Document XOzYvZddX9ybgMO4gGVB3YXJB
/
t-
C. H. HAUO
DIACCTOft
American Smelting and refining Company
CENTRAL ENGINEERING DEPARTMENT BOO CRANDALL BUILOINO
SALT LAKE CITY, UTAH 64101
March 20, 1970
AMCA COOK SOI TCLl.NONC JM-3COI
Automation Supply and Engineering Corp 1724 West Grant Road Box 5891 Tucson, Arizona 85703
MAR 2 3 K:
Attn: Mr. R. W. Norman
n
Dear Sir:
REQ. CE-70-EP-11
OUR P.0. 579-2
This is to advise that we have accepted your quotation dated March 13th and will confirm this by purchase order from our New York Purchasing Department on Order 70-579-2 as referenced above. Due to the mail strike we are authorizing you to proceed now against this order.
Your proposal includes support feet and speci fies 1/2" Fiberfrax gaskets in instances. We feel this is a typographical error.
We wish you to wire your revised proposal data to Mr. J. Wist, New York Purchasing, to take into consideration the following changes covered by our attached list of ap proved drawings to be used for fabrication and request approval Points as quickly as possible for our review.
1. Delete the support feet on conveyor troughs.
2. All gaskets to be 1/8" asbestos as shown on drawings instead of Fiberfrax. Temperatures on this installation do not require this.
3. Changes in lengths of conveyors 9, 11 and 12 and the ad dition of conveyor 13 detailed on drawing EP-15987
All reference should be made to include drawings as follows:
HER 0000045
-2-
}
Dwg. EP-15950 EP-15971 EP-15975 EP-15979 EP-15980 EP-15990 EP-15987
We have included two sets of drawings.
Very truly yours.
AOM: jj ccsEHHaug-w/o ends.
LCTravis-w/o ends. JWist, HYPur. Dept.
A. 0. MARSH, Jr. Chief Design Engineer