Document XVJyvGgMkjOBg1mk8QeQ6apB

Operation Report Aroclor - Dept. 246 August - 1963 PRODUCTION SUMMARY Scheduled Actual - % of Schedule - 1,500,000# . $1,442,456# 96 2 Inventory Downtime - 15.05# YIELDS Standard Actual Y.T.D. # Theory on Biphenyl - 93.5# 96.0# An experimental run on Aroclor 1242 has made material with exception ally good stability. The runs involved holding Aroclor 1242 as crude for a minimum of 24 hours. The runs will be re-checked and when con firmed will be incorporated in our plans for equipment changes. A failure occurred on #4 underground storage tank due to external corrosion. Ihis is the second in one year. Replacement is indicated in the near future. #2 Still pump and coil failed and were replaced. Sales were below capacity. PRODUCT - Aroclors 1st of Mo. Last of Mo. Whse. Stock - 1,300,240# 961,100# Dept. Stock - 530,046# 142,240# Total - 1,830,286 1,103,340# ghw E. E. Martin DSW 296553 STLCOPCB4066466