Industrial Hygiene
Asbestos Exposure Monitoring
Attached are the results of asbestos exposure monitoring for three days on insulators at the Institute Plan doing asbestos removal on lines in the #1 and #2 dock areas. A 3-inch steam line and two 3-inch product lines were stripped from the river to the top of the river bank and the risers across the road was stripped. Glove bags and enclosures were not used because it was not feasible according to the construction department and the 512 Plant Industrial Hygiene department. Employees used a powered man-basket to reach lines that were overhead.
All personal exposure samples were below the 2.0 fiber/cc level which permits the use of half-face HEPA cartridge respirators while employees are being monitored per 0SHA asbestos standard 29CFR 1926.58. One personal exposure sample exceeded the 0.2 fiber/cc permissible exposure level standard and four exceeded the 0.1 fiber/cc action level standard. Exposure monitoring may not be required in some instances where supplied air respirators in a positive pressure mode are being used while stripping and removing asbestos insulation. We encourage you to use supplied air respirators as much as possible in the asbestos abatement procedures.
Employees wore no street clothes, two pair of coveralls, headcovers, boots, gloves and A0 R57-A half-face HEPA cartridge respirators. They showered before lunch and at the end of the workday before leaving plant.
UCC 024447
ASBESTOS EXPOSURE MDNITCRING
Ccrrp ref. W2187
W2188 W2189
Date 4-21-87 4-21-87 4-21-87 4-22-87 4-22-87 4-22-87 4-23-87 4-23-87 4-23-87
Saiple Type/ Enployee Name
Sarrpling Time
Personal/ S. R. Erskine
6hr 36min
Personal/ B. J. Agosti
6hr 38nin
Personal/ P. K. Snodgrass
6hr 33min
Personal/ S. R. Erskine
7hr 4nin
Personal/ P. K. Snodgrass
7hr 2nin
Personal/ C. B. Clendenin
Thr 3min
Personal/ P. K. Snodgrass
7hr 6min
Personal/ C. B. Clendenin
7hr 5min
Personal/ S. R. Erskine
7hr 4min
Air Cone fibers/cc
0.209 0.142 0.003 0.239 0.002 0.062 0.157 0.046 0.129
TWg fibers/cc
CDWENTS
0.172 0.118 0.003 0.211 0.001 0.046 0.139 0.041 0.113
Stripped, bagged and vacuuned approx. 90 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 90 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 90 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 100 feet of line at #1 dock.
Stripped, bagged and vacuimed approx. 100 feet of line at #1 dodc.
Stripped, bagged and vacuuned approx. 100 feet of line at #1 dock.
Stripped, bagged and vacuuned approx. 130 feet of line at #1 and #2 docks.
Stripped, bagged and vacuuned approx. 130 feet of line at #1 and #2 docks.
Stripped, bagged and vacuuned approx. 130 feet of line at #1 and #2 docks.
2289P
UCC 024448
Asbestos Exposure Monitoring
-2-
May 4, 1987
Please inform S. R. Erskine, B. J. Agosti, P. K. Snodgrass and C. B. Clendenin of their exposure monitoring results as soon as possible. Have them sign and date this report and return to M. A. Patel at Building 701-330.
If you have any questions or if we can be of further assistance, please call us on extension 4779 or 3750.
WORK BY:
APPROVED BY: