Document X8Dd7LEY0joydBEz0bLnYXNVw
(conoco)
Interoffice Communication
To From Date subject
J. H. McCulley, Jr. p> L> Fetzer Januaiy 6, 1975 Summary Update for Shiploading Dosimeter Data.
Attached is an update of the analytical data from the personnel dosimeter testing conducted during ship loading for the year 1974. The last summary letter was issued November 13, 1974.
P. L. Fetzer be CC:
VVC 000019431
DATE 4-22-74 Gamma Gas 5-2-74 Hoegh Shield
5-30,31-74 Alpha Gas 6-13,14-74 Hoegh Shield
6-22-23 Irene
PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA
HOSE CONNECTION
HEEL
AND FLANGE REMOVAL SAMPLING
HYDROQUINONE
LOADING OPERATION
ADDITION
VENT REC.
DOCK SHACK
1.83 1.79
43.5
1.34
1.2
.21
6.9
6.4 2.8
.79 .98 .85
66.3 1279
21.2 1.44
1.91 2.38
.44 1.48 1.48
.23 .74
1.18 .96 .67
.5 .5 .25 .11 3.3
.25 1.54
.48 73.46 55.21
28.84
3.67
.9 10.81
1.98 3.13
9.47 14.81 7.87
8.28 12.58
14.90
4.34 11.55
9.01
.18 .05 .69 8.2 2.83 7.64 6.19 .83
1.87
3.03
69.11
10.71
6.43 3.30 1.80
FINISH CARGO SPL.
53.67
HOSE RMC AND FIANCE TK
301 55.8
97.6
5.25
26.4 114.8
7.75
6.83 4.27 15.82
2.39 1.11 4.11
5.55
5.73 7.43
VVC 0 0 0 0 1 9 4 3 2
DATE
7-U-15-74 Niels
7-23,24-74 Hoegh Shield
HOSE CONNECTION
HEEL
AND FIANCE REMOVAL SAMPLING
.33 192
7.75
.79 1.24
7-28,29-74 Niels
1.80 .18
38.46
8-9,10-74 Thor Heyerdahl
.24 4.32
9.02
8-25,26,28,29 Irens
.41
1.62
9-11,12 Gamma Gas
9-22,23 Gamma Gas
3.75 28.64
5.66
56.99 33.3
HYDHQQUINONE
LOADING OPERATION
ADDITION VENT RFC. DOCK SHACK
8.03
,21 5.41 . 3.11
7.49
3.42 13.56 34.65
39.89 32.44
1.14 2.93
.32 3.66
.33
5.64 1.56 '
2.06 7.55
.25 .13 52.53 .54 15.02 1.42 .02 1.64 2.85
0.99 0.04
5.31 3.52
5.58
.29 0.0
0.04 0.06 0.07 0.03
FINISH
HOSE RIMOVAL
CARGO SPL. AND FLANGE INSERTION
2.55
00001^43
6.05 42.25
7.59
45.72 28.77
6.00 21.12
3.85 7.18
326.77 2.07
PERSONNEL DOSIMETER SUMMARY OF SHIP MONITORING DATA
DATE
HOSE CONNECTION
HEEL
AND FLANGE REMOVAL SAMPLING
HYDROQUINONE
LOADING OPERATION
--ADDITION VENT REC. DOCK, SHACK
10 -17,18,19-74 Irene
0.09 2.27
24.78
2.88
Nil 0.04 0.04
11-2,3-74 Alpha Gas *
0.12
2.25 2.47
0.24
11-9,10-74 Gamma Gas
0.00
15.42
0.07
1.99
0.00
11-18,19-74 Beta Gas
11-30,12-1-74 Beta Gas
--
0.20
7.89 1.50
0.48 2.25
-- --
0.04 0.02
12-20-74 Gamma Gas
12-27-74 Sigurd Jorsalfar
59.61 0.86
1.91 8.51
0.05 8.12
--
7.72
. 0.02 0.02
FINISH
HOSE REMOVAL
CARGO.SPL^ AND FLANGE INSERTION
33>01
27.62
VVC 0 0 0 0 1 9 4 3 A
4.02 19.91
9.98 0.19 0.36 2.50
0.32 50.28
0.83 0.08 823.2
______
** Placed < VCM technical staff personnel who were monitoring ' e various loading operations.