Document X8kz97411m9q6VBEvN22EmKLJ
PLAINTIFF'S EXHIBIT
ftufiject Asbestos Task Force - New York City Board of Education. March 8, 1979
Case #48106-3
Bel Laboratories
Mt March 12, 1979 tram.- C. P, Lichtenwalner
Mr. W. J. Schreibeis:
On March. 8th I attended a presentation by the Asbestos Task Force of the New York City Board of Education at 111th Street between 5th and Lenox Avenues in New York City with Mr. Norman Wood of the New York Telephone Company. This) presentation was given to contractors and school board members to explain the methods that would be used for controlling asbestos in New York City schools.
The coordinator of the Asbestos Task Force gave a brief
talk on where asbestos is used in the schools and discussed
some of the properties of fibrous asbestos. Afterwards, a
slide presentation was given describing in detail the
methods that will be used in removing asbestos insulation
in school buildings. In some places where asbestos is
present, the material will not be removed but will be
encapsulated with a spray-on material (currently they are
using Decadex Fire Check and will continue to use this
untilrthey get a list of approved materials from the EPA).
In other places the asbestos insulation will be contained
by boxing-in the insulation with gypsum board and then
covering the board with ceiling tiles. When the insulation
will be contained by these encapsulation or boxing-in
techniques, the extensive safety precautions necessary for
removal will not be necessary. These removal precautions
were given in the slide presentation. The precautions used
were:
\
1) prior to containment all moveable items of furniture j in thd- area were removed.
2) All vents, ducts, doors, windows, etc., were sealed with polyethylene sheets.
3) All floors and walls were covered with polyethylene sheets using duct tape for sealing (.006 inches on the floors and .004 inches on the windows).
LLA 000743