COMMERCIAL DEVELOPMENT MEETING MINUTES - 2/4/74
Present:
U. D. Shephard G. Fenton A. G. Santighian u'' S. J. Cinke G. II. I'itzCcrald D. J. Anderson
HOLDING TANKS
S. J. Cinke reports that Pro-quip considers we are on the night lines with our latest designs of blades and baffles. Some minor changes still to be made on MK IV tank. .
K2W MACHINES
S. J. Cinke and G. Fenton to get together on desirable size and location for projected KK V and new ring machine.
OVETT CAPACITY
A. G. Santighian - in recent test (EP-54G5 only) the plant had run 24 hours with oven temp, increased from 400 to 430 F, and cycle reduced from 32 min. to 25 min. A. G. Santighian felt could have been reduced further to 20 min., but driers were too hot for immediate re-use and pulpcrs could not keep up. A. G. Santighian to write this up and emphasize potential increase in capacity.
PULPERS
A. G. Santighian asked for improved pulpor liquid level control - S. J. Cinke
will study and considers timer systems probably best. Also will consider
problem of`Variability of pulping times.
-n
PRODUCT DENSITY
Recurring problems of hot tops ranging well above standard weight. G. FitzGerald and A. G. Santighian - recent supervised run produced boards well within standard range. At Manufacturing request, G. Fitzgerald is instituting survey to pinpoint reasons for variation.
Commercial Development Meeting
-2-
February 4, 1974
LIQUID U.r A. G. Santighian to write up benefits.
TOOLING
G. Fenton, again, asked for improvement in tooling delivery - S. Cinkc to advise.
AST7.ST0S-FRSS TESTS
H. D. Shephard to check on present stock and supply of Wollastonitc. G. Fenton - Wollastonitc requirement forecast will have to be changed again latest ring recipe does contain Wollastonitc - the previous recipe failed.
EP-5484 (asbestos-free Proflex as used on Wisconsin's 390 1-Pc in Chicago) has been tested successfully in Cleveland on Ohio Works 378 1-Pc.
Likelihood of manufacturing close-down due to trucking situation - we should take opportunity for as many tests as possible - G. FitzGerald to arrange with M. Wood.
JOHNSTOWN
'
*'
New tool 878 duo to tost 2/5/74. if o-K, there will be further delay for production driers - hand production of hoc tops likely Co continue through February which makes it impossible to meet their request for 10 tops/day.
--------- Winterized Fremix - calcium chloride is apparently affecting PF resin. A. Santighian will reduce quantity of calcium chloride.
SHARON
Price increase has caused them to check 454 breakage much mote closely. G. FitzGerald to discuss packaging with R. T. Callahan.
DUQlTF.SNg
Test quantities of molds, castings, hot tops were shipped from Lorain.
Need report from Eastern Region.
... . -
p,. ,
GF/cel