Document X76obL0JOaYLd6eDY1pr4D8wB

ARCOLINER BOILER WIDE BACK TYPE by American-Standard Installation-Operation and Maintenance Manual FOR WET BASE OIL FIRED BOILERS Flril la haatlaf ... Ilril la plaaibiag 07717 ARCOUNER BOILER BoiUit ai .hipped auembled with tectionj arranged is the teguenoe indicated in list below. WF--Oil Front Section WC-- Oil Center Section CODE LETTERS WCX -- Oil Center Connection Section TWB--OU Back Section for Flanged Water Heater 587 or 596 BOILER WITH FLANGED WATER HEATER 587, 589 or 596 Boiler Number Assemblage S or W-0-1S3-T S or W-O-IM-T S or W-O-155-T S or W-O-tSS-T WF-WCX-TWB WF-WCX-WC-TWB WF-WCX-WC-WCX-TWB WF-WCX-WC-WC-WCX-TWB FORCED HOT WATER INSTALLATIONS It is recommended on W-0*IS5-T and W-0-156-T Boilers that the flow tapping nearest to the boat be used for forced hot water installations. When locating boiler, be sure to allow sufficient clearance to nearest wall lor insertion and remora! of water heater. When using No. 589 or No. 596 tanhiess beater or No. 587 tank type heater, allow at least 15" space at right hand side of boiler. IMPORTANT If a water condition exists in the basement, or where it has been necessary to water-proof the basement floor, boiler should be mounted on a concrete or hollow tile base, preferably to a height of at least 3'. DRAIN TAPPING Drain tapping is located on back section at lowest point practical tor complete draining oi bailer. Remore plug for complete draining or connect drain cock to this tapping. DO NOT PLACE DRAIN COCK IN RETURN PIPE LINE. CAUTION--WATER BOILERS TW expansion tank should not be set in a cold or an exposed place. If the pipe trading to or from the tank freezes, serious damage may result. If valve d any descrip tion is installed in the piping loading to or from the expansion tank BF. SURF. THAT IT IS OPEN WHILE THE BOILER IS IN OPERATION. 07718 ARCOUXER BOILER (1) USE THIS BOOK FOR REFERENCE WHEN ERECTING BOILER, ORDERING PARTS AND FOR OPERATION impomtabit btotice The tie bolts of this boiler have regular steel washers and nutB. After the boiler is in final posi tion, remove the steel nuts. Do not remove the washers. Sheet steel compression washers and cast iron safety nuts are included in the bag of parts. Place a compression washer on each tie rod with the open or cupped side against the regular washer. Apply lubricating oil to the threads and screw the safety nuts up against the cupped washers. Tighten with FINGERS ONLY, do not use wrench. FAILURE TO OBSERVE THIS MAY RESULT IN DAMAGE TO BOILER BACK FRONT 07719 (2) ARCOUNER BOILER No. 1 1. Locate boiler in desired position. Allow sufficient clearance for water heatsr* at di rected on inside oi front cover. Plug tapping*, till boiUr with water and subject it to not Uu than 10 lbs. nor morn than 30 Lbs. pressure. Inspect boiler in*id* and oat* tide lor leakage to Insure against breakage is handling and shipping. To safeguard accuracy of gage supplied with boiler, DO HOT INSTALL GAGE UNTIL AFTER TEST OF BOILER. (Where built-in water heater in used attach heater before test ing). Make certain there are no leaks, drain boiler and remove plugs born tappings needed. Connect supply and return piping. On forced water jobe where only one flow tapping is used, oonnect flow pipe to top tapping near est to front. 2. Attach smakepipe ooilar to rear section. Install crown sheet baffle on 3, 4 and 5 section boilers. To Install baffle, insert it through fire door opening lengthwise, with narrow plain edge first, and keeping flanged side down. Turn baffle inside boiler so that cast lettering "To Front" will faoe iron! of boiler. Place the right side of baffle on top of tide lug and push to rear until notch on left sidt lines up with lag on left side of boiler. Then lift the left side of oaifl# over the lug through the notch and push back so that rear edge rests in lot formed by break In fins on rear section. When installed, the baffle, with flanges down, is supported by lag* on sides of sections and by lot in rear. Attach door hinges and catches but tight en Mfk only moderately. Lock doors In posi tion with hinge pins. Door should lift over catches easily and dose tightly. Adfust doors by tapping hinge and oaten Hghtly. After ad justment, tighten hinge and catch bolts. Putty outside of sections at joints with boiler putty. Ha 2 3. To jacket, screw jacket studs in back section. Attach jacket side panels at bent with ends of Center and Lower Front jacket pieces fastened under tides. Attach Upper and then Lower Rear paneL Slide Upper Front panel Into grooves at front of sides. Place right and then left hood top panels In position and insert screw*. REMOVE KNOCKOUTS opposite tappings to be used before attaching panels. See cut No. 3. 07720 A&coum BO&n (3) No. 3 Where extended jacket boat Is used (Cvt Mo. A\ lubetitute the plate with two etude in place of the upper front panel, aLeo substitute etude for the two upper ecrewi holding the cen* ter front panel as shown in Cut No. 5. Assemble tide* of jacket exteasioa by attaching two pacer stupe to etude ineide, with flanged aide oi stripe facing boiler. Attach front extension adapter to bottom of upper front panehwith two sheet metal sciewt. Attach upper front to tides by sliding it down into clips on front of extension side panels. Attach Door Sill at bottom. Place the extension against boiler with slots in the spacer strips engaging tour etude; fatten with wing cuts. Assemble the top panel and access door. Door enters opening at top first, then drops to en* gage sill. See additional data on page 6. 4. On steam boilers, attach safety valve at left hand top of rear section and water column trim at left hand side of front section. Attach pres sure or water temperature gauge to top of front section. Attach contrail as directed on Page S. Fill steam boiler with water until it reaches a height of 4" in the gauge glass. On water boiler installations fill system up to */l of height of expansion tank or on closed system until relief valve relieves. This must be at less than 30 lbs. Remove rim and glass from gauge and set movable pointer under automatic pointer. Replace rim and glass. 5. INSTALLATION OF BURNER AND COMBUSTION CHAMBER--Assemble steel liner plate and steal combustion chamber to She rear side of the burner plate using the flat head screws provided. Turn the burner plate and combustion chamber assembly 90* to enter the com bustion chamber through the opening In the front section. Install the oil burner as per instructions accompanying same. Where HEAT-UB-O-RATOR pre-cast combustion chambers are used, install as per Instructions packed with chamber. Recommendations for hand built chambers are given on Page 6. Thoroughly seal the space between the burner air tube leeve and the opening leading Into the combustion chamber if hand built chamber Is Installed. NOTE: Draft tube for reading draft In combustion chamber can be Inserted through a slot in service door which is open when observation door Is moved toward open position. 07721 (4) AACOUNER BOILER CLEANING BOILERS Ths grease used to lubricate the cutting tools during erection of new piping systems serve* aa a carrier for sand and dirt, with the result that a ecum of fine particle* and grease accumulate* on the surface of the water In all new boiler*, while heavier particle* may eettle to the bottom of the boiler and form sludge. Theee impurltiee tend to cause foaming, pre venting the generation of steam and causing an unsteady water line This unavoidable accumulation of oil and grease should be removed by blowing-off the boiler as follows: If not already provided, install a surface blow connection of at least 1-1/4 Inch nominal pipe size with outlet extended to within 18 Inches of the floor or to sewer, in serting a valve in line cloee to boiler. Bring the water line to center of outlet, raise steam pressure, and while oil burner Is operating open valve in blow-off tine. When pressure recedes, dose valve and repeat process adding wattr at intervals to maintain proper level. As a final operation bring the pressure In the boiler to about 10 lb., dose blow-off. stop burner, and open drain valve. After boiler has cooled, partly fill and flush out several timet before filling It to proper water level for normal service. The use of soda or any alkali, vinegar or any add Is not recommended for cleaning heating boilers because of the difficulty of complete removal and the possibility of subse quent Injury after the cleaning process has been completed Cut shows suggested piping arrangement fcr blowing off steam boiler. A. M/2" Blow-off tapping B Blow-off valve C. Pipe to drain CAUTION rf a built-in Law Water Cutout Is used, it is reoommeoded that this central be removed during the blow cd operation. ATTENTION TO BOILER WHILE IN OPERATION Eeep water in steam boiler at proper level (4' visible in gauge glass). If boiler is operated daring rammer time, it Is recommended that the water line during this period be carried about 1* higher. Eeep water systems filled to J/j of expansion tank (as indicated when moving pointer of altitude gauge is even with stationary pointer). ON A CLOSED HOT WATER SYSTEM THE PRESSURE MUST NOT EXCEED 30 LBS. IF IT DOES IT MUST BE RELIEVED IMMEDIATELY AND THE CAUSE 07 THE FAILURE OF THE RELIEF VALVE INVESTIGATED AND CORRECTED, OTHERWISE PRESSURE MAY BUILD UP AND CAUSE DAMAGE TO THE HEATING SYSTEM. ON STEAM BOILERS--At the start of each heating season and once or twice dunng the season try Safety Valve to be sure that it is in working condition. To do this fasten wire or cord to valve lever and pull lever standing safe distance away from valve. Clean boiler surfaces at regular intervals. Do not draw water from boiler while in use. When adding water while boiler Is in opera tion do not open supply valve fully but add water slowly. ATTENTION TO BOILER WHILE NOT IN OPERATION At end of heating season clean boiler thoroughly and spray flue surfaces with light lubri cating or crankcase oil using gun with extended item so as to reach all corners. Leave boiler doors and dampers open to permit air circulation thru boiler. Clean and remove smokepipe where feasible and oil door hinges. With steam boilers, at end of season, add suificie&t water to fill boiler to top of water column and leave it that way until fall, when water should be drained again to proper levsL If at this time boiler water is dirty, drain water, flush out boiler, and refill with dean water to prescribed water WveL On water boilers keep ryrtems filled with water, in other words, leave water aloes. It is advisable in fall to drain a little water to remove sludge but not mors than necessary. IF BOILER IS NOT USED DURING WINTER TIME IT MUST BE FULLY DRAINED (SEE INSIDE OF FRONT COVER). * i f, 07722 _________________________________________ ABCOUNZB BOILER (3) BOILER WITH WIDE BACK Used With Flanged Type Water Heater Side View SECTION TWflJ OL FIFED KXEfi Boiler Amn- Namber and Sise at Tapping* Boiler Dimension* (Steam and Water) biace Hnmoer flow Return A 8 D L OIS3-T 1-3' 1-3' 13 12% 20% O-154-T 1-3' 1-3' 18 17% 25% O-135-T a_3* 1-3' 23 13 22% 30% O-156-T 2-3' 1-3' 28 13 27% 33% Tapping* Looa- Si**7 tion In*. Steam or Vapor Boilen Water Boilen A Lnternal Low Water Limit 2% Water Cutout Control B % EhromroContraJ KoiUMd C Waiu Tampor- Water Tempera% atar* Control tore Control D 1W iaiotr VoIt* tloliof Vtln r Uow-Oti 1% Hot Und Reeeree Acting H % Hot U*od Temperature Control Boiler Dimeneton* Application at Controls Note; See Page 6 lor Bitended Jacket and farther Dlmeneioa*. 07723 16' ARCOUNEH BOHER BOILER WITH JACKET EXTENSION - - 2'l ja_ I "T 3* TAP 40i - ,53 - i L-- --roost vcw Center Section Removable Jacket Extension--Rear View Showing Cross Tie* CAUTION: Jacket extension is built lor easy removal and to (acilitate servicing oi burner and boiler. Do not attach wiring or piping to ex tension. Oil pipes and wires can be run through arches at bottom oi extension. Wiring can also be run through grille in top panel as this panel can be detached when re moving extension. Side View Boiler Number and Assem Size oi Tappings blages Number Flow Return O-153-T O-154-T O-155-T O-156-T 1-3' 1-3' 2-3' 2-3' 1-3' 1-3' 1-3* 1-3' Boiler Dimensions (Steam and Water) AB L 13 40% 18 45% 23 13 SO% 28 13 ss% Boiler Dimensions Hand Built Combustion Chamber 07724 _________________________________________________ARCOLINER BOILER (7) STEAM AND WATER BOILERS COMPLETE BOILER CONSISTS OF: SECTION ASSEMBLAGE PLATEWOU BOX CROWN SHEET BATTLE Narrow lot 3 & 4 Section, Wid. for 5 Section Awm. TRIM BOX (Steam or Water) JACKET WHEN OIL HEATING UNIT IS SPECIFIED, FOLLOWING ADDITIONAL PARTS ARE SUPPLIED: 1 Oil Burner Box (with Pressure Ring Assembly) 1 Stack Control Box 1 Arcoflame Control Set (with Nozzle) 1 Droit Stabilizer Box 1 Steel Combustion Chamber Eox (with Front Plate Liner) Following are furnished on Special Chder Water Heater Refractory--Steel Combustion Chamber GIVE BOILER SIZE AND SERIES NUMBER WHEN ORDERING REPAIR PARTS BOILER SHIPPING UNITS CONSIST OF FOLLOWING PARTS PLATEWORK BOX 1 WATER TRIM BOX 1 CWanout Door Ais*mhly 1 Seprice Door Arrembly 1 Front Plato Assembly 1 Smoko Collar 1 Bag Sundry Parti 1 Inrtallatton Manual STEAM TRIM BOX I P & V Steam Gauge (S-3Vt-10) 2 V6'*l/4' Buehingu (gauge A control) t Set Water Column Trim (722-8^1 I Safety Valve and Barbing 2 * Pip* Plugs 1 Lb. Patty 1 Comb. Altitude Gaugs and Th*rmom*t*r (AW*3W45) 2 2' Ctik. Pip* Pings 1 16' RP* Hug 2 44' Pipe Ptugr 1 14' Ctrk. Pipe Plug l 114' Ctik. Pip* Plug (Wh*n r*qd. far S. V. Too.) 1 Lb. Putty 1 iW 1V Rad. Barbing 1 R*Ud Yah* (nnl-- otb*nrlM p*dfi*d) 07725 (8) AflCOLMIR BOtLXH NOTE: All parts for this boiler have been carefully inspected and packed. In case of shortage, make sure that all parts have been re moved from shipping container and examine packing material thor oughly. If part cannot be found, report shortage to your dealer, giving boiler size, series number, date, inspector's number and packer's number. (See Parts List on Page 7 and Packer's Check Ticket below.) PACKER'S CHECK TICKET BOILER SIZE............................................ SERIES No. (cee series Plate on Boiler)... DATE......................................................... INSPECTED BY........................................ PACKED BY............................................. GIVE BOILER SIZE AND SERIES NUMBER WHEN ORDERING REPAIR PARTS 07726 Plumbing and Haatlng Dlvlalon AMERICAN RADIATOR & STANDARD SANITARY CORPORATION AO W. 40TH STREET, NEW YORK IB, N.Y. nrv. (i!-) 07727