Document XM7oOEzM9ZjQm4q4mvvkB55R

Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 04/05/21 Water CWA - NPDES, Produced Water Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: WN Operating, Inc. Anicker Lease 35.723463N, -95.581521W Okmulgee, Oklahoma 74447 P.O. Box 551 Okmulgee, Oklahoma 74447-0551 Okmulgee County 918-758-7115 James Wise wiseexploration@gmail.com FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: N/A OKU000897 N/A 211111 1311 Personnel participating in inspection: Kent Sanborn EPA, 6ECDW EPA Lead Inspector EPA Lead Inspector Signature/Date Supervisor Signature/Date forJEANNE ECKHART Kent W. Sanborn Digitally signed by JEANNE ECKHART DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=JEANNE ECKHART, 0.9.2342.19200300.100.1.1=68001003655845 Date: 2021.04.29 10:47:19 -05'00' GUY TIDMORE Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2021.04.29 08:04:53 -05'00' Guy Tidmore 29 APR 2021 Date 29 APR 2021 Date 6ENFORM-019-R8.2 (02/12/2020) 1 WN Operating, Inc./Anicker Lease Inspection Date: 04/05/2021 Section I - INTRODUCTION Purpose of inspection EPA Region 6 inspector Kent Sanborn arrived at the WN Operating, Inc. oil and gas facility at 2:30 pm on 04/05/2021 for an inspection of brine facility that has had previous discharges. There were no facility representatives present at the site. The inspection was conducted under the authority of the Clean Water Act (CWA) to assess a previously reported spill from the brine facility. The scope of the inspection is to assess unauthorized discharges and impacts of nearby water resources under the CWA. Facility Description The facility was a tank battery located next to a small tributary. The entire battery had been relocated southwest of the old site by just a few yards. Section II - OBSERVATIONS I had the following observations during the inspection: The tank battery had been moved slightly away from the creek. Any runoff that occurs should now run away from the creek due to this relocation. The dry pit had an installed sump pump. No evidence of recent discharges from the battery. Were control measures put in place? N/A National Response Center (NRC) notified? N/A Remedial action ongoing? N/A Downstream Observations? NO Upstream Observations? N/A Spill Ongoing? NO Spill reached waterbody? N/A Aquatic Life Kill/Damage? N/A Vegetation damage? N/A Section III - AREAS OF CONCERN The following areas of concern were identified: No. There is historical brine spill damage north of the tank battery. Section IV - FOLLOW UP The following follow up actions that are recommended for EPA are: None Section V - RESOURCES Below are compliance resources for oil and gas facilities: To report spills associated with your facility, call: 1-800-424-8802, for more information: https://www.epa.gov/pesticide-incidents/how-report-spills-and-environmental-violations. For information regarding Spill Prevention, Control, and Countermeasure (SPCC) program: https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/facilityowneroperators-guide-oil-pollution. For information regarding Underground Injection Control (UIC) (Safe Drinking Water Act): https://www.epa.gov/uic. 2