Document VjomqqJZ9ExmYb1J1DwXkGX7g

PLAINTIFF'S EXHIBIT GF-1687 FORM 2S1(--M FRIMTtO IN U.J.A. INTEROFFICE CORRESPONDENCE OAF Corporation TO LOCATION PROM LOCATION Hr. R. Van Buren Mr. P. 9tama MTEFebruary 24, 1969 CC PLANT ENGINEERING MONTHLY REPORT - FEBRUARY 1969 SUBJECT: Tha following is a list of improvements made by tha Plant Enginaaring De partment daring tha month of Fabruary: 1. Revised two hoods on banbury dock for handling asbastos. Naw hoods plus mora caraful handling hav greatly reduced free asbastos in air. 2. Started installing siding on naw shipping dock enclosure. 3. Replaced 6 line 50 HP planishar motor with a 25 HP unit. 4. Replaced 6 line No. 2 calendar 75 HP motor with tha 50 HP motor from planishar. 5. Received approval from Naw Ynrk State to go ahead with closed loop water recirculating system. 6. Started rearranging maintenance shop men to get better coverage. 7. Revised PVC storage silo No. 4 transition piece which was found to be different from silo No. 3. This could be reason silo No. 4 has never been used for any length of time without jamming. 8. Made and instiled small glue tank for 6 line sealing machine to be used instead of 55 gallon drum. This small tank has stopped buildup of glue on pump, but has not entirely eliminated glue head problem. Vill try glue pot on 5 line machine in March. 9. Changed Eaton clutch, tachometer-generator, power supply and controller on 5 line No. 1 calender in an effort to correct a speed control problem we've had for 3 months. The replacement components have been on a week and have had no trouble so far. 10. Received approval for second half of dust collection system. Contractor has started on revisions called for on this job. 11. York on training program for maintenance department craftsmen has pro gressed to point where the overall plan can be discussed with Union. F. Sterne MICH08709