that about 2.0 ppB of Aroclor 1254 is still being discharged throurh the South outfall. The highest level in the river water intake was 0.47 ppB, and it usually ranged down to less than the lowest detectable level, 0.0S ppB. One only sample was taken at the woodlined ditch sample station, and it shoved less than 0.08 ppB. It is hard to see how any PCB could still be picked up from any bottom sediments, since this is a new outfall, so an explanation of the presence of even 2 ppB is difficult. Chilled. Water Lines Plant Test Treatment application continues, with results to be determined by CED next week.-' . Escambia River Mgcro-ir.vertchrate Survey Dr. Wurt2 i conducting a quarterly survey on the river this week. MQNS 09&Z7Q