Document XOxQLrnmwovXVodOMgrv13VxR
CHEMICALS AND PLASTICS
To (Nairn) Di'riiion location
Mr. Fred Williams
Mr. R. 0. Midkiff Mr. R. E. Peele
institute plant p. o. sox 2331. charl"'> , west Virginia 25330
Date January 24, 1973
Originating Dipl. Answering letter <!ate
Employee Relaa :.r :is Hygiene/Safety
Subject
Asbestos Sampling Values 511 Insulation Fabrication Shop
Asbestos fiber counts for samples we have collected at the Plant 511 Insulation Fabrication Shop are submitted for your information. they may serve as guidance for any sampling program you may initiate and they rl.euid be valid as part of a records program.
Sample No.
Date Sampling Time, min Fiber Count/ml Sample-Job Description
512-HHF-01 3-8-72
512-HHF-02 3-8-72
512-HHF-03 3-8-72 512-HHF-04 11-21-72 512-HHF-05 11-21-72
512-HHF-06 11-21-72 512-HHF-07 11-21-72 512-HHF-08 12-4-72 512-HHF-09 12-4-72 512-HHF-10 12-4-72 512-HHF-ll 12-4-72 512-HHF-12 12-4-72 512-HHF-13 12-4-72 512-HHF-14 12-4-72 512-HHF-15 12-4-72
15
5
15 6 6
9 15 15 15
9 15
4 13
lk lk
Too heavy to count
61.5
24.5 min. 4.1
23.4
4.1 3.9 0.05 5.3
11.8 min. 27.8
6.5 9.8 48.3
S. E. Painter - Dust
collection removal for
disposal.
S. E. Painter - Dust
collector wearing
respirator.
S. E. rainier - End of
dust removal job.
L. I.
A ell - Butt sawing.
L. I. Mitchell - Placing
pairs 0:. : -ed blocks in
cartons.
H. Stanley - Janitor
broom rv -ing.
H. E. i, . les - Cementing
pre-forn_0 rlocks.
L. I. Mitchell - Off bearing
south saw 1st cut.
H. E. i : :: - Separate
sawed hi: .;. - apply glue.
Bad filter - not counted.
H. E. Scrnles - Removing glued
blocks f rstack-edging.
H. E. Samples - Sawing block.
L. I. Mitchell - Off bearing
second 0._ - placing in carton.
L. I. Mitchell - Unpacking a
single o:.:rr:. :-n - sawed 22 pcs.
L. I.
: . 11 - Filling
cartor f. t : sawed blocks.
A.04074
t
Hr. Fred Williams
Page 2
January 24, 1973
All samples were collected on the person of the employee and each of them represents a peak exposure for the various work tasks. All work was involved with asbestos containing KAYLO block materials.
The problem area most deserving corrective measures is obviously the dumping procedure of the shop dust collecting facility. Excessive exposures are encountered in the handling, especially packing, of sawed block material.
Exposure values have not been reported to the employees nor to shop supervision.
Very truly yours,
HHFillh
K. H. Frazier
A 0 4 0 7 5: