Document XRmMQ0erOYNEqrLxvdLMe1eYd
)fPl r,-
v !i :i
VICTOPAC QUALITY Henry Dehr
April 29, 1968
X have forwarded to your attention 24 blanked gaskets of Victor nusber 1194M. Please review these and note the surface imperfections which are indicated by grease pencil. Any gaskets that have no surface imperfections are out of gauge tolerance.
He are running approximately 20% rejects at this stage of manufacture. Can you determine Whether these defects are to he expected as a part of your normal production? If so, then we must incorporate them in our cost.
Xt had been our expectation that there would be less scrap if inspected after blanking instead of after square shearing because at this stage imperfections that fell within the combustion opening would not be effected.
W* or. Sheehan
WJStcm
VPD-91-0001206