Document XOpXvmOGvBjXbkBNog56q7L6R

DATE: SUBJECT: FROM: THRU: TO: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS 77 WEST JACKSON BOULEYARD CHICAGO, ILLINOIS 60604 OCT O2 2019 CLEAN AIR ACT INSPECTION REPORT Xcel Energy-- Wescott LNG Plant, Inner Grove Heights, Minnesota Luke Hullinger, Enviromnental Engineer AECAB (MI/WI) Ethan Chatfield, Acing Section Chief AECAB (Ml/WI) File BASIC lNFORIV[A TION Facility Name: Xcel Energy~ Wescott LNG Plant Facility Location: 10326 South Robert TraiL Inner Grove Heights, ",1innesota Date of Inspection: 8/15/2019 EPA lnspector(s): J. Luke Hullinger, Environmental Engineer 2. Kenneth Ruffatto, Enviromnental Engineer Other Attendees I. Shaun Levy, Gas Plants Manager, Xcel Energy 2. Patti Leaf, Environmental Manager, Xcel Energy 3. Jeremy G1ingras, Gas Plant Operator, Xcel Energy Contact Email Address: patricia.b.leaf@xcelenergy.com Purpose of Inspection: Clean Air Act Inspection Facility Type: Liquid Natural Gas Shaver Station Regulations Central to Inspection: National Emission Standard for Hazardous Air Pollutants Subpart ZZZZ for Reciprocating Internal Combustion Engines Arrival Time: 10:40 AM Departure Time: 12:30 PM Inspection Type: l2l Unannounced Inspection /\nnow:iceu 1nspecuon OPENING CONFERENCE l2l Credentials Presented l2l CBI warning to facility provided The following information was obtained verbally from Shaun Levy unless otherwise noted. Process Description: Xcel Energy - Wescott LNG Plant is a liquid natural gas shaver station in Inner Grover Heights, Minnesota. The plant receives natural gas from one pipeline at 320 psi, and sends natural gas out tbrnugb two pipelines hotb at 400 psi. When the natural gas is received it is chilled to -255'F. Next, the natural gas is stored in a storage tank pressure vessel at 0.4-0.7 psi. Then, depending on demand, the natural gas is sent out in two pipelines at 400 psi. Staff lntenciew: The combustion turbine was replaced with a more efficient one that had less emissions and the same capacity in 2012. During the inspection there was a temporary flare being used while maintenance was being performed. TOUR INFORMATION EPA toured the facility: Yes Data Collected and Obsencations: A FUR video was taken of emissions from the extension box between Compressor 102 and the natural gas line. Photos and/or Videos: were taken during the inspection. Appendix A Field Measurements: were taken during this inspection. Xcel Energy's LEL meter indicated 55'% level of LEL of emissions from the extension hox of Compressor I 02. Page 2 of 4 CLOSING CONFERENCE Concerns: EPA noted that the emissions coming from the extension box. The box came in contact with both refrigerants on a closed loop system and natural gas fonn the storage tank. SIGNATURES {o/3/1,(Jla\ J#3-~ Section Chief: __\,"~:_----""-e_=:==::-_J,r9r._r:jJ i~!L Date: __ eJ..itf,c:s(J Page 3 of 4 Facility Name: Xcel Energy- Wescott LNG Plant Facility Location: l 0326 South Robert Trail, Inner Grove Heights, Minnesota Date ofJnspection: 8/15/2019 APPENDICES AND ATTACHMENTS I. Appendix A - Video log Page 4 of 4 Facility Name: Xcel Energy- Wescott LNG Plant Facility Location: 10326 South Robert Trail, Inner Grove Heights, Minnesota Date of Inspection: 8/15/2019 APPENDIX A: DIGITAL IMAGE LOG 1. Inspector Name: Luke Hullinger 3. Company/Facility Name: Xcel Energy- Wescott LNG Plant 5. Number oflmages: 1 2. Date(s) ofinspection: 8/15/2019 4. Street Address, City, State: 10326 South Robert Trail, Inner Grove Heights, Minnesota 6. Archival Record Location: C:\Users\Lhulling\OneDrive - Environmental Protection A!encv (EPA)\Xcel Wescott\FLIR Video Image Number 1 File Name MOV 2518.mp4 Description of Image FUR video of emissions leaving the extension box of Compressor 102 Appendices Page 1 of 1