Document Xnm3Z3OXM7pOMYmwQvq6bwXK
' co e.
*x. crr^
SC-DP-00052
DUP 0 9 0 9 1 9 2 .0 0 1
Asbestos Issues Comittee Function
To: Recognize emerging asbestos (and other respirable fiber) issues and see that those with hide impact are ADDRESSED
In a Way That:
*
Considers health, regulatory, liability and cost CONCERNS
Is coordinated with the Corporate Asbestos Program
Involves participation from Medical, Industrial Hygiene, Legal, Public Affairs, Employee Relations, Workmans Compensation, Manufacturing and other
PERTINENT PERSPECTIVES
So That:
Employee health, regulatory, liability and other
concerns are addressed in a cost effective manner
DUP 0909314
Asbestos Issues Cowittee
S. VI. Dixon - S&OH - CHAIR A. S. Berg - S&OH/Polymers
J. 6. Gleich - Consol R. E. Kasch - Human Resources L. A. Legendre - Conoco
J. F. McAllister - External Affairs
C. P. Mihal - Fibers
W. J. Mottel - S&OH L. J. Natale - Automotive Products - TIMS R. S. Price - Environmental J. L. Riddle - N. E. Region/Asbestos Program Manager J. D. Shomper - Legal - Litigation
R. R. Strocko, M) - Medical P. M. Truax - Workers Compensation
J. T. Williamson - Legal - Compliance
DUP 0909315
Asbestos Issues Cowittee - Recent Activity
EQC? Guideline II-I issued "Management of Materials which
Contain Asbestos or other Respirable Fibers"
Global asbestos Engineering Standard (revised S4T)
prepared
Global NARF S&OH Guideline (9.10)/Engineering Standard (S15T) PREPARED
S&OH Bulletins issued on OSHA Compliance (smoking, excursion limit) and EPA NESHAP revision
Submitted comments on OSHA Remand Issues Rulemaking
Medical Guideline 5 Revised
Standard ARC terminology and diagnosis wording Use of CT scan to obtain accurate diagnosis -
borderline ARC Clarify DuPont requirements versus OSHA requirements Provide clearer guidance on who needs DuPont or OSHA
Program Asbestos Issue Manager (s) established to blitz management
issues
Much valuable work begun - closure needed
DUP 0909316
"ASBESTOS"STAKE IN DU PONT
Employee Health Removal Cost Liability Management
DUP 0909346
3L.fi-
PROPOSAL |
"Asbestos" is an issue for which ERC should have value.
Form Asbestos Focus Group (utilizing Asbestos Issues Committee and ERC Liaison).
Review "Asbestos" issues outlined by A.I.C. and determine: - if issues outlined are the right ones to work on. - If groups identified to lead particular issue are right groups.
DUP 0909347
V
ASBESTOS ACTIVITIES!
CORPORATE (ERC/A1C)
Develop policies, practices, etc. for Du Pont. Q Develop inspection/assessment guidelines for
comprehensive program (document practices and options for EPA Neshaps compliance). Maintain network of resources throughout the Company. Redefine and continue lab QA/QC program. Maintain Corporate Respirable Fibers System. Update businesses/regions/sites on changes in regulations and best practices.
MLS
Q Develop removal/contracting best practices -
administration guideline.
Q Develop integrated quality/cost abatement supplies program.
Review and resolve contractor liability insurance issue.
BUSINESS
Provide consultation and on-site inspection/management assistance to sites (options: Fibers, TIMS, MLS/vendors).
SUE
Manage their own own asbestos program and coordinate training specific to their site.
DUP 0909348
PLANNING FOR THE INSPECTION
REVIEW OF PREVIOUS INSPECTION RECORDS AND BUILDING DRAWINGS
1. Scheduling of the Inspection 2. Obtaining Access 3. Building Record Review 4. Probable Homogeneous Areas According to
Drawings 5. Consultation with Maintenance and Operations
Personnel 6. Previous Inspection and Sampling Reports 7. Previous Abatement Records 8. Maintenance Records 9. Exclusions for Previously Performed Inspections
(763.99) 10. General Planning Comments
OUP 0909465
1. SCHEDULING THE INSPECTION
Nights Weekends Business hours School hours Contract
DtJP 0909466
2. OBTAINING ACCESS
Locks (keys) Ladders/Lifts (Safety!!) "Unused" or "Unimportant" spaces Inaccessible spaces Unknown spaces (dimensional accountability) Contract
DUP 0909467
3. BUILDING RECORD REVIEW
Drawings
Specs
Construction contract
Bid documents (alternates)
Change orders
Pay requests (dates)
Construction field reports
Maintenance records
Original construction
Additions/Renovations
DU? 0909468
4. PROBABLE HOMOGENEOUS AREAS ACCORDING TO DRAWINGS
Design drawings
Contract document drawings
As-Built drawings
Shop drawings (Hyatt disaster)
Floor plans
Sections
Finish schedule
Mechanical/Plumbing/Electrical
Structural
OUP 0909469
5. CONSULTATION WITH MAINTE NANCE & OPERATIONS PERSONNEL
Maintenance procedures Maintenance schedules Operations procedures Operations schedules M/P/E design/iocation/operation "Unused" or "Unknown" spaces Passed ACM disturbance Current ACM procedures O & M procedures? Management sophistication Employee sophistication
DUP 0909470
6. PREVIOUS INSPECTION AND SAMPLING REPORTS
Location and pattern of samples? Number of samples? Composition of samples? Condition of ACM? Type and use of ACM? Other data applicable to AHERA
Assessment categories and your assessment methodology? Must be field verified Do exclusions apply? Are some samples applicable? Must the entire survey be redone? How was nonfriable ACM addressed? Was any suspect ACM indicated?
DUP 0909471
7. PREVIOUS ABATEMENT RECORDS
Location Methods Disposal Clearance criteria Worker training Residual contamination? Urgent response action needed? Special cleaning needed?
DUP 0909472
8. MAINTENANCE RECORDS
HVAC filter changes
TSI disturbance
- V.
*t' . '
"
O & M procedures?
Schedules
Routines
Emergency
.
DUP 0909473
9. EXCLUSIONS FOR PREVIOUSLY PER FORMED INSPECTIONS (763.99)
For homogeneous areas or sampling areas Friable ACBM was identified Nonfriable ACBM was identified No ACBM is present (inspector) No ACBM is present (lead agency) Suspect ACBM is assumed ACM All ACBM has been properly removed No ACBM specified or used
Must assess friable Has nonfriable become friable? Must assess newly friable
READ THIS SECTION !!
DU? 0909474
10. GENERAL PLANNING COMMENTS
2 major divisions of suspect ACBM Accessible Space Inaccessible Space
Assumptions Building conditions Survey Conditions
DU* 0909475