Although a strategy and workplan arc proposed in this paper end efforts have been started in
these areas, there ere considerable timing and feasibility issues in each of the identified
applications. Without funding or directed prioritization over other engineering effort the
work on the identified asbestos, hcxavalcnt chromium compounds or benzene applications
cannot proceed under present economic conditions. Nevertheless, a measured Company
reaction is necessary to initiate orderly substitution programs with sufficient flexibility to
adapt to engineering and economic limitations.
'*
Achievement of the elimination or control of potential carcinogens requires a corporate commitment to foster an integrated and sustained effort throughout the Company over a number of years. To accomplish this, the following actions and responsibilities ore recommondcd: (Fig. 23):
1. Assign hazardous substance control program management responsibility to Environmental und Safety Engineering Staff. (Responsibility: Environmental A Safety Engineering Staff - ESES)
2. Establish a Hazardous Substance Control Committee chaired by Environmental and Safety Engineering Staff. The Task Force would be discontinued. (Responsibility: ESES)
3. Revise Directive B-101 (Occupational Safety and Health and Control of Hazardous Materials) to reflect adjusted responsibilities for line and staff. No new Policy is
required, the matter is covered under Policy C-3, Standards of Corporate Conduct. (Responsibility: ESES Program Manager)
4. Adopt as the Company potential carcinogen listing, the 36 current OSHA-rcgulated and proposed Category 1 substances used in automotive production. Establish the top eight priorities proposed by the Task Force as Company priorities. Direct that the listing be updated semiannually. (Responsibility: P&O Staff)
5. Complete strategies and timetables for the eight prioritized potential carcinogens for review end approval by the subcommittees. (Responsibility: ESES Program Manager)
6. Continue the devclopment.of MATS by Environmental & Safety Engineering Staff. A budget and headcount transfer from Engineering Staff has been agreed to. (Responsibility: ESES Program Manager)
The Company has demonstrated a commitment to protect workers while seeking to eliminate specific substances. Directions on the use of and protection for numerous substances have been issued. Workers arc protected by restricting exposure and by special clothing and engineered safeguards designed to keep exposure within known permissible limits. Specific recommendations for eliminating asbestos, hcxavolent chromium compounds and benzene follow:"
7. Proceed with the elimination of Group A (known substitutes without major redesign) no later than Job #1, 1985 where appropriate os determined by the Hazardous Substance Control Committee. (Responsibility: PEO's, BMD's, Purchasing)
8. Include Group B (known substitutes with major redesign) elimination actions in Phase V of vehicle and powertrain programs and in new plant and renovation projects where appropriate as determined by the Hazardous Substance Control Committee. (Responsibility: ESES Program Manager, Product Planning, Vehicle Engineering, Manufacturing Staff)
9. Recommend advanced program funding to develop designs ond/or substitutes for new production and nonproduction parts and materials to identify feasibility, reliability, cost and weight implications of olternntive materials/designs for Group C applications (no known substitute, advanced engineering required). (Responsibility: PEO's, BMD's, Technicnl Planning, Scientific Research Stoff)
The implementation of the above actions ond responsibilities should be reviewed periodically by the Engineering and lteseoreh and Manufacturing ond Supply Subcommittees to provide a forum for discussion, Corporate overview and endorsement of appropriate funding and
prioritizotion of efforts.
| Verticol line indicates revision at subcommittee direction.
i
8006 1331
*- Mnv 27. 19R0 ' PRODUCED BY FORD