Document X7zN1Vm52g39bB52we3odk62G
PLAINTIFFS EXHIBIT
WV4S81I
o /
plaintiffs
EXHIBIT
iHoiC on
MINUTES
of the
TECHNICAL fe RESEARCH COMMITTEE MEETING
NATIONAL INSULATION MANUFACTURERS ASSOCIATION
New York, K Y*
September 18, 1962
Rock end Slag Section
Glass Section
The meeting was celled to order at 9:15 A, W. with the following in attendance:
W* Acker W. Gubar P. L. Loss* K. M, Ritchie EL L* Schneider J, M* Barnhart
Johns-Manville Sales Corp, Gustin-Bacoa Mfg, Company The Eagle-Picber Company Baidwin-'Ehret-Hill, Inc, Oxene-Corning Fibergl&s Corp*
NIMA
PROPOSED REVISIONS TO ASTM SPECIFICATIONS
Reports on latter ballots Have been received on the following proposed revisions to ASTM specifications;
1. ASTM C300, C-28I, C-378, C-262 and C-280; no negative ballots received, and therefore will be forwarded to either C-16 Committee or the Administrative Committee on Standards for further action*
2. ASTM C-392 Mineral Fiber Block or Board Thermal Insulation for Elevated Temperatures.
ASTM C-263 - Mineral Fiber Blanket Insulation (Metal-Mesh Covered) (Industrial Type)
Comments received on these specifications were of an editorial nature and will be discussed when the appropriate ASTM C-16 Subcommittee meets*
REVISIONS TO FEDERAL SPECIFICATIONS
The Elevated Temperature specification and Low Temperature specification were reviewed and revised in accordance with the comments received dur ing discussion* The revised specification will be circulated to the Com mittee for approval and/or comments*
fiC 422167 p
0078 VW-05811
r
z
PROPOSED FEDERAL SPECIFICATION ON DUCT LINERS
Ur. Erast is to be asked to write the specification including the requiremerits contained in the duct line? specification written by the Prefabricated Duct Committee*
PERFORMANCE STANDARD FOR FACINGS
Mr. Cubar will present the completed document at the next Committee meeting,
PROPOSED REVISIONS TO MIL*1-742
Comments are to be sent to Mr. Barnhart in order that NIMA can send them to the Bureau of Ships,
The subject of fiber diameter in specifications was discussed. It was decided that the various agencies whose specifications contain fiber diameter will be asked to delete the requirement as fiber diameter is not a physical requirement. Ae long as the material meets the physical re quirements in the specification the fiber diameter is unimportant.
x
Mr. Barnhart was asked to poll the manufacturers to determine what fiber diameters (diameter ranges) arc applicable to fine fiber, textile fiber and wool fiber products.
COMMERCIAL STANDARDS
The Committee decided that CS-105 and CS-ll ? were out of date and no longer served a useful purpose, and suggests that the documents be rescind ed. The Rock St Slag manufacturers and Glass manufacturers will be polled on this subject.
OTHER BUSINESS
1. It was asked that consideration be given to revising AJJTM C-167.
2. The Bureau of Standards is to be asked if it is feasible for them to set up standards of measuring fiber diameter by the Micronsire
ADJOURNMENT
There being no further business, the meeting was adjourned.
MC 4221&2 A
0029
r
MINUTES
oi the
TECHNICAL h RESEARCH COMMITTEE MEETING
NATIONAL INSULATION MANUFACTURERS ASSOCIATION
New Torts, N. Y.
September IS, 1962
Molded Section
Chairman K. P, Hoopes called the meeting to order at 9:13 A, M, with the following in attendance:
H. P Hoopes L, L, Collogue Butt Tower V/, P. SifacUir V. L, Miller A, Kevlin D. A. Davie E. F. Ott, Jr. V?. R. Selpt
Fibreboard Paper Products Corp, Mundet Cork Corp. Johns-ManviHe Sales Corp. Pittsburgh Coming Corp, (Unibestce) Pittsburgh Corning Carp* Owens-Coming Fiberglas Corp, 4 The Rubereid Company Keasbey U Matttson Co. Keaebcy & Matticon Co.
TUBING {COPPER} O.D. SIZES
At our last meeting we agreed to poll the members whether or net to adopt the ASTM Table of IPS O.D's for Copper Tubing. The returns of the April 23 ballot were 5 in favor, 2 opposed* V, L, Miller said his tubing sires do not now conform to this proposal. W. R, Sinclair commented that the Unibestos Tubing 0.0. *s are not the same as IPS for at least up to the 3 inch nominal 10 sizes. It was decided to defer further action until the next meeting, in the interim, the two dissenting members will determine from their companies what the possibilities are for them to produce tubing 0.0. *e to the JP& system of nesting sizes.
Mr. Hoopes pointed out that in some tubing sixes, using IPS O.D.'s, the thicknesses are considerably above the nominal thickness. He suggested each member talk to their management about the possibility, in such cases, for an economy in material by using the next lower IPS O. D. and thereby reduce the thickness to something nearer nominal,
TRUENESS AND SQUARENESS OF PIPE AND BhOCK
Since an ASTM proposal for block has been balloted and will be discussed by their Subcommittee T-VIE next week, there would be no need for us to consider it at our meeting today.
rrr p
0O&&
Six photographs of Paul Losse*s were preseated illustrating the different types o misfits which can occur between pipe covering half-sections on an appiicatioa. It was agreed that these photographs were necessary to identify the type of misfit and to show the means for measuring its extent* However, the one illustrating a tapered longitudinal joint opening should show the one end strapped tightly and the other "open" end as being free for measuring the extent of this gap*
INTERIM FEDERAL SPECIFICATION BH-I-0055lb
This interim specification for cellular glass covers four classes based upon factory applied finishes (jacketing)* It was explained that NIMA go on record as opposing any specification in which the jackets, constitute a part of the specification* If jackets are desired for one use or and:her or are a necessary part of the insulation, than such jackets should only be listed as to their availability or reference be made to specifications, if and when such specifications are issued for the jackets themselves. Jack Barchart will take up this item with the proper Government agency*
PROPOSED MILITARY SPECIFICATION M2L-I-27S2D
The proposed draft of MIL-X-2781D for pipe, dated 29 June 1962 was reviewed with the following changes recommended:
Par 1.2, Grade 1 Change "600 F" to SSO F and delete "Class b - compounded" Reinstate the Oaade 22 of MIL-J-278JC, but delete "Class c - Fibrous" and delete "Class d - Compounded"
Par 1*2, Grade IQ Delete "Class e - Compounded" "Claes f - Fibrous"
Mr. Sinclair opposed our eliminating these definitive terms, "Compounded" and "Fibrous"* The group, however, preferred to strike out any reference to compositions and to substitute in their place the following classification wherein each one is identified by its maximum density. If this is not satisfactory to the Military, then we would agree to retain the existing terms. If retained r however, we would ask for an additional paragraph to define these terms* The classification we propose on the basis of density is:
Grade l - Temperatures up to $50 F Grade U ~ Temperatures up to 750 F
Type 1 *- 13 density maximum Type 11-15 density maximum
MC 422s$r P
nn$ /
Grade 1U - Temperatures up tc 1200 F Type I - IS density maximum Type II -- 20 density maximum Type XU - 26 density maximum
The group at this point raised a question which Jack Barnhart is to present "Are there any needs of any Government Agency for insulation for pipe temperatures above 1200 F?"
Par 2. 2 Other Publications Under the ASTM liet of specifications their latest revision should be used rather than tieing one down to a specific date of issue, (Also: follow thru in any applicable subsequent paragraphs.)
The ASTM C-421 title should be changed to Weight Loss by Tumbling of Preformed insulation. Method of Test For.
Include the ASTM C-356 linear Shrinkage of Preformed High Temperature Thermal Insulation Subject to Soaking Heat. Method of Test For.
Par 3.1 delete '"as long aa it" and substitute that
Par. 3. 2 Heinsert some modified G?L testing procedure and acceptance method.
Par J.2.2 At the beginning of the first sentence insert Thermal
Par 3.2.3
-
--
change HPipe Covering
to Thermal Pine Insulation--^
Par 3.3, Table HI change "Mechanical Stability" to Weight Loss by Tumbling delete the requirements for mechanical stability for Grade Hi, Class f. Burt- Tower objected to the ,fk" factors and will write Jack Barnhart of J-M's recommendations.
Par 4.2.2 4*4. 2. 3 MIMA Objects to the high level of testing required herein. ach member company agreed to send Jack Barnhart their proposal for a more reasonable U. e. economicalJ level of testing.
Par 4.2. 3. X (a) thru (e) Amplify to emphasise that a test failure occurs if the average of the sample exceeds the specified limit. As an example the following
underlined words would be added: "The average density of the sample exceeds the specified maximum value. "
rrc *22i$r j*
OO
Par 4,2. 3* I ic) change title to Weight Loss by Tumbling, insert new paragraph.* 4,2* 4 - Action in Case of Failure (gee MILSTD-IQS, par* 12, 2).
Par 4.3,4 change title to Weight Loss by Tumbling
Par 4.3,6 In the laat sentence change "Mechanical Stability" to Weight Loss by Tumbling
Par 5, l This whole section on packing should be revised both for overseas and tor domestic shipment and will be handled by the NJMA Packaging Committee*
PROPOSED MILITARY SPECIFICATION M1L-X-2819D
The proposed draft of MXL-X-2819D for blocks, dated l August 1962 aa reviewed and the following changed desired.*
Par 1.2, Class l change *'600 F" to 550 F
Par 2* 2, Other Publications under the ASTM list of specifications, their lateat revision should be used rather than tioing each one down to a specific date of issue (Also: follow thru in any applicable subsequent paragraphs). ASTM C-421, change title to Weight hose by Tumbling of Preformed Insulation, Method of Test For* include ASTM C.356yLlnear"Shrinkage of Preformed Hiflh Tempera tore Thermal Insulation Subject to Soaking Heat* Method of Test For*
Par 3*1 delete "as tong as it" and substitute .t.h...a. .itn
Far 3.2 setosert some modified QPL testing procedure and acceptance method*
Par 3* 3 Table I reinstate the class 3 of MIL-U2819C* change "Mechanical Stability" to Weight Loss by Tumbling Utley Smith raised these questions; !tWhy do fixe mechanical stability requirements differ from pipe |278iD>"? ,(Wby do density & 'k* at 700 F for Class 2 differ from the pipe (2781D, Grade 1X1, Claes , Type X)"? "Why not have loss in weight after soaking heat for 6 hre. at
tfc 422ter p
00 S3
5
1200 F' for Claes 2 materials 14'7a mas* (U is now 12%) V* Ssipt wasted to revert to the 'k* values of the Claes 4 materials as they are specified in 2619C,
Far 4,2.2 U 4*2.3 NIMA objects to the high level of testing required herein. Sach member company agreed to send Jack Barnhart their proposal for a more reasonable (i. e. economic) level*
Far, 4.2,3.2 fa) thru fe) Amplify to emphasize that a test failure occurs if the average of the sample exceeds the specified limit. As an example the following underlined would be added, '`The average density of the sample exceeds the specified maximum valae'*.
Far 4. 2,3. 2 (b) Compressive Strength change to read Compressive strengths less than the minimum value whep tested ae specified,
Far 4. 2,3. 2 (c) change title to Weight Loss by Tumbling, insert new paragraph 4, 2, 4 - Action in Case of Failure (See MIL STL-IPS, oar 12*2)
Par 4.3*$ Change title to Weight Loss by Tumbling
Far 5.1 This whole section on packing should be revised both for overseas and ot domestic shipment and will be handled by the MIMA Packaging Committee,
Respectfully submitted
Willard P. Seipt Acting Secretary
fiC 4221G7 a
0034
MINUTES
of the
TECHNICAL k RESEARCH COMMITTEE MEETING
NATIONAL INSULATION MANUFACTURERS ASSOCIATION
Chicago, HI.
March 9, 1962
The meeting was called to order at 9:00 A. M. with the following in attend* anoe:
K, P. Hoopes, Chairman L* L. Collogue T. S- Clousing C. E* Ernst W* Gubar P. L* Losae V. L* Miller E. F, Ott W. R. Ssipt W, P. Sinclair U. W. Smith D, W. Wingerter R. C, Pariett
X* M, Barnhart
Fibreboard Paper Products Co Mundet Cork Corp. M, Hr Detrick Company Johns-Manville Sales Corp.
Gustia*Bacon Mfg* Company The Eagle-Picher Company
Pittsburgh Coming Corp* Keasbey k Mattison Company Keasbey & Mattison Company Union Aebestoa k Rubber Co* Baidwin-Ehret-Hill, Inc* Johns-ManWH Bales Corp. NIMA NIMA
BASIS OF CALCULATING HEAT TRANSFER
A write up on this subject, dated 2/14/62, circulated to the Committee prior to the meeting was discussed. Several revisions were proposed. The write up with these revisions edit be circulated to the Committee for approval and/or comments,
DEFINITIONS
The list of definitions applicable to thermal insulating materials dated 11/28/61 was discussed. Only minor editorial changes were made. This Recommended Practice is attached hereto.
MC 42226? #
OOSS
z
COMMON BASIS OF PRESENTING ECONOMIC THICKNESS
It was explained that when examining the table of "B" factors in the Economic Thickness Manual irregularities in the values of M3" can produce an economic thickness table that would not rise continually, i. e4| could drop back at certaia pipe sizes.
Mr. Barnhart was asked to talk to Mr. Vf, C. Tamer and try to ascertain aa to why this happens. (Mr. Turner said that the primary reason this occurs is due to the sudden increase in costs of kisul&tion for various pipe else*. )
It was decided that smoothing out the values would he Justified on the following basis;
COMMON BASIS OF PRESENTING ECONOMIC THICKNESS (Based on average conditions)
ECONOMIC THICKNESS TABXJSS (For pipe and flat insulation)
1. Utility s-Fowe* - Full year operation <876 hrs.} 2. Proce09 - Fiill year operation (8760 bra.) 3. Commercial - Full year operation (8760 hrs.) 4. Commercial - Keating Season <5400 hrs.)
Conditions
2. Temperatures 100 F to 1200 F in 100 F increments Note* Average of range
2. Use nominal thicknessea
3. Pipe sizes - as per preference
4. Average design - ambient still air ** SOT
5. Surface coefficient - as per curve shown in Fig. 5, la write up on "Basis of Calculating Heat Transfer Through Thermal Insulation on Pipe & Flat SurfacesM (The basic of which has been taken from the ASHRAE "Guide and Data Book**)
6. Depreciation period
Utility or power Process Commercial
Plant & Insulation Z0 yra, 15 yrs.
20 yre.
t*C *22t67 a
eose
7* "F" Factor Utility or power - $12.00 per lb steam per hr - $9,530 per million Btu per hr Proceed - $14,00 per lb steam per hr $11,110 per million Bcu per hr Commercial - $16,00 per lb steam per hr $12, 700 per bullion Btu per hr
8* "C" Factor - $U 30
9 Production coat of steam Utility o^power - $0, $0/1000 lb steam Process - $0*75/1000 lb steam Commercial - $1*00/1000 lb steam
10* 'V Factors - as per individual manufacturer
11* Whan using ,lD!' Tables go to nearest higher breakpoint for temperature and
ECONOMIC THICKNESS STUDY {LOW TEMPERATURE}
Mr* Barnhart was asked to ascertain Whether the cost data needed by West Virginia University has been obtained* (Mr* W* C* Turner has indicated that the cost data received Is adequate, however any further cost date re ceived from manufacturers, contractors, etc*, would be helpful).
Mr* Barnhart was asked to arrange a meeting of the special coordinating committees on this subject*
Q*P'S OF THERMAL INSULATION FOR TUBES
The Molded Section reported that their section could not come to an agree ment on insulation outside diameters for tubes* Mr* Barnhart was asked to circulate to the Committee the ASTM Table for IPS dated January 31, 2962. requesting approval and/or comments as to the acceptance of the Table for O* D. *a for tubes. The comments are to be returned to the N1MA office within 30 days* A summary of the results will be circulated to the Committee prior to the next T & R Committee Meeting*
OTHER BUSINESS
(a) Two requests had been received asking for recommendations for supports o* cold and refrigerated piping* Mr. Barnhart was asked to write to the individuals informing them that basically the problem was not NXMA'b responsibility for such design, and to advise them as to what factors should be taken into account when designing the supports.
NC 422167 (4
OOS 7
4
(b) Discussion on smoko and fire resistance of insulations and finishes was deferred for the present* The Committee does not feci it should duplicate the work that is being dose by ASTM o this subject*
(e) Mr* W* K* Seipt brought to the attention c the Committee an article entitled "Stainless Failures by Stress Corrosion" featured in Hydrocarbon Processing and Petroleum fiefiner, V4I, No* 1
,+* 1 (Jan* *62)* The article referred to magnesia insulation as a stress v correding material* Mr* Barnhart was asked to write to the Editor ' of the magazine informing Mm that his data was wrong and inform
ing him that we would review articles pertaining to insulating materials prior to publication* if he so desires*
(dj Mr* Barnhart informed the Committee that BfiAB is planning to publish technical data relating to thermal insulations* The Committee agreed that NXMA and the manufacturers could furnish data to BRAB and the government agencies only those values which were obtained by ASTM test methods*
Mr* Barchart ess requested to ask the NIMA Board of Directors as to the policy desired when other consumers request data not sub stantiated by ASTM teat methods,
(e) The subject of QJPL was discussed* especially the time and money involved by the manufacturers having tests made for qualification* It was requested that N1MA discuss this subject at the next Govern ment T k R Committee Meeting* <i,e* where do manufacturers go to get reliable tests, can some of the tests be eliminated, etc. >
ADJOURNMENT
There being no further business, the meeting was adjourned*
Respectfully submitted
WC 422X87
0038
rr >1 e'
3/9/62
NIMA RECOMMENDED PRACTICE DEFINITIONS APPLICABLE TO THERMAL INSULATING MATERIALS
COMPOSITIONSl. * 3 4 5 6
l. Mineral Fibers - A generic term for ail non-metallic inorganic fibers. Theso fibers may be natural, auch as asbestos, or may be manu factured, such as rock, slag or glass.
2* $5% Magnesia thermal insulation ie composed principally of basic magnesium carbonate with reinforcing mineral fiber,
3, Diatomaceoue Silica thermal insulation is composed principally of diamtoaceoue earth with or without heat-resistant inorganic binder(s) and reinforcing mineral fiber,
4, Calcium Silicate thermal insulation ie composed principally of hydrous calcium silicate with reinforcing mineral fiber,
5, Cellular Glees thermal insulation is composed of glass processed by fusion, to form a homogeneous rigid mass of hermetically sealed cells,
6, Amoeite Asbestos thermal insulation is composed principally of amoeite asbestos fiber with or without heat resistant inorganic binder and filler,
?, Mineral Fiber thermal insulation ie composed principally of fibers manufactured from mineral substances such as rock, slag or glass with or without binder.
6, Cellular Plastic thermal insulation ie composed of organic materials processed to form a homogeneous mass of cells,
FORMS
1, Pipe insulation is thermal insulation suited for application to cylindrical surfaces of pipe and tubing,
(a) Uolded-type Pipe Insulation is thermal insulation preformed in cylindrical, semi-cylindrical or segmented sections to fit pipe and tubing.
MC 4221S? Q
0099
4 /*. *- . ll'M <
2-
(b) Blanket-type Pipe Insulation is flexible thermal insulation furnished flat in sites to fit around pipe and tubing,
2, Block or Board Insulation is rigid thermal insulation preformed in rectangular units to fit flat surfaces or curved surfaces of diameters above 33 inches,
3, Insulating Cement is composed of a dry mixture of fibrous, powdery or granular materials which when mixed with water, applied as a plastic mass and dried in plaee, forms a monolithic thermal insulation,
4, Finishing Cement is composed of a dry mixture of fibrous, powdery or granular materials, which when mixed with water and applied as a plastic mass to thermal insulation, dries to a smooth, hard, protective surface*
5* Insulating-Finishing Cement is a dry mixture of fibrous, powdery or granular materials which when mixed with water, applied as a plastic mass, dries to form a monolithic thermal insulation with a smooth, firm surface. >
6. Loose Fill Insulation is thermal insulation composed of a dry mixture of fibrous, powdery, or granular materials for installation between confining surfacee or as a top layer,
7. Blanket Insulation is flexible thermal insulation that can readily be conformed to curved surfaces, and which is suitably bound together to provide units of substantial area for handling and application and which may be faced or reinforced with confining media*
fi. Felt Insulation is semi-rigid or flexible thermal insulation normally furnished in flat sheets composed of mineral fibers with or without binder*
PfC 47:21ST P
0090
n<ji
z
RECOMMENDED PRACTICE FOR PETE RMXKPJQ 0,P*s OF RIGID
THERMALINSULA
FORTUBE?
'
'"
Inasmuch as agreement has sot bees reached or this subject, a recom mendation wiU sot be submitted to ASTM Subcommittee S-VJ2I at this time* The proposed Table &e proposed by PA.BCO will be distributed to the Committee for comment*
"K" VALUES FOR ASHRAE GUIDE
The present Table appearing in the GUIDE was discussed and several suggested changes were discussed* A revised copy of the Table will be sent to the Committee for approval and/or comments*
ECONOMIC THICKNESS STUDY (COLD STUDY}
Mr* Barnhart reported that the study was in its final stage of completion and should be ready by about November 15, 1962*
TRADE NAMES (BRAB REQUEST}
The request from BRAB for NIMA to furnish trade name data as well as physical characteristics data on members' thermal insulating products was discussed* 2t was decided that Messrs* H. F* Hoopea, C. E, Ernst, V, L. Miller and J* M* Barnhart would talk to Mr* F Govan of BRAB at the forthcoming ASTM Meeting to determine the scope sad significance of the use the information received,
OTHER BUSINESS
1* The philosophy of QPL in specifications was discussed# It was agreed that the complete elimination of the QPL requirements (MIL-X-2781 and MB--1-2819} is undesirable.
Mr* ?* S* Cloasiag requested that the elimination of the mechanical stability test in MB--1-2819 be taken into consideration*
2t was deemed advisable that the subject of packaging requirements is government specifications be studied* h was suggested that the Packing Committee meet with the packaging perbobell from the various government agencies and discuss the subject*
W 422167. ff
0076
oni04 ; 5 2# Xt was agreed that the next meeting he held in New? York* N* Y,, on December 4 & 5* i9&2
ADJOURNMENT There being no further business, the meeting 'was adjourned*
MC 422167 0
0077