Document XO7kZxKYY06mLaNbbNaXb4Rxw
r ENGINEERS' -i i i. *, INTEROFFICE MEMGFTANDlM
TO R. E. Bonita AT Oakland
DATE FROM-
copies to /a, l. Lindsay
Mkgr 21, 1976 V. H. Hula
Attached hereto for farther distribution and. safekeeping is u originally signed copy of the subject contract vith Slalcaa. Division 21 distribution has been made.
WHMsams Attach.
KEN 001734
AGREEMENT
THIS AGREEMENT, made and entered into this J Q
day of M Ay_______ _
1976 effective as of the 9th day of January, 1976, by and between THE TIMKEN
COMPANY (hereinafter called "Owner") and KAISER ENGINEERS, INC. (hereinafter
called "Kaiser Engineers").
WITNESSETH
-V
WHEREAS, Owner desires Kaiser Engineers to perform engineering services
(hereinafter called the "Services") as described hereinbelow for an electric
furnace dust collection system and a roof evacuation system (hereinafter
called the "Project") at Owner's plant at Canton, Ohio; and
WHEREAS, Kaiser Engineers is willing to perform the Services upon the terms and conditions hereinafter set forth.
NOW, THEREFORE, it is agreed by and between the parties hereto as
follows:
-
ARTICLE A - SCOPE-OF PROJECT
Section A-l. The Project consists of a side draft hood dust collection
system for a new 22 ft. diameter electric arc furnace to be installed
in the Owner's Canton, Ohio plant and a roof evacuation system for the
building extension to be built to house the new furnace. The furnace
dust collection'system and the roof evacuation system are to be tied
into the plant's existing dust collection system which will be aug
mented by additional baghouse and fan capacity.
KEN 001735
1- -
032376