Document XRZGXdN9wGjREZV4w6bZwLopd
PRE-START UP AUDIT - C-6
PAGE 2
PLANT:
POWER 1______________ ____________
PROJECT TITLE: STEAM TURBINE # 3 NEW GOVERNOR & 235// ADMISSION ADDITION
DATE: 9/18/ 90
'
1. Has the Technology Center approved the process? YES. A SUPPORT T.ETTKK WAS WRITTEN BY THE TECH. CENTER TO SUPPORT THIS PROJECT
2. Has any reactive chemical data been generated?N/A___________________
3. Has a reactive chemical review been done since the design was finalized? ______ NO______ Attach the review letter along with a written answer to any questions that were raised during the review. Has reactive chemical checklist been completed? n/A
4. Has Environmental Control reviewed and approved the project?
-- VF-S_______________________________________________________________
______________
5. JOE RAWLINGSJIM LANDRY -- GEORGE NASSER BILLY STEARS
6.
When the construction project is essentially complete, a job safety inspection should be made. This inspection should in clude:
_____ Plant Supervisors
Plant Operators -JOE RAWLINGS
---------Plant Engineer/Mfg. Rep.
Safety Department- GERVEY SMITH
Their inspection should emphasize:
Piping and associated supports
Valve location and orientation
Structures and ladders
Electrical grounding
Insulation for personnel protection Safety showers Fire extinguishers and deluge guns Intercom locations
Lighting Line labeling Has such a review been made?
TO BE DONE BEFORE START UP. THE INSPECTORS HAVE BEEN IDENTiFIED.
Operator training classes should be held. These classes should highlight the following:
X A. X B. X C. X D. X E.
Project benefits and expected results.
Process description (includeexpected operating conditions)
Process controls
Operator responsibilities
New procedures:
xl. Start up
5. Job Procedures
2. Emergency
X 6. Normal Operating Procedures
X3. Shutdown
7. Red Tag
4. Sampling Lab Procedures
X8. Loading/Unloading
Has such training been done?
YES
DO A 118131 CONFIDENTIAL
PRE-START UP AUDIT - C-6
PAGE 3
7. Procedures should be reviewed by as many plant people as possible
and revised as necessary. A plant committee of operations and
technical people should make a final safety audit of procedures.
Has such a safety audit been done? THF PLANT OPERATORS WROTE THE PROCEDURES, WHICH WERE REVIEWED BY TWO ENG. THE PROCEDURES WILL B' kLVit-w&u aGAIN WITH
. OPERATORS IN A FOLLOW-UP TRAINING CLASS.
8 Has tne system been pressure tested? tt tjttt bf hffobf thf. TURBINE STARTS U]
Washed or cleaned?
rTFAurn______ How? thf. m.n PTPTNG WAS WIPED_CLEAN. THE
NEW PIPING WAS SAND BLASTED AND AIR PURGED.
___________________
9. Is it possible to have a dry run operation such as operating the
system on air. nitrogen. J water? VES If so* has this been done? STEAM BEFORE startup .Aire other plants involved in the new process? YES. (ALL PLANTS THAT USE 235It STEAM).
.10 Have all instrument loops been checked and documented? YES
Full range valve stroke?
YES Fail safe valve positions
verified? YES Have critical instruments been
identified and registered? YES_____________;____________________ _
.11 Has the new electrical equipment been checked out? Are field
switches, equipment and MCC starters labeled properly? Refer to
S-316 for electrical safety standards.
_____ YES
_____________________________________________________________
.12 Have the block operating manual and emergency procedures been
modified to include the new project? YES
13. Have pressure vessels and PSV's been added to the computer list? N/A___________ Do PSV's set pressure match design pressures
of vessels?
N/A
14. Have plant and engineering files and drawings (P&ID's) been updated to include the new equipment? I & E WIRING DIAGRAMS & loops have
been updated. P & ID'S HAVE TO BE COMPLETED. 15. Has a list of necessary spare parts been added to the existing
spare parts stocking list? YES____________ __ _________________________
16. Have training classes been set up for maintenance of the new
equipment:
YES______________________________ ___________________________ _
CONTROLS ARE CHECKED
17. Has all associated equipment been checked? NEED TO DO FINAL CHECKOUT
18. Has a review of the control system been completed? If computer control, has a simulation been done?
YES YES
This check sheet must be filled out and reviewed with the Plant Superintendent prior to the start up of a new project.
9/89
CDOONFAIDENTIAL
SDK
i
PROJECT AND MODIFICATIONS SAFETY ASSESSMENT
PLANT POWER 1 TITLE STEAM TURBINE # MODIFICATION
Underline those factors which have been changed by the proposal.
PROCESS CONDITIONS
ENGINEERING HARDWARD AND DESIGN
temperature pressure flow level composition toxicity flash point reaction conditions
OPERATING METHODS
start-up routine operation shutdown going through explosive
range preparation for maintenance abnormal operation emergency operation layout and positioning of
controls & instruments
ENGINEERING METHODS
trip and alarm testing maintenance procedures inspection portable equipment
SAFETY EQUIPMENT
fire fighting & detection systems
means of escape safety equipment for
personnel showers and eyewashes
ENVIRONMENTAL CONDITIONS
liquid effluent solid effluent gaseous effluent noise dust diking
line diagram
wiring diagram electrical feeders distribution plant layout design pressure design temperature materials of construction loads on. or strength of;
foundations structures vessels pipework/supports/bellows temporary or permanent: pipework/supports/bellows valves slip-plates restriction plates filters instrumentation trips and alarms Static electricity - grounding lightning protection radioactivity rate of corrosion rate of erosion isolation for ma-tr>tenance maintenance - electrical fire protection of cables handrails ladders platforms walkways tripping hazards access for: operation maintenance vehicles plant fire fighting underground overhead: service equipmtn safety relief devices
DO A 118133 CONFIDENTIAL