Document XOE0qZJq8a8L3DBYGJo2m33dJ

r-SeorgiaFfecific intracompany memo to Mr. G. E. Wilson from K. W. Brown 3- subiect OSHA Regulations - Joint Cement date cc: Messrs. T. W. Richards - Tigard J. R. Hurd - Portland M. F. Fink - Tigard O, PLAINTIFF'S EXHIBIT Portland Acme May 29, 1974 We have reviewed our situation relative to the requirements of the OSHA Act concerning the handling of asbestos. Listed below are the requirements of the Act and our situation in their regard. Item Acme Status 1. Establish a continuous monitoring system to determine amounts of fibers in air in work area. 1. (a) State has run tests and will report results within three weeks. (b) Have plans to train two of our people to run the required tests in this area. 2. Establish a system for safe handling and storage of bag asbestos. 2. (a) Cover pallet load with plastic cover as removed from box cars before s tori a (b) Loose material and broken bags cleaned up inmediately. (c) Empty bags placed in plastic bag, sealed and carried to dump and covered (d) Mi sing area where bags are opened has suction ventilation. 3. Medical examinations for employees exposed to asbestos. '3. (a) Annual medical examination for all bic employees of Jt.System Dept, and Lab. (b) Special examination for employees bidding into our out of this dept. (c) Appropriate records are kept of the above to which employees have access as needed. 4. Placement of warning signs in hazardous level areas. 4. Appropriate signs are posted. 5. Placement of warning labels on finished products containing asbestos. 5. Warning with suggested wording from Tigard Lab is stamped or labeled on all items containing asbestos. ,:: 1 rn GP09 SGP 0007566